Installation Manual. Arc Chamber

Similar documents
A compact, integrated solution for medium voltage connection, transformer and low voltage distribution

Circuit Breakers FAZ / FAZ6. Installation Products for Industrial Applications

INSTALLATION INSTRUCTION RRU DOUBLE LIGHT POLE MOUNT

INSTALLATION INSTRUCTIONS PART#:17GT23MSS\17GT23MA MODULAR GRILL GUARD FOR CHEVY SILVERADO 1/2 TON 99-02

INSTALLATION INSTRUCTIONS PART#:17A045200MSS\17A045200MA MODULAR GRILL GUARD FOR FORD SUPER DUTY F250/F

REC Series Rack Installation Guide

RE 2 Post Rack System

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

SM6. installation instructions. internal arc 16kA. 1s. addition to the standard cell user s instructions

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

INSTALLATION INSTRUCTIONS PART#:17A096400MSS\17A096400MA MODULAR GRILL GUARD FOR TOYOTA TACOMA 05-09

Pole Mount Installation Manual

Lab Style Table Frame Part No Assembly Guide Automation Technology

Suited to vehicle/s SIDE RAIL 2 DOOR (SWB) SIDE RAIL 4 DOOR (LWB) WARNING

Standards for MV switchgear rated for arc flash protection

INSTALLATION MANUAL H A

RBP-1215B-RX DODGE RAM QUAD CAB RX3

SUPPLEMENTAL INSTRUCTIONS

Dublin Stalls Installation Instructions

Model CR146. ArrowAntennas.com Simply the Best. Corner Reflector for 146 MHz. (307)

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

TITAN2-EDGE Public Access Computer Station Dual Track

ClampStar Safe-T-Link Tether Installation Instructions for Deadends

INSTALLATION INSTRUCTIONS

APPLICATION NOTE. Mounting instructions for EasyPIM / EasyPACK modules with screw clamps. 1. General information

Limit switch set BOA-H DN PN 16/25 Material variant EN-GJS LT

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Terminus TM CEN End Terminal

MICRO-AIR DOWNDRAFT TABLES INSTALLATION AND OPERATION MANUAL

Version: 1.0 Revised: 6/8/2011. CBU Assembly Instructions Manual

INSTALLATION INSTRUCTIONS SIDE BAR FORD ESCAPE & MAZDA TRIBUTE PART #

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

FLANGE MOUNT KITS FOR FRAMES MR4 TO MR7 MOUNTING INSTRUCTIONS

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

ALUMA-CLASSIC FENCE W1716 & W1720 INSTRUCTION MANUAL

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS / DODGE RAM CREW CAB 2500/3500

Ford Pick Up Rear leaf Spring Kit Installation Instructions

STRATUS SHELTER. Take bike parking to new heights

EBTRON a measurable difference!

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

Model CR 146/440. ArrowAntennas.com Simply the Best. Corner Reflector for 146 & 440 MHz. (307)

METAL BENDER OPERATING & MAINTENANCE INSTRUCTIONS Model Nos: CCB1 & CCB2 Part Nos: & CCB2 CCB1

Leveling Feet, Base Plates and Casters

Owner's Manual & Assembly Instructions

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

Rear Mount Installation Instructions

TEL:1-866-XANATOS INSTALLATION INSTRUCTIONS GRILL GUARD FOR FORD EXPLORER PART # 17FJ26MA

Installation Instructions

Installation of the JD 900 Series Flex Grain Platform Auger Trough Liner Kit

Standard Pole Mount Parabolic Antenna Mounting Instructions 3 ft. (90cm) & 4 ft. (120cm)

(W) INSTALLATION INSTRUCTIONS 3" ROUND & 4" OVAL SIDEBAR (90-DEG BENT END) DODGE RAM 1500 QUAD CAB PART #DZ /DZ /DZ /DZ

HP-2 / HP-4 Wall Wash Recessed Spackle & Visible Flange Installation Instructions Overview

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

Installation Instructions

W6 series greenhouse

Installation Manual for Metal Emperor Lockers

Installation Instructions for Bike Fixtation Public Work Stand and Floor Pump Manual RevH

MODEL 83 Pail Handler

Veto spring agitator / kw burner heads

INSTALLATION INSTRUCTIONS Product No. MULTI-FIT PICK-UP

8mm x 25mm "Z" Bolt Plates. (2) Tube Spacers. (2) 12mm Bolt Plates w/ Nut

OFS ED-6C Instruction Sheet LIGHTGUIDE CROSS-CONNECT Comcode: LGX DISTRIBUTING FRAME INSTALLATION

Installation Instructions

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake

INSTALLATION INSTRUCTIONS

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

V Installation instructions, accessories. Auxiliary seat. Volvo Car Corporation Gothenburg, Sweden V70 (00-08) 2002

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

Baseball Backstopper System

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Note: This assembly instruction will cover all configurations of Alloy adjustable height single bases.

INSTALLATION INSTRUCTIONS and OPERATIONS & MAINTENANCE MANUAL for SUPER SIMPLEX DISAPPEARING STAIRWAYS

11 x11 Pergola. Assembly Instructions. Paragon Group USA cm cm cm

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

3000 SERIES STEPGUARD

ULTRA SPACE SAVER Installation Instructions

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

INSTRUCTIONS INSTRUCCIONES CONSIGNES

MM750 Installation Instructions

FRAME BRACKET. Doing Our Best to Provide You the Best. Ford F /2, 6 1/2 & 8 Boxes. BOlT TORQUE SPECIFICATIONS. 7/17 HJ31001,Rev 3

INSTRUCTIONS INSTRUCCIONES CONSIGNES

.com. More than a machine. Power your life. Operating Manual

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Size Grade Torque 9/ ft/lbs. 5/ ft/lbs. 3/ ft/lbs. 7/ ft/lbs ft/lbs.

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Note: This assembly instruction will cover all configurations of Alloy adjustable height double bases.

Industrial Wall Fan SAX Installation and Maintenance Instructions

FRAME BRACKET. Doing Our Best to Provide You the Best. Ford F250, F350 & F parts list. Page 1. 2/17 HJ32002,Rev 2.

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

FRAME BRACKET. Doing Our Best to Provide You the Best. Ford. Page 1. BOlT TORQUE SPECIFICATIONS HJ31000,Rev 0

M2 Antenna Systems, Inc. Model No: 2M4

CHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

Important Safety Instructions

SAFETY. Read and understand all safety precautions and instructions before installing this product.

3/4 Rear DuraRac Installation Instructions

Pickup Box Utility Rack Package Installation (Instruction ID: )

Track Rack. * Track Racks are not lockable

Transcription:

Installation Manual Arc Chamber Installation Manual

Introduction Administrative data Issue number: 6082940 G01 01 Date of issue: 25-03-2013 2 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Table of contents Table of contents 1 Introduction 5 1.1 General description 5 1.2 Using this manual 5 1.2.1 Structure of the manual 5 1.2.2 Safety instructions 5 2 Floor Plan 6 2.1 Arc chamber with extension pieces 6 2.2 Arc chamber+arc absorber 6 3 Arc chamber installation 9 3.1 Preparation of arc chamber installation 9 3.2 Installation of standard or low height arc chamber 9 3.3 Installation of arc chamber with arc absorber 11 3.4 Installation of arc chamber extension pieces, end grille and wall flange unit 11 3.4.1 Assembly of the end grille and wall flange unit 12 3.4.2 Installation of arc chamber extension pieces 15 4 Appendix 17 4.1 Typical wall opening drawing 17 4.2 Typical drawing of 600 mm wide Arc Channel 19 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 3

4 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Introduction 1 Introduction 1.1 General description Power Xpert UX Switchgear has an internal arc classification of AFLR according to IEC62271-200 and satisfies all the criteria from 1 to 5. This guarantees the safety of personnel within the switchroom in the event of an internal arc occurring within the switchgear. An integral Arc Chamber collects and exhausts the hot gases and particles. This duct is mounted on the top of the switchgear and is normally extended on either the right or left side. The recommended solution is to extend the arc chamber to the external environment with arc chamber extension pieces, wall flange and protection grille to vent the gasses outside the switchgear room. If due to special circumstances this is not possible then certain precautions need to be taken into account when designing a safe environment for exhausting the gasses within the switchgear room. Figure 1-1 Panel with arc chamber and extension piece installed viewed from outside the switchroom. Eaton provides 3 standard solutions: 1. Standard height arc chamber (560mm) with extension pieces (See Figure 1-1 and Figure 1-2). 2. Low-height arc chamber (250mm) with extension pieces (See Figure 1-1 and Figure 1-2). 3. Arc Chamber + Arc Absorber for applications where the IAC requirement up to 31.5kA -1s (See Figure 1-3). Contact Eaton for recommendations if a non-standard solution is required. 1.2 Using this manual 1.2.1 Structure of the manual The manual contains 4 chapters. Figure 1-2 Panel with arc chamber and extension piece installed viewed from inside the switchroom. Chapter 1 contains general information on the arc chamber. Chapters 2 and chapter 3 contain floor plan drawings for arc chamber installation. Chapter 4 appendix provides typical drawing for the arc chamber installation. 1.2.2 Safety instructions Read this user manual carefully before installing the arc chamber. Make sure that you have read and understood all instructions. Figure 1-3 Panel with arc chamber and arc absorber up to IAC 31.5kA-1s. Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 5

Floor Plan 2 Floor Plan 2.1 Arc chamber with extension pieces Floor plans for installations with standard or low height arc chamber with extension pieces are provided in the Operation and Maintenance manual. Installing extension pieces requires a wall opening to be provided to allow for the end grille and wall flange unit to be installed. An example of the wall opening drawing is provided, as shown Figure 2-1. For other wall openings refer to par. 4.1. 2.2 Arc chamber+arc absorber Example of a floor plan for arc chamber with arc absorber provided, as shown Figure 2-2. 6 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Floor Plan Typical wall opening drawing Value of dimension Type of panel A C UX-17-2000-40-VCB 800 X+145 UX-17-2000-50-VCB 800 X+145 UX-17-3150-40-VCB 1000 X+145 UX-17-3150-50-VCB 1000 X+145 Figure 2-1 1. Wall cut-out for arc-chamber 610 x 1100 mm 2. Wall cut and wall flange 3. Fasten L-profile to the wall via bolts M12 x L (depends on wall thickness) 4. Gap of two flanges can be adjusted from 90-200 mm 5. X-dimension depends on installation requirements. Standard extension please are 800 and 1000 mm Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 7

Floor Plan Typical floor plan Front view Side view Dimension Front and rear access Front access Dim A Min. 800 Min. 500 recommended Dim B Min. 100 Min. 100 Dim C Depends on cable bend radius * Optional Centre mounting is optional 1. LV control cable entry 4. Second pouring of the concrete 2. Main cable entry 5. First pouring of the concrete 3. C channel steel 6. Foundation Figure 2-2 Typical floor plan for bottom cable panel entry panel with arc absorber 17.5kV 630/1250A 25/31.5 ka 8 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Arc chamber installation 3 Arc chamber installation 3.1 Preparation of arc chamber installation Install arc chamber only when the items below are completed 1. Switchgear is erected and placed in the right position 2. Main busbars are connected correctly 3. Earth busbar is connected correctly 4. Auxiliary cables are connected correctly 5. Main cables are connected correctly 6. All tools are taken away from the switchgear 3.2 Installation of standard or low height arc chamber Step 1 Mount L-profile Mount the L profile to each of the end panels of the switchboard with M8x30 bolts, apply torque 20Nm. Step 2 Mount front and rear plates Starting at one end of the switchboard (left or right), fix the front and rear plates of the arc chamber to the panel with bolts M8x30, apply torque 20Nm. Each arc chamber front and rear plate corresponds to the width of the panel. Hint: Mount all front and rear plates to the entire length of the switchboard. If working from the front of the switchboard it may be an advantage to mount all the rear plates first,and if working from the rear it may be an advantage to mount all the front plates first. Step 3 Mount next front and rear connector plates Fix the front and rear connector plates of the arc chamber to the next panel with bolts M8x30, apply torque 20Nm. Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 9

Arc chamber installation Step 4 Mount end cover The arc chamber can be arranged to exit either from the Left or the Right of the installation. At the opposite end from the exhaust side the arc chamber is fitted with an end cover. Fit the end cover using M8x30 bolts apply torque of 20Nm. Step 5 Mount top cover plate Mount the top cover to the side plates with bolts M8x30, apply torque of 20Nm. Proceed to mount all adjacent top cover plates to each panel. 10 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Arc chamber installation 3.3 Installation of arc chamber with arc absorber The installation of the arc chamber with arc absorber is exactly the same as for the standard arc chamber, follow steps 1 5 above. The arc absorber replaces the top covers in step 4. An arc absorber top cover is fitted on every 3rd panel with a minimum of 2 arc absorbers per installation. When arc absorbers are used an End Cover is mounted on each end of the arc chamber. Figure 3-1 Top cover with arc absorber. 3.4 Installation of arc chamber extension pieces, end grille and wall flange unit The arc chamber extension pieces, end grille and wall flange unit are to be mounted together to provide a complete channel to exhaust the gasses outside the switchroom. The number of arc chamber extension pieces depends on the dimension between the panel and switchgear wall. First assemble end grille and wall flange unit. See par. 3.4.1 and loosely mount in the opening in the wall. Figure 3-2 Extension pieces Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 11

Arc chamber installation 3.4.1 Assembly of the end grille and wall flange unit Step 1 End grille and wall flange are to be assembled before arc chamber extension pieces are mounted to the installation. Step 2 Mount front, rear and bottom plate of end grille with stainless bolts M8x25, apply torque 20Nm. Step 3 Mount grille bracket to the front and rear plate of end grille with stainless bolts M8x25, apply torque 20Nm. 12 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Arc chamber installation Step 4 Place grille between front and rear grille bracket. Step 5 Place plain washer, nut M12 between grille bracket and front or rear plate of end grille. Insert shaft through front or rear plate of end grille Nut M12, grille bracket, grille. Apply torque 20Nm for nut M12. Turn nut M8 to shaft and apply torque 20Nm. Mount remaining grille to the grille bracket. Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 13

Arc chamber installation Step 6 Fix L profile to the top plate of end grille with stainless bolts M8x25, apply torque 20Nm. Step 7 Fix top plate to the front and rear plate of end grille with stainless bolts M8x25, apply torque 20Nm. End grille is assembled. Step 8 When the wall is reached, insert the pre-assembled extension piece through rectangular hole in the wall. The wall should be prepared to accept the wall flange before inserting the extension piece. Some drilling is necessary to mount the wall flanges to the extension piece. Wall opening drawings are shown on Figure 2-1. Step 9 Mount wall flange to the top and bottom plate of end grille with stainless bolts M10x30. Don t tighten. 14 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Arc chamber installation 3.4.2 Installation of arc chamber extension pieces Step 1 Extension arc chamber supports Standard widths of arc chamber extension are 600mm, 800mm and 1000mm. Supports need to be put in place for the assembly of the extension pieces. Normal support is from above using standard threaded rods (1) and support brackets (2) not supplied by Eaton. Step 2 Rear plates Fix rear plate of arc chamber extension to the panel with bolts M8x30, apply torque 20Nm, and use support bracket previously mounted on Step 1 to support the installation. Step 3 Bottom plates Fix bottom plate of arc extension to rear plate, arc chamber and support the arc chamber installation as it is assembled till it reaches the end grille. Use bolts M8x30, apply torque 20Nm. Continue to assemble the rear plate and bottom plate to adjacent extension piece and ensure the assembly is supported properly until the end grille and wall flange unit is reached. Step 4 Front plates Fix all the front plates of arc extension assembly to the bottom plates, Continue until the end grille and wall flange unit is reached. Use bolts M8x30, apply torque 20Nm. Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 15

Arc chamber installation Step 5 Cover plates Fix front and rear cover plates to the front and rear of extension pieces and end grille with bolts M8x30, apply torque 20Nm. Step 6 Top cover plates Mount the top cover to the side plates with bolts M8x30, apply torque of 20Nm. Mount remaining top covers to the installation, each top plate corresponds to the width of the panel. 16 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Appendix 4 Appendix 4.1 Typical wall opening drawing Value of dimension Type of panel A C UX-17-2000-40-VCB 800 X+145 UX-17-2000-50-VCB 800 X+145 UX-17-3150-40-VCB 1000 X+145 UX-17-3150-50-VCB 1000 X+145 Figure 4-1 1. Wall cut-out for arc-chamber 610 x 1100 mm 2. Wall cut and wall flange 3. Fasten L-profile to the wall via bolts M12 x L (depends on wall thickness) 4. Gap of two flanges can be adjusted from 90-200 mm 5. X-dimension depends on installation requirements. Standard extension please are 800 and 1000 mm Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 17

Appendix Typical wall opening drawing Value of dimension Type of panel A C UX24-800-20-VCB 800 X+145 UX24-1250-25-VCB 800 X+145 UX24-2000-25-VCB 1000 X+145 UX24-2500-25-VCB 1000 X+145 Figure 4-2 1. Wall cut-out for arc-chamber 610 x 1130 mm 2. Fasten L-profile to the wall via bolts M12 x L (depends on wall thickness) 3. Gap of two flanges can be adjusted from 90-200 mm 4. X-dimension depends on installation requirements. Standard extension please are 800 and 1000 mm 18 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Appendix 4.2 Typical drawing of 600 mm wide Arc Channel Left hand arc chamber assembly drawing 17.5kV 630/1250A 600 wide Notes: Type 1: Arc chamber with integral arc absorber assembly Type 2: Standard arc chamber Seq. Qty. Part number Description Type 1 Type 2 1 1 535.5311.017.04 Left End Cover 2 1 535.5144.002.04 L-Bracket 3 1 535.8100.010.01 Front Connection Plate 4 1 535.5160.002.04 Front Cover Plate 5A 1 535.5002.009.05 Arc Absorber Assembly x 5B 1 535.8310.031.04 Top Plain Cover x 6 1 535.5160.003.04 Back Cover Plate 7 1 535.8100.011.01 Back Connection Plate 8 57 535.8920.014.00 Bolt M8x30 9 80 535.8950.003.00 Plain washer 8 10 57 535.8950.007.00 Spring washer 8 11 23 535.8940.003.00 Nut M8 Figure 4-3 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 19

Appendix Middle panel arc chamber assembly drawing 17.5kV 630/1250A 600 wide Notes: Type 1: Arc chamber with integral arc absorber assembly Type 2: Standard arc chamber Seq. Qty. Part number Description Type 1 Type 2 1 1 535.8100.010.01 Front Connection Plate 2 1 535.5160.002.04 Front Cover Plate 3A 1 535.5002.009.05 Arc Absorber Assembly x 3B 1 535.8310.031.04 Top Plain Cover x 4 1 535.5160.003.04 Back Cover Plate 5 1 535.8100.011.01 Back Connection Plate 6 47 535.8920.014.00 Bolt M8x30 7 70 535.8950.003.00 Plain washer 8 8 47 535.8950.007.00 Spring washer 8 9 23 535.8940.003.00 Nut M8 Figure 4-4 20 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric

Appendix Right hand arc chamber assembly drawing 17.5kV 630/1250A 600 wide Notes: Type 1: Arc chamber with integral arc absorber assembly Type 2: Standard arc chamber Seq. Qty. Part number Description Type 1 Type 2 1 1 535.5311.054.05 Right End Cover 2 1 535.5144.005.05 L-Bracket 3 1 535.8100.010.01 Front Connection Plate 4 1 535.5160.002.04 Front Cover Plate 5A 1 535.5002.009.05 Arc Absorber Assembly x 5B 1 535.8310.031.04 Top Plain Cover x 6 1 535.5160.003.04 Back Cover Plate 7 1 535.8100.011.01 Back Connection Plate 8 57 535.8920.014.00 Bolt M8x30 9 80 535.8950.003.00 Plain washer 8 10 57 535.8950.007.00 Spring washer 8 11 23 535.8940.003.00 Nut M8 Figure 4-5 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric 21

Eaton s Electrical Sector is a global leader in power distribution, power quality, control and automation, and monitoring products. When combined with Eaton s full-scale engineering services, these products provide customer-driven PowerChain solutions to serve the power system needs of the data center, industrial, institutional, public sector, utility, commercial, residential, IT, mission critical, alternative energy and OEM markets worldwide. PowerChain solutions help enterprises achieve sustainable and competitive advantages through proactive management of the power system as a strategic, integrated asset throughout its life cycle, resulting in enhanced safety, greater reliability and energy efficiency. For more information, visit www.eaton.com/electrical. Eaton Industries (Netherlands) B.V. P.O. Box 23 7550 AA Hengelo The Netherlands Tel.: +31 74 246 91 11 Fax: +31 74 246 44 44 info.electric@eaton.com www.eaton.eu/electric 2013 Eaton Corporation All rights reserved 22 Arc Chamber Installation Manual 6082940 G01 01 March 25th 2013 www.eaton.eu/electric