CINTRALUX ALU BARREL VAULT EP 10/10

Similar documents
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION


PolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.

Installation of HORIZONT and HORIZONT HIGH pool enclosures

3/ /

FITTING INSTRUCTIONS FOR CAMEC 4RC ODYSSEY PREMIUM PUSH OUT WINDOW

Corrugated Installation and Technical Guide

Installation Guide Simplicity Alfresco. V1.9 Lu070318

PAT installation of a Sun Dome over a in-ground

SHOWER ENCLOSURE INSTALLATION

UNIDOOR-X TUB DOOR TUB DOOR INSTALLATION NSTRUCTIONS. MODEL #s D58580-##

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

APPLICATION OF JAC FILMS

UNIDOOR (STYLE B & C)

Greenhouse Assembly Instructions

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Gardman Lean-to Greenhouse Assembly Instructions

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

Curium 19H Installation Instructions & Parts List

POOL ENCLOSURES LEIA & ALVA. Assembly manual

How to operate (folding)

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GrafiWrap Vehicle Wrapping

CAVALIER. Shower Door Installation Instructions

AQUA ULTRA SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR STANDING SHOWER CABIN OWNER'S MANUAL PLEASE READ INSTRUCTIONS BEFORE PROCEEDING Packing List. Door (pc) 2. Hinge (2pc) 3

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

ATLANTIS RAIL Contact Information

GREENHOUSE EXTENSION 6 X4

COFFEE TABLE WITH RECESSED TRAY

Installation Instructions for. Before You Begin TOOLS REQUIRED

EASY APPLICATION. Furniture Linoleum

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

Shed Assembly Instructions

Renaissance Pavilion. Assembly Manual

Storing, Handling, and Cleaning dekō Markerboards Storing Markerboards. Handling. Cleaning

Fitting Instructions

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

EZYSTONE WORKSURFACES

SHOWER DOOR INSTALLATION & CARE GUIDE

INSTALLATION GUIDE SLIMLINE ROOF LANTERN

An adjacent sauna must be well insulated and located to leave a gap of at least 10 cm (4 ) for air to circulate between the sauna and the steam room.

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

KITCHEN INSTALLATION GUIDE

Synseal assembly guide 2009:Synseal assembly guide /2/09 12:38 Page 1. Conservatory Roof Assembly Guide

KITCHEN INSTALLATION GUIDE

KuraStone TM Installation Guide

The following instructions will guide you through the installation of your new vinyl railing.

Wave Profile Installation Guide

PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Coffee table with recessed tray

PAGE 1 OF 6 FITTING INSTRUCTIONS FOR CAMEC 4 RADIUS CORNER SLIMLINE WIND OUT WINDOW. Rev 3 change all cutout radiuses from 55mm to 68mm.

Installation Guide. brighter. lighter.

INFINITE RANGE - CENTRE FOLDING DOOR

Manual 2: Graficast print films for high level wrapping. MANUAL 2. Graficast Print Films FOR HIGH LE VEL WR APPING

W6 series greenhouse

Glass Systems. Technical Information on Pilkington Profilit Profiled Glass with System. - English Edition - Pilkington Profilit

INFINITE RANGE - HINGE DOOR

VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

QUATRA LUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

The following instructions will guide you through the installation of your new vinyl railing stair kit.

maintenance-free free from painting easy to install Fixing Guide Cedral Lap

SunTrackerTwo Preparation

FLOW HIVE ASSEMBLY GUIDE. If we look after the bees they will look after us, and the honey really is an amazing bonus. Flow Hive Hybrid 3 Frame

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

IFRC SHELTER TOOL KIT

Deauville Installation Guide

Regulator installation guide Air Arms S4xx/S5xx

Building With Polycarbonate 101

Orion. English Garden VITAVIA 6' x 6'(3800) and 6' x 8' (5000) These revised instructions replace the original instructions provided in the kit.

IMPORTANT! READ BEFORE PROCEEDING! SV Weather Caps

16ft Polytunnel Assembly Instructions

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world

lindab we simplify construction LindabSandwichPanels Installation instructions PIR Panels

UNIDOOR (STYLES B&C)

Installation Guidelines

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Hoesch Arched Roof Installation guide

Multi-wall Polycarbonate Installation Instructions

Durabrac Gable Bracket Installation Guide

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Installation and Care Instructions: Rear Windshield - CFMOTO UForce 800

ARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)

Curium 19.4H Installation Instructions & Parts List

SIMPLER BETTER FASTER

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Steel Reinforced Joining Guide (Horizontal / Vertical)

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

GV Standard PitchVent

Dura-Lock Roof System

LOG CABIN 40 ASSEMBLY INSTRUCTIONS

Installation Guide Contemporary Alfresco V1.3 LU

INSTALLATION AND CARE INSTRUCTIONS

Guardian warm roof conversion system. Installation Guide

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

S W E RV E RAC K. Simple Security. Simple Stability.

Installation Guide Simplicity 16. V2.9 Lu171117

DUTCH GABLE FREESTANDING CARPORT

Transcription:

CINTRALUX ALU BARREL VAULT EP 10/10 Installation instructions EN 14963 Artn 43984 E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 1

Installation instructions Cintralux aluminium barrel vault: Cintralux alu EP 10/10 mm 1. Introduction: a. Upstand: -Before installing of the barrel vault, the customer has to foresee a solid timber or metal upstand. This upstand must be undeformable (if necessary to be reinforced) The minimum height is 15 cm (against the finished roof). The upper side of the upstand is HORIZONTALLY and 6,5 cm thick. A metal upstand is min. 3 mm thick. Timber as well as metal upstands must resist the forces as described in our technical file. On roof coverings in plastic (PVC and others) with clamp at the height of the upstand, this must strictly close up on top of the upstand against the upstand over its full length and width (no play between the upstand and the clamp ) Not one of the upstands may continue at the angle of the lateral side and the front side, i.e. that the upstand construction must be free around. -If the upstand is in concrete, you have to previously anchor a timber strip of minimum 44 mm with appropriate galvanized screws. Make sure you cover the timber strip with the roof covering. Strictly respect the determined sizes. b. Sizes: -Since the barrel vault is made to size, sizes cannot be changed after ordering. Therefore the overall size of the upstand (roofing included) must be respected. c. Glazing and arch s: -The glazing panels are only clamped to allow dilatation and extraction in function of temperature fluctuations. The system is conceived in a way that silicone and rubber sealings between the aluminum and the glazing are not necessary (even forbidden). -All s and glazing panels (except the end panels and the end panel divisions) are cut to size, precurbed and foreseen with screw thread. -Respect the exposed UV protected top side of the sheets (glazing). -At first, apply the bolts always by hand before using a screwing machine to have two full rotations in the arch s foreseen with screw thread. Otherwise you risk to damage the screw thread. -Do not forget to remove the protection film of the sheets (glazing) after installation. d. Sealings: - When using roof covering, apply this correctly until it covers de upstand. It must be covered entirely up the daylight size. If the barrel vault is not detached and it approaches 1 or several walls, the connection must be vertically and smooth,. eg by using a lead flashing. 2. Control of the upstand: Check previously the agreed correct sizes of the upstand (overall size roofing included). Check if the upstands are parallel with each other. Check the right angles and make sure the top side is smooth and equal. Clean it if necessary before installation and remove sawing pieces, irregularities, etc 3. Fixation butyl sealing: Fix the delivered butyl sealing over the full outline of the upstand. Put two stripes next to each other at approximately 10 mm from the inner edge. Make sure the ends of each strip overlap. Press firmly on the butyl sealing and remove the film. Spacer upper sheet RVS-bolts Outer arch Drawing total assembly inner sheet Lateral Intermediate arch Under arch 4. Installation of the end and lateral : First install the end and then the lateral s. The lateral s come at the ends always on top of the end. Make sure they are perfectly parallel in pairs and that the daylight size is the same everywhere. The lateral s for barrel vaults of > 4 m come in different parts and are packed per reference, with the aluminum strips. Fix the end with the delivered screws with neoprene sealing (Fig. 1). Foresee a screw every 50 cm. Only use adapted screws (metal screws for metal upstand, timber screws for timber etc.) Tighten the screws so that the pinion connects perfectly to the. Fig 1 Installation of the end on the upstand E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 2

Position the lateral s (Fig 2) in the right order (scheme enclosed and let a play of approximately 5 mm between the s. Fix the lateral s on the upstand. (Fig 3) Foresee a screw every 50 cm. Only use adapted screws (metal screws for metal upstand, timber screws for timber etc.) Tighten the screws so that the pinion connects perfectly to the. Fig 2 Lateral putted next to the upstand (see plan), Fig 3 Fix lateral Sealing of the joints (Fig. 4 en 5). Fig 4 Sealing at the end Fig 5 Sealing at the joints of the lateral s 5. Installation of the inner sheet of the end panel: Fix the U on the end panel. After that install the under arch in front of the end panel (Fig. 6). After that the bottom side of the panels, which must be cut to size, fits in the U of the slit of the bottom drain. Present the sheet in this slit and draw the form to be cut out on the protection film with a marker. Use a metal saw with a new saw blade to cut out the sheet at approximately 2 cm of the marked off edge. Beware of the UV protected side of the sheet. Blow out the sheet and tape off the sheet edges with the delivered appropriate tape. Install the sheet in the slit underneath the end and in the slit of the bottom arch. (Fig. 7). Fig 6 Mounted bottom arch of the end Fig 7 Mounted inner sheet and bottom arch of the end panel E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 3

6. Installation of the under arch s and the inner sheets: Place the under arch s. On small spans, the under arch s are only clamped. On large spans, the under arch s are tightened in the lateral by means of a stainless steel bolt through the predrilled opening. Don t tighten the bolts yet! After that, install the sheets by gliding the sheets in the lateral at one side and bend them cold at the other side. Side of the panels/sheets! Install the sheet with the UV protected side to the outside. It is the side with the printed protection film (after having removed the protection film you will see a small print on the edge) Remove the protection film of the sheets just before installation of the sheet. Remove only 10 cm of the film at the top side. Only remove the film just before installation of the intermediate arch s. (Fig 8) inner sheet under arch Don t tighten the bolts yet! Fig 8 installation under arch s and sheets 7. Installation of the intermediate arch s and the spacer s: Install now the intermediate arch s. Make sure the bottom s in the middle of the bottom side of the intermediate arch fit in the notch of the bottom arch. (Fig 9 & 10). Don t tighten the bolts yet! After that the spacers/intermediate clipses with bend are hooked behind the barb of the intermediate clip of the lateral. Use a rubber hammer on the spacers to fit the sheets in the slit. (Fig. 11). Use therefore the wooden accessory or large filling knife (watch out for damages!) Intermediate arch Spacer Don t tighten the bolts yet! Spacer Fig 9 Installation intermediate arch and spacer Fig 10 Placing spacer with the use of the wooden accessory Fig 11 Placed sheet with spacer 8. Installation of the outer sheets: The outer sheet is installed and glided into the outer slit of the lateral panel. Pay attention to the right side of the sheets (see point n 6). (Fig 12) Outer sheet Fig 12 Placing outer sheet E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 4

9. Installation of the upper arch s: Install now the upper arch s (Fig. 13 & 14). Make sure the bottom s in the middle of the bottom side of the upper arch fit in the notch of the intermediate arch. Fix the upper arch s by hand with the stainless steel bolts M6 or M8 (Fig. 15). Do not tighten up yet and make sure you do not block everything as the aluminum strips must be installed and the arch s must be able to extend. The upper arch s next to the opening parts have an adapted with downward flange. (Fig. 16). Install them the same way as the previous upper arch s. A centered U- is put between the intermediate arch and the upper arch to be used as drain. Attention: another is also used for the upper arch of the end panels. Must be installed after finishing point 10. Don t tighten the bolts yet! Upper arch Fig 13 installation upper arch s Fig 14 Mounted bottom arch with separate upper arch Fig 15 Fixation upper arch s Fig 16 upper arch at the edge of a fix element 10. Tighten the bolts The bolts may be tightened, to fix the intermediate arch s and the upper arch s. (Fig 17) 11. Installation of the outer end panels: Tighten the bolts Fig 17 thightening the bolts If the end panel is composed of 2 elements, first cut the end panel divisions to size, attach the angle s (L s) (Fig 18) and screw the angle s at the bottom on the end and on top against the intermediate arch. (Fig. 19). Fig 18 End panel division Fig 19 Mounted end panel division E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 5

The bottom side of the panels, which must be cut to size, fit in the U of the slit of the end underneath. Present the sheet in this slit and draw the form to be cut out on the protection film with a marker (Fig. 20). Use a metal saw with new saw blade to cut out the sheet at approximately 2 cm of the marked off edge (Fig 21). Fig 20 Mark off the form of the sheets Fig 21 Cut out the end panel sheets Blow out the sheet and tape the sheets of with the delivered tape (Fig. 22). Put the sheet in the slit underneath the end and in the slit of the intermediate arch. Fig 22 Tape off the sheets edges Screw the protection at the end panel division at approximately 10 cm of the extremities (Fig. 23). Fig 23 Screw the Install the centered arch with U-slit over the sheets and the intermediate arch. Mount the upper arch and tighten it slightly (Fig. 24). Fig 24 Mount the upper arch s and tighten up E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 6

On figure 25 shows a cross section of the s. From the overall width of 3 m, there is 1 ridge reinforcement over the first 3 arch s; from more than 3,5 m there are 2 ridge reinforcements. Fig 25 Cross section of the s, to place the end panels 12. Finish with aluminum strips: Clip the aluminum strips between the arch s at the point of the transition glazing panel / upper arch lateral. Start at one side, press and use a timber block or rubber hammer to get the aluminum strips in their position. Make sure not to damage the sheets. 13. Tighten the bolts: Tighten the fixation bolts of all arch s manually. It is not necessary and we advise against tightening firmly. 14. Maintenance and use guidelines for Cintralux Alu barrel vaults: a. Immediately after installation: If there is any work to be done with risk of dust parts (e.g. cutting, drilling, plaster works), we advise to hermetically close off the opening underneath the barrel vault with pvc foil. The dust could adhere to the plastic sheets and in worst case enter the split of the plastic glazing through the ventilation holes. b. Maintenance: Only clean the plastic sheets with tepid rain water and a soft sponge. You may add some non-aggressive cleaning product (no detergent) makes cleaning easier. Use an iso-propanol solution for tenacious spots (50% iso-propanol and 50% water). After cleaning, rinse with plenty of water and let dry. Do not rub dry (risk of scratches). c. Covering: Covering the barrel vault (eg for warmth reflection) is only possible when the cloth does not contain any softening agents. We strictly advise against covering the acrylic or polycarbonate with a coating or paint. In that case, you cannot apply on guarantee. Please inform yourself at the supplier or producer of the coating or paint about the guarantee. d. Condensation: Acrylic and polycarbonate sheets are very less permeable to damp, which can cause condensation in the canals of the sheets. This could mostly happen at the beginning of the installation because there is a lot of construction liquid that must damp. This is a physical phenomenon and disappears after some time. The condensation has no influence on the characteristics of the plastic sheets or on the guarantee. e. Extension: Acrylic and polycarbonate sheets are plastic sheets and will extend and shrink in case of temperature fluctuations. The system allows this extension and shrinking. This could cause some noise, but will not influence the stability of the construction. f. In general: Damage or dirt of or on the barrel vault following polishing or plaster work and others by third parties, always are at the customer s expense. The barrel vaults resist normal wind and snow load. We can foresee aluminum reinforcement s with supplement in price (and only at customers request). The guidelines are indicative. They must be used as information. Installation always is at customer s responsibility. AG.PLASTICS COPYRIGHT 2016 E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 7