Statement of Woks Data Template Vesion: 4.0 Date: 16.08.17 This Statement of Woks (SoW) Data Template is to be completed by Distibution Netwok Opeatos (DNOs) in ode to povide National Gid the equied data fo SoW applications. Thee ae two types of SoW applications; an initial SoW baseline assessment and a SoW update. The baseline assessment is fo the fist SoW application of the GSP(s) within the new SoW pocess and the SoW update is fo when the mateiality tigge has been beached and a netwok e-assessment is equied. The baseline assessment has moe extensive data equiements as it is the fist time the detailed netwok data is being povided. In the SoW updates a educed set of data can be supplied as data is only equied whee thee have been changes fom the baseline assessment. A summay of the data equiements is outlined in the table below SoW Application Data Requiements Data Schedule Embedded Powe Station Data Fault Infeed Data Demand Data Netwok Data Medium Powe Station Data SoW Baseline Assement Full submission of all data Full submission of all data Full submission of all data Full submission of all data Full submission of all data SoW Update Only changes to Embedded Powe Stations Only the contacted Embedded Powe Station fault infeed. Updated annually o post season Only when equied fo new connections Only equied fo new connections Please note that the Statement of Woks pocess being eviewed within the ENA howeve it is envisaged that this dataset will emain unchanged following this eview.
Gid Code Link to Data Requiements NG equies the infomation within this data template to detemine the impact on the NETS. Fo example, a 33 kv PV fam will impact the PQ chaacteistics at the BSP. NG does not model below the BSP level theefoe this infomation needs to be povided by the DNO. Voltage studies ae dependent on eactive powe flows, thus without this infomation an accuate voltage study cannot be undetaken. This equiement is futhe claified within Planning Code Appendix A2 (of the Gid Code) Standad Planning data, Use s System Data (see below). In essence, the infomation equest above is aleady codified. PCA.6 povides a list of possible tigges fo equiing infomation as pe PC.A.2.1.4. Whee existing data povision is insufficient fo the pupose of poducing meaningful system studies, NGET may easonably equest such data
Embedded Powe Station Data THIS DATA IS REQUIRED TO BE UPDATED FOR EVERY STATEMENT OF WORKS APPLICATION GSP - Gid Supply Point Commecial Position - Connected/ Accepted Geneato Name Embedded Small Powe Station Refeence Numbe Connection Date Geneato unit Refeence Technology Type CHP (Y/N) Registeed Capacity BSP - Bulk Supply Point Geogaphic Location fo PV & Wind Contol mode Contol mode voltage taget and eactive ange o taget pf (as appopiate) Loss of mains potection type Loss of mains potection settings Comments - Including Powe Station connection point if above the BSP level Total Enegy Stoage Capacity (MWh) Additional Requiements fo Stoage Expoting Powe Rating (Geneating) MW Impoting Powe Rating (Stoage) MW 3 Phase Shot Cicuit Infeed of Small Sub-Tansient I'' (ka RMS) Tansient (120ms) I' (ka RMS) X/R (G74 Method 'C') Zeo sequence Impedance at BSP whee Ro - % on 100MVA base Xo - % on 100MVA base PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) PC.A.3.1.4 (a) GUIDANCE: * Data that is not essential at the application stage is geyed out * This table should be updated fo all Statement of Woks applications with all Embedded Powe Stations of a size geate o equal to 1MW at each GSP being studied. * The Powe Station Refeence can eithe be in the fom of a code (with a combination of numbes and/o lettes) o a name. The name and efeence numbe must be the same as in the Appendix G within the BCA. * Any Small Powe Station that connects above the level of the lowest voltage modelled node (BSP) will be discetely modelled and will equie: - the thee phase shot cicuit contibution (oange columns above) - its location maked on the week 24 single line diagam (see Netwok Data tab) - netwok data fo the netwok between its connection point and the netwok povided in the Week 24 SLD (see Netwok Data tab)
Bulk Supply Point Fault Infeed Gid Code Refeence: PC.A.2.5.4 / PCA 2.5.6 GSP National Gid Node (BSP) Name Opeating Voltage Existing Netwok BSP Fault Infeed Sub-tansient T (kv) I'' (ka RMS) I' ( k A R M S ) X/R (G74 Method 'C') THIS DATA IS REQUIRED TO BE UPDATED FOR EVERY STATEMENT OF WORKS UPDATE Post Contacted DER BSP Fault Infeed Sub-tansient T I'' (ka RMS) I' ( k A R M S ) X/R (G74 Method 'C') Diffeence in BSP Fault Infeed Node Data Shot Cicuit Shot Cicuit Shot Cicuit Sub-tansient T I'' (ka RMS) I' ( k A R M S ) X/R (G74 Method 'C') 0.000 # 0.000 0.000 # 0.000 0.000 # 0.000 0.000 # 0.000 0.000 # 0.000 Zeo sequence Impedance at BSP whee thee is a zeo Ro - % on 100MVA base X o - % o n 1 0 0 M V GUIDANCE: * The data equiements above ae explained in moe detail in the Statement of Woks Data Guidance Note and in sections PC.A.2.5.4 & PCA 2.5.6 of The Gid Code * The maximum thee phase fault infeed shall be povided fo evey BSP node within each GSP in the SOW application * BSP Node Names should align with those within Week 24 submission (and associated SLDs) * Whee thee is a new Node o any netwok einfocement on the DNO netwok this must be clealy identified and elevant paametes povided to NGET (see the 'Netwok Data' tab) * Zeo sequence impedance data shall only be povided whee thee is a zeo sequence path (see guidance note)
Bulk Supply Point Goss Demand ONLY REQUIRED FOR BULK STATEMENT OF WORKS APPLICATION OR ANNUAL/SEASONAL UPDATE, SEE BELOW Gid Code Refeence: PC.A.4.3.4 GSP Node Data National Gid Node (BSP) Name GSP Peak Demand (Goss) Powe Summe Minimum AM Demand (Goss) Powe Summe Minimum PM Demand (Goss) Maintenance Peiod Peak Demand (Goss) Opeating Voltage BSP Demand (+ve = demand, o inductive BSP Demand (+ve = demand, o inductive BSP Demand (+ve = demand, o inductive BSP Demand (+ve = demand, o inductive (kv) MW M MVA MW M MVA MW M MVA MW M MVA v v v v a a a a Powe Powe GUIDANCE * The data equiements above ae explained in moe detail in the Statement of Woks Data Guidance Note * Data to be povided fo each node (BSP) within a GSP, even in cases whee thee is no change to flows. This is valuable fo confimation of P,Q because it is ecognised that data povided within Week 24 submission is fo the pupose of Demand Compliance and not necessaily fo undestanding the wost case high volts o peak evese flows * Node Names should align with those within Week 24 submission (and associated SLDs) * Whee thee is a new Node o any netwok einfocement on the DNO netwok this must be clealy identified and elevant paametes povided to NGET (see the 'Netwok Data' tab) * Demand should be based on the most ecently meteed demand of the elavent peiod on yea and should be updated annually (e.g. following the maintenance peiod, the 'Maintenance Peiod Peak Demand' can be updated) * If thee ae significant inceases of mico-geneation/stoage within a yea (equal o geate than Mateiality Tigge size fo the GSP) this should be discussed with NGET pio to SoW updates * Whee thee ae planned futue demand connections o significant load change in the next 7 yeas which will have a mateial impact on the demand as seen at the GSP this should be detailed in the comments below. DNO Comments: 1 2 3 4
Additional Netwok Data REQUIRED IN SOW UPDATE FOR NEW MEDIUM POWER STATIONS OR DISCRETELY MODELLED SMALL POWER STATIONS * Netwok data will be equied upto the voltage below the GSP/subtansmission level voltage. * Fo example fo a GSP connected at a subtansmission voltage of 132kV the next voltage down may be 33kV. All node and banch data will be equied up until this voltage. * The demand and geneation data (on the othe tabs in this wokbook ) should be supplied fo the nodes at lowest voltage level modelled * The fomat of the node and banch data should be the same as the shedule 5 data which foms pat of the week 24 data submsisions, please update the elavent week24 shedules when poviding this data * The data equiements below ae explained in moe detail in the Statement of Woks Data Guidance Note Data Item Gid Code Section DRC Shedule Desciption
Embedded Medium Powe Station Data REQUIRED IN SOW UPDATE FOR NEW MEDIUM POWER STATIONS * Futhe data is equied fo Embedded Medium o Lage Powe Stations. The data equiements ae highlited in the table below. * Embedded Medium Powe Stations ae only equied to supply DRC data if they ae subtansmission connected (the fist voltage level below the tansmission voltage) * They ae equied to complete Data Registation Codes 1,2,5 & 14 if synchonous and 1,2,5 & 13 is they ae powe electonics based geneation * The links below will take you to the elavent data tab in this speasheet Embedded Medium Powe Station (Synchonous) DRC Embedded Medium Powe Station (Powe Electonic) DRC Embedded Medium Powe Station Netwok Data Guidance notes on the submission of Gid Code data fo Powe Stations
Embedded Medium Powe Station Data (Synchonous) Powe Station Geneating Unit Data Data Item Gid Code Refeence Unit Value Powe Station Name List of units within Powe Station (PC.A.3.2.2 (g)) Geneating Unit Data Connection Point to Use System (DNO Netwok) as on Use (DNO) Wk 24 SLD Geneating Unit Type (PC.A.3.4.1) (PC.A.3.2.2 (h)) Rated MVA (PC.A.3.3.1) MVA Rated MW (PC.A.3.3.1) MW Rated teminal voltage (PC.A.5.3.2.(a) & PC.A.5.4.2 (b)) kv Intetia Constant (PC.A.5.3.2(a)) MW secs Impedances /MVA Diect axis synchonus eactance (Unsatuated) (PC.A.5.3.2(a)) Z% (100MVA) Diect axis tansient eactance (PC.A.3.3.1(a)& PC.A.5.3.2(a) Z% (100MVA) Diect axis sub-tansiet eactance (PC.A.5.3.2(a)) Z% (100MVA) Time Constants Diect axis sub-tansient time constant (PC.A.5.3.2(a)) s Excitation Excitation System - Rotating o Static Excite (PC.A.5.3.2c) Powe Station Netwok Paametes Data Item Gid Code Refeence Unit Value Geneating Unit Step-up Tansfome Rated MVA (PC.A.3.3.1 & PC.A.5.3.2) MVA Votlage Ratio (PC.A.5.3.2) Positive Sequence Reactance (PC.A.5.3.2) Z% (100MVA) Positive sequence esistance (PC.A.5.3.2) Z% (100MVA) Zeo phase sequence eactance (PC.A.5.3.2) Z% (100MVA) Max tap Min tap Nominal tap Tap change step size (PC.A.5.3.2) % Please complete the Embedded Medium Powe Station Netwok Data Shedule: -
Embedded Medium Powe Station Netwok Data
Embedded Medium Powe Station Data (Non-Synchonous) Data Item Gid Code Refeence Unit Value Powe Station Name List of Powe Pak Modules/Geneating Units within Powe Station Powe Pak Module/Geneating Unit Data Connection Point to DNO Netwok as on Wk 24 SLD Geneating Unit Type (PC.A.3.2.2 (g)) (PC.A.3.4.1) (PC.A.3.2.2 (h)) Rated MVA (PC.A.3.3.1) MVA Rated MW (PC.A.3.3.1) MW Shot Cicuit Infeed to Use System (DNO Netwok) Connection Point Symmetical thee phase shot-cicuit cuent infeed - Sub-Tansient (PC.A.3.3.1 & PC.A.5.3.2) KA Symmetical thee phase shot-cicuit cuent infeed - Tansient (PC.A.5.3.2) KA Positive sequence X/R atio at instance of fault Pe-Fault voltage magnitude at which the maximum fault cuents wee calculated p.u. Zeo sequence souce impedances as seen fom the Point of Connection o node on the Single Line Diagam (as appopiate) consistent with the maximum infeed above: - Resistance % on 100 MVA Zeo sequence souce impedances as seen fom the Point of Connection o node on the Single Line Diagam (as appopiate) consistent with the maximum infeed above: - Reactance % on 100 MVA Negative sequence impedances of Use s System as seen fom the Point of Connection o node on the Single Line Diagam (as appopiate). - Resistance % on 100 MVA Negative sequence impedances of Use s System as seen fom the Point of Connection o node on the Single Line Diagam (as appopiate). - Reactance % on 100 MVA (PC.A.5.3.2) (PC.A.5.3.2) (PC.A.5.3.2) p.u. R% (100MVA) X% (100MVA) R% (100MVA) X% (100MVA) Please complete the Embedded Medium Powe Station Netwok Data Shedule: - Embedded Medium Powe Station Netwok Data