Mounting systems for solar technology

Similar documents
Mounting systems for solar technology

Mounting systems for solar technology

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

VarioSole SE. Installation instructions

INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world

Accessories. Module clamps. TTModule clamps 22. TTSelf-drilling wood screw, flange head 24. TTSelf-tapping hexagon screw with sealing washer 24

Installation manual. novotegra for tiled roofs

orientation Conergy SunTop Instructions for professional installation

On-roof system Alpha + Product catalogue

MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

Roof fastener. Perfectly thought out for every roof

Pricelist - K2 mounting system

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM

2 ADULTS REQUIRED FOR ASSEMBLING

Installation Instructions

Installation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs

FS Uno mounting instructions. 2 Pile driving (Ramming) 5. 6 Components list Torque specifications 15

Alpha + On-Roof System Installation manual

ASSEMBLY INSTRUCTIONS. Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS

Simotec. 13.i

On-Roof Mounting Sets for Flat-Plate Collectors

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.

ATLANTIS RAIL Contact Information

ALUMINIUM SOLAR MOUNTING SYSTEM. Components catalogue FOR ALL TYPES OF ROOFS AND SITES

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Pole Mount Installation Manual

Installation Instructions for Solar Snow Pad (SSP-T-3)

Installation Instructions - Model V4JSD 1

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

INSTALLATION INSTRUCTIONS ENGLISH

EzQuikTM. MicroSolar System EzQuik TM Aluminum Solar PV Module Mounting System. Code-Compliant Installation Manual V1011 (AS/NZ1170) Model 2012

PV-ezRack Solar Terrace II-A Installation guide

Installation Instructions for the AlphaDeck Staging System

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Unirac Installation Manual

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

Artsign Adjustable Flat Roof Mount System

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

INSTALLATION INSTRUCTIONS

Installation manual for sloped roof assembly system. Jurchen Technology GmbH Prinz-Ludwig-Straße Helmstadt

Kai Installation Instructions

INSTALLATION INSTRUCTION RRU DOUBLE LIGHT POLE MOUNT

INSTALLATION INSTRUCTIONS

BLACK WIDOW COMPOSITE

Components made of special materials. Floor Elements for Profile St Profile KH. Fastening Elements for Profile KH

Guardian warm roof conversion system. Installation Guide

May 14, Installation Manual

Rear Mount Installation Instructions

Always be your solar support

Determine the proper ground fixing stair position, by using, as a reference, the landing tread [Fig. 7].

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

2 ADULTS REQUIRED FOR ASSEMBLING

XIAMEN FENGWEI ENERGY TECHNOLOGY CO., LTD. GRACE SOLAR ROOF MOUNTING SYSTEM INSTALLATION Manual

Pole Mounting System Installation Manual

fischer NEW The installation-friendly nylon toggle plug for high loads in gypsum plasterboard.

ADULT ASSEMBLY REQUIRED

PV-ezRack PostMount 1-A Installation Guide

SunPower Installation Manual

Adjustable Feet Castors Accessories for Floor Elements

SolarMount-I INSTALLATION MANUAL

Outdoor Water Solutions, Inc. Small Backyard Windmill. Installation Manual

Flat Panel Stand FPZ-655. for 32" to 55" Flat Panel Screens FEATURES. Reinforced universal adapter plate for a strong hold

SINGLE TRACK BYPASS (patent pending) barn door hardware

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

MEAstep Staircase construction kit

ELEVEN COLLABORATIVE. CONFERENCE TOPS Assembly Instructions

Video Wall Installation Instructions 2W X 3H, 3W X 3H

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

Wooden Rectangle Pergola Assembly Manual

Installation Instructions

Installation Guide Simplicity Alfresco. V1.9 Lu070318

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

SolarMount (E)volution

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

model tsa-sa48 Sliding Crosscut Table installation guide

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

Solar. mounting solutions. system components.

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

ASSEMBLY AND ADJUSTMENT

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

Heavy duty profiles. Heavy loads with maximum stability. Profile general overview... p Heavy duty profiles... S Load data... p.

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

DIY GLASS BALUSTRADE AND POOL FENCING THE CHOICE IS SIMPLE

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

Installation Instructions

Code-Compliant Planning and Installation Complying with AS/NZS1170.2:2011 ADMT

3/4 Rear DuraRac Installation Instructions

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

F-150 Structural Holding System

Side DuraRac Installation Instructions

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

FURNITURE HARDWARE & ACCESSORIES - PART 3 : LEVELLERS AND HANGERS

ASSEMBLY INSTRUCTIONS Last Updated

Transcription:

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Crosshook 3S CrossHook 4S GB

Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 2 3 4 5 7 8 Table of contents 2 13

PARTNER WITH A SYSTEM With sophisticated, fully developed product ideas and obvious customer-orientation, K2 Systems is your friendly partner in the field of mounting systems for solar technology. International customers appreciate the tried and tested designs for use on roofs and in outdoor and individual solutions. Mounting systems from K2 Systems impress with their attractive design and many well thought-out details. High grade materials and quality workmanship guarantee outstanding functionality and durability. Our products consist of few yet perfectly matching components - this reduces the amount of material used, simplifies assembly while saving time and money. As an energetic, experienced company, and in keeping with the times, we benefit from cooperation as partners in order to ensure the dynamic development of our company. The experiences from the personal dialogue with our customers forms the basis for permanent optimisation of our range of products.the team of K2 Systems looks forward to a successful cooperation with you. TESTED QUALITY Multiple Certifications K2 Systems stands for secure connection, highest quality and precision. Our customers and business partners have already known that for a long time. Independent institutes have tested, confirmed and certified our capabilities and components. Please refer to http://www.k2-systems.uk.com/downloads/certificates.html to download our quality and product certificates. The Company 3 13

GENERAL SAFETY INSTRUCTIONS Please be aware that our General Assembly Regulations must be adhered to. They can be viewed under www.k2-systems.com/en/downloads/product-information.html In general, the following applies: Systems may only be installed and put into use by people who can ensure the proper carrying-out of the work due to their technical suitability (e.g. training or occupation) and/or experience. Before assembly, it must be checked that the product meets the local static requirements. For roof systems, the load-bearing capacity of the roof has to be checked in principle. National and local building regulations, standards and environmental regulations are always to be adhered to. Work safety and accident prevention regulations and corresponding standards and regulations of occupational associations are to be adhered to! In particular, it is to be ensured that: - Safety clothing is worn (especially safety helmets, work shoes and gloves). - For work on roofs, the regulations for working on roofs are to be adhered to (e.g. use of anti-fall guards, scaffolding with arrestor equipment from an eaves height of 3m etc.) - Presence of two people is vital for the entire course of the assembly, so that swift help can be ensured in the case of an accident. K2 mounting systems are constantly being developed further. Because of this, assembly procedures can change. Therefore, before assembly, always check that the assembly instructions are up-to-date under www.k2-systems.com/en/downloads/product-information.html. We can also send you the latest version on request. The assembly instructions of the module manufacturer are to be adhered to. The grounding must be prepared on site (if necessary use lightning protection clamp). During the entire assembly time it is to be ensured that at least one copy of the assembly instructions is available on site. In the event of non-adherence to our General Safety Instructions and if competitor s parts are built in or attached, K2 Systems GmbH reserves the right to refuse liability. With disregarding our general installation and assembly instructions and not using all system components and assemblies according to these instructions as well when components are used, which were not obtained from us, K2 Systems is not liable for any resulting defects and damages. Warranty is excluded in such cases. If all safety instructions are adhered to and the system is correctly installed, there is a product warranty entitlement of 12 years! In this context we strongly recommend to also read our terms of guarantee which can be viewed under www.k2-systems.com/en/downloads/product-information.html. We can also send them to you on request. The dismantling of the system takes place according to the assembly steps, in reverse order. K2 components made of stainless steels are available in different corrosion resistance classes. In every case,the expected corrosion exposure of each structure or component must be checked. Safety Regulations 4 13

ESSENTIAL: THE MATERIALS REQUIRED All system components listed in the following are essential for assembling the K2 Systems CrossHook 3S system. The piece quantities are calculated on the basis of the respective requirements. The listed item numbers facilitate the comparison of items. K2 CrossHook 3S height under bracket: 40/47/54 mm Material: aluminium 2000133 Alternatively: K2 CrossHook 4S 2000466 height under bracket: 40/47/54 mm position bracket height adjusting range 30 mm Material: aluminium K2 Self-drilling wood screw round head Material: stainless steel A2, bit TX 25 for M6, TX 40 for M8 Alternatively for roof insulation: K2 Self-drilling timber screw, round head, 2 threads Material: stainless steel A2, TX 25 K2 Climber 36/48 Material: aluminium EN AW-6063 T66 Article number system-specific Article number system-specific 1002286 K2 Bolts with serrated under head M8x25 according to DIN 912/ EN ISO 4762 2001732 Material: stainless steel A2, WS 6 mm Mounting Rail K2 CrossRail 36 Material: aluminium EN AW-6063 T66 Article number system-specific Alternatively: Mounting Rail CrossRail 48 K2 CrossRail 36 Rail connector Set The set consists of: 1 Rail connector (1002284), aluminium 4 T-Bolt M8x20 (1002387), stainless steel A2 4 Hexagon flange nut with serration M8 (1000043), stainless steel A2 1002389 Alternatively: K2 CrossRail 48 Rail connector Set 1002392 Materials Required 5 13

K2 Module End Clamp Standard Set item number system-specific The set consists of: 1 Module End Clamp Standard, Aluminium plate finished/ black anodized 1 bolt with serrated under head M8, WS 6 mm, stainless steel A2 1 M K2 Slot nut with clip (1001643), stainless steel and PA 1 spring, stainless steel K2 Module Middle Clamp Standard Set item number system-specific The set consists of: 1 Module Middle Clamp, Aluminium plate finished/ black anodized 1 bolt with serrated under head M8, WS 6 mm, stainless steel A2 1 M K2 Slot nut with clip (1001643), stainless steel and PA 1 spring, stainless steel Alternatively: K2 Module Middle Clamp XS Set K2 Pad Spacer Material: glass fibre reinforced PA K2 EndCap CrossRail 36 Material: glass fibre reinforced PA Alternatively: K2 EndCap CrossRail 48 1002361 1004767 1004768 Additional material for cross bracing Mounting Rail K2 CrossRail 36 Material: aluminium EN AW-6063 T66 M K2 slot nut with clip Material: stainless steel, PA Article number system-specific 1001643 Alternatively, also slot nut made of aluminium can be used. K2 Climber 36/48 Material: aluminium EN AW-6063 T66 K2 Bolts with serrated under head M8x25 according to DIN 912/ EN ISO 4762 1002286 2001732 Material: stainless steel A2, WS 6 mm Materials Required 6 13

AT A GLANCE: OVERVIEW OF THE TOOLS K2 Systems mounting systems are designed to ensure effortless assembly. Only the tools that are required are not included in the scope of supply. Here we have listed them together for ease of reference. Cordless screwdriver With mount for TX 25 or TX 40 Torque wrench WS 6 mm (WS= wrench size) Measuring tape Angle grinder Tools Required 7 13

in general Please carefully read through all the steps first to ensure safe and correct assembly of the system. The required material is listed for each step. The grounding must be prepared on site and carried out in accordance to the respective national regulations. The General Assembly Instructions must be observed. These can be viewed at: http://www.k2-systems.uk.com/downloads/product-information.html In the case of high snow loads the roof fastener boom must be supported with suitable measures (base plate) to avoid tile breaking. In the case of on-roof insulation or counter lathing, special screws must be used, to guarantee an even distance screw joint. Due to thermal expansion, we recommend to break the rows after 20 m, however, no further than 24.4 m. The minimum spacing for separation between the two K2 rails is 3-5 cm. The roof hook is not a climbing aid. Do NOT climb or step on the roof hooks during the install. Assembly CrossHook System 8 13

Crosshook system ASSEMBLY: STEP BY STEP 1 Uncover rafters (remove tiles) The rafters, on which the roof fasteners are to be mounted, must be exposed. The height of the roof fastener must be checked and adjusted if necessary. 2 Assemble roof fastener The roof fastener must be mounted with a minimum of two stainless steel timber screws on the wooden rafters (at least one screw per row of holes). Choosing the dimensions and position of the screws has to be carried out according to the applicable regulations. This also applies to on-roof insulation or counter lathing. Horizontally align the roof hook hangers in order to get into the hollow of the tile. Untighten the Allen bolt in the bracket. After adjusting the bracket fasten the Allen bolt. Torque moment 16 Nm. If the bracket will sit right at the edge of the baseplate make sure the bracket is at least flush with the baseplate edge. Flex deck tiles and lower tiles in the area of the hanger. The top edges of a horizontal row must be at the same height. min. 5mm The roof fasteners must be mounted in such a way that there is a minimum spacing of 5 mm between the roof fastener bracket and the tile. When using the Crosshooks 4S, an additional height adjustment of the bracket itself is possible. The bolt is tightened to 14 Nm. (The amount of roof fasteners that need to be mounted depends on roof requirements and will be specified when order is placed.) min. 5mm Required materials: K2 CrossHook 3S / 4S, K2 Self-drilling wood screw round head Assembly CrossHook System 9 13

3a CrossRail assembly The CrossRail is mounted on to the roof fastener using K2 Climbers and K2 Bolts with serrated under head. Tightening torque 16 Nm. Due to thermal expansion, we recommend to break the rows after 20 m, however, no further than 24.4 m. The minimum spacing for separation between the two K2 rails is 3-5 cm. Required materials: K2 Climber, Bolt with serrated under head M8x25, CrossRail 3b Pads for height adjustment Smaller unevenness is offset by one or more stacked K2 Pads. Required materials: K2 Pad Alternatively: Assembly with CrossHook 4S. Height adjustment 30 mm. 4 Rail connector assembly Lay CrossRail on joint with rail connector and connect with 4 T bolts and self-locking nuts. The rail joint may not be in the range of the roof fastener. Tightening torque 16 Nm. Required materials: Rail connector set Assembly CrossHook System 10 13

5 Attach modules The M K2 slot nut is first inserted into the K2 CrossRail and rotated clockwise by 90 degrees. If the module end clamps and middle clamps are delivered as a set, the entire set must be fixed to the rail in the same way. Attach module to the mounting rails according to the manufacturer s instructions. Attach module at the end of each row with module end clamps and allen bolt M8 as well as the M K2 slot nuts. Never mount module end clamps directly on the rail joint or end of the rail! (Spacing: min. 20 mm from module end clamp). Pay attention to the mounting instructions by module manufacturer! Tightening torque 14 Nm. Required materials: End Clamp Set 6a Attach module gaps Attaching with Module Middle Clamp Standard Use two standard module middle clamps between two modules, which also need to be screwed with allen bolt M8 in the M K2 slot nuts. Pay attention to the mounting instructions by module manufacturer! Tightening torque 14 Nm. Required materials: Modue Middle Clamp Set 6b Attaching with XS Middle Clamp Use two XS middle clamps between two modules, which also need to be screwed with allen bolt M8 screws in the slot nuts. The XS middle clamps will need longer screws than the standard middle clamp. Tightening torque 14 Nm. Required materials: Middle Clamp Set XS Assembly CrossHook System 11 13

Alternative system designs (cross bracing) with CrossRail 7 Mount rails with cross bracing In cross bracing, the upper rail position is fitted using the M K2 slot nut, climber and bolt with serrated under head M8 to the desired location, with appropriate spacing. Tightening torque 16 Nm. Required materials: CrossRail, Climber, M K2, Bolt with serrated under head M8 Ready! THANK YOU FOR CHOOSING A K2 MOUNTING SYSTEM. Systems from K2 Systems are fast and simple to install. We hope these instructions have helped you in this. Please contact us if you have any questions or suggestions for improvements. All contact details can be found at: http://www.k2-systems.uk.com/contact.html Our General Terms of Business apply. Please refer to http://www.k2-systems.com/en/gsc.html. German Law shall apply excluding the UN Convention on CISG. Place of venue is Stuttgart Assembly CrossHook System 12 13

Mounting systems for solar technology Service-Hotline +49 (0)7159 42059-0 Info@k2-systems.de Montageanleitung CrossHook3S/4S GB6 0715 Änderungen vorbehalten Product illustrations are exemplary illustrations and may differ from the original.