SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

Similar documents
This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

SECTION PANELBOARDS

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis

First Draft Language

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

SECTION POWER SYSTEMS STUDIES

Arc Flash Analysis Training

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

Arc Flash Analysis and Documentation SOP

SECTION DISTRIBUTION SWITCHBOARDS

Electrical Overcurrent Studies

Selective Coordination for Emergency and Legally-Required Standby Power Distribution Systems

{40C54206-A3BA D8-8D8CF }

SECTION DISTRIBUTION SWITCHBOARDS

B. Manufacturers: Square-D, G.E. or Westinghosue.

Electrical Arc Hazards

3Ø Short-Circuit Calculations

2014 NEC Changes Part 1

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

DESIGN CHECKLIST INTRODUCTION

2015 NFPA 70E. SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation

Paul Dobrowsky Innovative Technology Services

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

Arc Flash Calculation Methods

Short Circuit Current Calculations

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

Technical T TECHNICAL. C o n t e n t s SPEEDFAX TM 2017

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

SECTION MEDIUM-VOLTAGE CABLES

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Power System Study for the Pebble #2 Lift Station Las Vegas, Nevada

ECET 211 Electric Machines & Controls Lecture 3-1 (Part 1 of 2) Motor Transformers and Distribution Systems

TABLE OF CONTENT

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Electrical Wiring: Commercial, Seventh Canadian Edition

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ARC FLASH HAZARD ANALYSIS AND MITIGATION

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

NOTICE ER Roland Flood Pumping Station Arc Flash Study

DESIGN STANDARD DS 29

Note: The let-through of the protective device must be equal to or less than the short-circuit current rating of the component being protected.

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Electrical Measurement Safety. Sponsored By:

COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS

Electrical PIP ELEGL03 Guidelines for Power Systems Analysis

NFPA-70E. Electrical Safety in the Workplace. Standard for Edition

Upgrading Your Electrical Distribution System To Resistance Grounding

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Arc Flash Study Principles & Procedures for below 15 kv AC Systems. Xuan Wu, Dennis Hoffman, Ronald Wellman, and Manish Thakur

Webinar: An Effective Arc Flash Safety Program

A Guide to Establish an Arc Flash Safety Program for Electric Utilities

Effective System Grounding

APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

Education & Training

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

NEC 2014 Code Changes

Power System Study for the DL Dusty Dickens Elementary School Las Vegas, Nevada

Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010

1960 Research Drive, Suite 100, Troy, Michigan with. REVISION: December 10, 2007 (Supersedes previous versions) Prepared by:

7. INSPECTION AND TEST PROCEDURES

This document covers common questions concerning the design of an effectively grounded system.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Arc Flash Mitigation An Overview. Gus Nasrallah, P.E. Electroswitch May 30, 2013

E S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY --

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

ET 51 - Electrician Theory Examination Marking Schedule

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Bruce L. Graves /01/$ IEEE. IEEE Industry Applications Magazine PhotoDisc, Inc.

THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA

BED INTERCONNECTION TECHNICAL REQUIREMENTS

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

SECTION MEDICAL AND SURGICAL LIGHTING FIXTURES

Residential Construction Checklist Single and Two Family Construction

UNIFIED FACILITIES GUIDE SPECIFICATIONS

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

REDUCING ARC FLASH HAZARD BY REMOTE SWITCHING

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS

Wisconsin Contractors Institute Continuing Education

ETAP PowerStation 4.0

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Bus Protection Fundamentals

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings

Cutler-Hammer January 1999

SECTION CABLE TRAYS

Poly Canyon Cogeneration System

Transcription:

PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section and renumber the paragraphs. This section shall be included in all projects requiring new electrical systems, or modification to existing electrical systems. Purpose of this specification is to ensure that the selected manufacturer s equipment shall perform as intended. A. This section specifies the overcurrent protective device coordination study, related calculations and analysis, indicated as the study in this section. B. A short-circuit and selective coordination study, and arc flash calculations and analysis shall be prepared for the electrical overcurrent devices to be installed under this project. SPEC WRITER NOTE: For renovation projects, insert the limits of the study in the blank space if a study of the entire electrical system is not specified. C. The study shall present a well-coordinated time-current analysis of each overcurrent protective device from the //individual device// // // up to the utility source// and the on-site generator sources//. 1.2 RELATED WORK A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements that are common to more than one section of Division 26. B. Section 26 13 13, MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR: Mediumvoltage circuit breaker switchgear. C. Section 26 13 16, MEDIUM-VOLTAGE FUSIBLE INTERRUPTER SWITCHES: Mediumvoltage fusible interrupter switches. D. Section 26 23 00, LOW-VOLTAGE SWITCHGEAR: Low-voltage switchgear. E. Section 26 24 13, DISTRIBUTION SWITCHBOARDS: Low-voltage distribution switchboards. 26 05 73-1

F. Section 26 24 16, PANELBOARDS: Low-voltage panelboards. G. Section 26 24 19, MOTOR CONTROL CENTERS: Motor control centers. H. Section 26 32 13, ENGINE GENERATORS: Engine generators. I. Section 26 36 23, AUTOMATIC TRANSFER SWITCHES: Automatic transfer switches. 1.3 QUALITY ASSURANCE A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. B. The study shall be prepared by the equipment manufacturer, and performed by the equipment manufacturer s licensed electrical engineer. 1.4 SUBMITTALS A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Product data on the software program to be used for the study. Software shall be in mainstream use in the industry, shall provide device settings and ratings, and shall show selective coordination by time-current drawings. 2. Complete study as described in paragraph 1.6. Submittal of the study shall be well-coordinated with submittals of the shop drawings for equipment in related specification sections. 3. Certifications: Two weeks prior to final inspection, submit the following. a. Certification by the Contractor that the overcurrent protective devices have been set in accordance with the approved study. 1.5 APPLICABLE PUBLICATIONS A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only. B. Institute of Electrical and Electronics Engineers (IEEE): 241-90...Recommended Practice Electrical Systems in Commercial Buildings 242-03...Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems 26 05 73-2

399-97...Recommended Practice for Industrial and Commercial Power Systems Analysis 1584-02...Performing Arc-Flash Hazards Calculations 1584A-04...Performing Arc-Flash Hazards Calculations Amendment 1 1584B-11...Performing Arc-Flash Hazards Calculations Amendment 2 C. National Fire Protection Association (NFPA): 70-17...National Electrical Code (NEC) 70E-18...Standard for Electrical Safety in the Workplace 99-18...Health Care Facilities Code 1.6 STUDY REQUIREMENTS A. The study shall be in accordance with IEEE and NFPA standards. B. The study shall include one line diagram, short-circuit and ground fault analysis, protective coordination plots for all overcurrent protective devices, and arc flash calculations and analysis. C. One Line Diagram: 1. Show all electrical equipment and wiring to be protected by the overcurrent devices. 2. Show the following specific information: a. Calculated fault impedance, X/R ratios, and short-circuit values at each feeder and branch circuit bus. b. Relay, circuit breaker, and fuse ratings. c. Generator kw/kva and transformer kva and voltage ratings, percent impedance, X/R ratios, and wiring connections. d. Voltage at each bus. e. Identification of each bus, matching the identification on the drawings. f. Conduit, conductor, and busway material, size, length, and X/R ratios. D. Short-Circuit Study: 1. The study shall be performed using computer software designed for this purpose. Pertinent data and the rationale employed in developing the calculations shall be described in the introductory remarks of the study. 2. Calculate the fault impedance to determine the available shortcircuit and ground fault currents at each bus. Incorporate applicable motor and/or generator contribution in determining the 26 05 73-3

momentary and interrupting ratings of the overcurrent protective devices. 3. Present the results of the short-circuit study in a table. Include the following: b. Operating voltage. c. Overcurrent protective device type and rating. d. Calculated short-circuit current. E. Coordination Study: 1. Prepare the coordination curves to determine the required settings of overcurrent protective devices to demonstrate selective coordination. Graphically illustrate on log-log paper that adequate time separation exists between devices, including the utility company upstream device if applicable. Plot the specific time-current characteristics of each overcurrent protective device in such a manner that all devices are clearly depicted. 2. The following specific information shall also be shown on the coordination curves: b. Potential transformer and current transformer ratios. c. Three-phase and single-phase ANSI damage points or curves for each cable, transformer, or generator. d. Applicable circuit breaker or protective relay characteristic curves. e. No-damage, melting, and clearing curves for fuses. f. Transformer in-rush points. 3. Develop a table to summarize the settings selected for the overcurrent protective devices. Include the following in the table: b. Protective relay or circuit breaker potential and current transformer ratios, sensor rating, and available and suggested pickup and delay settings for each available trip characteristic. c. Fuse rating and type. F. Arc Flash Calculations and Analysis: 1. Arc flash warning labels shall comply with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 26 05 73-4

2. Arc flash calculations shall be based on actual over-current protective device clearing time. Maximum clearing time shall be in accordance with IEEE 1584. 3. Arc flash analysis shall be based on the lowest clearing time setting of the over-current protective device to minimize the incident energy level without compromising selective coordination. 4. Arc flash boundary and available arc flash incident energy at the corresponding working distance shall be calculated for all electrical power distribution equipment specified in the project, and as shown on the drawings. 5. Required arc-rated clothing and other PPE shall be selected and specified in accordance with NFPA 70E. 1.7 ANALYSIS A. Analyze the short-circuit calculations, and highlight any equipment determined to be underrated as specified. Propose solutions to effectively protect the underrated equipment. 1.8 ADJUSTMENTS, SETTINGS, AND MODIFICATIONS A. Final field settings and minor modifications of the overcurrent protective devices shall be made to conform with the study, without additional cost to the Government. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ---END--- 26 05 73-5