Designing for Seismic Success with Precast Concrete

Similar documents
PRECAST CONCRETE STRUCTURES

Two basic types of single

JVI Vector Connector

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

BRIDGE TYPE CONCEPT EVALUATION

Moment Resisting Connections for Load Bearing Walls

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online):

Prof. Sudhir Misra, Dept of CE (PI) Prof. Samit Raychaudhari, Dept of CE (Co PI) Dr. KK Bajpai, Dept of CE (Co PI)

REINFORCEMENT DESIGN FOR METAL BUILDING SYSTEMS

3.1 General Provisions

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

ESR-1254 * DELETED BY CITY OF LOS ANGELES. Reissued April 1, 2006 This report is subject to re-examination in one year.

Total precast solution for large stadium projects meet tight schedule

Heavy Timber Buckling-Restrained Braced Frames

Bs Anchor Bolt Design Guide

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

Appendix A. Steel Deck Details & Calculations

MAT106: Wall Framing. AMERICAN FOREST & PAPER ASSOCIATION American Wood Council Engineered and Traditional Wood Products

of buildings constructed of a particular material, in this case precast concrete, based on sound analytical and experimental

ESR-2403 Reissued October 1, 2009 This report is subject to re-examination in one year.

White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado

General Layout. Eng. Maha Moddather

LP SolidStart LSL. LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.

A Study On Bracing Systems On High Rise Steel Structures Jagadish J. S [1], Tejas D. Doshi [2]

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in two years.

ENGINEERING SERVICES FOR CREATING PRECAST PROJECTS

T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.

CE2045-PREFABRICATED STRUCTURES QUESTION BANK

STRUCTURAL ATTACHMENTS

ESR-1799 Reissued April 2014 This report is subject to renewal June 1, 2015.

GLOSSARY OF TERMS SECTION 8

Erstantie 2, FIN Villähde Tel , Fax

602.4, TABLE 602.4, , , , , , , , , TABLE

PART II ENGINEERED BASIS OF RIDGE AND EAVE VENT DETAILS

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

Unit 8 Precast Concrete

WOODEN BUILDINGS 6.1 INTRODUCTION 6.2 TYPICAL DAMAGE AND FAILURE OF WOODEN BUILDINGS. Chapter 6

Trusted ICC ES PASLODE, Evaluation. report, or as to any. ICC-ES Evaluation

Ductility is Damage People Don t want to live in Damaged Buildings Akira Wada Professor Emeritus Tokyo Institute of Technology

Shearwall System Installation Guide

ICC-ES Evaluation Report Reissued June 1, 2011 This report is subject to renewal in one year.

CITY OF LOS ANGELES CALIFORNIA

Maximizing the value of highperformance

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado

Seismic Response of Cellwise Braced Reinforced Concrete Frames

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )

Joint Evaluation Report

Shinde Suyog Sudhakar, Galatage Abhijeet.A, Kulkarni Sumant.K, International Journal of Advance Research, Ideas and Innovations in Technology.

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013.

Design of structural connections for precast concrete buildings

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Look Our New Technology

Technical Note. Placing Drawings The Detail Drawings for Reinforcing Bars in Site-Cast Reinforced Concrete Construction ENGINEERING.

2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ

Wood Connections. Concepts of Well Designed Connections

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

A Tale of Tearouts: Web Supplement

Classic Connection Conundrums

ESR-2024* Reissued September 1, 2011 This report is subject to renewal September 1, 2013.

Seismic Performance of Brick Infill in RCC Structure

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1

Section Downloads. Terminology Outline. Industry Standards/ Publications. American Softwood Lumber Standard ANSI/TPI 1. Section 02: Terminology

CHAPTER I INTRODUCTION

ESR-1799 Reissued June 1, 2009 This report is subject to re-examination in one year.

Composite Sections. Introduction BETON PRATEGANG TKS Session 10: 2015/4/27

Always be your solar support

Application of Advanced Materials and New Detailing for ABC Column Connections

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: LAMINATED VENEER LUMBER SECTION: LAMINATED STRAND LUMBER REPORT HOLDER:

1. In the Y direction: to the vertical axis of the wall (middle of the wall)

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year.

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

Design Responsibility for Architectural Precast-Concrete Projects

Experimental investigation of the behaviour of pinned beam to column connections to pure shear monotonic and cyclic excitation

CONCRETE ACCESSORIES BAR-LOCK REBAR COUPLER SYSTEM

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

Exterior Wall Fastener Schedule

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in two years.

DIVISION: CONCRETE SECTION: CONCRETE ANCHORS REPORT HOLDER: HILTI, INC. EVALUATION SUBJECT:

EXPERIMENTAL AND ANALYTICAL STUDIES ON THE STRENGTHENING OF RC FRAMES

OVERVIEW OF PRECAST INDUSTRY IN BRAZIL. ABCIC s Experience Brazilian Precast Concrete Association Íria Lícia Oliva Doniak

Technical Data Sheet. T E C H N I C A L D A T A S H E E T Superprop. Mass 25 Mass 50 M AT 125 Superprop. MU Bridging

CITY OF LOS ANGELES CALIFORNIA

Wood Roof Framing Common Design and Construction Defects Concurrent Session #5.3, Friday April 28, 2017, 9:45 AM-10:30 AM

Precast Multistorey Highrise Residential & Commercial Buildings. Buildings & Factories IC

Changes in the 2001 NDS for Wood Construction

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

Effect of Masonry Infills on Seismic Performance of RC Frame Buildings

STANDARD MSGDET4AC: NOTES TO DESIGNER

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

IRC 2015 Code Compliant Wood Framed Residential Details. Incorrect Installations of Connectors with code references and remedies, discussion.

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models

Concrete Connections. MeadowBurke

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER:

Aspen Art Museum Creating Innovative Wood Structure

Welded connections Welded connections are basically the same design in AISI as in AISC. Minor differences are present and outlined below.

Evaluation of In-Pavement Light Fixture Designs and Performance

REPORT HOLDER: JAACO CORPORATION NORTHEAST 68 TH STREET, SUITE C-130 REDMOND, WASHINGTON EVALUATION SUBJECT:

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

Transcription:

Designing for Seismic Success with Precast Concrete Presented by: Ned Cleland, Ph.D., P.E. Blue Ridge Design, Inc. drned@brd-inc.com Byron Dietrich, S.E. TaylorTeter Byron.dietrich@taylorteter.com Learning Objectives Discuss seismic design methodology using precast concrete. Explain how precast concrete can be used to meet performance needs in seismic regions. Describe the PRESSS system. Describe the benefits of using precast concrete in seismic region. Emulation Design ACI 550.1R-01 Emulating Cast-in-Place Detailing in Precast Concrete Structures ACI 318-11, Chapter 21 Earthquake-Resistant Structures 21.4 Intermediate precast structural walls 21.8 Special moment frames constructed using precast concrete 21.10 Special structural walls constructed using precast concrete 1

Intermediate moment frames A cast-in-place frame complying with the requirements of 21.3 in addition to the requirements for ordinary moment frames An intermediate moment frame can be constructed with precast concrete with emulative detailing Intermediate precast concrete walls In ACI 318-02, the scope in Chapter 21 was changed to require intermediate precast concrete walls in regions of moderate risk. The commentary states that the intention was to result in an intermediate precast structural wall having minimum strength and toughness equal to that for an ordinary reinforced concrete wall of cast-in-place concrete. In ASCE 7-05, Table 12.2-1 added lines for intermediate precast concrete shear walls to recognize the distinctive precast wall created by ACI 318. Intermediate precast concrete walls ASCE 7-05, however, went further than was intended by ACI 318H when the table also permitted the intermediate precast concrete wall to be used to a height of 40 ft (or to 45 ft for single story warehouses) in SDC D, E and F. The simple improvement made by ACI 318H to precast walls in SDC C was complicated by this additional application, where ordinary cast-in-place concrete walls are not permitted. 2

Intermediate precast concrete walls The additional requirements imposed by ACI 318 required that connections between wall panels or between wall panel and foundation be restricted to yielding of steel elements or reinforcement. Any connection not intended to yield must be designed for 1.5S y. ASCE 7, in chapter 14, modifies ACI 318 to add deformation requirements for connections and shear detailing for wall piers. Type 2 spliced bars meet the ductility requirements Reinforced Concrete Brace Frames UBC 97 had system parameters for reinforced concrete braced frames With IBC 2000, there was a transition from the 3 separate model codes, and ASCE 7 became the referenced load standard. ASCE 7 99 did not include reinforced concrete braced frame in the systems table ASCE 7 05 expanded Table 12.2-1 to include many added structural system, but did not include reinforced concrete braced frames Reinforced Concrete Brace Frames 3

Reinforced Concrete Brace Frames Special moment frames Special moment frames of precast concrete must satisfy all the requirements for cast-in-place special moment frames in addition to the requirements of 21.8 Special moment frames Special moment frames with ductile connections Special moment frames with strong connections 4

Ductile Connections V n for connections designed by shearfriction 2V e Mechanical splices of beam reinforcement shall not be located closer than h/2 from the joint face Ductile Connections Special moment frames 5

Strong Connections Special Moment Frames Seismic Design Handbook Example 6

Monolithic Joint Special Moment Frames Special precast structural walls Special precast structural walls must meet the requirements for intermediate precast concrete walls and for special cast-inplace concrete 7

Special precast structural walls Type 2 Splices Special precast structural walls Strong and Ductile connections are implied by reference to 21.4, but not prescribed Special precast structural walls Strong connection with cast-in-pace closure 8

Special precast structural walls Strong connection using high-strength bolts (after AISC composite requirements) Emulation Design Emulation is the application of the requirements for cast-in-place construction with adaptation to the manufacture, transportation and erection of discrete components PRESSS Research Precast Seismic Structural Systems Five systems tested Hybrid Frame Pretensioned Frame TCY Gap Frame TCY Frame Unbonded Post-tensioned Wall 9

PRESSS Research PRESSS Hybrid Frame PRESSS PreTensioned Frame 10

PRESSS TCY Gap Frame TCY Frame PRESSS Shear Wall 11

PRESSS UFP PRESSS Codification Hybrid Frame ACI 374.1 ACI ITG-1.2 Unbonded Post-Tensioned Wall ACI ITG-5.1 ACI ITG-5.2 PRESSS Hybrid Frame Hybrid frame design in practice 12

Project Description Single Story Fruit Sorting/Packaging Approximately 600,000+ SF Seismic Design Category (SDC)=D Facility Design Criteria: Elevated Food Safety Large Open Span for large equipment and Specialty Rooms 13

All Precast Building Components Precast Gravity Components Roof Double Tees Beams Columns Bearing Wall panels PRESSS Intermediate Precast Shear Walls Topped concrete Diaphragm Hybrid Precast Moment Frames Each Area as a Separate Building 14

Building Gap Locations Lateral Force Resisting System Shear Transfer at Building Gap 15

A2 Diaph Reinforcement Patterns A2 Diaphragm/ Chords 16

Intermediate precast concrete walls The additional requirements imposed by ACI 318 required that connections between wall panels or between wall panel and foundation be restricted to yielding of steel elements or reinforcement. Any connection not intended to yield must be designed for 1.5S y. ASCE 7, in chapter 14, modifies ACI 318 to add deformation requirements for connections and shear detailing for wall piers. Type 2 spliced bars meet the ductility requirements 17

Wall Panel Group Panel Group/ Overturning Wall Panel Hold-down (1.5Sy) 18

Shear Panel Stitch Connections Special/Hybrid Moment frames Special moment frames of precast concrete must satisfy all the requirements for cast-in-place special moment frames in addition to the requirements of 21.8 Hybrid MF/ Line 1 19

Hybrid MF/ Line 1 Hybrid MF Joint Shear Affects Col Size 20

Ductile Connections V n for connections designed by shearfriction V e Mechanical splices of beam reinforcement shall not be located closer than h/2 from the joint face Hybrid MF Joint Hybrid/ Beam Reinforcement 21

Resist Torsion Beam Reaction 22

Hybrid/ Column Section Hybrid MF Column Reinforcement Hybrid MF/ Baugrid 23

Thank you! Questions? Ned Cleland, Ph.D., P.E. drned@brd-inc.com Byron Dietrich, S.E. Byron.dietrich@taylorteter.com Or contact your local PCI Region. Visit http://pci.org/about/regional/index.cfm for details. 24