82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or ) or full replacement (rank 2, or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 200 200 82,20 $2,8,5 SITE $2,5 Campus Total 82,20 $,0,080 Building: Main 200 Category: Building Exterior Entrance Entrance Control - Audio 2 EA $ Exterior Doors - Exterior Steel Door EA 5 $, Exterior Doors - Exterior Steel Door EA $,28 Exterior Doors - Side lite 2 EA $2 Exterior Doors - Store Front 0 EA $5, Exterior Doors - Transom Lite 8 EA $2,50 Power Door Operator and Controls EA Foundation Lighting Roof System Foundation - Concrete,05 LF Superstructure - Metal Deck/ Concrete Topping 82,000 SF Exterior Lighting - Parapet or Roof Mounted 5 EA $25, Exterior Lighting - Parapet or Roof Mounted 5 EA $8,08 Exterior Lighting - Wall Mounted EA $2,02 Chimney - Metal Flue 2 LF $,2 Coping - Metal,5 LF $, Downspouts - Interior Downspouts 8 LF $28, CUFFE Page of Assessment Date: //20
Building: Main 200 Category: Building Exterior Roof System 82 S Racine Ave Chicago, IL 020 Parapet - " - 0" Height,52 LF $5,08 Roof - Modified Bitumen 20 SF $,02 Roof - Modified Bitumen,08 SF $8,88 Roof Structure - Steel / Metal Deck/ Concrete Topping,08 SF Walls Windows Canopy - Metal 5 SF $,8 Exterior Walls - Brick 2, SF $220,85 Exterior Walls - Precast Panel Wall SF $2,5 Exterior Walls - Stone-Cast 585 SF $,2 Guard - Guards perforated 2,50 SF $,28 Lintels - Steel,25 LF $, Windows - Sash Aluminum Double-pane 0 SF 5 $8, Windows - Sash Aluminum Double-pane,5 SF $, Building Exterior Subtotal: $8,88 Building: Main 200 Category: Electrical System Emergency System Automatic Transfer Switch EA Emergency A/C Power - Corridors and Stairs, SF Emergency A/C Power - Gym,2 SF Emergency A/C Power - Lunchrooms 82 SF Emergency A/C Power - Multipurpose Room,0 SF Emergency A/C Power - Students Toilets 2,2 SF Emergency Battery Packs - Corridors and Stairs 2 EA Emergency Battery Packs - Gym 5 EA Emergency Battery Packs - Multipurpose Room EA Emergency Battery Packs - Students Toilets 2 EA Exit Signs - Corridors and Stairs 2 EA Exit Signs - Gym EA Exit Signs - Lunchroom 2 EA Exit Signs - Multipurpose Room EA Security System - CCTV 82,20 SF CUFFE Page 2 of Assessment Date: //20
Building: Main 200 Category: Electrical System Emergency System 82 S Racine Ave Chicago, IL 020 Security System - Intrusion Detection 82,20 SF Main Service Power Distribution Main Electrical Service - 200 to 000 A 2/80/PH EA PA System 82,20 SF $2,00 Lighting and Power Panels - Above 00 A 25 EA Main Distribution Panels - 0-00 amp 2 EA Main Distribution Panels - Greater than 00 amp EA Transformers - 2/80-20/208 EA Transformers - 2/80-20/2 EA Electrical System Subtotal: $2,00 Building: Main 200 Category: Safty System Fire Alarm Fire Alarm Panel EA Fire Alarm Strobe Lights 82,20 SF Fire Alarm_System 82,20 SF Fire Pump Controller EA Pump Room Assembly Sprinkler System Fire Pump - 25-50 hp EA $,558 Jockey Pump EA $58 Sprinkler Heads 82,20 SF Sprinkler Piping 82,20 SF Wet Sprinkler System 82,20 SF Safty System Subtotal: $2, Building: Main 200 Category: Mechanical System CUFFE Page of Assessment Date: //20
Building: Main 200 Category: Mechanical System Air Conditioning Air Handling Systems Boiler Systems Heating Devices 82 S Racine Ave Chicago, IL 020 Chemical Pot Feeder EA Chiller-Air Cooled-Screw Type-Roof Mounted - 20-00 tons EA 5 $0,0 Condensing Unit- Roof Mounted - Less than 5 tons EA $, Glycol Feed EA $0 Pipes - Chilled Water Pipe- Galvanized 800 LF Pressure Fill System EA $,5 Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - 200- EA $,50 20000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - 00- EA $,50 8000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - 800- EA $,50 2000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - Greater EA $,50 than 0,000 cfm Air Intake EA $,2 Air Intake EA Fan Coil Unit- Celing Mounted - Electric EA $820 Fan Power Box - Fan Power Box with Hot Water Coil 58 EA $28,582 Indoor Return Fans- Centrifugal Inline - 000-20000 CFM EA $,85 Indoor Return Fans- Centrifugal Inline - 5000-0000 CFM EA $,85 Indoor Return Fans- Centrifugal Inline - Greater than 20000 CFM EA $2, Indoor Return Fans- Centrifugal Inline - Less than 5000 CFM EA $,282 VAV Box 20 EA $5,58 Boiler Auxiliary- on Condensing Hot Water - 200-000 MBH 2 EA $,0 Chemical Pot Feeder EA $25 Combustion Dampers 2 EA $88 Hot Water Pump 2 EA $8 on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 200-000 EA $8 MBH Piping,000 LF Water Fill System EA $,8 Cabinet Heaters - With Hot Water Coil EA Fin Tube - Hot Water 0 LF Unit Heater - Electric EA $28 CUFFE Page of Assessment Date: //20
Building: Main 200 Category: Mechanical System Heating Devices 82 S Racine Ave Chicago, IL 020 Unit Heater - Hot Water 5 EA $, Mechanical Plumbing Temperature Control Ventilation Hot Water Pump - Less than 0 EA $, DDC System 82,20 SF 5 $5,0 Thermostats - DDC 0 EA Exhaust Fans- Indoor - Less than 500 CFM EA $2 Exhaust Fans- Roof Mounted - 50-8000 CFM EA $, Exhaust Fans- Roof Mounted - 500-500 CFM EA $,25 Exhaust Fans- Roof Mounted - 500-500 CFM EA $52 Exhaust Fans- Roof Mounted - Less than 500 CFM EA $,2 Exhaust Fans- Roof Mounted - Less than 500 CFM EA $2 Type I Exhaust Hood- Kitchen 2 EA $2,5 Mechanical System Subtotal: $2,20 Building: Main 200 Category: Plumbing System Hot Water Gas Heater - 0000-00000 BTU/HR 2 EA $20 Piping Domestic Piping-Cold Water from Risers to Fixtures 82,20 SF Domestic Piping-Cold Water Horizontal Lines 82,20 SF Domestic Piping-Cold Water Risers 82,20 SF Domestic Piping-Hot Water from Risers to Fixtures 82,20 SF Domestic Piping-Hot Water Horizontal Lines 82,20 SF Domestic Piping-Hot Water Return Lines 82,20 SF Domestic Piping-Hot Water Return Risers 82,20 SF Sanitary Piping 82,20 SF Storm Piping 82,20 SF Vent Piping 82,20 SF CUFFE Page 5 of Assessment Date: //20
Building: Main 200 Category: Plumbing System Pumps 82 S Racine Ave Chicago, IL 020 Pumps - Domestic Booster Pump-Duplex EA $, Pumps - Sump-Simplex EA $5 Plumbing System Subtotal: $,2 Building: Main 200 Category: Classrooms Art Room ( room) Casework LF $0 Ceiling - Lay-in SF $2,0 Chalk Board LF $,285 Doors - Side-lite 5 SF $25 Doors - Wood Doors inclu hw EA $0 Floor - Tile SF $, Lighting - Lay-in 2 EA Marker Board LF $00 Storage/ Closet 2 SF $ Walls - Concrete Block 80 SF $2,8 Work Sink 2 EA $58 Computer Lab (2 rooms) Casework 0 LF $,8 Ceiling - Lay-in 2,20 SF $,8 Charging Station EA $85 Charging Station EA Doors - Side-lite 0 SF $502 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile 2,20 SF $5,00 Lighting - Lay-in 5 EA $,85 Lighting - Lay-in 2 EA Marker Board 8 LF $,028 Storage/ Closet 2 SF $5 Walls - Concrete Block 2,5 SF $, Wireless System EA $2 Wireless System EA CUFFE Page of Assessment Date: //20
Building: Main 200 Category: Classrooms Kindergarten (2 rooms) 82 S Racine Ave Chicago, IL 020 Casework LF $2,2 Ceiling - Lay-in 2 SF $2, Doors - Side-lite 0 SF $502 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile,800 SF $,8 Lighting - Lay-in 2 EA Marker Board LF $, Storage/ Closet 252 SF $,82 Walls - Concrete Block 0 SF $2,8 Walls - Concrete Block 0 SF Work Sink 5 EA $,85 Office ( room) Casework LF $80 Ceiling - Lay-in 20 SF $,82 Doors - Side-lite 5 SF $25 Doors - Wood Doors inclu hw EA $0 Floor - Tile 20 SF $,5 Lighting - Lay-in EA Marker Board 0 LF $2 Storage/ Closet 2 SF $ Walls - Concrete Block SF $2,00 Work Sink EA $ Other Instructional Use ( room) (22 rooms) Casework LF $80 Ceiling - Lay-in 55 SF $,55 Doors - Side-lite 5 SF $25 Doors - Wood Doors inclu hw EA $0 Floor - Tile 55 SF $,20 Lighting - Lay-in EA Marker Board 0 LF $2 Storage/ Closet 2 SF $ Walls - Concrete Block SF $,85 Work Sink EA $ Casework LF $8,58 Ceiling - Lay-in 8,08 SF $5,80 CUFFE Page of Assessment Date: //20
Building: Main 200 Category: Classrooms (22 rooms) Science Lab Level ( room) 82 S Racine Ave Chicago, IL 020 Doors - Side-lite 0 SF $,08 Doors - Wood Doors inclu hw 2 EA $,22 Floor - Tile 8,08 SF $, Lighting - Lay-in 2 EA $,28 Lighting - Lay-in 2 EA Lighting - Pendent/Surface EA Marker Board 5 LF $2, Storage/ Closet 2,582 SF $8,20 Walls - Concrete Block 2,088 SF $,8 Work Sink EA $2,2 Casework LF $0 Ceiling - Lay-in, SF $,2 Doors - Side-lite 5 SF $52 Doors - Wood Doors inclu hw EA $0 Floor - Tile, SF $,5 Lighting - Lay-in 5 EA Marker Board 28 LF 0 Science Lab Elements 0 SF $8 Storage/ Closet 2 SF $2, Walls - Concrete Block,522 SF $,2 Work Sink EA $, Vacant ( room) Casework LF $0 Ceiling - Lay-in SF $2,0 Doors - Side-lite 5 SF $25 Doors - Wood Doors inclu hw EA $0 Floor - Tile SF $, Lighting - Lay-in EA Marker Board LF $ Storage/ Closet 2 SF $ Walls - Concrete Block 0 SF $2,8 Work Sink 2 EA $58 Classrooms Subtotal: $2,58 CUFFE Page 8 of Assessment Date: //20
Building: Main 200 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 82 S Racine Ave Chicago, IL 020 Ceiling - Lay-in 2,505 SF $,52 Doors - Side-lite SF $,555 Doors - Steel Doors incl hw EA $0 Doors - Transom Window SF $,0 Doors - Wood Doors inclu hw 0 EA $,00 Floor - Carpet 5 SF $, Floor - Concrete Epoxy/ Painted SF $5 Floor - Tile,8 SF $,02 Floor - Tile/Sheet 20 SF $20 Lighting - Lay-in 8 EA Power Distribution 82 EA $,2 Storage/ Closet 200 SF $,50 Walls - Concrete Block 2,82 SF $8,2 Walls - Structural Glazed Tile 28 SF $ Work SInk 2 EA $,0 Gymnasia Kitchen Library Bleacher Seating 0 EA $,8 Ceiling - Exposed,2 SF $,2 Doors - Steel Doors incl hw EA $,20 Floor - Sport Flooring,2 SF $8,0 Lighting - Metal Halide/Sodium Vapor EA $2, Walls - Concrete Block 5,00 SF $,5 Ceiling - Lay-in,2 SF $,2 Doors - Steel Doors incl hw 2 EA 2 Floor - Concrete Epoxy/ Painted,2 SF $5 Lighting - Lay-in EA Storage/ Closet SF $2 Walls - Masonry,2 SF $,8 Casework 200 LF $5,05 Ceiling - Lay-in 2,50 SF $8,258 Doors - Side-lite 0 SF $502 Doors - Wood Doors inclu hw 2 EA 2 Floor - Carpet 2,50 SF $5,85 Lighting - Lay-in 2 EA $2,855 CUFFE Page of Assessment Date: //20
Building: Main 200 Category: Rooms (Other Than Classrooms) Library Lunch & Multipurpose Room 82 S Racine Ave Chicago, IL 020 Walls - Plaster/Drywall,25 SF $,85 Ceiling - Exposed,0 SF $,8 Ceiling - Lay-in 82 SF $2,58 Doors - Steel Doors incl hw EA $,80 Floor - Tile, SF $,2 Lighting - Lay-in 0 EA Lighting - Metal Halide/Sodium Vapor 2 EA $,05 Serving Line 2 LF Stage 85 SF $2,802 Walls - Concrete Block,0 SF $, Walls - Plaster/Drywall,00 SF $2,85 MDF_IDF Doors - Wood Doors inclu hw EA $0 Finishes 5 SF $,02 Mechanical/ Service Rooms Janitor's Closet 85 SF $,25 Mechanical/ Service Rooms 5,8 SF $8,5 Storage Room,25 SF $,2 Restroom Accessories 2,8 SF $2,0 Ceiling - Lay-in 52 SF $,5 Ceiling - Plaster/Drywall 2,22 SF $,0 Doors - Wood Doors inclu hw 0 EA $,00 Floor - Concrete Epoxy/ Painted 2 SF $ Floor - Terrazzo 2,22 SF $,80 Floor - Tile 0 SF $88 Floor Drain 8 EA $,05 Lavatory EA $,02 Lighting - Lay-in 2 EA Partitions EA $0,05 Urinals 2 EA $,02 Walls - Concrete Block 50 SF $, Walls - Masonry 2 SF $52 Walls - Structural Glazed Tile 2, SF $8,5 CUFFE Page 0 of Assessment Date: //20
Building: Main 200 Category: Rooms (Other Than Classrooms) Restroom 82 S Racine Ave Chicago, IL 020 Water Closet EA $5,55 Rooms (Other Than Classrooms) Subtotal: $,2 Building: Main 200 Category: Building Interior Corridor Ceiling - Lay-in 0 SF 5 $, Ceiling - Lay-in,280 SF $,8 Doors - Side-lite 2 EA $55 Doors - Steel Doors incl hw EA $,8 Doors - Transom Window EA $,08 Floor - Terrazzo 2,2 SF $02, Lighting - Lay-in EA Walls - Concrete Block 2, SF $, Safety Stairs Vertical Conveyance Camera Viewing Station EA $2,0 Security Cameras 2 EA $,20 Ceiling - Lay-in 5,00 SF 5 $,5 Floor - Terrazzo 5,00 SF $,8 Handrails 80 LF $,0 Lighting - Lay-in 5 EA Stairs - Terrazzo 2 LF $5, Walls - Concrete Block 5,88 SF $,2 Elevator - Hydraulic Elevator EA $,28 Building Interior Subtotal: $2,2 Total Building Cost $2,8,5 SITE CUFFE Page of Assessment Date: //20
82 S Racine Ave Chicago, IL 020 Category: Site Civil/Drainage Fencing Landscape Parking Lot Playground Sidewalks Signage Civil/ Drainage - Catch Basin EA $,50 Civil/ Drainage - Site Manhole 5 EA $, Fencing - ew Standard Ornamental,82 LF $58, Irrigation 8,50 SF $,08 Landscape - Grass 0,20 SF $25,05 Landscape - Hardscape- Concrete,50 SF $0,00 Parkway trees 2 EA $5,8 Planting Beds/ Area, SF $,05 Play Area - Asphalt/ Hardscape,050 SF $,5 Concrete Curbs 2 LF $,8 Interior Plantings 80 LF $, Lighting - Pole Mounted 2 EA $2,05 Surface - Asphalt 2,0 SF $5,285 Trash Compactor EA Trash Enclosure - Masonry 2,80 SF $0,85 Vehicular Screening LF $5,800 Equipment - Pre K -5 EA $,5 Equipment - School Age 5-2 EA $,5 Surface - Poured Surface,85 SF 5 $50, Sidewalks - Internal Walks 55 LF $, Sidewalks - Perimeter Sidewalks 2,50 SF $2, Flag Pole - Flag Pole EA $,5 Marquee - Building Mounted Back Lighted EA Monument - Sign EA Site Subtotal: $2,5 Total Site Cost $2,5 CUFFE Page 2 of Assessment Date: //20
82 S Racine Ave Chicago, IL 020 Campus Total ² ³ $,0,080 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. CUFFE Page of Assessment Date: //20
82 S Racine Ave Chicago, IL 020 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main 200 Art Room Computer Lab Computer Lab Kindergarten Kindergarten Office Other Instructional Use Science Lab Level Vacant Art Room Computer Lab Kindergarten Special Education Kindergarten st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor 20 20 20 0 0 20 02 0 0/08 0 5 202 20 208 22 0 02 0 0 05 0 0 08 0 2 5 25 05 2-2- 2-0 - -8 2-0 -08 - -08 - - -20 2-05 2-0 2-08 2-0 -2-0 -22-0 -2-08 -20-0 -0-8 - - - 25 -, 20 55, 2 00 00, 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 58 2 2 2 20 2 8 2 2 20 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 52 8 5 2 5 00 5 5 2 5 5 2 5 5 50 5 5 5 5 00 5 CUFFE Page of Assessment Date: //20