Volume V of V SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO APRIL, 2012

Similar documents
CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP

Volute Dewatering Press as a New Technology. Bill LaPorte, Envirep, Inc.

Appendix B. Historical Aerial Photograph Review

TOBERMORY SEWAGE LAGOON

Dewatering Case Study Rotary Press Versus Screw Press

Scope of Work Temecula Valley Regional Water Reclamation Facility 23 MGD Expansion Engineering Services During Construction

Company Profile. Industry Leader in Design and Manufacture of Filtration Equipment.

Piloting for Evaluation of Innovative Residuals Dewatering Technologies. Presented By: Jay Surti, PE, Northeast Residuals Practice Lead

MD PRESS Advanced Wastewater Solutions

Switch rated equipment connectors for the Water & Waste. Industries

710 AVIS DRIVE WASTEWATER TREATMENT PLANT PHONE: FAX: INCINERATOR SCRUBBER REPLACEMENT

Plan Review and Standards

ADDENDUM NO. 2 CITY OF FREDERICK PURCHASING DEPARTMENT 111 Airport Drive East Frederick, MD (301)

MANUAL FOR MULTIPLE GUITAR RACK STAND RS B/1 FP, RS B/1 FP & RS B/1 FP

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

SECTION IDENTIFICATION DEVICES

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

ADVANCES IN INDUSTRIAL SUBSTATION DESIGN USING THREE WINDING POWER TRANSFORMERS

PCJWSA DAILY OBSERVATION REPORT

First Draft Language

CS3 represents manufacturers of products for use in the municipal waterworks industry.

Wiring Instructions for 10, 16 & 20 Function, 92 & 93 Series, FET Receivers.

Subdivision Application Checklist

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

MOPAR w/ PS w/o AIR PUMP SDA

RRC POWER & ENERGY STATEMENT OF QUALIFICATIONS. experience matters

COOLANT WASTE MINIMIZATION USING A COALESCING PLATE SEPARATOR

Grading, Erosion and Sediment Control (GESC) Checklist

1 REF PART NO DESCRIPTION REMARKS QTY

Compressed Air System Packages

HUSSEY GAY BELL SAVANNAH, GEORGIA

Onsite Mobile AC High Voltage Test System

Option Setting Level #1 Programming Chart For Standard Valves. Regeneration Time Example: 2:00 A.M. [ 2:00]

CIE4485 Wastewater Treatment

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Dewatering Innovations Bill Boggia, ORNL-UCOR/ATL International

HANSCOM FIELD ARFF AND CBP BUILDING

Acquisition of HR Textron

APPLICATION FOR SITE PREPARATION PERMIT

Application Note. Detection of Partial Discharge Using Ultrasound. Detection of Partial Discharge Using Ultrasound. Problem. iriss.

FUSS-EMV 3-phase sinusoidal filter 4 A ac 400V + 25% from: 3kHz to: up to 120Hz In housing

extending green Arka BRENStech Private Limited

VICINITY MAP LOCATION MAP GRAPHIC SCALES

Lincoln County Public Works Water and Sewer Submittal Application

INDUSTRIAL FABRICS. Geotube Dewatering Technology. Dewatering Systems. Geosynthetics. Protective & Outdoor Fabrics. Aerospace Composites

Isolation (ISO), Special Overvoltage functions protection (OP) Voltage measurement PAD-V8-P 8 Voltage, up to ±50 V BW: 6 Hz ISO: 350 V DC

UNIVERSITY OF WISCONSIN - PLATTEVILLE COMPREHENSIVE MASTER PLAN ELECTRICAL LOAD FLOW STUDY

Touch and Step Voltage Measurements on Field Installed Ground Grid Overlaid with Gravel and Asphalt Beds

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

Sludge dewatering. Wolfgang Stump Öko-control GmbH; Burgwall 13a; D Schönebeck

Oil&Gas Subsea Production

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

PALM COAST WASTEWATER TREATMENT PLANT NO. 2

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

MODEL 6700 Upflow - V2.0

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

INDUSTRIAL FABRICS Dewatering Systems. TenCate Geotube Dewatering Technology

Distribution System Development & Preliminary Studies

INSTALLING T400 LOAD SENSORS

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

Electrical Arc Hazards

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

B17. Sewer Site Plans BULLETIN

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

PME specialises in developing, implementing and maintaining solutions to the Mining industry.

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M OCTOBER 7, 2013

City of Massillon Site Plan Checklist

DWA Set of Rules. Guideline DWA-M 366E. en.dwa.de. Mechanical Dewatering of Sewage Sludge. February Maschinelle Schlammentwässerung

CITY OF JOLIET ADDENDUM NO. 1 LOCAL AREA NETWORK (LAN) HARDWARE RFP

Union Academy 1795 Wabash Street Bartow, FL 33830

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

How to get the most out of your dewatering equipment. Dr. Mohammad Abu-Orf, Residuals Group Practice Leader

Appendix A Site Reconnaissance Photographs

installation manual Gough Plastics freecall

Product Specifications

VHLP1-80-xxx. Product Classification. General Specifications. Electrical Specifications

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

Indaver Impex, your partner in sludge dewatering

Product Specifications

PD Solutions. On-Line PD Measurement Devices

Fleet of our own Semi Trucks to reach all states. 80,000 sq. ft. 125,000 sq. ft. 12 Crane Building 25,000 sq. ft. Office Space.

MANUFACTURERS & EXPORTERS OF COPPER BRAIDS & COPPER LAMINATED CONNECTORS

Product Specifications

STANDARDIZING ARC FLASH PPE LABELS

Low voltage switchgear

boost productivity. stay on GrADe. CAt ACCuGrADe

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Electric Service Guide. Residential Subdivision

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

RX23664/130.1 Project Name Building Name AIC Reference Number. Patient Room Plans Title BGA Job Number. Milwaukee, WI. Geographic Location

ELECTROMAGNETIC EMISSION COMPLIANCE REPORT

AUCTION. Wednesday, June 8 10:00 AM. Woodworking Machinery Material Handling Equipment Warehouse Equipment.

Shaft Absolute Vibration Monitor Specifications

2.1GHz. 2.1GHz 300nA RMS SFP OPTICAL RECEIVER IN+ MAX3748A IN- RSSI DISABLE LOS DS1858/DS1859 SFP. Maxim Integrated Products 1

Precast Concrete Pavement

Development of power transformer design and simulation methodology integrated in a software platform

ULIAN KISSIOV 476 PRESIDENTIAL LANE MADISON, WISCONSIN PHONE: NORTH

The Catalina OPTIONAL ELEVATION C. Rendering is Artist s Conception. *Rendering is an artist s conception and is for illustrative purposes only.

Transcription:

in association with FINAL REPORT SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO. 11-6501 APRIL, 2012 Final Submittal This document is released under the authority of William Sako, P.E., #93283, for review purposes only. Not intended for permit, bidding or construction. Date: April, 2012 Firm Registration No. F-2593 Volume V of V PLANT ONE-LINE DIAGRAMS

SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER TABLE OF CONTENTS VOLUME I Executive Summary Project Goals & Objectives Electrical System Condition Evaluation Appendix A Electrical Equipment Assessment Appendix B Instrumentation & Control (I&C) Assessment VOLUME II Short Circuit Study VOLUME II A Appendix D SKM Short Circuit Analysis Report VOLUME III Protective Device Coordination Study VOLUME IV Arc Flash Study Load Flow Analysis VOLUME V Plant One-Line Diagrams San Antonio Water System Gupta & Associates Dos Rios Water Recycling Center TOC Volumes I -V - 1 TBPE #F-2593

VOLUME V Plant Electrical Power Distribution One-Line Diagram FIG-2.1-1 FIG 2.4-1 Substation No. 1 One-Line Diagram & Elevation FIG 2.4-2 MCC- PS-1 Elevation FIG 2.4-3 MCC-PS-1 One-Line Diagram FIG 2.4-4 MCC-PS-1A Elevation FIG 2.4-5 MCC-PS-1A One-Line Diagram FIG 2.4-6 MCC-RS-1 Elevation FIG 2.4-7 MCC-RS-1 One-Line Diagram FIG 2.4-8 MCC-SG-1 Elevation FIG 2.4-9 MCC-SG-1 One-Line Diagram FIG 2.4-10 Elevation & One-Line Diagram FIG-2.4-11 MCC-B1 Elevation FIG 2.4-12 One-Line Diagram FIG 2.4-13 MCC-A Elevation and One-Line Diagram FIG 2.5-1 Substation No. 2 One-Line Diagram & Elevation FIG 2.5-2 MCC-PS-2 Elevation FIG 2.5-3 MCC-PS-2 One-Line Diagram FIG 2.5-4 MCC-PS-2A Elevation FIG 2.5-5 MCC-PS-2A One-Line Diagram FIG 2.5-6 MCC-RS-2 Elevation FIG 2.5-7 MCC-RS-2 One-Line Diagram FIG 2.5-8 MCC-RS-2A Elevation FIG 2.5-9 MCC-RS-2A One-Line Diagram FIG 2.5-10 MCC-SG-2 Elevation FIG 2.5-11 MCC-SG-2 One-Line Diagram FIG 2.6-1 Substation No. 3 One-Line Diagram & Elevation FIG 2.6-2 MCC-AT-1 Elevation FIG 2.6-3 MCC-AT-1 One-Line Diagram FIG 2.6-4 MCC-AT-1 Elevation San Antonio Water System Gupta & Associates Dos Rios Water Recycling Center Page TOC II - 1 TBPE #F-2593

FIG 2.6-5 MCC-AT-1A One-Line Diagram FIG 2.6-6 MCC-RS3 Elevation FIG 2.6-7 MCC-RS3 One-Line Diagram FIG 2.7-1 Substation No. 4 One-Line Diagram & Elevation FIG 2.7-2 MCC-AT-2 Elevation & One-Line Diagram FIG 2.7-3 MCC-AT-2A Elevation FIG 2.7-4 MCC-AT-2A One-Line Diagram FIG 2.7-5 MCC-RS-4 Elevation FIG 2.7-6 MCC-RS-4 One-Line Diagram FIG 2.8-1 Substation No. 5 One-Line Diagram & Elevation FIG 2.8-2 MCC-OC-1 Elevation FIG 2.8-3 MCC-OC-1 One-Line Diagram FIG 2.8-4 MCC-FT-1 Elevation FIG 2.8-5 MCC-FT-1 One-Line Diagram FIG 2.8-6 MCC-PD-1 Elevation FIG 2.8-7 MCC-PD-1 One-Line Diagram FIG 2.8-8 MCC-PD-3 Elevation FIG 2.8-9 MCC-PD-3 One-Line Diagram FIG 2.9-1 Substation No. 6 One-Line Diagram & Elevation FIG 2.9-2 MCC-PD-2 Elevation FIG 2.9-3 MCC-PD-2 One-Line Diagram FIG 2.9-4 MCC-FT-2 Elevation FIG 2.9-5 MCC-FT-2 One-Line Diagram FIG 2.9-6 MCC-OC-2 Elevation FIG 2.9-7 MCC-OC-2 One-Line Diagram FIG 2.9-8 MCC-PD-4 Elevation FIG 2.9-9 MCC-PD-4 One-Line Diagram FIG 2.9-10 MCC-STP Elevation and One-Line Diagram FIG 2.9-11 MCC-BT-1 Elevation FIG 2.9-12 MCC-BT-1 One-Line Diagram San Antonio Water System Gupta & Associates Dos Rios Water Recycling Center Page TOC II - 2 TBPE #F-2593

FIG 2.10-1 Substation No. 7 One-Line Diagram & Elevation FIG 2.10-2 MCC-DB-1 Elevation FIG 2.10-3 MCC-DB-1 One-Line Diagram FIG 2.10-4 MCC-EF-1 Elevation FIG 2.10-5 MCC-EF-1 One-Line Diagram FIG 2.11-1 Substation No. 8 One-Line Diagram & Elevation FIG 2.11-2 MCC-DB-2 Elevation FIG 2.11-3 MCC-DB-2 One-Line Diagram FIG 2.11-4 MCC-EF-2 Elevation FIG 2.11-5 MCC-EF-2 One-Line Diagram FIG 2.12-1 Substation No. 9, 10, 13, 14 and 15 One-Line Diagram & Elevation FIG 2.12-2 MCC-CB-1 Elevation and One-Line Diagram FIG 2.12-3 MCC-CB-2 Elevation and One-Line Diagram FIG 2.12-4 MCC-CB-6 Elevation and One-Line Diagram FIG 2.13-1 Substation No. 11 One-Line Diagram & Elevation FIG 2.13-2 Substation No. 12 One-Line Diagram & Elevation FIG 2.13-3 MCC-CAB-2 Elevation and One-Line Diagram FIG 2.14-1 Substation No. 16 One-Line Diagram & Elevation FIG 2.14-2 MCC-BFP-1 Elevation FIG 2.14-3 MCC-BFP-1 One-Line Diagram FIG 2.14-4 MCC-BFP-1 One-Line Diagram FIG 2.15-1 Substation No. 17 One-Line Diagram & Elevation FIG 2.15-2 MCC-BFP-2 Elevation FIG 2.15-3 MCC-BFP-2 One-Line Diagram FIG 2.15-4 MCC-BFP-2 One-Line Diagram FIG 2.16-1 Substation No. 19 One-Line Diagram & Elevation FIG 2.16-2 Bldg 19 MCC Elevation and One-Line Diagram FIG 2.17-1 FEB SUB 01 FIG 2.17-2 MCC-A, MDP-A1, & MCC-E Elevation FIG 2.17-3 MCC-A, MDP-A1, & MCC-E One-Line Diagram San Antonio Water System Gupta & Associates Dos Rios Water Recycling Center Page TOC II - 3 TBPE #F-2593

FIG 2.18-1 FEB SUB 02 FIG 2.18-2 MDP-B & MCC-B Elevation FIG 2.18-3 MDP-B & MCC-B One-Line Diagram FIG 2.19-1 Emergency Generator 1/2 FIG 2.20-1 Emergency Generator 3/4 FIG 2.21-1 Switchgear DR-LELE SWG-33 FIG 2.21-2 MCC-DR-DPD2MCI Elevation and One-Line Diagram FIG 2.22-1 Switchgear DR-LELE SWG-34 FIG 2.22-2 MCC-DR-DPD6MCI Elevation FIG 2.22-3 MCC-DR-DPD6MCI One-Line Diagram FIG 2.23-1 Pad Mount-1 FIG 2.23-2 Pad Mount-2 FIG 2.23-3 Pad Mount-3 FIG 2.23-4 MCC-CB-3, 4, & 5 FIG 2.23-5 MCC-CB-3 FIG 2.23-6 MCC-CB-4 FIG 2.23-7 MCC-CB-5 San Antonio Water System Gupta & Associates Dos Rios Water Recycling Center Page TOC II - 4 TBPE #F-2593

Plant One Line Diagrams PLANT ELECTRICAL POWER DISTRIBUTION ELEVATION & ONE LINE DIAGRAM FIG 2. 1 1 SUBSTATION NO.1 EAST SIDE SETTLING TANKS 2 & 4 FIG 2. 4 1 MCC PS 1 ELEVATION PRIMARY SETTLING TANKS 3 & 4 FIG 2. 4 2 MCC PS 1 ONE LINE DIAGRAM PRIMARY SETTLING TANKS 3 & 4 FIG 2. 4 3 MCC PS 1A ELEVATION PRIMARY SETTLING TANKS 1 & 2 FIG 2. 4 4 MCC PS 1A ONE LINE DIAGRAM PRIMARY SETTLING TANKS 1 & 2 FIG 2. 4 5 MCC RS 1 ELEVATION BETWEEN FIRST STAGE AERATION TANKS 2 & 3 FIG 2. 4 6 MCC RS 1 ONE LINE DIAGRAM BETWEEN FIRST STAGE AERATION TANKS 2 & 3 FIG 2. 4 7 MCC SG 1 ELEVATION SOUTH OF SCREEN & GRIT FACILITIES FIG 2. 4 8 MCC SG 1 ONE LINE DIAGRAM SOUTH OF SCREEN & GRIT FACILITIES FIG 2. 4 9 MCC B ELEVATION & ONE LINE DIAGRAM EAST OF PRIMARY SETTLING TANK 6 FIG 2. 4 10 MCC B1 ELEVATION EAST OF PRIMARY SETTLING TANK 6 FIG 2. 4 11 MCC B1 ONE LINE DIAGRAM EAST OF PRIMARY SETTLING TANK 6 FIG 2. 4 12 MCC A ELEVATION AND ONE LINE DIAGRAM NEAR MCC B FIG 2. 4 13 SUBSTATION NO.2 BETWEEN PRIMARY SETTLING TANKS 6 & 8 FIG 2. 5 1 MCC PS 2 ELEVATION BETWEEN PRIMARY SETTLING TANKS 5 & 6 FIG 2. 5 2 MCC PS 2 ONE LINE DIAGRAM BETWEEN PRIMARY SETTLING TANKS 5 & 6 FIG 2. 5 3 MCC PS 2A ELEVATION BETWEEN PRIMARY SETTLING TANKS 7 & 8 FIG 2. 5 4 MCC PS 2A ONE LINE DIAGRAM BETWEEN PRIMARY SETTLING TANKS 7 & 8 FIG 2. 5 5 MCC RS 2 ELEVATION SO. OF PLATFORM BETWEEN 1st STG SETTL TKS 8 & 9 FIG 2. 5 6 MCC RS 2 ONE LINE DIAGRAM SO. OF PLATFORM BETWEEN 1st STG SETTL TKS 8 & 9 FIG 2. 5 7 MCC RS 2A ELEVATION N. OF PLATFORM BETWEEN 1st STG SETTL TKS 8 & 9 FIG 2. 5 8 MCC RS 2A ONE LINE DIAGRAM N. OF PLATFORM BETWEEN 1st STG SETTL TKS 8 & 9 FIG 2. 5 9 MCC SG 2 ELEVATION SO. OF SCREEN AND GRIT FACILITIES FIG 2. 5 10 MCC SG 2 ONE LINE DIAGRAM SO. OF SCREEN AND GRIT FACILITIES FIG 2. 5 11 SUBSTATION NO.3 EAST SIDE OF COMPRESSOR BUILDING FIG 2. 6 1 MCC AT 1 ELEVATION SECOND STAGE AREATION ELECTRICAL BLDG FIG 2. 6 2 MCC AT 1 ONE LINE DIAGRAM SECOND STAGE AREATION ELECTRICAL BLDG FIG 2. 6 3 MCC AT 1 ELEVATION SECOND STAGE AREATION ELECTRICAL BLDG FIG 2. 6 4 MCC AT 1A ONE LINE DIAGRAM SECOND STAGE AREATION ELECTRICAL BLDG FIG 2. 6 5 MCC RS3 ELEVATION SECOND STAGE AREATION BASIN SCREW PUMPS FIG 2. 6 6 MCC RS3 ONE LINE DIAGRAM SECOND STAGE AREATION BASIN SCREW PUMPS FIG 2. 6 7 SUBSTATION NO.4 WEST SIDE OF COMPRESSOR BLDG FIG 2. 7 1 MCC AT 2 ELEVATION & ONE LINE DIAGRAM SECOND STAGE AERATION ELECTRICAL BLDG FIG 2. 7 2 MCC AT 2A ELEVATION SECOND STAGE AERATION ELECTRICAL BLDG FIG 2. 7 3 MCC AT 2A ONE LINE DIAGRAM SECOND STAGE AERATION ELECTRICAL BLDG FIG 2. 7 4 MCC RS 4 ELEVATION SECOND STAGE AREATION BASIN SCREW PUMPS FIG 2. 7 5 MCC RS 4 ONE LINE DIAGRAM SECOND STAGE AREATION BASIN SCREW PUMPS FIG 2. 7 6 SUBSTATION NO.5 NEXT TO GENERATOR 1 FIG 2. 8 1 MCC OC 1 ELEVATION ODOR CONTROL UNIT BUILDING CONTROL ROOM FIG 2. 8 2 MCC OC 1 ONE LINE DIAGRAM ODOR CONTROL UNIT BUILDING CONTROL ROOM FIG 2. 8 3 MCC FT 1 ELEVATION POLYMER BUILDING ELECTRICAL ROOM FIG 2. 8 4 MCC FT 1 ONE LINE DIAGRAM POLYMER BUILDING ELECTRICAL ROOM FIG 2. 8 5 MCC PD 1 ELEVATION MCC PD 1 BLDG BETWEEN DIGESTERS 1 & 3 FIG 2. 8 6 MCC PD 1 ONE LINE DIAGRAM MCC PD 1 BLDG BETWEEN DIGESTERS 1 & 3 FIG 2. 8 7 MCC PD 3 ELEVATION ELECTRICAL BLDG SO. OF DIGESTER 7 FIG 2. 8 8 MCC PD 3 ONE LINE DIAGRAM ELECTRICAL BLDG SO. OF DIGESTER 7 FIG 2. 8 9 San Antonio Water System Dos Rios Water Recycling Center Page - 1 Gupta Associates TBPE #F-2593

SUBSTATION NO.6 SO. W. SIDE OF DIGESTERS NEAR SUP 5 FIG 2. 9 1 MCC PD 2 ELEVATION MCC PD 2 BLDG BETWEEN DIGESTERS 2 & 4 FIG 2. 9 2 MCC PD 2 ONE LINE DIAGRAM MCC PD 2 BLDG BETWEEN DIGESTERS 2 & 4 FIG 2. 9 3 MCC FT 2 ELEVATION POLYMER BUILDING ELECTRICAL BUILDING FIG 2. 9 4 MCC FT 2 ONE LINE DIAGRAM POLYMER BUILDING ELECTRICAL BUILDING FIG 2. 9 5 MCC OC 2 ELEVATION ODOR CONTROL UNIT BUILDING FIG 2. 9 6 MCC OC 2 ONE LINE DIAGRAM ODOR CONTROL UNIT BUILDING FIG 2. 9 7 MCC PD 4 ELEVATION ELECTRICAL BLDG N.W. SIDE DIGESTER NO. 8 FIG 2. 9 8 MCC PD 4 ONE LINE DIAGRAM ELECTRICAL BLDG N.W. SIDE DIGESTER NO. 8 FIG 2. 9 9 MCC STP ELEVATION AND ONE LINE DIAGRAM SO. SIDE SLUDGE STORAGE TANK 1 FIG 2. 9 10 MCC BT 1 ELEVATION EAST SIDE OF DIGESTER 2 FIG 2. 9 11 MCC BT 1 ONE LINE DIAGRAM EAST SIDE OF DIGESTER 2 FIG 2. 9 12 SUBSTATION NO.7 DISINFECTION BUILDING FIG 2. 10 1 MCC DB 1 ELEVATION DISINFECTION BUILDING ELECTRICAL ROOM FIG 2. 10 2 MCC DB 1 ONE LINE DIAGRAM DISINFECTION BUILDING ELECTRICAL ROOM FIG 2. 10 3 MCC EF 1 ELEVATION WASTE BACKWASH RETURN PS ELECTRICAL ROOM FIG 2. 10 4 MCC EF 1 ONE LINE DIAGRAM WASTE BACKWASH RETURN PS ELECTRICAL ROOM FIG 2. 10 5 SUBSTATION NO.8 DISINFECTION BUILDING FIG 2. 11 1 MCC DB 2 ELEVATION DISINFECTION BUILDING ELECTRICAL ROOM FIG 2. 11 2 MCC DB 2 ONE LINE DIAGRAM DISINFECTION BUILDING ELECTRICAL ROOM FIG 2. 11 3 MCC EF 2 ELEVATION WASTE BACKWASH RETURN PS ELECTRICAL ROOM FIG 2. 11 4 MCC EF 2 ONE LINE DIAGRAM WASTE BACKWASH RETURN PS ELECTRICAL ROOM FIG 2. 11 5 SUBSTATION NO.9, 10, 13, 14, AND 15 N. SIDE OF COMPRESSOR BLDG FIG 2. 12 1 MCC CB 1 ELEVATION AND ONE LINE DIAGRAM COMPRESSOR BUILDING FIG 2. 12 2 MCC CB 2 ELEVATION AND ONE LINE DIAGRAM COMPRESSOR BUILDING FIG 2. 12 3 MCC CB 6 ELEVATION AND ONE LINE DIAGRAM COMPRESSOR BUILDING FIG 2. 12 4 SUBSTATION NO.11 WEST OF PRIMARY SETTLING TANKS 1 & 2 FIG 2. 13 1 (MV) PRE AERATION AND CHANNEL AER BLOWERS SUBSTATION NO.12 WEST OF PRIMARY SETTLING TANKS 1 & 2 FIG 2. 13 2 (MV) PRE AERATION AND CHANNEL AER BLOWERS MCC CAB 2 ELEVATION AND ONE LINE DIAGRAM CHANNEL AERATION BLOWERS FIG 2. 13 3 SUBSTATION NO.16 EAST OF BELT FILTER PRESS BLDG. FIG 2. 14 1 MCC BFP 1 ELEVATION BELT FILTER PRESS BUILDING FIG 2. 14 2 MCC BFP 1 ONE LINE DIAGRAM BELT FILTER PRESS BUILDING FIG 2. 14 3 MCC BFP 1 ONE LINE DIAGRAM BELT FILTER PRESS BUILDING FIG 2. 14 4 SUBSTATION NO.17 EAST OF BELT FILTER PRESS BLDG. FIG 2. 15 1 MCC BFP 2 ELEVATION BELT FILTER PRESS BUILDING FIG 2. 15 2 MCC BFP 2 ONE LINE DIAGRAM BELT FILTER PRESS BUILDING FIG 2. 15 3 MCC BFP 2 ONE LINE DIAGRAM BELT FILTER PRESS BUILDING FIG 2. 15 4 SUBSTATION NO.19 SO W. PLANT AREA DISENFECTION AREA FIG 2. 16 1 BLDG 19 MCC ELEVATION AND ONE LINE DIAGRAM BUILDING 19 FIG 2. 16 2 FEB SUB 01 N.W CORNER OF PLANT NEAR SLUDGE HAUL ROAD FIG 2. 17 1 MCC A, MDP A1, & MCC E ELEVATIONS PRE AERATION FIG 2. 17 2 San Antonio Water System Dos Rios Water Recycling Center Page - 2 Gupta Associates TBPE #F-2593

MCC A, MDP A1, & MCC E ONE LINE DIAGRAM PRE AERATION FIG 2. 17 3 FEB SUB 02 WEST SIDE OF PLANT, E. OF EXCAV STOCKPILE AREA FIG 2. 18 1 MDP B & MCC B ELEVATIONS REMOTE PUMP STATION FIG 2. 18 2 MDP B & MCC B ONE LINE DIAGRAM REMOTE PUMP STATION FIG 2. 18 3 EMERGENCY GENERATOR 1/2 WEST OF PRIMARY SETTLING TANKS 7 & 8 FIG 2. 19 1 EMERGENCY GENERATOR 3/4 NEAR DISINFECTION FACILITY FIG 2. 20 1 SWITCHGEAR DR LELE SWG 33 N.W. OF DIGESTER 10 FIG 2. 21 1 MCC DR DPD2MCI ELEVATION AND ONE LINE DIAGRAM DIGESTER 2 NEW ELECTRICAL BLDG. FIG 2. 21 2 SWITCHGEAR DR LELE SWG 34 N.W. OF DIGESTER 10 FIG 2. 22 1 MCC DR DPD6MCI ELEVATION DIGESTER NO. 10 ELECTRICAL BLDG FIG 2. 22 2 MCC DR DPD6MCI ONE LINE DIAGRAM DIGESTER NO. 10 ELECTRICAL BLDG FIG 2. 22 3 PAD MOUNT 1 ELEVATION AND ONE LINE DIAGRAM ADMIN AREA FIG 2. 23 1 PAD MOUNT 2 ELEVATION AND ONE LINE DIAGRAM OPERATIONS BUILDING FIG 2. 23 2 PAD MOUNT 3 ELEVATION AND ONE LINE DIAGRAM SLUDGE DRYING BEDS FIG 2. 23 3 MCC CB 3, 4, & 5 ELEVATION COMPRESSOR BUILDING FIG 2. 23 4 MCC CB 3 ONE LINE DIAGRAM COMPRESSOR BUILDING FIG 2. 23 5 MCC CB 4 ONE LINE DIAGRAM COMPRESSOR BUILDING FIG 2. 23 6 MCC CB 5 ONE LINE DIAGRAM COMPRESSOR BUILDING FIG 2. 23 7 San Antonio Water System Dos Rios Water Recycling Center Page - 3 Gupta Associates TBPE #F-2593

FINAL REPORT SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO. 11-6501 APRIL, 2012 Joining Hands... Teamwork, Commitment, Excellence, Quality in association with