ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

Similar documents
ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

Bid Advertisement in The Wylie News and NTMWD.com Website INVITATION TO BID NORTH TEXAS MUNICIPAL WATER DISTRICT DIGITAL IMAGING SERVICES

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions

Answer: Qualification statement should be provided with the bid.

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

East Central College

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

FAST TRACK WORKSHOP OBJECTIVES

Bid No. B14-02 Building 100 HVAC Improvements

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SUBMITTAL PROCEDURES

Residential Room Additions

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

CONVEYANCE PIPELINE AND PUMP STATION

SECTION SUBMITTAL PROCEDURES

BROOKINGS municipal utilities

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

REQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

TAB B-9 RECORD DRAWINGS

Harris County Capital Projects Electronic Submittal Guidelines for Consultants

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Aesthetic Steering Committee Meeting No. 8

Construction Contracts Administration Oregon State University, 644 SW 13th Street, Corvallis, OR T F

submittals 1s e c t i o n

Montclair, NJ ADDENDUM NO. 2. Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014

SECTION SUBMITTAL PROCEDURES

Applications should be ed to:

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Call for Entries 2019/2020 El Paseo Sculpture Exhibition (DEADLINE FOR ENTRIES February 28, 2018)

Request For Information (RFI) For

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

Humboldt Bay Piling Removal

ADDENDUM 1. Forsyth County. Request for Qualifications and Proposals. Consulting Services for Public Safety Radio Communications

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

CHAPTER A-10 DRAWINGS

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

Applications should be ed to:

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

A. Section includes administrative and procedural requirements for project record documents, including the following:

Addendum #2: Revised Price Sheets, Added Questionnaire and Questions and Answers (Q&A)

Applications should be ed to:

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

This specification describes the general requirements for Engineering Services provided to Vale.

Information Manual for Architects

Considerations in FERC Licensing of New Projects

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS 2019 LEGISLATIVE SESSION

Section XV - PER, Design, and Construction Submittal Requirements

Jacksonville District Master

Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

Solicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project.

REQUEST FOR QUOTATION INVITATION

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Request for Proposal (RFP) Nepal EGRP-RFP-FY19-P001. Raising Public Awareness of Early Grade Reading through Regional and National Radio

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

REQUEST FOR PROPOSAL

Louisville-Southern Indiana Ohio River Bridges Project

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0

SARASOTA COUNTY GOVERNMENT

Applications should be ed to:

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

Single-Family Dwelling Submittal Requirements

Town of Apex, North Carolina

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

SUBDIVISION PLAT APPLICATION

The attached information contains mandatory requirements and a submission form.

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

SECTION OPERATION AND MAINTENANCE DATA

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

Attachment J-8 Contractor / Supplier Submittal Register

Section Meetings Section Material and Equipment. None Required

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Transcription:

ADDENDUM NO. 1 November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR North District Pre-Development Studies Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study PROJECT NO. 958080 UC Rev. 0, August 1, 2007 UCR Rev 2010-04-28

North District Pre-Development Studies Soils Geotech Hydrology, Phase 2 Environmental Study Project Number: 958080 Addendum No. 1, November 6, 2016 The following changes, additions, or deletions shall be made to the following documents as indicated for this Project; and all other terms and conditions shall remain the same. Each firm is responsible for transmitting this information to all affected subconsultants and suppliers before the Deadline. 1. Request for Qualifications: Revise RFQ submittal deadline from Thursday, December 8, 12:00 PM to Monday, December 12, 2016, 12:00 PM. Questions: 1-1 Question: We have reviewed all three RFPs for project 958080. There seems to be overlap amongst the three. The Site Aerial Survey RFP contains quite a bit of geotechnical scope as well as field survey, but there is a separate RFP for Geotechnical and Hydrology Services, and there is also surveying in the RFP for ALTA/NSPS. Was the intent to put all of the geotechnical services into one RFP and the survey in another? Answer: YES- It is the intent to put all of the geotechnical services into one RFP and the survey in another. (Please see below) Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. 1-2 Question: What information should be included in SOQs beyond the forms specified in the RFQ (i.e., Attachment A Qualification Submittal Form, sample insurance certificate, UC Consultant Experience Form, and Declaration)? Do you require an organization chart, resumes, and descriptions of relevant projects? Do you require a scope and/or understanding narrative, or a project schedule? Answer: Yes. 1-3 Question: For the Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study pursuit, and the Base Mapping Services Site Aerial Survey and Field Survey Site Design pursuit, must a geotechnical firm be proposed as the lead consultant, or can a civil engineering and/or survey firm be the prime? Answer: A civil engineer and/or survey firm can conduct all of the referenced studies and reports. C. Title authorities apply to two specialized areas of civil engineering: structural engineering and geotechnical engineering. Only the use of the title is restricted. Civil engineers may choose to obtain the additional licenses giving them the authority to use the titles Structural Engineer, Geotechnical Engineer, Soil Engineer, and Soils Engineer. Any civil engineer may practice structural engineering or geotechnical engineering except in specifically restricted areas. Specifically, only a structural engineer may design a hospital or public school (primary, secondary, and junior college). (These restrictions are contained in the Health & Safety Code and the Education Code.) Civil engineers may perform all geotechnical work. The titles Geotechnical Engineer, Soil Engineer and Soils Engineer are synonymous. Since structural engineering and geotechnical engineering are part of the practice of civil engineering, and since all structural engineers and geotechnical engineers are also civil engineers, any reference to civil engineering or civil engineer inherently includes structural and geotechnical engineering and structural and geotechnical engineers. (B&P Code 6736, 6736.1) UC Rev 0, August 1, 2007 1 UCR Rev 2010-04-28

North District Pre-Development Studies Soils Geotech Hydrology, Phase 2 Environmental Study Project Number: 958080 Addendum No. 1, November 6, 2016 1-4 Question: Geotechnical services are requested in two of the RFQs with an identical Scope of Work, covering the same site. Is it the intent of UCR to procure two separate geotechnical reports for the same site? If so, what is the differentiation between the two? Answer: No Is not the intent of UCR to procure two separate geotechnical reports for the same site. (please see below) Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. 1-5 Question: If subconsultants are required to complete portions of the work on a given contract, should we identify those subconsultants in our SOQ? Answer: Yes. 1-6 Question: Is there a page limit for the SOQs? Answer: 40, excluding tabs and required documents in attachment A. 1-7 Question: Are billing rates required to be submitted as part of the SOQs? Answer: No. Please do not submit billing rates in response to this RFQ. 1-8 Question: Section C. Scope of Services, Item 2, elements g, h, I, and j, seem to overlap with the concurrent Site Areal Survey RFQ for the same project. Would UCR consider removing those items from the Soils, Geotech, Site Hydrology RFQ? Answer: YES- UCR would consider removing those items from the Soils, Geotech, Site Hydrology RFQ.(Please see below) Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. 1-9 Question: Is Section C, Scope of Services, Item 2, element k requesting that the site exploration data be submitted on an AutoCAD file? UC Rev 0, August 1, 2007 2 UCR Rev 2010-04-28

North District Pre-Development Studies Soils Geotech Hydrology, Phase 2 Environmental Study Project Number: 958080 Addendum No. 1, November 6, 2016 Answer: YES- Section C, Scope of Services, Item 2, element k is requesting that the site exploration data be submitted on an AutoCAD file, or another equal method to ensure that UCR can incorporate this information into UCR s GIS system. 1-10 Question: The RFQ requests qualifications for Phase 2 Environmental Study services. Have a Phase I Environmental Studies been completed? If so, are they available? Answer: Yes, see attachment. 1-11 Question: Since the RFQ was advertised just prior to the Thanksgiving holiday, would UCR consider extending the timeline by one week? Answer: No. 1-12 Question: Page 5 Item 2a (hydrology) and items g-m are tasks done by a civil engineering consultant. Is it your intent to include these tasks in a geotechnical/environmental RFQ? Answer: Please see below- Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. END OF ADDENDUM UC Rev 0, August 1, 2007 3 UCR Rev 2010-04-28