0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 9,8 $,8,09 Addition 90,9 $3,33,88 SITE $,99 Campus Total 0,8 $,8, Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $,3 Exterior Doors - Exterior FRP Door EA $3,9 Exterior Doors - Exterior Steel Door EA $,9 Exterior Doors - Overhead Rolling/ Garage Door EA $,8 Exterior Doors - Transom Lite EA $,00 Exterior Stairs - Concrete 30 LF $3,8 Exterior Stairs - Concrete LF $3, Foundation Lighting Roof System Foundation - Concrete,38 LF Superstructure - Steel with Clay Tile Arch,8 SF Exterior Lighting - Parapet or Roof Mounted EA $3,9 Exterior Lighting - Wall Mounted EA $3, Chimney - Brick Chimney- Concrete/ Mortar Liner 0 LF $,8 Coping - Metal 83 LF $,88 Coping - Stone 9 LF $,0 HARPER HS Page of Assessment Date: 0/3/0
Category: Building Exterior Roof System 0 S Wood St Chicago, IL 03 Coping - Terra Cotta,08 LF $3,3 Downspouts - Interior Downspouts 0 LF $3,0 Parapet - " - 30" Height 3 LF $,9 Parapet - " - 30" Height 9 LF $,33 Parapet - Parapet > 30", LF $30,9 Roof - Asphalt Gravel Ballast 8,0 SF $,39,98 Roof Structure - Steel with Clay Tile Arch 8,0 SF Walls Windows Exterior Walls - Brick,8 SF $93,93 Exterior Walls - Stone-Cast,3 SF $3, Exterior Walls - Terra Cotta,8 SF $8,8 Guard - Guards perforated,98 SF $3,33 Lintels - Steel, LF $,99 Lintels - Stone 3 LF $,383 Windows - Sash Aluminum Double-pane,38 SF $,09 Building Exterior Subtotal: $3,9,080 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $8 Emergency A/C Power - Auditoium and Aisle Lighting 3,98 SF $,03 Emergency A/C Power - Corridors and Stairs 39,000 SF $, Emergency A/C Power - Gym 3,900 SF $, Emergency A/C Power - Pool, SF $,03 Emergency Generator- Outdoor- Diesel - 0-00 KW EA $9,8 Exit Signs - Auditoium 0 EA $,9 Exit Signs - Corridors and Stairs 0 EA $0,8 Exit Signs - Multipurpose Room EA $9 Main Service Independent Electrical Service for emergency power EA Main Electrical Service - 00 A 0/08/3PH EA HARPER HS Page of Assessment Date: 0/3/0
Category: Electrical System Main Service 0 S Wood St Chicago, IL 03 Main Electrical Service - 00 A /80/3PH EA PA System,8 SF $,99 Power Distribution Lighting and Power Panels - 00 A 8 EA $38,9 Lighting and Power Panels - 00 A EA $,9 Lighting and Power Panels - 00 A EA Lighting and Power Panels - Above 00 A EA $,8 Lighting and Power Panels - Above 00 A EA $,8 Lighting and Power Panels - Above 00 A 0 EA $,90 Lighting and Power Panels - Above 00 A EA Main Distribution Panels - 0-00 amp EA $3,9 Main Distribution Panels - 0-00 amp EA $,0 Main Distribution Panels - Greater than 00 amp EA $30 Main Distribution Panels - Greater than 00 amp EA Transformers - 0/ - 0/08 EA $9,0 Transformers - /80-0/08 EA $,30 Electrical System Subtotal: $0,30 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA $, Fire Alarm Strobe Lights,8 SF $3,9 Fire Alarm_System,8 SF $3,9 Safty System Subtotal: $9,39 Building: Main Category: Mechanical System Air Conditioning Condensing Unit- Ground Mounted - Less than tons EA $, Condensing Unit- Roof Mounted - Less than tons EA $,9 HARPER HS Page 3 of Assessment Date: 0/3/0
Category: Mechanical System Air Handling Systems Boiler Systems Gas Booster Heating Devices 0 S Wood St Chicago, IL 03 Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - 00-3000 cfm EA $,9 Air Handling Unit- Built Up-Multi Zone- Steam Coils - 00-000 cfm EA $3,8 Air Handling Unit- Built Up-Multi Zone- Steam Coils - 800-000 cfm EA,003 Air Intake EA $9,883 Auxiliaries - 00-000 cfm EA $9,98 Auxiliaries - 00-3000 cfm EA $, Auxiliaries - 800-000 cfm EA $,908 Make Up Air Unit- Indoor Mounted- Electric and DX Cooling Coil - Less than 000 cfm EA $, Reheat Boxes - Reheat Boxes with Steam Coil EA $30,08 Return Duct Work - Indoor- Vertical Shaft and Ducts LF $9 Return Duct Work - Masonry and Ducts- Missing or Existing Shaft 300 LF $39,0 Zone Dampers 3 EA $,3 Zone Dampers EA $,9 Boiler Auxiliary- Steam Boiler - Greater than 00 HP EA $8,3 Chemical Feed System EA $,08 Combustion Dampers EA $,0 Condensate Pump EA $,0 Feed Water Pumps and Tank EA $, on Condensing- Water Tube- Flexible Tube- Force Draft- Steam Boiler - Greater than 00 EA $,08 HP on Condensing- Water Tube- Flexible Tube- Force Draft- Steam Boiler - Greater than 00 EA $,0 HP Piping - Condensate Pipe- Steel 0 LF $, Piping - Steam Pipe- Steel 0 LF $, Steam Traps 0 EA $9,3 Vacuum Pump EA $, Gas Booster EA $90,0 Gas Booster EA $99 Cabinet Heaters - With Electric Coil 9 EA $30,38 Cabinet Heaters - With Electric Coil 3 EA $,00 Cabinet Heaters - With Steam Coil 3 EA $, Cabinet Heaters - With Steam Coil 3 EA $,88 Fin Tube - Steam 3 LF $,0 HARPER HS Page of Assessment Date: 0/3/0
Category: Mechanical System Heating Devices 0 S Wood St Chicago, IL 03 Radiators - Steam EA $,3 Radiators - Steam EA $0,0 Temperature Control Electric Thermostat EA Pneumatic System,8 SF $909,983 Thermostats - Pneumatic 38 EA $8,0 Thermostats - Pneumatic 0 EA Unit Ventilation Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor EA $9, Ventilation Exhaust Fans- Indoor - 00-00 CFM 3 EA $, Exhaust Fans- Roof Mounted - 0-8000 CFM EA $,9 Exhaust Fans- Roof Mounted - 00-00 CFM 3 EA $,0 Lab Exhaust Hood EA $,9 Type I Exhaust Hood- Culinary Arts 3 EA $3,3 Type II Exhaust Hood- Warming Kitchen EA $,8 Mechanical System Subtotal: $,33,0 Building: Main Category: Plumbing System Hot Water Gas Heater - Greater than 00000 BTU/HR 3 EA $, Gas Heater - Less than 0000 BTU/HR EA $30 Hot Water Storage Tank_Gas - 0-000 Gallons EA $,3 Piping Domestic Piping-Cold Water from Risers to Fixtures,88 SF $3,0 Domestic Piping-Cold Water Horizontal Lines,88 SF $, Domestic Piping-Cold Water Risers,88 SF $3, Domestic Piping-Hot Water from Risers to Fixtures,88 SF $,09 Domestic Piping-Hot Water Horizontal Lines,88 SF $3, Domestic Piping-Hot Water Return Lines,88 SF $,008 Domestic Piping-Hot Water Return Risers,88 SF $,008 HARPER HS Page of Assessment Date: 0/3/0
Category: Plumbing System Piping 0 S Wood St Chicago, IL 03 Sanitary Piping,88 SF $0,0 Storm Piping,88 SF $,0 Vent Piping,88 SF $,38 Pool Systems Pumps Pool Drain Piping 30 LF $89 Pool Filtration System including Pump EA $,839 Pool Hot Water Heater - Gas Fired EA $0 Pool Supply and Return Piping 00 LF $,80 Pumps - Domestic Booster Pump-Simplex EA $8,93 Pumps - Sump-Duplex EA $,00 Pumps - Sump-Simplex EA $,90 Plumbing System Subtotal: $83, Building: Main Category: Classrooms Band Room ( room) AC Units EA $9 Ceiling - Splined,30 SF $8,0 Doors - Transom Window 3 SF $ Doors - Wood Doors inclu hw EA $,0 Floor - Wood,30 SF $,9 Lighting - Pendent/Surface 0 EA Marker Board 8 LF $ Storage/ Closet 8 SF $8 Walls - Plaster/Drywall,88 SF $,0 Choral Room ( room) AC Units EA $9 Ceiling - Plaster/Drywall,0 SF $3,8 Doors - Steel Doors incl hw EA Floor - Wood,0 SF $,8 Lighting - Pendent/Surface EA Marker Board LF $3 HARPER HS Page of Assessment Date: 0/3/0
Category: Classrooms Choral Room ( room) 0 S Wood St Chicago, IL 03 Walls - Plaster/Drywall,900 SF $,0 Computer Lab ( rooms) Culinary ( rooms) AC Units EA $,8 Casework LF $0 Ceiling - Lay-in, SF $8,0 Ceiling - Lay-in,8 SF $, Ceiling - Plaster/Drywall 80 SF $3,0 Chalk Board 3 LF $ Doors - Transom Window SF $3 Doors - Wood Doors inclu hw 9 EA $,09 Floor - Carpet SF $,9 Floor - Tile/Sheet,8 SF $,8 Floor - Wood,9 SF $,9 Lighting - Lay-in 8 EA Lighting - Pendent/Surface EA $,0 Marker Board LF $,9 Storage/ Closet SF $90 Walls - Plaster/Drywall, SF $0,98 Walls - Plaster/Drywall,9 SF $3,98 Work Sink EA $39 AC Units EA $99 Casework 0 LF $3,030 Ceiling - Plaster/Drywall,88 SF $9,98 Doors - Side-lite 9 SF $0 Doors - Steel Doors incl hw 3 EA $903 Doors - Transom Window 9 SF $ Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet,0 SF $, Floor - Wood,3 SF $8,0 Lighting - Pendent/Surface 3 EA Marker Board LF $ Storage/ Closet SF $,3 Walls - Plaster/Drywall,0 SF $,9 Work Sink EA $, HARPER HS Page of Assessment Date: 0/3/0
Category: Classrooms Faculty Lounge ( rooms) Other Instructional Use ( rooms) (9 rooms) 0 S Wood St Chicago, IL 03 AC Units EA $99 Ceiling - Lay-in,30 SF $,89 Doors - Steel Doors incl hw EA $30 Doors - Transom Window 9 SF $ Doors - Wood Doors inclu hw EA Floor - Tile,30 SF $3, Lighting - Lay-in EA Lighting - Pendent/Surface 0 EA Marker Board 9 LF $93 Storage/ Closet 90 SF $3 Walls - Plaster/Drywall,98 SF $,3 Walls - Plaster/Drywall,0 SF $,99 AC Units EA $,93 Casework LF $ Ceiling - Plaster/Drywall, SF $,3 Ceiling - Plaster/Drywall,9 SF $0,30 Chalk Board 0 LF $,83 Doors - Transom Window 33 SF $9 Doors - Wood Doors inclu hw EA $, Floor - Tile,3 SF $3,000 Floor - Tile/Sheet 90 SF $90 Floor - Wood,30 SF $,8 Lighting - Pendent/Surface 8 EA $99 Lighting - Pendent/Surface 3 EA Marker Board 3 LF $,89 Storage/ Closet SF $399 Walls - Concrete Block, SF $,9 Walls - Plaster/Drywall,008 SF $,0 Walls - Structural Glazed Tile,0 SF $3, AC Units 39 EA $9,38 Casework 9 LF $,3 Ceiling - Lay-in 8 SF $,908 Ceiling - Lay-in 3, SF $,8 Ceiling - Plaster/Drywall 3,8 SF $30, HARPER HS Page 8 of Assessment Date: 0/3/0
Category: Classrooms (9 rooms) Science Lab Level ( rooms) 0 S Wood St Chicago, IL 03 Ceiling - Plaster/Drywall, SF $,99 Chalk Board 9 LF $8 Chalk Board 0 LF $,0 Chalk Board 9 LF $0 Doors - Steel Doors incl hw EA Doors - Transom Window 30 SF $,8 Doors - Transom Window SF Doors - Wood Doors inclu hw EA $, Floor - Tile,8 SF $0,0 Floor - Wood 9, SF $3,8 Lighting Lighting - Lay-in 9 EA Lighting - Pendent/Surface 9 EA $,9 Lighting - Pendent/Surface 3 EA $, Lighting - Pendent/Surface 38 EA Marker Board LF $,3 Storage/ Closet, SF $,3 Walls - Plaster/Drywall 9,03 SF $8,0 Walls - Plaster/Drywall 3,8 SF $8,8 Work Sink EA $8,9 Work Sink EA $,08 Work Sink 3 EA $,3 AC Units EA $99 Ceiling - Plaster/Drywall,00 SF $,000 Ceiling - Plaster/Drywall,00 SF $3,80 Chalk Board LF $,00 Doors - Transom Window SF $ Doors - Wood Doors inclu hw EA $,0 Eye Wash Station EA $ Floor - Tile,00 SF $, Floor - Tile/Sheet,00 SF $,0 Fume Hood EA $8 Gas Line EA $,09 Lighting - Lay-in 0 EA Lighting - Pendent/Surface 30 EA Marker Board LF $ HARPER HS Page 9 of Assessment Date: 0/3/0
Category: Classrooms Science Lab Level ( rooms) Science Lab Level 3 (3 rooms) 0 S Wood St Chicago, IL 03 Science Lab Shower EA $39 Storage/ Closet SF $,98 Walls - Plaster/Drywall 930 SF $,08 Walls - Plaster/Drywall,9 SF $,90 Work Sink 8 EA $,8 AC Units EA $,98 Ceiling - Lay-in,00 SF $,0 Ceiling - Plaster/Drywall 0 SF $,88 Ceiling - Plaster/Drywall 80 SF $,9 Chalk Board 30 LF $, Doors - Transom Window 8 SF $83 Doors - Wood Doors inclu hw EA $,80 Eye Wash Station 3 EA $,008 Floor - Tile 3,0 SF $,8 Lighting - Lay-in 3 EA Lighting - Pendent/Surface 0 EA Marker Board LF $900 Storage/ Closet 8 SF $,9 Walls - Plaster/Drywall,30 SF $,88 Work Sink EA $, Special Program (3 rooms) Store Room (3 rooms) AC Units EA $9 Ceiling - Plaster/Drywall 3,83 SF $3, Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw EA $,80 Floor - Tile,0 SF $3,3 Floor - Wood, SF $,039 Lighting - Pendent/Surface 8 EA Marker Board LF $ Storage/ Closet SF $0 Walls - Plaster/Drywall, SF $,9 Walls - Plaster/Drywall,00 SF $3,93 Work Sink EA $39 AC Units EA $99 HARPER HS Page 0 of Assessment Date: 0/3/0
Category: Classrooms Store Room (3 rooms) 0 S Wood St Chicago, IL 03 Auto Repair Lifts EA $93 Casework LF $ Ceiling - Exposed 3, SF $,9 Ceiling - Plaster/Drywall SF $,09 Ceiling - Splined 8 SF $ Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $,0 Dust Collection System EA $9,93 Floor - Epoxy/ Painted 3, SF $,0 Floor - Wood, SF $0,8 Lighting - Pendent/Surface EA $,8 Lighting - Pendent/Surface 30 EA Marker Board LF $8 Storage/ Closet SF $3,9 Walls - Concrete Block,09 SF $,00 Walls - Plaster/Drywall,90 SF $,8 Vacant (3 rooms) AC Units EA $,98 Casework LF $0 Ceiling - Plaster/Drywall 3 SF $, Ceiling - Plaster/Drywall, SF $,90 Doors - Transom Window 0 SF $8 Doors - Wood Doors inclu hw EA $,80 Floor - Wood,9 SF $,90 Lighting - Pendent/Surface EA $,88 Lighting - Pendent/Surface EA Marker Board 09 LF $,33 Storage/ Closet SF $ Walls - Plaster/Drywall 3,90 SF $0, Work Sink EA $39 Classrooms Subtotal: $,03,09 Building: Main Category: Rooms (Other Than Classrooms) HARPER HS Page of Assessment Date: 0/3/0
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 0 S Wood St Chicago, IL 03 AC Unit EA $,93 Ceiling - Lay-in SF $, Ceiling - Lay-in,9 SF $,38 Ceiling - Plaster/Drywall 9 SF $,99 Ceiling - Plaster/Drywall 9 SF $3,3 Doors - Steel Doors incl hw EA Doors - Store Front EA $, Doors - Transom Window SF $9 Doors - Wood Doors inclu hw 8 EA $8,8 Floor - Carpet 890 SF $,89 Floor - Terrazzo 3 SF $88 Floor - Tile,3 SF $,9 Floor - Tile 8,3 SF $,3 Floor - Wood,38 SF $9,8 Lighting - Lay-in 3 EA $3 Lighting - Lay-in 0 EA Lighting - Pendent/Surface EA $,33 Lighting - Pendent/Surface 9 EA Power Distribution 8 EA $3,8 Storage/ Closet SF $ Walls - Concrete Block, SF $,90 Walls - Plaster/Drywall,38 SF $0,0 Walls - Plaster/Drywall,8 SF $, Walls - Structural Glazed Tile 0 SF $,900 Auditorium & Theater Balcony Seating EA $0,000 Ceiling - Plaster/Drywall 3,98 SF $90, Doors - Wood Doors inclu hw 8 EA $,8 Floor - Wood 3,98 SF $, Lighting - Pendent/Surface EA Main Floor Seating 9 EA $03,80 Sound System EA $0, Stage 3 SF $,3 Stage Curtain 8 EA Stage Lighting System EA $8,0 Stage-Stairs - Wood 8 LF $9 Walls - Masonry,3 SF $,088 HARPER HS Page of Assessment Date: 0/3/0
Category: Rooms (Other Than Classrooms) Auditorium & Theater 0 S Wood St Chicago, IL 03 Walls - Plaster/Drywall, SF $9,83 Gymnasia Locker/Shower Room MDF_IDF Ceiling - Plaster/Drywall 3,900 SF $,0 Doors - Wood Doors inclu hw EA $,80 Floor - Wood 3,900 SF $,9 Lighting - Metal Halide/ High Pressure Sodium 3 EA $,99 Scoreboards EA $, Storage/ Closet 9 SF $, Walls - Structural Glazed Tile,8 SF $,83 Accessories,0 SF $,9 Benches, ped mounted LF $,98 Ceiling - Plaster/ Drywall,0 SF 3 $,888 Doors - Transom Window SF $ Doors - Wood Doors inclu hw EA Floor - Tile Ceramic/ Porcelain,0 SF $3, Floor Drain EA $,3 Hand Dryer EA $3, Lavatory EA $39 Lighting - Pendent/Surface EA Partitions EA $9 Showers EA $, Student Lockers - Two Tier EA $,98 Walls - Structural Glazed Tile,8 SF $,99 Water Closet EA $ AC Unit EA $9 Doors - Steel Doors incl hw EA $30 Finishes SF $,03 Mechanical/ Service Rooms AC Unit EA $9 Boiler Room,098 SF $,8 Janitor's Closet 3 SF $380 Mechanical/ Service Rooms 8 SF $3,83 Storage Room 3,3 SF $,88 HARPER HS Page 3 of Assessment Date: 0/3/0
Category: Rooms (Other Than Classrooms) Mechanical/ Service Rooms 0 S Wood St Chicago, IL 03 Vaults, SF $, Pool & atatorium Prep Room Restroom Accessories, SF $,80 Ceiling - Lay-In, SF $8,80 Doors - Steel Doors incl hw EA $30 Floor - Tile Ceramic/ Porcelain, SF $, Lighting - Pendent/Surface EA Lighting - Wall Mounted 30 EA $3, Pool Basin, SF $,09 Pool Deck SF $, Pool Deck Drains 8 EA $3,3 Walls - Masonry,8 SF $,39 Ceiling - Lay-in 9 SF 8 Doors - Wood Doors inclu hw EA $30 Floor - Tile 9 SF $30 Lighting - Lay-in EA Walls - Plaster/Drywall 398 SF $,098 Accessories 3,3 SF $3,39 Ceiling - Plaster/Drywall 3,3 SF $,83 Doors - Transom Window 3 SF $0 Doors - Wood Doors inclu hw 9 EA $,9 Floor - Tile 9 SF $ Floor - Tile 8 SF $80 Floor - Tile Ceramic/ Porcelain 3,89 SF $,9 Floor Drain 8 EA $8,3 Lavatory EA $8,9 Lighting - Pendent/Surface EA $ Lighting - Pendent/Surface EA Lighting - Wall Mounted EA $8 Partitions EA $, Showers EA $3 Urinals EA $,3 Walls - Concrete Block 8 SF $,33 Walls - Plaster/Drywall 33 SF $,00 HARPER HS Page of Assessment Date: 0/3/0
Category: Rooms (Other Than Classrooms) Restroom 0 S Wood St Chicago, IL 03 Walls - Plaster/Drywall SF $ Walls - Structural Glazed Tile 3,38 SF $0,9 Water Closet EA $,9 Rooms (Other Than Classrooms) Subtotal: $,0, Building: Main Category: Building Interior Corridor Ceiling - Plaster/Drywall, SF $0,99 Doors - Steel Doors incl hw 8 EA $,8 Doors - Wood Doors include hw 8 EA $,8 Drinking Fountains - Single Fountain EA $,8 Floor - Terrazzo 8,09 SF $,99 Floor - Tile/Sheet 3,3 SF $,93 Lighting - Pendent/Surface 98 EA $, Lighting - Pendent/Surface 9 EA Student Lockers - Two Tiers,00 EA $0,8 Walls - Plaster/Drywall,8 SF $89,0 Safety Stairs Vertical Conveyance Camera Viewing Station EA $83 Metal Dedector EA $, Security Cameras 3 EA $,3 Ceiling - Plaster/Drywall,9 SF $8,3 Floor - Terrazzo,9 SF $00,30 Handrails,9 LF $, Lighting - Pendent/Surface 8 EA Stairs - Terrazzo 9 LF $9,08 Walls - Masonry,8 SF $,9 Walls - Plaster/Drywall,8 SF $8,9 Elevator - Elevator- Roped Holeless Hydraulic EA HARPER HS Page of Assessment Date: 0/3/0
Category: Building Interior 0 S Wood St Chicago, IL 03 Building Interior Subtotal: $,39,383 Total Building Cost $,8,09 Building: Addition Category: Building Exterior Entrance Entrance Control - Audio and Video EA Exterior Doors - Exterior FRP Door EA $, Exterior Doors - Exterior Steel Door EA $9 Exterior Doors - Transom Lite EA $,880 Power Door Operator and Controls EA Foundation Lighting Roof System Walls Windows Foundation - Concrete 83 LF Superstructure - Metal Deck/ Concrete Topping,9 SF Exterior Lighting - Parapet or Roof Mounted 3 EA $,0 Exterior Lighting - Wall Mounted 9 EA $,99 Coping - Metal LF $,0 Downspouts - Interior Downspouts 0 LF $3,0 Roof - Asphalt Gravel Ballast,0 SF $,0 Roof Structure - Steel / Metal Deck/ Concrete Topping,0 SF Canopy - Concrete/ Stucco, SF $38,0 Exterior Walls - Brick SF $0, Exterior Walls - Brick 3, SF $88, Guard - Guards perforated SF $9,8 Guard - Guards wire guard 9 SF $,3 Lintels - Steel 399 LF $,83 Windows - Sash Aluminum Double-pane, SF $,03 HARPER HS Page of Assessment Date: 0/3/0
Building: Addition Category: Building Exterior 0 S Wood St Chicago, IL 03 Building Exterior Subtotal: $93,3 Building: Addition Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs,990 SF $98 Emergency A/C Power - Gym 8,8 SF $3, Emergency A/C Power - Lunchrooms, SF $, Exit Signs - Corridors and Stairs 8 EA $,98 Exit Signs - Gym EA $8 Exit Signs - Lunchroom EA $,08 Security System - CCTV,9 SF $3,803 Security System - Intrusion Detection,9 SF $,83 Main Service Power Distribution Main Electrical Service - 00 A /80/3PH EA $,3 PA System,9 SF $,8 Lighting and Power Panels - 00 A EA $,89 Lighting and Power Panels - 00 A EA $,89 Lighting and Power Panels - 00 A EA $98 Lighting and Power Panels - Above 00 A EA $,988 Main Distribution Panels - 0-00 amp EA $8 Transformers - /80-0/08 EA $, Electrical System Subtotal: $9,8 Building: Addition Category: Safty System Fire Alarm Fire Alarm Strobe Lights,9 SF $,3 Fire Alarm_System,9 SF $9,3 Safty System Subtotal: $3,808 HARPER HS Page of Assessment Date: 0/3/0
Building: Addition Category: Mechanical System Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing Temperature Control Ventilation 0 S Wood St Chicago, IL 03 Air Handling Unit- Built Up- Single Zone- Steam Coils - 00-8000 cfm EA $,083 Air Handling Unit- Built Up- Single Zone- Steam Coils - 800-000 cfm EA $3,00 Air Handling Unit- Built Up-Multi Zone- Steam Coils - 800-000 cfm EA,003 Air Intake EA $,9 Air Intake EA $, Auxiliaries - 00-8000 cfm EA $3,3 Auxiliaries - 800-000 cfm EA $,8 Return Duct Work - Indoor- Vertical Shaft and Ducts 00 LF $9,98 Return Duct Work - Masonry and Ducts- Missing or Existing Shaft 00 LF $,8 Roof Top Unit-Multi Zone-Roof Mounted- Electric and DX Cooling w/ Self Contained EA $, Compressor - - 30 tons Zone Dampers EA $3,39 Piping - Condensate Pipe- Steel 00 LF $89 Piping - Steam Pipe- Steel 00 LF $89 Steam Traps EA $,0 Fin Tube - Electric 00 LF $,0 Condenser Pump - Less than 0 EA $, Pneumatic System,9 SF $39, Thermostats - Pneumatic 3 EA $, Thermostats - Pneumatic EA Exhaust Fans- Roof Mounted - 0-8000 CFM 3 EA $, Exhaust Fans- Roof Mounted - 00-00 CFM 3 EA $,3 Exhaust Fans- Roof Mounted - 00-00 CFM 8 EA $,39 Type II Exhaust Hood- Warming Kitchen EA $,8 Mechanical System Subtotal: $9,93 Building: Addition Category: Plumbing System HARPER HS Page 8 of Assessment Date: 0/3/0
0 S Wood St Chicago, IL 03 Piping Domestic Piping-Cold Water from Risers to Fixtures,9 SF $9,0 Domestic Piping-Cold Water Horizontal Lines,9 SF $, Domestic Piping-Cold Water Risers,9 SF $8, Domestic Piping-Hot Water from Risers to Fixtures,9 SF $,30 Domestic Piping-Hot Water Horizontal Lines,9 SF $8, Domestic Piping-Hot Water Return Lines,9 SF $,3 Domestic Piping-Hot Water Return Risers,9 SF $,3 Sanitary Piping,9 SF $,0 Storm Piping,9 SF $,09 Vent Piping,9 SF $30,893 Plumbing System Subtotal: $0,898 Building: Addition Category: Classrooms Computer Lab ( room) ( room) AC Units EA $99 Ceiling - Lay-in 80 SF $,0 Chalk Board 8 LF $,3 Doors - Steel Doors incl hw EA $30 Floor - Tile/Sheet 80 SF $8 Lighting - Lay-in 0 EA Storage/ Closet 33 SF $39 Walls - Concrete Block,8 SF $3, AC Units EA $99 Ceiling - Lay-in SF $, Doors - Wood Doors inclu hw EA $30 Floor - Tile SF $, Lighting - Lay-in EA $,98 Marker Board 8 LF $38 Storage/ Closet 3 SF $ Walls - Concrete Block 9 SF $,89 Classrooms Subtotal: $,9 Building: Addition HARPER HS Page 9 of Assessment Date: 0/3/0
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 0 S Wood St Chicago, IL 03 AC Unit EA $,98 Ceiling - Lay-in 3,3 SF $9,9 Doors - Steel Doors incl hw EA $30 Doors - Wood Doors inclu hw EA $,80 Floor - Carpet, SF $,3 Floor - Tile, SF $,9 Lighting - Lay-in 83 EA Lighting - Pendent/Surface EA Power Distribution 38 EA $93,33 Storage/ Closet SF $399 Walls - Concrete Block 3,0 SF $0, Walls - Plaster/Drywall 08 SF $ Work SInk EA 8 Gymnasia Kitchen Library Bleacher Seating 800 EA $3, Ceiling - Exposed 8,8 SF $, Doors - Steel Doors incl hw 8 EA $,8 Floor - Wood 8,8 SF $9,9 Lighting - Metal Halide/ High Pressure Sodium 8 EA $3, Scoreboards EA $, Sound System EA $, Storage/ Closet 9 SF $, Walls - Concrete Block,8 SF $, Walls - Structural Glazed Tile 3,90 SF $, Ceiling - Plaster/Drywall,90 SF $,0 Doors - Wood Doors inclu hw EA Floor - Terrazzo,90 SF $3,9 Lighting - Pendent/Surface 8 EA Walls - Structural Glazed Tile,88 SF $, Casework LF $,8 Ceiling - Lay-in,33 SF $9,0 Doors - Wood Doors inclu hw EA $,0 Floor - Carpet,33 SF $3,9 Lighting - Lay-in 0 EA $0, Storage/ Closet SF $39 HARPER HS Page 0 of Assessment Date: 0/3/0
Building: Addition Category: Rooms (Other Than Classrooms) Library 0 S Wood St Chicago, IL 03 Walls - Concrete Block,3 SF $,0 Walls - Plaster/Drywall,8 SF $,0 Locker/Shower Room Accessories,0 SF $,9 Benches, ped mounted LF $,389 Ceiling - Plaster/ Drywall,0 SF $,8 Doors - Steel Doors incl hw 8 EA $,8 Floor - Tile Ceramic/ Porcelain,0 SF $03,9 Floor Drain EA $,9 Hand Dryer 8 EA $,8 Lavatory EA $39 Lighting - Pendent/Surface 9 EA Partitions EA $9 Showers 0 EA $8,8 Student Lockers - One Tier 00 EA $9,8 Student Lockers - Two Tier 8 EA $,80 Urinals EA $,3 Walls - Structural Glazed Tile,8 SF $3,38 Water Closet EA $ Lunch & Multipurpose Room Mechanical/ Service Rooms Ceiling - Lay-in 8, SF $,98 Doors - Steel Doors incl hw EA $,0 Doors - Wood Doors inclu hw 0 EA $3,00 Floor - Terrazzo 3, SF $, Floor - Tile, SF $, Lighting - Lay-in 08 EA Lighting - Pendent/Surface EA Serving Line 80 LF $, Walls - Masonry,093 SF $3,39 Walls - Plaster/Drywall 0 SF $,98 Walls - Structural Glazed Tile 8,33 SF $,8 Janitor's Closet 3 SF $ Mechanical/ Service Rooms 9 SF $,09 Storage Room, SF $8,00 HARPER HS Page of Assessment Date: 0/3/0
Building: Addition Category: Rooms (Other Than Classrooms) Restroom 0 S Wood St Chicago, IL 03 Accessories SF $3 Ceiling - Plaster/Drywall SF $9 Doors - Wood Doors inclu hw EA $30 Floor - Tile Ceramic/ Porcelain SF $9 Lavatory EA $30 Lighting - Pendent/Surface EA Walls - Structural Glazed Tile 0 SF $0 Water Closet EA $33 Rooms (Other Than Classrooms) Subtotal: $99,98 Building: Addition Category: Building Interior Safety Security Cameras 3 EA $,3 Building Interior Subtotal: $,3 Total Building Cost $3,33,88 SITE Category: Site Civil/Drainage Fencing Civil/ Drainage - Catch Basin 3 EA $,0 Civil/ Drainage - Catch Basin EA $, Civil/ Drainage - Site Manhole 8 EA $,89 Fencing - Chain Link 8 LF $, Fencing - Chain Link 9 LF $,80 Fencing - Iron and Concrete Post 0 LF $3 Fencing - ew Standard Ornamental,8 LF $3,9 Fencing - Old Standard Ornamental 8 LF $,30 HARPER HS Page of Assessment Date: 0/3/0
0 S Wood St Chicago, IL 03 SITE Category: Site Landscape Parking Lot Sidewalks Signage Landscape - Grass 8, SF $, Landscape - Hardscape- Asphalt,3 SF $,9 Landscape - Hardscape- Concrete, SF $3,0 Landscape - Hardscape- Concrete, SF $3,90 Parkway trees 3 EA $3,98 Planting Beds/ Area 3,8 SF $, Surface - Asphalt 0,3 SF $,38 Surface - Concrete 8 SF $89 Trash Compactor EA Trash Enclosure - Chain Links SF $,30 Sidewalks - Internal Walks LF $9,83 Sidewalks - Internal Walks 8 LF $3,099 Sidewalks - Perimeter Sidewalks,09 SF $,03 Sidewalks - Perimeter Sidewalks, SF $9,00 Flag Pole - Flag Pole EA $, Marquee - Free Standing Back Lighted EA Site Subtotal: $,99 Total Site Cost $,99 Campus Total ² ³ $,8, ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. HARPER HS Page 3 of Assessment Date: 0/3/0
Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. 0 S Wood St Chicago, IL 03 Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. HARPER HS Page of Assessment Date: 0/3/0
0 S Wood St Chicago, IL 03 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Band Room Choral Room Computer Lab Computer Lab Computer Lab Computer Lab Culinary Culinary Faculty Lounge Faculty Lounge Other Instructional Use Other Instructional Use Other Instructional Use Other Instructional Use Other Instructional Use Band Room Music Room Computer Lab Computer Lab Computer Lab Culinary Store Room Other Instructional Use Other Instructional Use Faculty Lounge Science Classroom th Floor th Floor st Floor nd Floor nd Floor th Floor th Floor nd Floor th Floor st Floor th Floor st Floor st Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor th Floor th Floor th Floor 8 0 30 0 98B 0 30 3 3 0 00 0 0 03 0 0 09 300 30 303 30 30 309 3 3 3 8 0 30 0 98B 0 30 3 3 0, A, B 00 0 0 03 0 0 09 300 30 303 30 30 309 3 3 3,30,0,8 80,0,3,09 3,3 90 90 80 0 80 9 80 88 8 88 88 88 8 8 90 88 88 88 88 90 88 8 8 30 0 9 9 0 0 0 9 330 90 80 0 08 0 0 80 0 80 0 80 0 90 0 80 0 80 80 80 80 8 300 300 80 300 80 80 8 0 0 90 88 3 3 8 30 0 90 8 3 8 8 8 3 8 8 8 39 300 300 8 300 8 3 8 39 3 3 HARPER HS Page of Assessment Date: 0/3/0
0 S Wood St Chicago, IL 03 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Science Lab Level Science Lab Level Science Lab Level 3 Science Lab Level 3 Science Lab Level 3 Special Program Special Program Special Program Store Room Store Room Store Room Vacant Vacant Vacant Science Lab Level Science Lab Level Science Classroom Science Lab Level 3 Science Lab Level 3 Special Program Autoshop Band Room Special Program th Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor st Floor st Floor st Floor th Floor th Floor th Floor th Floor 9 0 ROTC 30 3 30 33 0 3 ROTC 0 3 9 39 9 0 98A 30 3 30 33 0 3 0 0 3 9 39 88 88 9 90 90 9,00,00 90,00,00,0,00, 3, 8 88 88 8 0 0 8 8 0 90 0 0 0 0 0 0 9 80 80 0 3 80 0 0 80 80 0 0 3 3 0 0 0 39 8 8 8 8 8 3 3 Addition Computer Lab Health nd Floor nd Floor 8 0 8 0 80 30 3 0 8 0 HARPER HS Page of Assessment Date: 0/3/0