CHICKEN COOP & CHICKEN RUN ASSEMBLY MANUAL SKU# 6839 Tools required for assembly (not included) Distributed by: TRACTOR SUPPLY COMPANY 0 VIRGINIA WAY, BRENTWOOD, TN 3707 For customer support, call: -888-376-960 www.tractorsupply.com MADE IN CHINA
Instruction for chicken run PARTS LIST Side panel Standard panel 3 Door panel Coop attachment frame Roof panel 6 Connecting tube 7 3-3 clamp 8 3- clamp 9 - clamp 0 M0x0 bolt M0x3 bolt M0 lock nut 3 8 6 0 36
Please select a flat and level location to position and assemble the chicken coop and run. Step Connect the short side of side panel () with standard panel () using clamps (7). Secure with bolts (0) and nuts (). **PLEASE NOTE: Arrange panels as shown below. 7 0 Step Connect the tall sides of panels () using clamps (7). Secure with bolts (0) and nuts () as shown below. 7 0 3
ASSEMBLY Step 3 Repeat steps and to assemble the remaining panels. **PLEASE NOTE: before finishing panel assembly, choose desired position of coop attachment frame () & door panel (3). 3 Please note the chicken coop mounting panel must be positioned with the coop sliding door handle hole to the outside corner. 3 Step Connect two roof panels () using connectors (6) as shown below. Note: These two panels will complete one half of the roof assembly. 6
ASSEMBLY Step Lift the completed roof panel assembly to the top of the side panels as shown below. Allow roof to rest on the four pre-welded clamps, then use clamps (8) to tighten the four pre-welded clamps and secure with bolts (0) and nuts (). 0 Repeat steps - to complete the second half of the roof assembly. 6 0 8 8
ASSEMBLY Step 6 Complete the roof assembly by installing clamps (9) and secure with bolts () and nuts (). 7 9 The chicken run is now complete. Next, assemble the chicken coop near the coop attachment frame. 6
Instruction for chicken coop PARTS LIST Front door for storage area Right panel for storage area 3 Left panel for storage area Connecting rod with two holes Support rod for floor panel 6 Floor panel for storage area 7 Mid-panel for storage area 8 Floor panel for nesting area 9 Upper right panel 0 Upper left panel Connecting rod with single hole Connecting rod for back door 3 Support rod for tray Divide panel for nesting box 7
PARTS LIST Upper panel for nesting box 6 Door panel for nesting box 7 Right panel for nesting box 8 Left panel for nesting box 9 Right slant rod 0 Left slant rod Rod for fixing roosting bars Connecting rod with rain cover 3 Front window panel Connecting rod L Left steel tray R Right steel tray 6 Back door panel 7 Connecting rod with two grooves 8 Upper back panel 8
PARTS LIST 9 Roof for Nesting Box 30 L-G-plate I 3 R-G-plate I 3 Main Roof 33 L-G-plate II 3 R-G-plate II 3 L-plate III 36 Short roosting bar I 37 Long roosting bar II 38 Plastic tray 39 Ramp 0 Connectors for ramp Clamp Push-pull rod 3 M6x bolt 36 M6x0 bolt 6 M6 lock nut Self- tapping screw ST 3.x3 8 6 7 Tapping screw x 33 8 Mx0 bolt 9 M6 Washer 9
Step All the parts needed for step are listed below. Front door for storage area Right panel for storage area 3 Left panel for storage area Connecting rod with two holes Support rod for floor panel 3 M6x bolt 0 M6 lock nut Connect right () & left (3) panels for storage area to front door () and secure the four corners with bolts (3) & nuts (). DO NOT tighten at this step. Lay out parts () and () as shown below, then connect to door panel and side panels with bolts (3). Now you can tighten the bolts. 3 3 0
Step All the parts needed for step are listed below. Connecting rod with two holes 6 Floor panel for storage area 7 Mid-panel for storage area 3 M6x bolt Place the floor panel (6) on the support rods (). Slide the mid-panel (7) into the grooves of () & (3) and cover with connecting rod (). Secure the connecting rod () to () & (3) with bolts (3). 7 6 3 3
Step 3 All the parts needed for step 3 are listed below. Support rod for floor panel 8 Floor panel for nesting area 3 M6x bolt Attach support rods () to front door () and connecting rod () with bolts (3) as shown below. Place floor panel (8) into position and the storage area is assembled. 3 8 3
Step All the parts needed for step are listed below. 9 Upper right panel 0 Upper left panel Place right panel (9) and left panel (0) onto the end of each side panel as shown below. 0 9 3
Step All the parts needed for step are listed below. Connecting rod with single hole Connecting rod back for door 3 Support rod for tray 3 M6x bolt 6 Place connecting rod () between panels (9) and (0) as shown below and secure with bolts (3). Secure the other side with connecting rod () and bolts (3). Place support rod (3) between rods () & () and secure using bolts (3). Becareful of the orientation the hole on connecting rod(). 0 3 3 9 3
Step 6 All the parts needed for step 6 are listed below. Divide panel for nesting box Upper panel for nesting box 7 Tapping Screws x Insert divider panels () into the grooves of the floor panel (8) and cover with upper panel () as shown. Secure using tapping screw (7). 6 7 8
Step 7 All the parts needed for step 7 are listed below. 6 Door panel for nesting box Attach door panel (6) to the front door () as shown below. 7 6 6
Step 8 All the parts needed for step 8 are listed below. 7 Right panel for nesting box 8 Left panel for nesting box Slide the right panel (7) into the right side of nesting area and the left panel (8) into the left side as shown below. 8 8 7 7
Step 9 All the parts needed for step 9 are listed below. 9 Right slant rod 0 Left slant rod 3 M6x bolt M6 lock nut A t t ach right slant rod (9) to right panel (7) and secure to panel (9) using bolts (3) & nuts (). Then, secure to door panel (6) with bolts (3). For the left side, attach left slant rod (0) to left panel (8) and secure to panel (0) using bolts (3) & nuts (). Then, secure to door panel (6) with bolts (3). 9 3 3 0 8 9 7 3 8 0 9 6 3 7 9 8
Step 0 All the parts needed for step 0 are listed below. Rod for fixing roosting bars Connecting rod with rain cover 3 Front window panel Connecting rod 3 M6x bolt 6 Secure rod for roosting bar () to the lower hole on each side using bolts (3). Note that there are two holes on the rod and when assembling, please make sure the roosting bar () is attached to the lower holes and the U trench faces inside. Place the connecting rod () into position and secure with bolts (3). Note that the edge with rain cover faces out. Slide window panel (3) into position and cover with connecting rod (). Then secure the rod to both ends using bolts (). 0 3 3 3 9
Step All the parts needed for step are listed below. L Left steel tray R Right steel tray 0 Connectors for ramp 6 Self-tapping screw ST 3.x3 6 Put the connectors for ramp (0) onto the () as shown below and make the distance between the two connectors is 8.7". Place steel trays () into position. Please note that two of the four edges are wider and when assembling, please put the wider edges facing inward. Attach the trays to the frame on the wider side with screws (6). R 6 L R L 0 8.7" 0
Step All the parts needed for step are listed below. Connecting rod 6 Back door panel 7 Connecting rod with two grooves 8 Upper back panel 3 M6x bolt Slide back door panel (6) into connecting rod (). Place connecting rod (7) onto panel (6) and fasten to side panels using bolts (). Then, slide upper back panel (8) into the upper groove of connecting rod (7).Place rod () onto back panels (8) and fasten to both sides using bolts (3). 8 3 7 3 6
Step 3 All the parts needed for step 3 are listed below. 9 Roof for Nesting Box 30 L-G-plate I 3 R-G-plate I 3 Main Roof 33 L-G-plate II 3 R-G-plate II 3 L-plate III 7 Tapping screw x 3 Before assembling the roofs to the frame, you must attach the G-plate I to the roof. For front roof (9), place G- plate I (30,3) on the front of the panel, and secure with screws (7) as diagram A. For the main roof (3), place G-plates II (33,3) on the front of the panel and secure with screws (7) as diagram B. And then attach the L-plate (3) to the side with batten of the main roof (3) as diagram C. **PLEASE NOTE: The screw positions have been marked. 3 30 9 A 33 3 3 B 7 3 3 C 3 Back
Step All the parts needed for step are listed below. 6 Self-driling screw ST 3.x3 7 Tapping Screw x Place both roof panels into position. Please note that when assembling the front roof (9), the rain cover edge of () is on top of the roof. Secure the rain cover edge to the roof with screws(7). Then, secure the right and left side of both roofs to the frame with screws(6). 6 6 6 7 7 6 3
Step All the parts needed for step are listed below. 36 Short Roosting bar I 37 Long Roosting bar II 38 Plastic tray 7 Tapping Screw x 6 Place the four roosting bars into their positions. Please note that bars (37) rest beneath bars (36). Secure (36) to the holes on () & (7) with screws (7).Then, secure the inside end of (37) to the holes on () with screws (7). Place plastic trays (38) onto steel trays (). Now, the chicken coop is ready to be attached to the run. 7 36 7 36 37 37 7 Becareful that the side with hole should be attached to the U bracket.
Step 6 All the parts needed for step 6 are listed below. Clamp 6 Self-tapping screw ST 3.x3 8 Assemble the chicken coop to the run panel using clamps () and screws (6) on the four positions as shown below. 6 6
Step 7 All the parts needed for step 7 are listed below. 39 Ramp M6x0 bolt M6 lock nut 9 M6 Washer Assemble the ramp (39) to the chicken coop. Adjust the position of the connectors (0) and fix them to ramp with bolts () & nuts () & washer (9) as shown below. 7 9 39 0 6
Step 8 All the parts needed for step 8 are listed below. Push-pull rod 8 Mx0 Bolt Thread the push-pull rod () through the hole on the frame and secure the other end to the door with bolt (8). 8 8 The chicken coop and run are now ready for use. 7