HeatBoard Joisted Floor System

Similar documents
FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

For ANGLE-DROP Styles

1INSTALLATION GUIDE: ENGINEERED WOOD FLOORING

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE.

Laying instructions Installation of multilayer Herringbone / Basket-weave with tongue and groove joint.

Roll Out Vinyl Installation Guide

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS

Wallgard 1,3 product

General Installation Instructions

Installation Instructions

Installation instructions for Egger Laminate and Comfort flooring with UNI fit! installation system

Install your floor between 18 and 30 C.

Installation Instructions

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

JUNCKERS HEXPARKET LAYING INSTRUCTIONS

Installation Instruction

Engineered Hardwood Flooring Installation Instructions

Columbia Laminate Installation Instructions

Plantation Compressed Bamboo Flooring Installation instructions

For best results, it is essential that you follow the installation instructions exactly.

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

BAMBOO FLOORING PRE-FINISHED SOLID BAMBOO INSTALLATION GUIDE

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

INSTALLATION GUIDE.

1. AREAS OF APPLICATION. CREATION CLIC SYSTEM 55 [INSIGHT CLIC] PLANKS AND TILES 5 mm including 0.55 mm of wear layer In planks or in tiles

General Installation Instructions. Laminate Drop & Lock installation - 2G

INTERNAL LININGS INSTALLATION GUIDE

Installation Instructions for Viking Hearth Engineered Wood Flooring

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

INSTALLATION INSTRUCTIONS

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

Wall Installations. Chapter 16 Wall Installations 16. 1

WOOD. Floating. Installation Instructions

Recommendation for fitting the floor coverings: Alfa / Beta

EPS 200 Overfloor Heating Boards

DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions

PLEASE READ THIS FIRST

Life* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)

Installation Instructions for Engineered Wood Flooring

Please read and review installation instructions completely before proceeding with the actual installation.

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

INSTALLATION INSTRUCTION

Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

multipanel Installation (panels) CONTENTS

18mm/21mm Engineered Installation

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Installation recommendations nora stair solutions

Flooring. Technical specifications plus acclimatisation, laying preparations and after-care instructions

ClicWall. Decorative wall covering

LuxCore Installation Instructions

[320] LAYING PRINCIPLE: CREATION 30 CLIC

Colosseum and Palace 5G Clic. 01 General guidelines INSTALLATION INSTRUCTIONS

Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products

INSTALLATION GUIDE Timber Stairs

Installation Guide - Evolution Series Wood Siding

INSTALLATION MANUAL STORAGE

INSTALLATION. Installer / Owner Responsibility. Basic Tools and Equipment. Putty and Filler Use. Recommended Installation Methods

Engineered Hardwood Installation

Installation Instructions

Laying and maintenance of cement tiles

CLASSIC RANGE PLUS RANGE PHOTO WALL. Pre-installation check-list

Engineered Hardwood Installation

Fibre Cement Board The first tile backing system with a lifetime guarantee

Installation instructions

Laminate Installation Guide

Loose Lay Luxury Vinyl Plank

AquaGuard - Water Resistant Flooring Installation guidelines

INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website

English Professional Installation Guidelines

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

Laminate Floor Installation Guide

PREPARATION PREPARATION BEFORE DELIVERY INSPECTION MOISTURE TESTING PREPARING THE SUBFLOOR LAYING THE FLOOR HEATING AND AIR CONDITIONING

Installation Instructions. This leaflet must be read thoroughly before commencing installation. 1 P a g e. Version 2.

Installation Manual for M4-Exterior Sheathing

DO NOT HESITATE TO CONTACT US TO BE GUIDE DURING THE INSTALLATION OF SQUAREDECKO PRODUCTS

Direct Importers of the Finest Exotic Hardwood Decking, Lumber, & Flooring

installation guide TASMANIAN HARDWOOD OVERLAY FLOORING

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

SPEKVA. Installation Instructions. Solid wood. August

Unit5EustonStreet FreemensCommon Leicester LE27ST T: F:

How To Create An Entertainment Unit

Installation Instructions for Panel Siding and Soffit

Engineered Strand Uniclic Floating Installation

CLASSIC RANGE PLUS RANGE CREATE RANGE - PHOTO WALL

READ PRIOR TO BEGINNING INSTALLATION

Installation Manual for Thermo Panel

THE PARQUET WORLD AT YOUR FEET

Trendwood Flooring Installation Instructions

Install Instructions for Torrance Jurastone #4004 Mantel

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions and Details

INSTALLATION INSTRUCTIONS of Chevron and Herringbone Engineered Hardwood Flooring

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

Kraus Engineered Luxury Vinyl Plank 5G Insta-Loc Click Installation Instructions

Transcription:

Design HeatBoard Joisted Floor System The Floor Heating Warehouse Underfloor Heating using Heatboard Slotted and Turning Boards is intended for installation on standard wood joist floors of a max. 600mm c/c (ideally suited to UK standard 400mm joists). The construction comprises of a load bearing slotted 22mm chipboard floor, which replaces the standard board in a floor construction. Construction Outline

1. Floor joists 2. Insulation Joist insulation should fill up the entire joist cavity. 3.HeatBoardDim.1200x800x22mm 1800 x 600 x 22mm 4. Heat Distribution Plate L=1150mm 5. Pipe The Floor Heating Warehouse 16mm Pex-Al-Pex Pipe 6.HeatBoardSlottedTurningBoardDim.595x800x22mm 7. Vapour Barrier and cell foam/rag board according to the floor manufacturer s instructions Floor Finishes: Wood, Laminate and Parquet Floors The heating system is first covered with a vapour barrier (PE sheet) followed by rag paper or open-cell foam sheet according to the floor manufacturer s instructions. Flooring [min. 14mm thick] is then laid in the same direction as the floor heating circuits. Consult flooring supplier & follow flooring supplier s instructions for wood floors on floor heating. Vinyl or linoleum flooring Dry areas Where using decorative vinyl/linoleum, lay open-cell sheet (suitable for use with underfloor heating), over the floor heating, then lay and fix chipboard [min. 16mm] or plywood [min. 12mm]. The vinyl/linoleum is then fixed over to the manufactures instructions. Wet areas In wetroom areas, lay open-cell sheet (suitable for use with underfloor heating), over the floor heating, then lay and fix chipboard [min. 16mm] or plywood [min. 12mm].

Ceramics or natural stone Dry areas Aluminium Heat Distribution Plate must, after completing laying the pipe, be screwed in place in a zigzag pattern c/c 150mm. Use suitable flat headed screws (length 14-20mm). Make sure that the floor and heat distribution plates are clean, vacuum carefully. Apply Primer on the entire surface, let dry for 1-2 hours. If there is oil or grease on the plates this must be washed off before applying primer. Glue a 12mm floor grade form stable board for floors (for example fibre cement board) onto the floor with glue. Apply the glue with a putty-knife, and then comb out the glue with a notched trowel (notched 6-8mm). Mount the floor grade form stable board within 10-15 minutes after the glue is applied. Mark out the position of the pipes at the same time, to avoid any damages in the next step, when the boards are screwed in place. The boards are screwed in place with a screw for plaster board along all sides and between the pipe rows. Begin to screw the sides of the board 50 mm in from the corners and after that with a distance of max. 300mm in between. Screw between the pipe rows with a distance of max. 500mm between the screws. When the glue has dried after approx. 5 hours the tiling can begin. Wet areas Aluminium Heat Distribution Plate must, after completing laying the pipe, be screwed in place in a zigzag pattern c/c 150mm. Use suitable flat headed screws (length 14-20mm). Make sure that the floor and heat distribution plates are clean, vacuum carefully. Apply Primer on the entire surface, let dry for 1-2 hours. If there is oil or grease on the plates this must be washed off before applying primer. Glue a 12mm floor grade form stable board for wet

areas (for example fibre cement board) onto the floor with glue. Apply the glue with a putty-knife, and then comb out the glue with a notched trowel (notched 6-8 mm). Mount the floor grade form stable board within 10-15 minutes after the glue is applied. Mark out the position of the pipes at the same time, to avoid any damages in the next step, when the boards are screwed in place. The boards are screwed in place along all sides and between the pipe rows. Begin to screw the sides of the board 50mm in from the corners and after that with a distance of max. 300mm in between. Screw between the pipe rows with a distance of max. 500mm between the screws. When the glue has dried after approx. 5 hours the tiling can begin. Use levelling compound on the boards to create a sloping floor in wet areas, min. 12mm by the floor drain. After that a waterproofing/sealing layer and ceramic tiles. Follow the suppliers instructions. Alternative solution for dry and wet areas As an alternative to the above, a screed/self leveling screed can be laid over the underfloor heating. Lay 2 layers of good quality DPM over the underfloor heating and ensure the DPM forms a skirt up walls of at least 100mm. Overlap all joints by a minimum 200mm and tape seal all joints. Lay the screed to a minimum 50mm depth. For wet areas the area must be sealed/waterproofed according to manufacturers requirements.

Assembly of HeatBoard Slotted and Turning Boards Slotted and turning boards are laid at right angles to the joists The maximum allowed distance between joists is 600mm. HeatBoard Slotted boards are tongue and grooved on all four sides. Short sided joints must not be positioned closer than 200mm to the short sided joint in the next row if the joints occur between the same pair of joists. The turning boards are not tongue and grooved on the long sides. When the short side of the slotted board meets the turning board the tongue/ groove of the slotted board must be cut/ removed. Observe that the joint between the slotted board and the turning board needs to be supported in the middle by a floor joist. If the installer decides not use turning boards, but to use a routing tool, the board must be fully supported from beneath.the HeatBoard floor boards must be fully supported by joists or studs along all walls. Ensure 10mm expansion gap is left around all walls and fixtures. Glue the boards thoroughly to the joists and studs using Casco mounting glue 3303 or the equivalent. The grooves and joints of the boards must be glued using Casco mounting glue 3303 or the equivalent. The amount of glue must be generous so that an excess will be pressed out during laying; excess should then be wiped off. The amount of glue required is approx. 1.2 L per 10 square metres of floor area.

Screw the boards to each joist and joist support using a row of screws. Where the short joints meet insert a row of screws in each board on the same joist, with a maximum screw distance of 150mm along all supported outer edges and short joints and 300mm along the intermediate supports. Use 3.9 x 55mm chipboard screws countersunk approx. 2mm into the board. Complete the installation one board at a time. Pipe turning with HeatBoard Slotted Turning Board When turning pipes above floors, the slotted turning board must be fitted and the pipes must be laid at the same time. Please note that the laying of the flow and return pipe ends is done before the slotted turning board is fitted. Heat Distribution Plate (aluminium) The Aluminium Heat Distribution Plate is laid out at a spacing distance between plates of between 10-100mm and pressed down into the board slots. The plates can be shortened by snapping across the break lines. The slots in the board must be carefully cleaned (vacuum-clean the slots) before the plates are laid out.

When using ceramics as surface layer Heat Distribution Plates must be screwed in place in a zigzag pattern as described above. Laying the pipe Lay the underfloor heating pipe out according to the layout diagram. Ensure the direction of flow in the loop is such that the flow pipe is closest to the outer wall. Number and name the loops according to the drawing. Check before you lay the pipe that the plates are clean (vacuum-clean the slots). Press or tread down the underfloor heating pipe into the slot of the plate. After assembly the pipe must lie in the slot and must never under any circumstances touch the over-lying floor. Entry and exit from the floor joist boxes for flow/return of the circuits is made from the cut-outs in the turning boards. Pipes should be cut using pipe shears intended for PEX-AL-PEX Pipe.

Handling instructions General At delivery and before assembly; always check that the boards do not have any visible defects. Before the boards are fitted, it is important that they be conditioned for 2-3 days in the climate in which they will be used. Read these assembly instructions before beginning to install HeatBoard. If something is unclear or indistinct, contact your supplier before installing Standard HeatBoard Grade Standard HeatBoard Slotted Boards and Turning Boards marked quality class V20 are intended for use in dry indoor environments, climate classes 0 and 1. They must not be used outdoors or in such a way that they are exposed to damp or to air with a very high humidity level. Moisture Resistant HeatBoard Grade Moisture-resistant HeatBoard Slotted Boards and Turning Boards marked quality class V313 are intended for use in climate classes 0, 1 and 2, i.e. in both dry indoor environments and rather damper environments, up to 80 % relative humidity. However, the boards must not be exposed to water in the form of precipitation or otherwise without being protected. Protection during storage Sheets of chip board should be stored indoors. If this is not possible, storage out of doors should be of short duration and the boards must be carefully covered, e.g. with a tarpaulin, to protect them from precipitation. Remember to allow for ventilation if they are closely packed. The boards must be stored on a flat and level surface. NOTE The boards must never be stacked directly on the ground. The ideal storage conditions are 15-25 C and 50-60 % relative humidity. The relative humidity must not exceed 80% for lengthy periods.