Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply Chain Management Arrangements for the Hinkley Point C Project

Similar documents
Office for Nuclear Regulation Strategy

ONR perspectives on design assessment and licensing of SMRs

Office for Nuclear Regulation

ONR-NR-PAR Rev 2

ONR Strategy 2015 to 2020

The UK Generic Design Assessment

Office for Nuclear Regulation

Office for Nuclear Regulation

Office for Nuclear Regulation

IOP Nuclear Industry Group

Doing, supporting and using public health research. The Public Health England strategy for research, development and innovation

Managing Projects, Managing Knowledge

SMR Conference Manchester 2014 Regulator s view UK and International. Bob Jennings Systems Lead for ONR s Generic Design Assessment (GDA)

Information & Communication Technology Strategy

New Reactors Programme. GDA close-out for the AP1000. GDA Issues GI-AP1000-CI-05 Smart Device Justification

Our Corporate Responsibility pages 2016

New Nuclear Reactors: Generic Design Assessment

Contribution of civil society to industrial safety and safety culture: lessons from the ECCSSafe European research project

1 HPC Knowledge Management 1 January 2014 EDF Energy plc. All rights Reserved

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

Our digital future. SEPA online. Facilitating effective engagement. Enabling business excellence. Sharing environmental information

Wylfa Nuclear Power Station

Stakeholder involvement in Canadian Initiatives for Deep Geological Repositories for the Long Term Management of Radioactive Wastes

Getting the evidence: Using research in policy making

Creative Informatics Research Fellow - Job Description Edinburgh Napier University

Health Based Exposure Limits (HBEL) and Q&As

Rolling workplan of the Technology Executive Committee for

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

The Gibraltar Financial Services Commission. Experienced Investor Fund Directors Thematic Review Outcomes

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

University of Northampton. Graduate Leaders in Early Years Programme Audit Monitoring Report by the Quality Assurance Agency for Higher Education

II. The mandates, activities and outputs of the Technology Executive Committee

VISUAL ARTS COLLECTION COORDINATOR

Quarterly News. April June Cover Introduction Corporate update Q1 at a glance Programme updates Spotlight 1 Spotlight 2 Looking ahead

Impact of ICH Q9 and the application of Risk Management

COMMUNICATIONS POLICY

CNSC s Regulatory Approach to Small Modular Reactors and Other Advanced Technologies Presentation to UK Nuclear Graduates

Board composition The Board currently comprises seven non-executive directors and one executive director.

Title: care.data Pathfinder Stage CCG Recruitment and Selection Process

The work under the Environment under Review subprogramme focuses on strengthening the interface between science, policy and governance by bridging

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

Sutton CCG. CCG 360 o stakeholder survey 2014 Summary report. Version 1 Internal Use Only Version 1 Internal Use Only

Enfield CCG. CCG 360 o stakeholder survey 2014 Summary report. Version 1 Internal Use Only Version 1 Internal Use Only

DIGITAL LITERACY. Executive Summary. A scoping study to explore the digital skills of NHSScotland Estates and Facilities staff

Artist Residency as part of TATE EXCHANGE at Beaconsfield Gallery Vauxhall, Gasworks and Pump House Gallery

Convention on Certain Conventional Weapons (CCW) Meeting of Experts on Lethal Autonomous Weapons Systems (LAWS) April 2016, Geneva

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

Triennial Review of the Medicines and Healthcare Products Regulatory Agency. Call for Evidence

NHS Vale of York CCG TURNAROUND ACTION PLAN

Digitisation Plan

A Science & Innovation Audit for the West Midlands

Statutory Gender Pay Gap Report 2018

I. Introduction. Cover note. A. Mandate. B. Scope of the note. Technology Executive Committee. Fifteenth meeting. Bonn, Germany, September 2017

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION

ATMP GMP requirements. Andrew Hopkins

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

JOB DESCRIPTION. Department: Technical Length of contract: 3 years renewable. Reporting to: Chief of Party Direct reports: Numbers to be confirmed

GSA SUMMARY REPORT OF EQUALITY CONSIDERATION AND ASSESSMENT OF EQUALITY IMPACT. PGT Ethics Policy. New: Existing/Reviewed: Revised/Updated:

INPRO Dialogue Forum on Sustainable Supply Chains for Advanced Nuclear Power Systems

Submission to the Productivity Commission inquiry into Intellectual Property Arrangements

Public Engagement with Nuclear Energy

Developing a Strong Nuclear Safety Culture. Larry Weber Chief Nuclear Officer, Senior Vice President American Electric Power Cook Nuclear Plant

South West Public Engagement Protocol for Wind Energy

Science and engineering driving the global economy David Delpy, CEO May 2012

Gardens, Libraries and Museums. Digital Strategy Termly Update, June 2018

BUILDING A SAFER FUTURE GUIDANCE DOCUMENT

The Trustees and the Director present the National Gallery s Corporate Plan

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

JOB PROFILE. Corporate Communications Team Leader (Change Programme) Stratford upon Avon

North Sea Safety Regulators responses to Macondo/Montara

Implementation of the integrated emerging contractor development model: Towards enhanced competition for small construction firms

CCG Assurance Framework. England

The CNSC s Approach to Communications

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014

The creation of the Emergency Preparedness and Response Expert Group (EPREG) which held its second meeting last month.

Knowledge Exchange Strategy ( )

EPRI Update. Marc H. Tannenbaum Technical Leader, EPRI. RAPID Clearwater Beach, Florida May16, 2016

NHS SOUTH NORFOLK CLINICAL COMMISSIONING GROUP COMMUNICATIONS AND ENGAGEMENT STRATEGY

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

ICH Q10 Pharmaceutical Quality System

RESEARCH AND INNOVATION STRATEGY. ANZPAA National Institute of Forensic Science

Public Information and Disclosure RD/GD-99.3

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

ABI Framework for the Management of Gone-Away Customers in the Life and Pensions Market

Chief Executive, Offshore Renewable Energy Catapult. Application Pack

Wells Expert Committee Bulletin

Statement of Corporate Intent

The role of women in nuclear - attracting public participation in regulatory decision-making process

MINISTRY OF HEALTH STAGE PROBITY REPORT. 26 July 2016

The Board is comprised of five members, three of whom are independent directors i.e. Mr Tan Cheng Han, Ms Ooi Chee Kar and Mr Rolf Gerber.

Accountable Officer Report

Guide to the Requirements for Public Information and Disclosure GD-99.3

Variation of UK Broadband s spectrum access licence for 3.6 GHz spectrum

NZFSA Policy on Food Safety Equivalence:

RESEARCH AND INNOVATION STRATEGY

Research integrity. House of Commons Science and Technology Committee. Submission from the Royal Academy of Engineering.

Silex Systems - Board Changes

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1

STRATEGIC PLAN

Transcription:

Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply Chain Management Arrangements for the Hinkley Point C Project

15 March 2018 Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply Chain Management Arrangements for the Hinkley Point C Project ONR copyright 2018 The text of this document (this excludes, where present, the Royal Arms and all departmental or agency logos) may be reproduced free of charge in any format or medium provided that it is reproduced accurately and not in a misleading context. The material must be acknowledged as ONR copyright and the document title specified. Where third party material has been identified, permission from the respective copyright holder must be sought. Any enquiries related to this publication should be sent to us at contact@onr.gov.uk

Contents 1. Foreword... 2 2. The CNI inspection of supply chain for Hinkley Point C... 4 3. ONR s intervention... 4 4. Inspection activities... 5 5. Summary of key findings... 6 6. Specific themes identified... 6 Theme 1: Areva s improvement programme... 6 Theme 2: Learning associated with shortfalls at ACF... 6 Theme 3: Supply chain self-assessment improvement programme... 7 Theme 4: Quality Management System shortfalls... 7 Theme 5: Roles and responsibilities for quality... 7 Theme 6: Internal assurance activities... 7 7. Conclusion... 8 1

1. Foreword The Office for Nuclear Regulation s (ONR) overriding purpose is to hold the nuclear industry to account in order to keep the public safe. To operate a nuclear plant in Great Britain, a range of regulatory permissions are needed from ONR to allow construction, commissioning, and subsequent plant operations to commence. This helps ensure that facilities meet our regulatory expectations, maintaining the high standards of safety required under UK law. This was our first Chief Nuclear Inspector s themed inspection, referred to in this summary report as a CNI Inspection. These new inspections are designed to examine Mark Foy Chief Nuclear Inspector regulatory matters that are strategic or broader in nature than our more routine regulatory inspection activities and this report is intended to provide our stakeholders with an easily readable summary of the inspection, its findings and overall conclusions. CNI Inspections are intended to raise awareness of important issues and highlight our regulatory activities and expectations to a wider audience, in addition to the nuclear industry. They will be delivered on a regular basis over and above our normal regulatory activities, which include approximately 1,000 inspections each year across licensed nuclear sites and transport dutyholders. The first themed inspection has examined whether NNB GenCo (HPC) Ltd. s supply chain management arrangements for ensuring the quality of structures, systems and components supplied to Hinkley Point C 1 are fit for purpose. The inspection was instigated as a consequence of the records falsification issues that emerged during 2016 at Areva s Creusot Forge facility 2 in France - a key supplier to the Hinkley Point C Project. In doing so, my inspection team did not form a view on the broader Hinkley Point C project, but was instead seeking assurance on the adequacy of arrangements in a focussed area where potential shortfalls had previously been identified. The team noted improvements have been made since 2016 but it also identified that further work is required to ensure adequate quality management system arrangements are consistently embedded across the wider project, raising regulatory issues where shortfalls where identified. It is important to note however, that there are no current risks to public safety arising from our inspection findings. Importantly, the inspection was timed to allow NNB GenCo to respond to any identified shortfalls in a timely manner, prior to acceleration in both construction and manufacturing activity at the Hinkley Point C project. This ability to shape future safety is a key role for a modern, responsive safety regulator and the CNI Inspection is an effective means for us to demonstrate that we are delivering against our strategic themes of Influencing improvements in nuclear safety and security and Inspiring a climate of stakeholder respect, trust and confidence. 1 NNB GenCo, or Nuclear New Build Generation Company (HPC) Ltd, is the nuclear site licensee for the Hinkley Point C project. The company is a wholly owned subsidiary of EDF Energy. 2 The Le Creusot Forge facility was operated by Areva at the time of inspection. It is now operated by Framatome. 2

Inspection activities involved a total of 11 ONR inspectors in both England and France. I am extremely grateful to our French regulatory colleagues at the Autorité de Sûreté Nucléaire (ASN) for their support in achieving our inspection objectives. This is another example of the close working relationships that we have with fellow national regulators and the benefits that it brings to nuclear safety. It is also worth recognising the co-operation and commitment to the process that was demonstrated by the Hinkley Point C site licensee, EDF NNB GenCo (HPC) Ltd (referred to as NNB GenCo) and its key supplier Areva. Finally, we always welcome feedback from all our stakeholders on how we might improve and how we might communicate better in the future. Please let us know your thoughts at contact@onr.gov.uk 3

2. The CNI inspection of supply chain for Hinkley Point C ONR s new CNI inspections differ from more routine inspections in that they are specifically identified and commissioned by the Chief Nuclear Inspector. The purpose of the inspection is to inform the CNI s position on a specific regulatory matter that is of a strategic nature. A CNI Inspection will usually involve engagement at a senior level and may involve multiple sites and dutyholders, as well as other stakeholders with an interest in the matter being inspected. It may, as in this inspection, include visits and engagements internationally. This inaugural CNI Inspection of the supply chain for Hinkley Point C, was instigated in the context of the records falsification issues that emerged in 2016 at Areva s Creusot Forge facility - a supplier of key components to the Hinkley Point C project. These became apparent after the French nuclear safety regulator, ASN, confirmed that major technical and organisational shortcomings had occurred at the Creusot Forge plant. 3. ONR s intervention In light of these issues, ONR proactively sought to scrutinise the supply chain management arrangements for the Hinkley Point C project, working closely with ASN with whom we have bilateral working arrangements. In late 2016, ONR participated in a multinational inspection of Areva s Creusot Forge led by ASN as part of the international Multinational Design Evaluation Programme (MDEP). The MDEP had targeted the ACF facility due to regulatory concerns regarding historic product record irregularities. The international MDEP inspection identified shortfalls in Areva s quality management arrangements and the adequacy of their corrective action plan. As a result of these shortfalls, a focussed executive level meeting was held between ONR and NNB GenCo in February 2017 and was considered an initial step in rebuilding confidence in NNB GenCo s arrangements. NNB GenCo subsequently wrote to the ONR Chief Nuclear Inspector detailing its improvement action plan and associated governance arrangements. This CNI Inspection was instigated to examine the robustness of NNB GenCo s supply chain management arrangements in light of these commitments, focussing on oversight and assurance arrangements as well as progress against the improvement action plan. NNB GenCo is currently undertaking work associated with design, construction and early manufacturing activities for Hinkley Point C. Although arrangements for control of quality are judged, through ONR s wider regulatory activities, to be appropriate at present, this inspection has identified a number of areas where improvements are required to ensure this position is robustly maintained as the project progresses and the volume of work and resources required increases. The targeted inspection was undertaken during the early stages of construction and manufacturing to allow ONR to reinforce its regulatory expectations and allow NNB Genco to address any identified shortfalls prior to acceleration of both construction and manufacturing activity in support of the Hinkley Point C project. 4

4. Inspection activities The inspection consisted of four interconnected elements beginning at Areva s Creusot Forge and progressing to the Hinkley Point C construction site to assess the effective deployment of lessons for other key project contractors. ONRs activities were carried out in October and November 2017 over four sites: Areva s Creusot Forge, NNB GenCo s Delivery and Command Centre in Bristol, Hinkley Point C construction site, and NNB GenCo s Engineering Command Centre in Paris. In total, 11 ONR inspectors undertook the inspection activities over seven inspection days. The outcome of all four elements informed the judgements and conclusions of the overall CNI Inspection which has been recorded in an ONR Intervention Record in line with our normal regulatory practices.. Image courtesy of EDF Energy 2018 5

5. Summary of key findings ONR believes that good progress has been made by NNB GenCo and its key supplier Areva Creusot Forge in deploying their improvement programme - including enhanced manufacturing processes, management system arrangements and safety and quality culture. ONR concluded that further work is required to ensure that adequate quality management system arrangements are consistently embedded across the wider Hinkley Point C project, but also recognised the commitment by NNB GenCo to continue to deliver its improvement action plan to achieve this. For this reason, ONR has rated the overall inspection finding as amber. This means that some arrangements are below standard and ONR is seeking improvements against a number of Regulatory Issues that have been raised under Licence Condition 17 (Management Systems). Timely resolution of the issues identified in this inspection will ensure adequate arrangements are properly implemented across the project and contribute to NNB GenCo s aim of quality right first time delivery. 6. Specific themes identified The key findings and judgements of the CNI Inspection can be most appropriately defined against six key themes listed below. The first theme reflects the positive progress made by NNB GenCo and its key supplier Areva against their improvement programmes. The remaining five themes represent deficiencies in arrangements and a Regulatory Issue has been raised by ONR against each, defining the required improvement activity. It is ONRs view that they highlight deficiencies in NNB GenCo s management system arrangements. ONR will track these issues to completion and engage with the licensee to ensure they are addressed in line with our regulatory expectations, ensuring that the high standards expected to ensure nuclear safety are maintained. Theme 1: Areva s improvement programme Overall, ONR is broadly satisfied with the enhanced management system arrangements at Areva Creusot Forge. The inspection team concluded that Areva and NNB GenCo had made good progress in deploying their improvement programme and had enhanced their manufacturing processes, management system arrangements and the facility s nuclear safety and quality culture. However, as the improvement programme is not yet fully deployed, the enhanced arrangements have yet to be fully embedded and will therefore require continued drive and appropriate oversight and assurance from NNB GenCo as the Intelligent Customer. Theme 2: Learning associated with shortfalls at ACF The effective deployment of lessons learnt to other key contractors was a key element of the CNI Inspection. Evidence was not provided during the inspection to demonstrate how NNB GenCo had captured all key learning from the issues associated with the failings at Areva Creusot Forge and ensured effective dissemination to key contractors interviewed as part of this inspection. 6

Theme 3: Supply chain self-assessment improvement programme NNB GenCo s own Supply Chain Improvement Programme examined during the inspection requires further development to ensure it is effectively prioritised, time-bound, resourced and better aligned to the project schedule and associated regulatory permissioning points. We also concluded that the plan requires enhanced project-wide governance and leadership to ensure effective delivery. Theme 4: Quality Management System shortfalls The CNI Inspection found shortfalls in NNB GenCo s quality management system arrangements related to supply chain management activity. Some shortfalls had been identified during NNB GenCo s supply chain self-assessment activity performed in advance of the inspection. However, we identified further shortfalls related specifically to: inspection and test plans; internal assurance; and supply chain assurance activity. Addressing these issues should ensure that effective quality management system arrangements are maintained across the project as it accelerates and the work and number of contractors on site increases. Theme 5: Roles and responsibilities for quality We found that there was a lack of clarity over the project-wide leadership of NNB GenCo s quality organisation, this included responsibility for establishing an effective management system and communicating the quality standards, roles and responsibilities across the project to ensure right first time delivery on the construction site. Theme 6: Internal assurance activities Given the findings of the CNI Inspection, and the shortfalls identified through NNB GenCo s own supply chain self-assessment, it is evident that NNB GenCo needs to consider the effectiveness of its current project assurance arrangements and identify areas for improvement. 7

7. Conclusion This inspection was performed in the early stages of NNB GenCo s construction and manufacturing programmes. The timing will allow NNB GenCo to address the identified shortfalls prior to the build-up of increased levels of construction and manufacturing activity at Hinkley Point C. Alongside the good progress in deploying the improvement programmes at Areva Creusot Forge and NNB GenCo, the inspection has identified five thematic shortfalls which will each be tracked to closure through an associated ONR Regulatory Issue. The resolution of these issues will help mitigate the risk of substandard manufacture and construction quality, and potential impacts to the construction schedule and ONR s project permissioning decisions. For each of the five Regulatory Issues raised, detailed corrective actions will be agreed with NNB Genco that will identify specific action and delivery dates. ONR will continue to monitor NNB GenCo s progress against its commitments during future regulatory assessment work associated with key project permissioning points. ONR considers that, with the correct application, NNB GenCo will be able to implement the required improvements and close the five Regulatory Issues in advance of our regulatory assessments associated with the Nuclear Island Concrete permissioning point planned for later this year. Timely resolution of the identified issues will reduce project risk, contribute to ensuring product quality and right first time delivery, thereby ensuring that the high standards expected to ensure nuclear safety are maintained. 8