Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

Similar documents
PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Electronic Plan Review Submittal Standards

Electronic Plan Review. City of Mesquite, TX. eplan Review Standards Document

Electronic Document Review (EDR)

City of Aspen Electronic File Preparation Standards September 2018

Miami University. Physical Facilities Department. CAD Standards. April 2004

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Best Practices For Consultants

Applicant User Guide City of Venice 401 W. Venice Avenue Venice, Florida 34285

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Section 4: Ontario Realty Corporation CAD Standards and Guidelines

AutoCAD Standards University of California, Santa Cruz Physical Planning & Construction

City of Aspen Water Review for Pitkin County Permits Submission Packet

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

1 ELECTRONIC REVIEW PROCESS - GUIDELINES FOR DESIGN TEAMS.

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

Single-Family Dwelling Submittal Requirements

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

Checklist for Minor Plan Modification

BIM/VDC on TAA Projects:

Architectural Design Process

APPLICATION FOR SITE PLAN REVIEW

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Last Name: First Name: M.I:

Checklist for Tentative Subdivision Map

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

C I T Y O F M c K I N N E Y PLANNING

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

PLAN SUBMITTAL REQUIREMENTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Natural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption

Cloud Based Plan Review Process (Applicant)

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

DESIGN REVIEW PROCESS AND APPLICATION

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

Developer Design Review Submittal Requirements - SECTION 5

SIGN PERMIT CHECKLIST AND APPLICATION

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

Minor Site Plan Review Process

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects.

TEC634 Architectural CAD I (formerly Architectural Drawing I) A Course Outline for Architectural CAD I

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Residential Room Addition / Remodel Submittal Requirement Checklist

Radiocommunication Facility Review Protocol

WSSC eplan Review DSD Applicant Guide 2 Revised

SECTION SUBMITTAL PROCEDURES

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

SITE PLAN REVIEW GUIDELINES Rev. 2016

Equipment EQ ID SOP. Filename: Equipment EQ ID SOP (OFPC) Process_ docx Date: Page 1 of 6

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

Electronic Plan Check (EPC) Building Permit Submittal Requirements

Residential Room Additions

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

Town of Holly Springs Sign Installation Packet

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

SITE PLAN APPLICATION

Summerland Planning Advisory Committee

BERKELEY COUNTY ENGINEERING AND

TO WHOM IT MAY CONCERN:

Vanderbilt University Standard Specification Revised 2/6/08

EXECUTIVE SUMMARY of DESIGN REVIEW

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

UDS OVERVIEW Uniform Drawing System

Listed below are the competencies required and examples from the aforementioned job:

Electronic Plan Check (EPC) Building Permit Submittal Requirements

The CAD Technician s Role in Office Practice and Procedure

APPLICATION DESIGN REVIEW Please Print or Type

SECTION SUBMITTAL PROCEDURES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

APPLICATION FORM FOR INFRASTRUCTURE NOC

Over-the-Rhine Historic District New Construction Guidelines Competition: The Challenge to elevate new build design in OTR to national recognition.

BETTER YOUR PRODUCTIVITY WITH OUR ALL-PURPOSE WORKFORCE SCANNERS.

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Commercial Infill Project Guide

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

EG1003 Help and How To s: Revit Tutorial

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Electronic Plans Management Training. Submitting a Revision to Approved Plans (RTAP) Application & Uploading Drawings

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015

What is a Survey? The site plan is usually based on an professional land survey.

Required Supporting Information and Documentation for Historic Preservation Certification Applications

A. Section includes administrative and procedural requirements for project record documents, including the following:

Concept Plan. Application Upload Checklist & Submission Requirements

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Transcription:

Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018

SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC SUBMISSION Once you have made your initial request and paid the administrative fee, you will receive two emails. The first email is a payment receipt / confirmation. The second email will be an invitation to upload your plans and documents so that we may Pre-screen your request. The drawings and documents that you upload must meet our submission standards. Standards allow for easy identification of drawings by naming convention, vector file types in order to facilitate the most efficient review, colour coding of comments for visual identification of departments and so on. Some permit types are exempt from certain submission standards. These exemptions are outlined in the Quick Reference sheet for that permit type. See the eplan Quick Reference Guides published on our website for more information (www.markham.ca > Building & Development Services > Building Permits > eplan Guides & Tutorials). DOCUMENTS / DRAWINGS The submission standards in this section apply to all files uploaded to eplan. There are two categories of files: drawings and documents. Documents include forms, supporting documents, and approval documents. The following table summarizes the two file categories, examples of each and the folder they must be uploaded to in eplan: Documents Anything not falling into the Drawing Category File Type Examples Upload Folder Site plan Design drawings that will be used for the Key plan construction of the building. All submitted Architectural drawings must be on standardized sized Structural sheets, drawn to scale Mechanical Plumbing Forms Application forms required by the City of Markham. Supporting Documents Supporting document files include other files that are required as part of the application submission, but are not drawing files. Generally, these consist of shop drawings, calculations and reports. Approval Document Document issued by an external agency and required by Applicable Law identified on the Applicable Law checklist Electrical Applicable Law Checklist Schedule 1 Commitment to General Review Plumbing Data Form Energy Efficiency Design Summary Roof truss shop drawings Floor joist shop drawings Soils reports Specifications Heat loss / heat gain calculations Energy efficiency calculations Site plan approval memorandum Committee of Adjustment Final and Binding Decision TRCA Permit MTO Building and Land Use Permit Documents Documents Applicable Law eplan Submission Standards 1 Building Standards February 2018

REQUIRED FILE TYPES DRAWING FILES 1. Each drawing sheet or page shall be uploaded as a separate file. 2. Only Vector PDF files will be accepted for drawings. AutoCAD software is commonly used to create drawing files. created in AutoCAD are converted to Vector PDF by using the Autodesk Vector Graphic Converter DWG to PDF.pc3 plotter driver. 3. All drawings must be flattened into a single layer. We do not need to see layers that clutter the drawings. Layers such as floor finishes that are cross hatched, is an example of such a layer. 4. and resubmitted drawings must be oriented in LANDSCAPE. 5. Fire separation drawings are required to be in colour. All other PDFs are required to be grayscale. No colour should be on the greyscale drawings with the exception of borders, templates or stamps. SUPPORTING DOCUMENT FILES 1. Each document shall be uploaded as a separate file. 2. Roof truss and floor joist shop drawings must be submitted as a vector based PDF package. All other supporting files may be in the following formats: PDF, DOC, DOCX, XLS, XLSX, PPT, PPS, PPTX, TIF, TIFF, JPG, PNG, IMG, or BMP. 3. Submit searchable PDF files for calculations, reports and other supporting documentation (non-drawing files). FORMS & APPROVAL DOCUMENTS 1. Each form or approval document shall be uploaded as a separate file. 2. PDF is preferred, but forms may be in the following formats: DOC, DOCX, XLS, XLSX, PPT, PPS, PPTX, TIF, TIFF, JPG, PNG, IMG, or BMP. 3. Forms must be oriented in PORTRAIT. eplan Submission Standards 2 Building Standards February 2018

BORDER STANDARDS ALL DOCUMENT AND DRAWING FILES The top right corner of all drawings and documents must be reserved for the City of Markham s electronic approval stamps. Please leave the top right corner completely blank on all drawings (with exception of the border) and supporting documents. Sign Permit Supporting Documents Forms Approval Documents Stamp Location Box Dimensions (1/2 from edge of paper in both directions) All sheets 3 wide x 5 height All sheets 3 wide x 2 height Front Page 3 wide x 2 height Not applicable Not applicable The approval stamps are not transparent and may be applied over the base drawing. eplan Submission Standards 3 Building Standards February 2018

FILE NAMING STANDARDS BUILDING PLANS (RESIDENTIAL & COMMERCIAL) File names for drawings submitted through eplan Review should include the first character(s) of the discipline name, followed by a 3-digit sheet number and drawing type. File names for both drawings and documents shall remain the same for all submittals. Do not version or rename files when uploading resubmitted files. Discipline First character(s) in the file name represents the discipline area followed by the page number and type of drawing, i.e. A1.2 East Elevations. Ensure that all plans, including the associated details, are submitted under the correct discipline characters to use. Sheet Number Must be a 3 digit number with leading zeros. Note: if decimals are needed, place decimal after the 3rd digit, ex. P1.99 Sheet Name Adding in the sheet name will allows plans examination staff to quickly navigate your submission, this will aid in review process. The sheet name should be the same name that you would place in your title block for that drawing, for example A1.3 First NOTE: The naming convention in this Standard can be used in the absence of any existing drawing naming convention. If the Architect / Engineer / Designer already has named each drawing, the file names must replicate that name / number. For example, if the drawing label says A2.1 in the title block and it is for the first floor plan, then the file name should be A2.1 First Floor.pdf. For small permit scopes such as sign permits, small residential alterations, solar panels, etc., where there are a small number of drawings, the name convention is not as important. With larger scope drawings of new residential housing or industrial / commercial buildings, the file naming convention needs to reflect the actual drawings since those plans will contain section line and detail references to other drawings. In the end, we want the files to display in the folder in the same order as it would be if you printed and bound the drawing package for a paper submission. eplan Submission Standards 4 Building Standards February 2018

NAMING CONVENTION The following table can be used as an example when creating file names for your submission. Drawing Type Discipline Character Example File Names ARCHITECTURAL Cover Sheet ARCHITECTURAL A A0.1 Cover Sheet/Site Plan ARCHITECTURAL A A1.1, A1.2, A1.3 Basement to xxx Elevations ARCHITECTURAL A A2.1, A2.2, A2.3 Elevations Details ARCHITECTURAL A A3.1, A3.2, A3.3 Details Sections ARCHITECTURAL A A4.1, A4.2, A4.3 Sections STRUCTURAL STRUCTURAL S S1.1, S1.2, S1.3 Basement to xxx Elevations STRUCTURAL S S2.1, S2.2, S2.3 Elevations Details STRUCTURAL S S3.1, S3.2, S3.3 Details Sections STRUCTURAL S S4.1, S4.2, S4.3 Sections MECHANICAL / HVAC MECHANICAL M M1.1, M1.2, M1.3 Basement to xxx Elevations MECHANICAL M M2.1, M2.2, M2.3 Elevations Details MECHANICAL M M3.1, M3.2, M3.3 Details Sections MECHANICAL M M4.1, M4.2, M4.3 Sections PLUMBING PLUMBING P P1.1, P1.2, P1.3 Basement to xxx Elevations PLUMBING P P2.1,P2.2, P2.3 Elevations Details PLUMBING P P3.1, P3.2, P3.3 Details Sections PLUMBING P P4.1, P4.2, P4.3 Sections ELECTRICAL ELECTRICAL E E1.1, E1.2, E1.3 Basement to xxx Elevations ELECTRICAL E E2.1, E2.2, E2.3 Elevations Details ELECTRICAL E E3.1, E3.2, E3.3 Details Sections ELECTRICAL E E4.1, E4.2, E4.3 Sections INTERIOR INTERIOR ID ID1.1, ID1.2, ID1.3 Basement to xxx Elevations INTERIOR ID ID2.1, ID2.2, ID2.3Elevations Details INTERIOR ID ID3.1, ID3.2, ID3.3 Details Sections INTERIOR ID ID4.1, ID4.2, ID4.3 Sections eplan Submission Standards 5 Building Standards February 2018

Drawing Type Discipline Character Example File Names SIGN PERMITS SITE PLAN SIGN PERMITS SGN SGN1.1, SGN1.2, SGN 1.3 SITE PLAN ELEVATIONS SIGN PERMITS SGN SGN2.1, SGN2.2, SGN2.3 ELEVATIONS DETAILS SIGN PERMITS SGN SGN3.1, SGN3.2, SGN3.3 ELEVATION OTHER Survey Survey V V1.1 Survey Approved Servicing / Grading Plans Shoring Shoring SHR Fire Protection Fire Protection F Energy Energy EN DOCUMENTS Civil Engineering N N1.1 Grading Plan, N1.2 Servicing Plan File names for documents submitted through eplan Review should include the name of the document. Do not version or rename files when uploading resubmitted files. EXEMPTIONS FROM SUBMISSION STANDARDS In some cases, an exemption from the one of the Submission Standards criteria may be requested on a project by project basis. Written approval must be obtained from the Manager, Plans Review or designate. This approval is required to be uploaded with the submitted drawings and documents. MARK-UP NAME AND COLOUR STANDARDS Standard mark-up names and colours will be used for each reviewing discipline for easy identification. A markup can have one or more change marks. Change marks are created to quickly identify a mark-up and associated comments. Discipline Architectural Zoning Plumbing HVAC Structural Administration / Manager Mark-Up Colour Red Blue Brown Purple Green Orange eplan Submission Standards 6 Building Standards February 2018