MERALCO Standards: Electrical Design. Engr. Eduard Mercado Electrical Design Team

Similar documents
Customer Connection Guide Updates Effective May 2017

Quality Control Checklist - Design Drawings

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SECTION 5 TRANSFORMERS

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

FAQ ON EARTHING STANDARDS 16/08/2018

Three-Phase VFI Padmount Transformers. Double Duty in a Single Package. www. ElectricalPartManuals. com

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

CONTINUING EDUC ATION

Overvoltage Protection

Designing For a Critical Load using a Spot Network

Customer Requirements Commercial Secondary Service

Wisconsin Contractors Institute Continuing Education

3.1 Overview of ATCO Electric s URD System Design

Distribution/Substation Transformer

Electric Service Guide. Residential Subdivision

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

American Electrical Institute

2017 NEC TABLE OF CONTENTS

BGE STRATEGIC CUSTOMER ENGINEERING

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

PAD AND WELL DETAILS FOR TRANSFORMERS, SWITCHES CAPACITORS AND JUNCTION ENCLOSURES

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

MEDIUM VOLTAGE

Notes 1: Introduction to Distribution Systems

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

SECTION TRANSFORMERS

Status Date Prepared Reviewed Endorsed Approved

Article 250 Grounding & Bonding

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue...

6B.6 Substation Grounding

Single-Family Dwelling Submittal Requirements

Protection of Electrical Networks. Christophe Prévé

Page Electric Utility Service Specifications

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

MCset 17.5 kv. Installation instruction April Medium Voltage Distribution

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Busbar and Modular Wiring Systems

Power Quality. Case Study. Conrad Bottu Laborelec January 2008

IMP/007/011 - Code of Practice for the Application of Lightning Protection

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12

Article 225: Outside Branch Circuits And Feeders

Substation Preventive Maintenance

Single Line Diagram of Substations

WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

MV network design & devices selection EXERCISE BOOK

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Connection Impact Assessment Application

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

Standard Details Index NWTP Improvements and MF System Installation

Construction Measurement III SBQ3314. Electrical Installations : Single & Three Phase. Dr. Sarajul Fikri Mohamed

NEC 2014 Code Changes

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

Journeyman's Practice Exam

Unit 2. Single Line Diagram of Substations

S. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013)

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

PAPER. Dry-type transformer innovation: HiDry 72 for subtransmission lines

Embedded Generation Connection Application Form

Table of Contents. Introduction... 1

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably.

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

UNITED STATES DEPARTMENT OF AGRICULTURE Rural Utilities Service BULLETIN 1751F-810

Impact Assessment Generator Form

ASSEMBLY, INSTALLATION AND OPERATION MANUAL

How to maximize reliability using an alternative distribution system for critical loads

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

METER - INSTALLATION Pad Mount Transformer

Installation Instructions

Residential Room Addition / Remodel Submittal Requirement Checklist

CHAPTER-E-21. T1 Column With Beam Arrangement in Substation. T2 Column With Beam Arrangement in Substation

Optimize Outage Management and Improve Underground System Reliability

A. Product Data: For each electrical identification product indicated.

Two- and three-phase MagneX interrupter

ACCESS TO HIGH VOLTAGE APPARATUS

GE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

CONTENTS. 1. Introduction Generating Stations 9 40

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST

Installation and Maintenance Manual IM 770-1

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Substation: From the Outside Looking In.

7. INSPECTION AND TEST PROCEDURES

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:

Transcription:

MERALCO Standards: Electrical Design Engr. Eduard Mercado Electrical Design Team

Electrical Design Standards

SERVICE VOLTAGES SECONDARY METERED - 240 V, 400 V, 460 V PRIMARY METERING -34.5 kv, 13.8 kv (portions of Cavite & Bulacan), 115 kv (Subtransmission) FACILITIES 1. OVERHEAD POLE MOUNTED TRANSFORMERS PADMOUNT TRANSFORMERS VAULT TYPE DT 2. UNDERGROUND PADMOUNT TRANSFORMERS VAULT TYPE DT

Single Line Diagram SURGE ARRESTER FUSE CUTOUT OR POWER FUSE INCOMING OVERHEAD LINE TERMINAL POLE CABLE TERMINATION UNDERGROUND PRIMARY CABLES ALL CIVIL WORKS, i.e., CONCRETE-ENCASED PVC DUCTS & FITTINGS, TO BE PROVIDED AND INSTALLED BY THE APPLICANT/CUSTOMER PADMOUNTED TRANSFORMER SECONDARY CABLES CT TO CUSTOMER S MAIN SECONDARY CIRCUIT BREAKER ELBOW ARRESTER EPMC METER TRANSFORMER VAULT TO BE CONSTRUCTED BY THE APPLICANT/CUSTOMER BASED ON MERALCO STANDARD OVERHEAD LINE FEEDING A TRANSFORMER VAULT

Single Line Diagram UNDERGROUND FEEDER PADMOUNTED SWITCHGEAR UNDERGROUND PRIMARY CABLES ALL CIVIL WORKS, i.e., CONCRETE-ENCASED PVC DUCTS & FITTINGS, TO BE PROVIDED AND INSTALLED BY THE APPLICANT/CUSTOMER PADMOUNTED TRANSFORMER SECONDARY CABLES CT ELBOW ARRESTER EPMC METER TRANSFORMER VAULT TO BE CONSTRUCTED BY THE APPLICANT/CUSTOMER BASED ON MERALCO STANDARD TO CUSTOMER S MAIN SECONDARY CIRCUIT BREAKER UNDERGROUND LINE FEEDING A TRANSFORMER VAULT

34.5 kv OH Line Fuse Cut-Out or Power Fuse Lightning Arrester 4-Way Loadbreak Junction, 200A Transformer Vault Vault Type DT's (SEE NOTE) Load PRIMARY SECONDARY Load Elbow Arrester Single Line Diagram - 2 Banks w/ 4-Way Junction

4-WAY / 4-POINT JUNCTION

Transformers for Vault Installation Meralco-Supplied Padmounted Transformers Three-phase, 34.5 GrdY/20 kv or 13.2 GrdY/7.62 kv Available in either 240Y/139-V secondary (75-1000 kva) or 480Y/277-V secondary (500-2000 kva) 416Y/240 V secondary (500-1000 kva)

Transformers for Vault Installation Meralco-Supplied Padmounted Transformers Deadfront primary Less flammable liquid filled Completely selfprotected with fuses Provided with loop sectionalizing switch

Transformers for Vault Installation Meralco-Supplied Deadfront Distribution Transformer Single-phase, 34.5 GrdY/20 kv or 13.2 GrdY/7.62 kv Available in either 139/277-V secondary or 240/120-V secondary Available in 167 333 kva

Transformers for Vault Installation Meralco-Supplied Deadfront Distribution Transformer Deadfront primary Round tank construction Less flammable liquid filled Provided with standard DT accessories

Standard Vault Location

PREFERRED VAULT LOCATION: PREFERRED VAULT LOCATION SHALL BE ON THE GROUND FLOOR SECOND FLOOR MAY BE ALLOWED (FOR VAULT TYPE DT s AND PADMOUNTED XF WITH HOISTING FACILITIES) FIRST BASEMENT MAY BE ALLOWED FOR BUILDINGS WITH MULTIPLE BASEMENT

PREFERRED VAULT LOCATION: THE VAULT SHALL BE LOCATED ON PERIMETER OF THE BUILDING ADJACENT TO STREET/ROADWAY ACCESSIBLE TO MERALCO TRUCKS AND CRANE TRUCK MINIMUM ROAD WIDTH : 6.5 METERS

Standard Vault Specifications/Requirements

STANDARD SPECIFICATION/ REQUIREMENTS: WALLS AND ROOF SHALL BE MADE OF REINFORCED CONCRETE NOT LESS THAN 150MM THERE SHALL BE NO OPENING FROM THE VAULT TO ANY PART OF THE BUILDING INTERIOR 150 MM DOORSILL IS REQUIRED FOR LIQUID CONFINEMENT PROVISION FOR ADEQUATE AND PERMANENT VENTILATION (EXHAUST FAN-TEMP CONTROLLED RATED ¾ HP, 71 CuM/Min (2500 CFM)) CLEAR HEADROOM SHALL NOT BE LESS THAN 4M FROM THE BOTTOM OF THE I-BEAM TO MAINTAIN A 30 SLING ANGLE FROM THE VERTICAL (HOISTING FACILITY)

STANDARD SPECIFICATION/ REQUIREMENTS: DUCTS (PRIMARY AND SECONDARY) 110 MM DIAMETER, THICK WALLED, RED ORANGE COLOR, UNPLASTICIZED POLYVINYL CHLORIDE (UPVC) IN ACCORDANCE WITH PNS 14. IT SHOULD BE ENCASED IN CONCRETE PROVISION OF PERSONNEL ACCESS DOORWAY DIRECTLY ACCESSIBLE FROM OUTSIDE OF THE BUILDING

Customer Vault Layouts for Transformers (pdt & vt)

Requirements for Customer Vault MINIMUM DIMENSION PADMOUNT TRANSFORMER IN VAULT LOCATION 1-BANK 2-BANKS Ground Floor 2 nd Floor 1 st Basement NOTES: (W) 5m X (D) 4m X (H) 3m (W) 5m X (D) 6m X (H) 4m* (W) 5m X (D) 6m X (H) 3m [1] W = Width; D = Depth; H = Height (Headroom) (W) 8m X (D) 4m X (H) 3m (W) 8m X (D) 6m X (H) 4m* (W) 8m X (D) 6m X (H) 3m *[2] 4m vertical distance measured from the bottom of the I-beam to the floor is required when hoisting the transformer EXCEPTION: For 2nd floor transformer vault with a hatchway, the depth requirement is 8m.

Requirements for Customer Vault MINIMUM DIMENSION DEADFRONT (VAULT TYPE) DISTRIBUTION TRANSFORMERS LOCATION 1-BANK 2-BANKS Ground Floor 2 nd Floor 1 st Basement (W) 5m X (D) 4m x (H) 3m (W) 5m X (D) 4m x (H) 3m (W) 5m X (D) 4m x (H) 3m (W) 6m X (D) 6m X (H) 3m (W) 6m X (D) 6m X (H) 3m (W) 6m X (D) 6m X (H) 3m NOTE: W = Width; D = Depth; H = Height (Headroom)

PRIMARY METERING

SINGLE LINE DIAGRAM FOR PRIMARY METERING (OH)

SINGLE LINE DIAGRAM FOR PRIMARY METERING (UG)

TYPICAL PRIMARY METERING ARRANGEMENT

3 Way RMU with Metering Module

3 Way RMU with Metering Module

Thank you.