SECTION C DESCRIPTION/SPECIFICATIONS Spec. No. 769 O NEILL SUBSTATION STAGE 02 CALIFORNIA
O NEILL SUBSTATION STAGE 02 PROJECT DRAWINGS A. GENERAL: CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes. PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable. STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern. INFORMATIONAL DRAWINGS: Some project drawings have the words FOR INFORMATION ONLY appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed. EXISTING INSTALLATION DRAWINGS: Some project drawings have the words Existing Installation appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed. REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes. CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions. B. LIST OF DRAWINGS: LOCATION MAP: 1. ONE 0015 Rev. A Location & Vicinity Map ELECTRICAL: 2. ONE 0001 Rev. A EI Switching Diagram (Existing Installation) 3. ONE 0001 Rev. B Switching Diagram 4. ONE 1000 Rev. B EI General Arrangement (Existing Installation) 5. ONE 1000 Rev. C General Arrangement 6. ONE 1100 Equipment and Material Index 7. ONE 1110 Rev. B EI Detail A and Sections A-A, B-B, C-C, D-D, E-E and F-F (Existing Installation) 8. ONE 1110 Rev. C Detail A and Sections A-A, B-B, C-C, D-D, E-E and F-F 9. ONE 1500 Rev. B EI Grounding Plan (Existing Installation) 10. ONE 1500 Rev. C Grounding Plan 11. ONE 1600 EI Station Service Wiring Diagram (Existing Installation) 12. ONE 1600 Rev. A Station Service Wiring Diagram 13. 805-D-1628 Electrical Installation Main Single Line Diagram 14. ONE 1630 EI Electrical Installation A.C. Single Line Diagram (Existing Installation) 15. ONE 1630 Rev. A Electrical Installation A.C. Single Line Diagram 16. ONE 1700 EI Conduit Plan (Existing Installation) 17. ONE 1700 Rev. A Conduit Plan 18. ONE 1700 Rev. B3 Conduit Plan (Shoo Fly-Installation - For Information Only) 19. ONE 1710 Cable Entry Box PB3 Plan and Sections 20. ONE 1715 Pull Box PB4 Plan and Sections 21. ONE 7500 Telephone Backboard Details 22. ONE T600 Rev. A Control Cable List FOUNDATION AND STRUCTURAL DRAWING INDEX: 23. ONE 2010 Foundation/Structural Data and Drawing Index CONCRETE: 24. ONE 2000 Rev. B EI Foundations General Plan (Existing Installation) 25. ONE 2000 Rev. C Foundations General Plan 26. ONE 2001 Rev A FIO Foundations Outline and Reinforcement (For Information Only) 27. ONE 2300 Foundations Outline and Reinforcement STEEL STRUCTURES: 28. ONE 2003 Rev. A EI Steel Structures 69kV Switch and Take-Off Structure (Existing Installation) 29. ONE 2003 Rev. B Steel Structures 69kV Switch and Take-Off Structure 30. ONE 2550 Anchor Bolts 31. ONE 2925 Equipment Cabinet Platforms Steel Design and Details
O NEILL SUBSTATION STAGE 02 PROJECT DRAWINGS STRINGING REQUIREMENTS: 32. ONE 2008 Rev. A FIO Stringing Requirements (For Information Only) SERVICE BUILDING: 33. ONE 3200 General Structural Notes 34. ONE 3201 Structural Foundation Plan 35. ONE 3202 Structural Foundation Sections & Details 36. ONE 3100 Rev. A Architectural Floor Plan 37. ONE 3101 Architectural Equipment and Material List 38. ONE 3300 Rev. A Mechanical HVAC Floor Plan 39. ONE 3400 Rev. A Electrical Power Plan 40. ONE 3401 Rev. A Electrical Lighting Plan 41. ONE 4000 Rev. A Service Building Electrical Arrangement, Conduit, & Grounding 42. ONE 4001 70kV Vertical Switchboard Sections CHA1 through CHA4 Panel Arrangements 43. ONE 4002-1 70Kv Vertical Switchboard Sections CHA1 through CHA4 Bill of Materials (Sheet 1 of 2) 44. ONE 4002-2 230kV Vertical Switchboard Sections CHA1 through CHA4 Bill of Materials (Sheet 2 of 2) 45. ONE 4003 70kV Vertical Switchboard Sections CHA1 through CHA4 Side Sheet Arrangements 46. ONE 4004-2 Vertical Switchboard Section CHA1 Nameplate List (Sheet 2 of 2) 47. ONE 4005-2 Vertical Switchboard Section CHA2 Nameplate List (Sheet 2 of 2) 48. ONE 4006-2 Vertical Switchboard Section CHA3 Nameplate List (Sheet 2 of 2) 49. ONE 4007-2 Vertical Switchboard Section CHA4 Nameplate List (Sheet 2 of 2) 50. ONE 6006 Rev. A DC Distribution Panel BHA
Luis Ave Plaza Dr Leota Rd 1 Fahey Rd Whitworth Rd Cherokee Rd O'Neill Substation Merced County O'Neill Facility/Substation Access Road Facility Boundary O'Neill Saturn St W Comet Rd E Comet Rd 33 5 5 Henry Miller Rd 1 2 3 4 5 6 7 8 9 1:24,000 1 inch = 2,000 feet Adjoining 7.5' Quadrangle Names Center quad is this site 1. Crevison Peak 2. Howard Ranch 3. Ingomar 4. Pacheco Pass 5. San Luis Dam 6. Volta 7. Mariposa Peak 8. Los Banos Valley 9. Ortigalita Peak NW Site Coordinates Lat: 37 5' 54.297" N Long: 121 2' 53.995" W 0 0.25 0.5 0.75 1 Miles Deleon Ave State Hwy 33 Western Area Power Administration - O'Neill Substation O'Neill Substation is on the SE end of the O'Neill Pumping Plant, which is west of Santa Nella, CA 95322. The two nearest Interstate Highway I-5 exits are #403 & #407. Latitude: 37 deg 5 min 54.30 sec N Longitude: 121 deg 02 min 53.99 sec W Driving directions from Sacramento, California: Take Interstate Highway I-5 south to the California CA-33 exit (Exit 407), turn right (south) onto Santa Nella Road/CA-33 and go to the second canal crossing approximately 1 mile from the turnoff, to the access road gate on the south side of the canal. When at the gate call the delivery contact person for access and guidance to the substation site. The successful Contractor shall contact the delivery contact person for updated and detailed immediate vicinity directions. Primary Delivery Contact: Charles Forbes Phone No. 209-833-3040 Mobile Phone No. 209-247-8071 Email: forbes@wapa.gov UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION SIERRA NEVADA REGION - FOLSOM, CALIFORNIA DESIGNED O'NEILL SUBSTATION CALIFORNIA WAPA Official Use Only May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552), Exemption 3 and 6 U.S.C. 133 (Domestic Security, Critical Infrastructure Information). This information is voluntarily submitted to the Federal Government in expectation of protection from disclosure as provided by the provisions of the Critical Infrastructure Information Act of 2002. Western review required before public release. Name/Org: Date: This map and data are the property of WAPA/DOE and are intended for planning and analysis only. No reproduction or copying of this product is allowed without the sole consent of WAPA/DOE. To contact WAPA about this map, please call 1-800-336-7288. This cartographic product and GIS data were prepared in accordance with professional practice standards. The data represented on this map has been developed from the best available sources. Although efforts have been made to ensure that the data is accurate and reliable, errors may be reflected in the data. Users must be aware of these conditions and bear responsibility for the appropriate use of this map. The data on this map is for reference use only. VICINITY MAP Steve Tuggle APPROVED G IS JULY 16, 2013 ONE 0015
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
FOR INFORMATION ONLY 18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Ω 43
44
45
46
47
48
49
50