Looking into the Future Bentley Systems, Incorporated

Similar documents
Field Asset Data Collection and Integration with the Enterprise Database

2014 Bentley Systems, Incorporated. Industry Futures Dean Bowman, PE Bentley Fellow Bentley Systems

Integrated Life Cycle Management for Design, Modeling, and Operation of Stormwater Drainage Systems

Stream Design: From GEOPAK to HEC-Ras

SEPTEMBER, 2018 PREDICTIVE MAINTENANCE SOLUTIONS

Bentley Civil Update and Direction

Civil Product Update. Derricke Gray, Product Manager Bentley Civil Americas

Excellence in Engineering Since 1946

Success Stories within Factories of the Future

Integration of Traditional and Non- Traditional Remote Sensing for Bridge Condition Assessment

Forecasting Paper. Name. University / Affiliation / Institution

Sustaining Water Infrastructure using Bentley Water Solutions

Integrating Survey, CAD and GIS into a Single Solution

3D Modeling Demonstration

Quality Digest November

ELECTRIC DRAFTING TECHNICIAN I ELECTRIC DRAFTING TECHNICIAN II

X11-Using the New Civil Geometry Tools

Innovation through Smart Specialisation in MENA Countries

Introducing Bentley Map VBA Development

acatech Industrie 4.0 Maturity Index Development of company-specific Industrie 4.0 roadmaps FIR e. V. an der RWTH Aachen

Israel Railways No Fault Liability Renewal The Implementation of New Technological Safety Devices at Level Crossings. Amos Gellert, Nataly Kats

Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued)

2014 Bentley Systems, Incorporated. Bentley Rail Track SELECTseries2 Maintenance Release

Building a Smart Manufacturing Experimental Factory in Anna University

Corridors. To create a corridor you must have an alignment (baseline), a profile (existing or proposed), and an assembly.

Project Lead the Way: Civil Engineering and Architecture, (CEA) Grades 9-12

Bentley Rail Design Update. Robert Nice Bentley UK

LIGHT-SCENE ENGINE MANAGER GUIDE

National Commercial Bank. Digital Symposium City Lights by Morris Taylor

Application of AI Technology to Industrial Revolution

OpenBridge Modeler: What is it and how can I use it today?

Bentley Rail Track Update

TERMS OF REFERENCE FOR CONSULTANTS

FOUNDATION Fieldbus: the Diagnostics Difference Fieldbus Foundation

IBM SPSS Neural Networks

Share with Pride. SwP 013/15. Train Mounted Laser Survey of Birmingham New Street Area Resignalling Phase 7. Neil Archer Signalling Innovations Group

Materials Characterization Cluster A new European initiative

DEVELOPING YOUR DIGITAL ROADMAP

ACCENTURE INDONESIA HELPS REALIZE YOUR

«Digital transformation of Pharma and API Plants: a way to create value for long term sustainability» G. Burba

Industry 4.0: the new challenge for the Italian textile machinery industry

Non-Destructive Bridge Deck Assessment using Image Processing and Infrared Thermography. Masato Matsumoto 1

Sixth Management Seminar for the Heads of National Statistical offices in Asia and the Pacific

Information Technology in Facilities Management. 4 Questions. Demystifying technology 9/1/2014

THE DRIVING FORCE BEHIND THE FOURTH INDUSTRIAL REVOLUTION

BIG IDEAS. Personal design interests require the evaluation and refinement of skills. Learning Standards

Bentley's AECOsim Energy Simulator and What Next for Energy Simulation

MEDIA AND INFORMATION

OSRA Overarching Strategic Research Agenda and CapTech SRAs Harmonisation. Connecting R&T and Capability Development

Future. Ready. SM. Using Meters as Distribution Sensors for Capacitor Bank Monitoring. White Paper

OpenRoads Best Practice - Civil Cells

Technology Plan

Analysis of the influence of track quality for new and existing urban railway lines on train operation

2015 HDR, Inc., all rights reserved.

Optimizing wind farms

Geospatial Keynote Nordic Civil konference I Vejle Bentley Systems, Incorporated 2016 Bentley Systems, Incorporated

Development of the Digital Agenda 2030 Indonesia: Advanced Industry 4.0 Strategy

Programme TOC. CONNECT Platform CONNECTION Client MicroStation CONNECT Edition i-models what is comming

THE EFFECTS OF CURRENT TRENDS ON THE DEVELOPMENT FACTORS OF INDUSTRY 4.0 AND FACTORIES OF THE FUTURE (FOF)

MicroStation CONNECT Edition - Information Modeling for Infrastructure Professionals

Digitalization in Aker BP

CANADA S OCEAN SUPERCLUSTER DRAFT NOVEMBER 1

Machinery Prognostics and Health Management. Paolo Albertelli Politecnico di Milano

Racenet - Sports Gambling. Multi Maxa - MVP app built from scratch

OpenRoads Designer Best Practices Project Management

What's New in RhinoCAM 2018

Civil AccuDraw. Tools > Civil AccuDraw >Activate Toolbar Bentley Systems, Incorporated

2016 Smart Cities Survey Summary Report of Survey Results

Making your ISO Flow Flawless Establishing Confidence in Verification Tools

Computer-Aided Drafting and Design Technology, A.A.S.

Sparking a New Economy. Canada s Advanced Manufacturing Supercluster

Development of a Real Time Trains Monitoring System:Case Study of Tanzania Zambia Railway Authority

Railway Training Simulators run on ESRI ArcGIS generated Track Splines

2010 Bentley Systems, Incorporated. Point Clouds in MicroStation V8i

UWB Real-Time Location Systems in Factory Automation - Examples from the Automotive Industry

Bentley Substation 2010 Bentley Systems, Incorporated Håkan Norling Bentley Professional Services

A Centralised Interlocking System for Low-density Line Signalling with a Predictive Monitoring System

Rail segment. This presentation can be interpreted only together with the oral comments accompanying it

Marketing Assessment Guide

Future of Bentley Plant applications: AutoPLant and OpenPlant

Appendix B: Example Research-Activity Description

The IRIS 320 High speed Measurement Train set

OUR VISION FOR AMERICA S TREASURED OCEAN PLACES

Infographic: Google Search Prevalence by State

Exercise 1: The AutoCAD Civil 3D Environment

Technology Roadmapping An Overview for MAA Thrust Area Work Groups

State of IT Research Study

Tools and Methodologies for Pipework Inspection Data Analysis

Preparing for an Uncertain Future:

Computing Requirements of Sri Lankan Scientific Community

Digital Geotechnical Data: An Informed Client s Perspective

TECHNOLOGY ASSESSMENT STRATEGIC PLAN MISSION STATEMENT VISION STATEMENT

TRADE, SERVICES AND DEVELOPMENT

A STUDY OF WAYFINDING IN TAIPEI METRO STATION TRANSFER: MULTI-AGENT SIMULATION APPROACH

DESIGN AND CAPABILITIES OF AN ENHANCED NAVAL MINE WARFARE SIMULATION FRAMEWORK. Timothy E. Floore George H. Gilman

PolyWorks Inspector Standard. 3 Day Course

Information & Communication Technology Strategy

Full Contents. InRoads Essentials

Wide Area Visualization & SynchroPhasors

3D Cadastre - Bentley Systems Perspective on Today's Motivations and Opportunities

Transcription:

OPTRAM Looking into the Future

Universal Truisms of Rail Too much of: Not Enough of: Infrastructure Problems Maintenance Budget 2 WWW.BENTLEY.COM

Highest Priority Issues How Do You: 1) Know where to work 2) Know what work to do 3) Prioritize work 4) Monitor work progress, costing and material 5) Extend asset life whilst avoiding run to fail 6) Demonstrate competence to operate 7) Improve safety, reliability and Return on Investment 3 WWW.BENTLEY.COM

Integration Collect Interpret Analyze Disseminate Condition Workstation Work Web (Java) Inspection Equipment Location & Video Usage Finance Optram 3rd party software: EAM, Google, GIS, Etc. Handheld/ Tablet Reporting 4 WWW.BENTLEY.COM

Vizualization Enterprise or departmental solution Present decision support information Unified view of infrastructure data such as: Track layout Asset information Corridor assets Work items Condition data 5 WWW.BENTLEY.COM

Sample Optram Screen Mile/KM Post Track Layout Designed & Measured Curve Work History Defect History Geometry History Roughness History 6 WWW.BENTLEY.COM

7 WWW.BENTLEY.COM Rail Geometry

Track Geometry with Roughness and OLE 8 WWW.BENTLEY.COM

9 WWW.BENTLEY.COM Image Plot

10 WWW.BENTLEY.COM Video Synchronisation

11 WWW.BENTLEY.COM Links to Documents and Drawings

Looking into the Future Analysis and Forecasting An analytic engine built to automatically turn large amounts of railway data into prioritized actions like: Prioritize and plan work Identify areas of rapid deterioration or instable condition Evaluate work effectiveness Calculate quantitative measures of condition Do preventive maintenance by predicting failures Plan quarterly/monthly instead of annually Forecast when conditions will go out of tolerance 12 WWW.BENTLEY.COM

Optram Analysis and Forecasting Condition Work Inspection Organized & Correlated Data Unified Database Optram Insight Visualization and Reporting Assets Usage Finance Optram Scripts 13 WWW.BENTLEY.COM

Measurement Alignment Automatic 14 WWW.BENTLEY.COM

Measurement Thresholds Create event list based on threshold values in measurement data Output event data Threshold Event 58 57.8 57.6 57.4 57.2 57 56.8 56.6 56.4 56.2 56 0 2 4 6 8 10 12 14 16 15 WWW.BENTLEY.COM

Track Tolerance Use look up tables for defect thresholds for different track types Tables held in database Works on event sets If track type = Class 1 then Gauge Threshold >57.6 If track type = Class 2 then Gauge Threshold >57.2 If track type = Class 3 then Gauge Threshold >56.8 16 WWW.BENTLEY.COM

Script Commands 17 WWW.BENTLEY.COM

Example: Forecast Tamping Forecasts where and when tamping required Optram automates 4 steps: Aligns track measurements Calculates historic quality indexes every 100m Extrapolates when tamping is required Presents results graphically Makes prediction over large railways practical 18 WWW.BENTLEY.COM

Aligns Track Measurements 19 WWW.BENTLEY.COM

Trend Visualization 20 WWW.BENTLEY.COM Tamping History Last Measuremen t Recommend Tamping

Forecast Visualization Historic Forecast Red = Fix Green = OK Recommend Tamping Last Measuremen t Tamping History 21 WWW.BENTLEY.COM

Example: Work Analysis Analyzes where tamping work was effective Optram automates 4 steps: Aligns track measurements Calculate a Track Quality Index for each survey Determine where Track Quality improved Compare improved Quality locations with recorded work Summarizes amount of Productive and unproductive work Unreported work 22 WWW.BENTLEY.COM

Optram Aligns Track Measurements 23 WWW.BENTLEY.COM

Optram Forecast Visualization Recorded work Improved TQI No change in TQI 24 WWW.BENTLEY.COM

Optram Work Analysis Visualization Change in Track Quality Recorded Work Productive work Unproductiv e work 25 WWW.BENTLEY.COM

Other Example Scripts Available Data Correlation Segmentation Creation Segmentation Analysis Quality Calculation Rate of Change Prediction Alert Limits Channel Derivation Channel Filtering Plus whatever the user wants to write 26 WWW.BENTLEY.COM

Look into Future Development Roadmap Field Data System Linking to GIS Data upload from Bentley Rail design products Display and edit survey routes Integration with Bentley Platform 27 WWW.BENTLEY.COM

OPTRAM Looking into the Future