Greater Fort Lauderdale Alliance PERMIT SUBMITTAL REQUIREMENTS for BROWARD COUNTY'S 31 MUNICIPALITIES

Similar documents
Greater Fort Lauderdale Alliance PERMIT SUBMITTAL REQUIREMENTS for BROWARD COUNTY'S 31 MUNICIPALITIES

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS

Information package for obtaining a building permit

INFORMATION FOR OBTAINING A BUILDING PERMIT

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

Residential Room Additions

Conceptual, Preliminary and Final Site Plan Review in Holladay City

INFORMATION FOR OBTAINING A BUILDING PERMIT

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

INFORMATION FOR OBTAINING A BUILDING PERMIT

Single-Family Dwelling Submittal Requirements

APPLICATION FOR SITE PLAN REVIEW

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

A/C Change-Out Permit Guidelines - Residential

PLAN SUBMITTAL REQUIREMENTS

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Section Meetings Section Material and Equipment. None Required

SUBDIVISION PLAT APPLICATION

Commercial Infill Project Guide

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

Residential Room Addition / Remodel Submittal Requirement Checklist

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

SECTION 2 GENERAL REQUIREMENTS

DESIGN REVIEW PROCESS AND APPLICATION

Architectural Design Process

CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

Architectural Review Board Application For Modifications & Renovations

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

COMMERCIAL PERMIT APPLICATION GENERAL REQUIREMENTS

PLANNING AND DEVELOPMENT

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

UPDATE TO ARCOM SUBMITTAL REQUIREMENTS - JULY 2018

January, 2014 Page 1 of 5

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

ADDENDUM #2 September 12, 2018

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Applying for a Site Development Review

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

ARB Submittal Package Checklist

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Checklist for Minor Plan Modification

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

SECTION SUBMITTAL PROCEDURES

TOWN OF FLEMING 2433 Dublin Road, Auburn, NY Phone (315) , Fax (315)

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Answer: Qualification statement should be provided with the bid.

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES

Promontory Architectural Review Committee

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Residential Construction Checklist Single and Two Family Construction

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Tri-County Commercial Application Checklist

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

SIGN PERMIT APPLICATION

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Applying for a Site Development Review (Sign CVCBD only)

PROCEDURE FOR PROCESSING WORKING DRAWINGS

NEW SINGLE FAMILY HOMES

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

Baseline Performance REFERENCE GUIDE. Performance Measures Program

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

ADMINISTRATIVE DESIGN REVIEW Information

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

SECTION SUBMITTAL PROCEDURES

East Central College

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

SITE PLAN APPLICATION

Tenant Improvement. Training in the fundamentals of Commercial Construction

SECTION ADMINISTRATIVE REQUIREMENTS

SITE PLAN REVIEW GUIDELINES Rev. 2016

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

Transcription:

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Coconut Creek (7/27/15) EPD submittal / not Allow 1 NOC Not Coconut Creek Bldg. Dept is CLOSED on Friday. Contractor must be registered. None must Contractor must be registered. - Need Plan Re-submittal Form - INSPECTIONS: The City provides emergency inspection services upon request www.coconutcreek.net Cooper City (5/20/2015) EPD submittal / not Allow 1 NOC Not Insur is None must - Need Re-submittal Form - Use Re-submittal Form for 'Corrections' - Signatures Not required www.coopercityfl.org Coral Springs (7/8/2015 & updated 3/8/16) approval is not required at Approval is approval is not required at Approval is first inspection. office. 1 orginal needs to be submitted to the Bldg. Department. If NOC Not signed by Owner signature is required if the construction value is over $2,500. Insur is Signatures need to be. None required if interior alerations except patio enclosures. 2 copies are required at A design professional is commercial projects If required by code. Must be signed & sealed by professional property owner. & sealed by a professional stamped/original signed approved DRC 4 sets need to be provided. Owner or Autorizative Company Agent Two sets Sub Trade permits do not require Owner signature. City supplemental form needed as well as the contract. Requires additional City submittal form and copy of the contract. Not required at Required at first inspection. Must be signed & sealed by a professional - Need 2 sets of plans showing clouds and deltas for the changes www.coralsprings.org Dania Beach (6/26/15) You may submit concurrently to EPD approval, however, EPD approval must be received prior to issuance of the permit Elevator, you may submit concurrently to approval, however, approval must be received prior to issuance of the permit permti issuance. NOC Not Must include Insur is None If required by code must be s/s by must Two paper sets application Electronic PDF copies required at CO. Must include may be required - Signatures Not required www.ci.dania-beach.fl.us

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Davie (5/07/15) You may submit prior to EPD approval, however, EPD approval must be received prior to issuance of the permit Elevator, you may submit prior to approval, however, approval must be received prior to issuance of the permit issuance of permit. Not required if under $2,500. Must be in ink, with all fields filled out. Owner and Contractors signatures. Unless you are already in our system, a copy of Lic & Insurance is Broward Property Appraiser print-out sheet Current s/s 2 copies None engineer if If required by code, must be s/s by must engineer if You may submit prior to DRC approval, however, P&Z will not approve the plans until you have DRC approval. Two sets if submitting paper You may submit electronically. Must be in ink, with all fields filled out. Must be Unless you are already in our system, a copy of Lic & Insurance is and have statement that they have been DOR And must have statement of DOR. - Signature is www.davie-fl.gov Deerfield Beach (8/27/2015) EPD submittal / not Allow 1 NOC Not Insur is None None Required for change in occupancy. Change in space cooling or aded energy usage May be required for interiors also work May be required for interiors also work Product Approval Review Form - Signatures Are Required for new additions. www.deerfield-beach.com Fort Lauderdale (6/12/2015) 3 Additional catagories If required must be submitted. See attached. *** Changes have been made to this process which must be verified by EPD. prior to Bldg. Dept. for review. Recorded N.O.C. submitted to the Department prior to first inspection if job cost exceeds $2,500. *** Florida Statutes does not require a recorded N.O.C at the time of application. It must be on site for the 1st inspection. Contractor must be registered with Department. Required for change of occupancy, Change in space conditioning, and renovations 30 % of the assesed value of the structure. 2 copies. must owner and permit holder. None We have an updated form available online. In some cases- a special inspector is required as per FBC 110.10 S/S for all new residential structures and may be required as per FBC 107.3 Buoyancy calculations installation of tanks in Special Flood Hazard Areas. Change of Use Three sets if utilizing private company hired by the City to provide expedited review for a premium. Must be approved by the designer of record if part of a full set of Required for and premanufactured items such as sheds, All roofing products must have an NOA along with a complete roofing package as per FBC Chapter 15. All individual engineering sheets must be s/s by designer of record. Must be prepared Shop Drawings by - Need Permit installing trade. - Need 'Extra' stamped set. - Owner is required to sign - All voided sheets must be removed from each set - Revised date and revision # must be on each revised sheet. Required for new Tree survey and appraisal for existing trees onsite. additions. Floodproofing certificate required when floodproofing nonresidential new additions. V-Zone Certificate V-Zone new additions. Not required if interior non improvement(s). Any work done in right of way requires a separate permit application. www.fortlauderdale.gov http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 2 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Hallandale Beach (6/15/2015) EPD concurrent submittal/approval requirement at Create Master Account on line. Schedule Inspections online. Walk-thru M-F 8-9 am. Submit asbestos for interior or re-roof before permit issuance. Elevator concurrent review/approval NOC is not required at submittal but at first inspection. Need to submit 1 certified original copy for work valued over $2,500 or $7500 for A/C work. s signed by contractors prior to Executed contract for job value or RS Means. Zoning Review as applicable. None required if interior alterations. Final survey new construction/ Elevation certificate additions or improvement for Final Elevation Certificate new construction or improvement.. Commercial required s/s. Residential optional unless a design professional takes responsibility. Two sets of Energy Calcs. must DRC approved plans not required for building permit submittal or review. Two sets Property owner signature. No Update. Shop Drawings must be reviewed/approved by designer of record. May be submitted as a shop drawing after - Narrative not required but helpful - Changes must be clouded and deltas. www.hallandalebeach.org Hillsboro Beach (6/29/2015) EPD submittal / not Allow 1 $7,500 for AC NOC Not Insur is None Hillsboro Beach requires three sets of Energy Calcs. must Not required on retrofit work. www.townofhillsborobeach.com Hollywood (12/16/2015) EPD approval permit issuance, when applicable. Elevator Approval Bldg. Dept. approval when applicable. Recorded N.O.C. submitted to the Department and posted on jobsite prior to first inspection if job cost exceeds $2,500, or A/C repair or replace $7500 or more. The NOC is not permit issuance but is required to be able to schedule the first inspection. Permit applications in their entirety and must be signed by Property Owner/Agent & Proof of license & insurance is If the value of the work is less than 2,500 only the contractor needs to sign. Current s/s survey and elevation certificate new buildings, structures, additions and site work. An s/s elevation certificate is required on any work that might be a improvement, interior or exterior. Spot s/s survey required before first tie beam inspection with noted slab elevations of new buildings or additions. Final s/s survey and elevation certificate required prior to final of new buildings, structures, additions and site work. 2 sets when and sealed by special inspector and must be signed by Property Owner and the Two copies must be sealed by the engineer of record. Projects must go through a Preapplication Conceptual Overview (PACO) and then on to the Technical Advisory Committee (TAC) prior to applying for the Permit. Notarized affidavit required from Property Owner authorizing agent to be able sign on behalf of Property Two Sets Permit applications in their entirety and must be signed by Property Owner/Agent & Proof of license & insurance is If the value of the work is less than 2,500 only the contractor needs to sign. All NOA s must be design professional of record if they are part of a designed set of If the NOA's are for replacement permits which do not require professionally designed plans, then they are not required to have the approval. Must provide two completed HVHZ uniform roofing permit applications and attachments as Truss package (engineered truss design and layout) must be s/s by truss designer of record. signed and sealed sprinkler drawings and hydraulic calculations. Cut sheets all components used. - Need the Transmittal Form filled out for all submissions including initial submission, corrections, revisions and documents. - Need designer of records narrative, plans clouded and deltas noted for corrections and revisions. - Department hours Mon, Tues, Thu and Fri 8am to 4pm, Wed 8am to 3:30pm Elevation Certificate req'd for Substantial Improvements or Substantial Damage determination and prior to final for compliance with project plans of new buildings and additions. Flood proofing certificate required when flood proofing nonresidential new additions. V-Zone Certificate required for V-Zone new additions. No documents required for only interior non improvements. Landscape review required for all new buildings and for any work(interior or exterior) with a value of $20,000 or more. Any work done in right of way requires a separate permit application. www.hollywoodfl.org http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 3 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Lazy Lake (6/29/15) EPD submittal / not Allow 1 $7,500 for AC NOC Not Insur is None must Not required on retrofit work Required for new additions. Floodproofing certificate required when floodproofing nonresidential new additions. V-Zone Certificate V-Zone new additions. Not required if interior non improvement(s). Tree survey and all landscaping to be submitted. Any work done in right of way requires a separate permit application. Web Site TBD Lauderdale-By-The-Sea (6/11/15) EPD submittal / not Allow 1 NOC Not Use town form available on line. Require construction time limit form signed by owner and contractor. None Elevation certificate, base flood elevation flood zone must Need Architect's Narrative. Need clouds and deltas. www.lauderdalebythesea-fl.gov Lauderhill (5/21/15) EPD submittal / not Allow 1 NOC Not Permit forms not available on-line. Lauderhill Bldg Dept is CLOSED on Friday. None must building official lauderhill-fl.gov http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 4 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Lauderdale Lakes (8/13/15) EPD submittal / not Allow 1 NOC Not Lauderdale Lakes will accept Applic without recorded copy of NOC. None Requires three sets of Energy Calcs. Must be s/s by None required if for interior and sealed by engineer, once approved by Official. Not required if interior architect. Not required by interior Must include values, SF and quantities signed by trade contractor. Copy license and insurance required - Need Architect s Narrative - Use Transmittal Form for Corrections which must be signed by architect or www.lauderdalelakes.org Lighthouse Point (6/29/15) EPD submittal / not Allow 1 office. Secure 1 NOC Not Lighthouse Point will accept Applic without recorded copy of NOC. Must be in ink. Insur is contract req. Current copies None Owner must sign Zoning affadvit if survey is more than 1 year old and still accurate. engineer or architect. May be interiors also work Owner signature. Retaining walls and drainage require 3 sets. Must be in ink. contract Must prepare PA review form. complete package with roof NOA's and roof prepared Shop Drawings by installing trade. - Signature is required - A non-refundable deposit is required with every application package. www.lighthousepoint.com Margate (6/11/15) EPD submittal / not Allow 1 NOC Not Insur is Proof of Ownership & Cost documents reqd in Margate. Margate CLOSED Friday. None Margate requires three sets of Energy Calcs. must May apply for a building permit prior to DRC/Final Site Plan approval, however, zoning staff will not approve the building permit application until the DRC/Final Site Plan process is complete. DRC may be required for interior buildout, depending on use - Signature is www.margatefl.com Miramar (6/9/15) EPD submittal / not Allow 1 NOC Not Proof of Ownership document signed Contract. ERC Letter and Miramar Impact Fee Paid Receipt. CLOSED on Friday. Schedule of values for permit pricing subcontractors None must interiors Welding supervision when additional supports of bar joists are required DRC not required for Four sets. Must be reviewed and approved by architect. - Need Revision Coversheet form in color - Signatures Not required - If sealed original, new to be sealed also www.ci.miramar.fl.us http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 5 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements North Lauderdale (6/29/2015) EPD submittal / not Allow 1 $7,500 for AC NOC Not Insur is None must Not required on retrofit work www.nlauderdale.org Oakland Park (6/19/15) EPD approval Bldg. Dept. approval and issuance of Bldg. permit Elevator Div. approval Elevator Permit issued and inspection done by Elevator Div. Must be recorded Quantity, value & and posted before square ft. 1st inspection Survey required on most building permits. Interior work only exception. 2 sets, signed & sealed when Required as per code for specific structural items. & sealed by Engineer. Submit DRC approval information with review. Form must be notorized. Two sets required Submitted and sealed. approved before master permit is issued. Submitted when exterior components of building. Submitted with roof permit application package. Signed and sealed by Submit hydraulic calcs and cut sheets of all devices and - Plan Review - Permit or form not required - Need corrected office and job copy plans (pages) - Bind and submit all voided pages (saved for reference) - Comment response information (letter/list). www.oaklandparkfl.org Parkland (7/15/15) EPD submittal / Elevator Approval Recorded N.O.C. submitted to the Department prior to first inspection if job cost exceeds $2,500. If value of Work is under $2,500, NOC Not Must be completely filled out. Must be by both the Qualifier and All Contractor's must be registered with the City and provide current Lic & Insur. Also application needs to include all subcontractor to be used on the project. None Residental signed by owner/agent and by individual that prepared them. Commercial engineer for struc, mech, plumb & elec. May be interiors also work. must May be interiors also work May be interiors also work DRC not required for Two sets minimum. Must be completely filled out, Must prepare Schedule / Comparison Chart for Windows, Doors, Louvers, Shutters, Must be approved by architect for new construction. Both the single engineering sheets or summary chart and map/lay out must be s/s by truss Plans must be s/s by Engineer. Must have hydraulic calcs and cut sheets of all devices and - Need Change-of-Plan coversheet - Need Permit signed by each trade and owner - Need Architect's/Engineer's sheets s/s with clouds and deltas. www.cityofparkland.org Pembroke Park (5/20/15) EPD submittal / not Allow 1 NOC Not Must prepare and print on-line Permit. Permit s shall have original signatures, not photocopies. All permit masters shall have subtrade permits included in package. None must - Need on-line Permit - Department hours of operation M-F 7:30 am - 4:00 pm (closed 12 pm-1:00 pm). Department number is 954-966-4600 x 211. www.townofpembrokepark.com http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 6 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Pembroke Pines (6/29/15) EPD submittal / not Allow 1 NOC Not Dept. CLOSED on Friday. None must REVISIONS www.ppines.com Plantation (4/29/15) approval submittal to the Bldg dept. approval submittal to the Bldg dept. Required by first inspection after issuance of permit for jobs exceeding $2,500 ($7,500 for A/C replacements) Must be completely filled out. Must be by Qualifier and signed by Owner/Tenant or submit a copy of contract. Contractor must be registered and all licenses and insurance up to date. most recent survey required, (exclusions may apply) Engineer, when applicable (3 sets required) Must be approved by Official prior to issuance of permit. Forms must be s/s by Engineer, when applicable. Not required at time of permit and by 3 sets Must be completely filled out. Must be by Qualifier and signed by Owner/Tenant/G C. Contractor must be registered and all licenses and insurance up to date. Must provide Product Approval Review form or must be stamped by Architect, when applicable. Must provide complete HVHZ Shop drwgs must Revisions/Supplemental: be prepared by uniform package, include all calcs installing trade. (2 sets minimum) plan (2 sets minimum) - Permit application required by Qualifier, signature not required by owner/tenant (required on supplemental) - Need Architects narrative, clouds and deltas, need to bring original approved set of www.plantation.org Pompano Beach (5/20/15) EPD submittal / Number. Impact not Allow 1 irst inspection NOC Not Pompano will accept Applic without recorded copy of NOC. or blue ink. Insur is Pompano requires Fire Review. None must Or as required during the review process. And when the work is structural in nature One set. Pompano requires one set, or direct download, since is 100% electronic. or blue ink. www.mypompanobeach.org Sea Ranch Lakes (7/23/15) EPD submittal / not Allow 1 NOC Not Insur is None must Required if review reveals necessary - Need new application if value changes for scope of work - Arch. to cloud and detail Web Site TBD http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 7 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Southwest Ranches (5/17/15) EPD submittal / not Allow 1 first inspection.. NOC Not A/C repair or replace $7500 or more Permit applications in their entirety. Must Owner/Agent & Proof of license & insurance is every Except Revisions. Check payment at the time of drop off. None must GC Qualifier can sign for Permit applications and all License's & insurance for every submittal must be attached. and sealed/ stamped by designer of record /architect. - Permit is required - Owner not required to sign - Do Not return Void sheets unless a stamp is on the back - Check payment at the time of drop off Per the requirments in the FBC 2014 www.southwestranches.org Sunrise (6/12/15) EPD approval permit issuance, when applicable. Elevator Approval Bldg. Dept. approval when applicable. Recorded N.O.C. submitted to the Department and posted on jobsite prior to first inspection if job cost exceeds $2,500, or A/C repair or replace $7500 or more. Permit applications in their entirety. Must Owner/Agent & Proof of license & insurance is Current sealed copies when 2 sets when and sealed by special inspector and must be signed by and sealed by original approved None Two sets Permit applications in their entirety. Must Owner/Agent & Proof of license & insurance is Must designer of record for compliance with design for all pre-manufactured products such as, but not limited to Must provide complete HVHZ uniform roofing permit application form and attachments as required by form. (2 sets minimum) The truss system shop drawing requires the seal of an Engineer, and shall be reviewed and accepted by the Architect or Engineer of record for conformance to design concepts and load interaction with the building. signed and sealed sprinkler drawings and hydraulic calcs. Cut sheets all components used. - Permit application must be filled out for revisions - Need narrative and all changes must be clouded and deltas added. www.sunrisefl.gov Tamarac (5/08/15) EPD submittal / not Allow 1 Plans can be submitted on line using epermits system NOC Not NOC required to be submitted before permit is issued Color must be secured from. a signed 'Cost of Construction' Affidavit. s can be downloaded from our Bldg. Dept. Website and submitted on line using the epermits system None must Special Inspector forms must show type of inspections to be performed by the Special Inspector. Once approved by DRC, DRC plans are not required to be submitted for building permits. Approvals are documented in the epermits system. Tamarac uses epermits system. No paper plans are Plans can be submitted via the epermits system. If paper plans are submitted, (up to 3 large pages) we will convert them into the Electronic system for an additional charge. Permits having more than 3 large pages shall be submitted on line or brought in on a flash drive or CD. All applications and paperwork submited by Trade Contractors can be submiited online using the epermits system Must be reviewed and approved by architect if they are part of a desingned set of plans. Windows, Doors, Louvers, Shutters, If the NOA's are for a replacement permits for Re-roof, they are not required to have the approval of the architect. They can be submitted on line. designer of record and include all calcs. None required if Interiors - Predevelopment meetings available upon request - Department is a peperless department as of Marc 2014 - All permits are done electronically via the epermits system - All paperwork a permit shall be submitted online - All reviews are also done online with the customer having the ability to view the comments live via the computer. www.tamarac.org http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 8 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Weston (1/29/2016) EPD concurrent submittal/approval requirement at Create Master Account on line. Schedule Inspections online. Walk-thru M-F 8-9 am. Submit asbestos for interior or re-roof before permit issuance. not Allow 1 is not required at submittal but at first inspection. Need to submit 1 certified original copy for work valued over $2,500 or $7500 for A/C work. The Broward County Uniform. Must be completely filled out. Must be by Qualifier and Property s shall have original signatures, not photocopies. Unless you are already in our system, a copy of Lic. & If value of Work is less than $2500.00, only the contractor needs to sign Current s/s two copies Improvements, fence, driveway, pool, slabs, 2 Originals surveys for new constructions. Engineer or Architect and must (2 sets required). None Engineer or Architect and must. must (2 sets required). The Broward County Uniform. Must be completely filled out. Must be by Qualifier and Property s shall have original signatures, not photocopies. Unless you are already in our system, a copy of Lic. & If value of Work is less than $2500.00, only the contractor needs to sign. and have statement that they have been DOR And must have statement of DOR. For correction: - Need DOR Narrative - Need one void set - Separate check required Per trade - Contractor must be registered and all licenses and insurance up to date Required for new additions. For new S FR we For Commercail required one set of projects, plans for review Engineering and approval. Permit approval Landscaping is requested prior review on to permit Commercial issuance. project is part of the Engineering Permit www.westonfl.org West Park (6/29/15) EPD submittal / not Allow 1 NOC Not Insur is None must - Need Permit Applic and Transmittal form - Need one set Void sheets - Above also applies to plan 'Corrections' www.cityofwestpark.org Wilton Manors (7/02/2015) EPD submittal / not Allow 1 NOC Not Bldg. Dept is CLOSED on Friday. Inspections are scheduled for Friday. Open Monday thru Thursday 7 AM to 6 PM Must be in Black ink. Insur is None must, piping diagraham - Permit application required - Plans s/s by original design professional - Updated Permit - Open until 6pm and inspections are conducted on Fridays. www.wiltonmanors.com http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 9 of 10

Municipality EPD Elevator NOC Surveys Calcs Forms Calcs Plans Letter s/s Sets s NOA (HVC) Shop Dwgs Alarm Dwgs Comments Certifications Requirements Requirements Unincorporated (6/15/2015) EPD submittal / not Allow 1 $7,500 for AC NOC Not Insur is Current s/s two copies two sets required must Exemptions may apply two sets required Not required on retrofit work Two set required www.co.broward.fl.us http://www.gflalliance.org/businessassistance/streamlined-development-review-permitting-process Page 10 of 10