Installation Instructions

Similar documents
INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

INSTALLATION INSTRUCTIONS

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS

MPA-9000 Universal Ceiling Projector Mount Kit

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

5 5 8 " 60" 53 8 " " 7" 5 1 2" 7" " FIVE MODELS TO MEET YOUR DESIGN REQUIREMENTS.

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Preference Collection 5543 Central Console INSTALLATION GUIDE

Preference Collection and Treatment Console INSTALLATION GUIDE

Installation Instructions - Model V4JSD 1

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

AUXILIARY FRAMING AND ACCESSORIES

ULTRA SPACE SAVER Installation Instructions

INSTALLATION INSTRUCTION

Installation Instructions

PRE-ENGINEERED HORSE STALL SYSTEMS 4884 HSD STANDARD SLIDING DOOR. & Assembly. Installation Instructions

INSTALLATION INSTRUCTION

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

INSTALLATION GUIDE. 5" Balustrade System

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

APPENDIX FENCE GENERAL NOTES

The following instructions will guide you through the installation of your new vinyl railing stair kit.

Preference Slimline 5536 Utility Console

CSS Central Mount System

Original Gallery System

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

Installation Instruction

Universal flat-panel mount

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

Installation Instructions for. Before You Begin TOOLS REQUIRED

CountryAccents Pergola Assembly Instructions

Leveling Feet, Base Plates and Casters

PORCH-LOC INSTALLATION INSTRUCTIONS

MM750 Installation Instructions

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Preference Collection 5531 Accessory Console I NSTALLATION GUIDE

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

How to Use the Jahn Forming System

ALUMINUM PIPE GUIDERAIL 01/01/

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Installation Instructions

GLOSSARY OF TERMS SECTION 8

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Assembly Instructions

Laser Safety Curtains Page 1 of 5

INSTALLATION INSTRUCTIONS

Universal flat-panel mount

Oxford Stalls Installation Instructions

Installation and Assembly: In-wall Mount for 32" to 71" Flat Panel Screens

Shetland Stalls Installation Instructions

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

The following instructions will guide you through the installation of your new vinyl railing.

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

Vinyl Gazebo Instructions

Track Rack. * Track Racks are not lockable

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

Installation Instructions for 30, 40, and 50 Series Plastic Laminate Toilet Partitions.

DOCK WEDGE - STANDARD

Straight Stringer Installation Instructions

SERIES M MIXER MASTS

PREPARATION & TOOL CHECK LIST

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

STEEL PIPE GUIDERAIL 01/01/

SINGLE TRACK BYPASS (patent pending) barn door hardware

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Mounting a BalanceBox 400 to a brick wall

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

Model #SH & CH SH Pine CH Naturaline

Open Lattice tube Patio Cover- Basic Installation Guidelines

Yardistry. External Display YP *Time required for assembly approximately 1.5-2hrs

Installation and Assembly: In-wall Mount for 32" to 71" Flat Panel Displays

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

SM-RAZOR-F-M/L/XL. Strong Low Profile Fixed Mount for Ultra-Thin Flat-Panel TVs INSTALLATION MANUAL

Office Partitions WARNING. Assembly Instructions. Customer Service A S S E M B LY HARDWARE H1 H2 H3 H4 H5 H8 H9 H10 H11 H12

Assembly Instructions for Model: VMPR1

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

BioPrism Solid Surface

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

Open Lattice tube Patio Cover- Basic Installation Guidelines

Installation Manual for Metal Toilet Partitions Standard Series

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

Assembly Instructions for model: VMPR1

Steel Casework Metal Framing System

TV WALL MOUNT ASSEMBLY GUIDE RF-TVMLPT01V2

ASSEMBLY INSTRUCTIONS TF Tent Flooring System. 125 Taylor Parkway Archbold, Ohio Phone: (419) Fax: (419)

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Spring Loaded All Season Roll-Up Doors

19 to 39 TV WALL MOUNT - FULL MOTION

Baseball Backstopper System

Transcription:

Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16

AVR Installation Notes 1 Safety The AVR Vault Reinforcement System must be installed by qualified personnel who have been trained in proper safety practices. It is the responsibility of the utility or contractor to implement proper work and safety methods. Laminated Wood Systems, Inc. is not responsible for daily work safety practices. ROADWAY 2. Vault Depth 25 COMPACT FILL The maximum post spacing and beam overhang are based on a minimum vault embedment depth of 25 inches as shown at right. Vault embedment of less than 25 inches will require an engineering review. Debris Netting VAULT CEILING PAGE 1

Step 1 Mount AVR-03-A welded brackets to top of the columns using two 5/8 x 8 hex bolts. The bottom ends of the columns may be cut in the field to fit the ceiling height if necessary. NOTES: AVR-03-A Welded Bracket (2) 5/8 x 8 Hex Bolts Support Column For installations requiring columns in quantities other than three, refer to the engineering drawings included in the hardware crate. Listed maximum span lengths are based on maintaining proper ventilation. 3-3 Max Beam Overhang 6-9 Maximum 6-9 Maximum 3-3 Max Beam Overhang Page 2

Step 2 Locate, plumb & temporarily support all support columns using temporary shoring. Support columns should be located as close to the center of the vault as possible. 6 to 8 Feet AVR-01W-ND 6 x 6-3/4 x 7-9 1/2 Wood Column Temporary Shoring (2 x 6 Cut to Length) 3 Hex Screws Variable Variable END VIEW Page 3

Step 3 Plumb & tie together support columns with temporary shoring. Edge of 4 x5 Access Opening (see note below) 6-9 Maximum 6-9 Maximum TOP VIEW NOTE: Beam may be offset within 12 inches and / or rotated as needed provided it does not impede the access opening. Page 4

Step 4 Attach plate AVR-03-B to the columns using one 5/8 x 8 hex bolt as shown in the illustration below below. Lift first support beams into place on top of columns and temporarily secure with 3 hex screws from the back through small holes in the center of the welded brackets AVR-03-A. Lift remaining beams into place as shown and rotate side plates into position and secure with 5/8 hex bolts. NOTE: Refer to material list in hardware crate for specific bracket and beam quantities. AVR-01W-A 3-1/8 x 15 x 8-0 or AVR-01W-A10 3-1/8 x 15 x 10-0 Wood Beams AVR-01W-A 3-1/8 x 15 x 8-0 or AVR-01W-A10 3-1/8 x 15 x 10-0 Wood Beams 5/8 x 8 Hex Bolt 3-3 Max AVR-03-B Side Plate 3-3 Max 6-9 Maximum 6-9 Maximum Attach AVR-03-B side plates as shown using one 5/8 x 8 hex bolt. After beams are in place the side plates are rotated into position and secured. SIDE VIEW Page 5

Step 5A 8-0 x 10-0 Vault Debris Netting Corner Access Opening Application 2-0 (max) 5-1/2 Galvanized Wedge Anchor w/ Eyenut Anchor to Vault Ceiling 6 x 8 Netting 4-0 5-0 Vault Access Area 1/2 x 8 Hex Bolt & 1/2 Eyenut 8 Cable Tie (typ.) (6 Max Spacing) 4 x 4 Netting 5/16 Galvanized Shackle Steps 5A-1 Install galvanized anchors and eyenuts for 4 x 4 netting section 5A-2 Install 4 x 4 netting section securing it to the eyenuts with galvanized shackles 5A-3 Install galvanized anchors and eyenuts for 6 x 8 netting section 5A-4 Install 6 x 8 netting section, draping it over beam, securing it to the eyenuts with galvanized shackles Page 6

Step 5B 8-0 x 10-0 Vault Debris Netting Center Access Opening Application 2-0 (max) 5-1/2 Galvanized Wedge Anchor w/ Eyenut 4 x 4 Netting Anchor to Vault Ceiling 8 Cable Tie (6 max. spacing) 6 x 8 Netting (Folded) 1/2 x 8 Hex Bolt & 1/2 Eyenut 3 x 8 Netting 4-0 Vault Access Area Anchor to Vault Ceiling 5-0 5/16 Galvanized Shackle Steps 5B-1 Install galvanized anchors and eyenuts for 4 x 4 netting section 5B-2 Install 4 x 4 netting section securing it to the eyenuts with galvanized shackles 5B-3 Install galvanized anchors and eyenuts for 3 x 8 netting section 5B-4 Install 3 x 8 netting section, draping it over beam, securing it to the eyenuts with galvanized shackles and cable ties 5B-5 Install galvanized anchors and eyenuts for 6 x 8 netting section 5B-6 Install 8 x 10 netting section (folding it to make a 3 x 8 section), draping it over beam, securing it to the eyenuts with galvanized shackles and cable ties Page 7

Step 5C 8-0 x 14-0 Vault Debris Netting Corner Access Opening Application 2-0 (max) 5-1/2 Galvanized Wedge Anchor w/ Eyenut 8 x 10 Netting (folded) Anchor to Vault Ceiling 4-0 5-0 Vault Access Area 1/2 x 8 Hex Bolt & 1/2 Eyenut 8 Cable Tie (typ.) (6 Max Spacing) 4 x 4 Netting 5/16 Galvanized Shackle Steps 5C-1 Install galvanized anchors and eyenuts for 4 x 4 netting section 5C-2 Install 4 x 4 netting section securing it to the eyenuts with galvanized shackles 5C-3 Install galvanized anchors and eyenuts for 8 x 10 netting section 5C-4 Install 8 x 10 netting section, draping it over beam, securing it to the eyenuts with galvanized shackles Page 8

Step 5D 8-0 x 14-0 Vault Debris Netting Center Access Opening Application 2-0 (max) 5-1/2 Galvanized Wedge Anchor w/ Eyenut Anchor to Vault Ceiling 8 x 10 Netting (Folded) 4 x 4 Netting 5 x 8 Netting Anchor to Vault Ceiling 4-0 1/2 x 8 Hex Bolt & 1/2 Eyenut Vault Access Area 5-0 5/16 Galvanized Shackle Steps 5D-1 Install galvanized anchors and eyenuts for 4 x 4 netting section 5D-2 Install 4 x 4 netting section securing it to the eyenuts with galvanized shackles 5D-3 Install galvanized anchors and eyenuts for 4 x 8 netting section 5D-4 Install 4 x 8 netting section, draping it over beam, securing it with cable clips 5D-5 Install galvanized anchors and eyenuts for 5 x 8 netting section 5D-6 Install 8 x 10 netting section (folding it to make a 4 x 8 section), draping it over beam, securing it to the eyenuts with galvanized shackles Page 9

Step 5E 8-0 x 18-0 Vault Debris Netting Corner Access Opening Application 2-0 (max) 5-1/2 Galvanized Wedge Anchor w/ Eyenut 5-0 8 x 14 Netting (folded) Anchor to Vault Ceiling 4-0 Vault Access Area 1/2 x 8 Hex Bolt & 1/2 Eyenut 8 Cable Tie (typ.) (6 Max Spacing) 4 x 4 Netting 5/16 Galvanized Shackle Steps 5E-1 Install galvanized anchors and eyenuts for 4 x 4 netting section 5E-2 Install 4 x 4 netting section securing it to the eyenuts with galvanized shackles 5E-3 Install galvanized anchors and eyenuts for 8 x 14 netting section 5E-4 Install 8 x 14 (folded to 8 x 10 ) netting section, draping it over beam, securing it to the eyenuts with galvanized shackles Page 10

Step 5F 8-0 x 18-0 Vault Debris Netting Center Access Opening Application 2-0 (max) 5-1/2 Galvanized Wedge Anchor w/ Eyenut 8 Cable Ties (6 max. spacing) 4 x 4 Netting 8 x 14 Netting (Folded) 7 x 8 Netting Anchor to Vault Ceiling 4-0 1/2 x 8 Hex Bolt & 1/2 Eyenut Vault Access Area 5-0 5/16 Galvanized Shackle Steps 5F-1 Install galvanized anchors and eyenuts for 4 x 4 netting section 5F-2 Install 4 x 4 netting section securing it to the eyenuts with galvanized shackles 5F-3 Install galvanized anchors and eyenuts for 8 x 8 netting section 5F-4 Install 8 x 14 netting section (folding it to make a 8 x 8 section), draping it over beam, securing it with galvanized shackles and cable ties 5F-5 Install galvanized anchors and eyenuts for 7 x 8 netting section 5F-6 Install 7 x 8 netting section, draping it over beam, securing it to the eyenuts with galvanized shackles Page 11

Step 6 * Debris Netting Threaded Rod Assembly Upper Hex Nuts Lower Hex Nuts Using a wrench, rotate the upper hex nut (see diagram below) clockwise to raise the rod assembly against the support beams. Continue rotating both upper hex nuts until the support beam is firmly pressed against the vault ceiling. Hand tighten the remaining hex nuts against bottom of bracket to temporarily secure the rod assemblies. Upper hex nut used as locknut Upper hex nut used to raise AVR beam Lower hex nuts used as locknuts END VIEW * Any void in ceiling more than 1-1/2 wide, 5 wide, and 18 long shall have a field cut wood shim added in the center of the void. Page 12

Step 7 Field drill holes in the support beams and install 7/8 hex bolts to secure the support beams to the plates as shown. Field Drill 15/16 Diameter Holes 7/8 x 10 Hex Bolts 7/8 x 10 Hex Bolts SIDE VIEW Page 13

Step 8 VAULT CEILING Using a wrench, loosen nuts and lower Rod Assemblies as shown at right. Rod Assembly Step 9 Measure each gap between the beams and top of columns. Using the AVR-01W-B 4-1/2 x 6 x 6-0 Filler Block beam supplied with the AVR System, trim the 4-1/2 thickness to tightly fit this gap. Cut each section to a mimimum of 18 in length. Insert filler blocks into each gap. Gap between bottom of beam and top of column VAULT CEILING Support Beam Filler Block Step 10 Using a wrench, raise the rod assemblies tightly against the spacer blocks. Permanently secure the rod in place by tightening remaining hex nuts. VAULT CEILING Rod Assembly Page 14

Step 11 Drill 5/16 x 3 pilot holes in support beams. Attach angles to the support beam at the ceiling (see step 12 for placement). Attach angles to the base of the support columns at the floor. AVR-01-A Stainless Steel Angle 5/8 x 6 Stainless Steel Wedge Anchor (5/8 x 3-1/2 Pilot Holes in concrete) 5/8 x 8 Hex Bolt AVR-05-A Stainless Steel Angle AVR-01-A Stainless Steel Angle 5/8 x 6 Stainless Steel Wedge Anchor (5/8 x 3-1/2 Pilot Holes in concrete) 5/8 x 10 Hex Bolt 5/8 x 8 Hex Bolt END VIEW 5/8 x 10 Hex Bolt 5/8 x 8 Hex Bolt 5/8 x 6 Stainless Steel Wedge Anchor (5/8 x 3-1/2 Pilot Holes in concrete) Page 15

Step 12 Complete installation by removing temporary shoring and attaching safety caps to adjustable rods as shown below. 6 + 12 + 12 + 6 + AVR-01-B Safety Cap SIDE VIEW Page 16