Inspection and Test Plan for Battery Charger

Similar documents
for industry.com

Inspection and Test Plan for Water Tube Boiler

INSPECTION AND TEST PLAN

Production Part Approval Process (PPAP) Marion Body Works, Inc.

INSPECTION REPORT N o

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Weldment Visual Inspection Requirements

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Scope/Purpose of SI Training:

CORPORATE QUALITY SYSTEM PROCEDURE

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

(AMMA) American Maritime Modernization Association

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

BHARAT HEAVY ELECTRICALS LIMITED

GPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0

Optional Training Courses - January 26, 2015

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION PANELBOARDS

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

CIRRUS AIRCRAFT FAI INSTRUCTION

Drawings & Documentation Rotary Compressors

Test Report. File No.: SHV01023/16 Test Report No.: Taizhou, Zhejiang , P.R. China

PRACTICAL UNDERSTANDING AND INTERPRETATION OF TECHNICAL STANDARD TS30a WELDING SPECIFICATION

GENERAL DESCRIPTION OF THE CMC SERVICES

STANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

SECTION SUBMITTAL PROCEDURES

1.1 RELATED DOCUMENTS

Electroimpact Supplier Inspection Documentation

East Central College

SQS Supplement A. Bridge Fabricators and Minor Structural. Component Manufacturers. MnDOT Supplier Qualification Standard

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SPECIFICATION SS-140/9. 0.6/1 (1.2) kv CONTROL AND POWER UNDERGROUND CABLES WITH PVC OR XLPE INSULATION AND PVC JACKET

DNVGL-CP-0338 Edition October 2015

SPECIFICATION FOR RUBBER INSULATING GLOVES FOR LOW VOLTAGE 500V

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Requirements for manufacture of anchors

FORM Q-120 PROCEDURE SPECIFICATION FOR CLASS II VESSELS (Revision C 2017) Part I Fabrication

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Thank you for your business. Sincerely, Jason Greeson

Test Report. File No.: SHV04007/15-02 Test Report No.: , P.R. China

INS Process Outline Requirements

1. General Information Background Information Validity Basic Requirements Drawings and their Information...

7. INSPECTION AND TEST PROCEDURES

TUV Rheinland (India) Pvt. Ltd. Product Safety &Quality. Test Report. Salt Mist corrosion Testing of Photovoltaic modules acc IEC

Engineering Policy & Procedure

Welding Inspection Management

Ritch Rappel Enbridge

This document is a preview generated by EVS

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition

TUV Rheinland (India) Pvt. Ltd. Product Safety &Quality. Test Report. Salt Mist corrosion Testing of Photovoltaic modules acc IEC

Substation Preventive Maintenance

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

STEAM QUALITY TEST ELBOWS

Woven Steel Wire Fence Type-47. Under the state specification for fencing, ASTM A 116 is called out.

POWER TRANSFORMERS CATALOGUE

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION 16483D ADJUSTABLE FREQUENCY DRIVE - MICRODRIVE (MVX <10-HP)

Test Report. File No.: SHV01032/18-02 Test Report No.:

Waukesha Foundry. Industry Experience Engineering Expertise

SECTION DISTRIBUTION SWITCHBOARDS

ELECTRICAL EQUIPMENT. Inspection. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

TIP READ THE MANUAL. Following taken from FIRST Tech Challenge Game Manual Part 1 Rev 1.2. ispacescience.org

ISO INTERNATIONAL STANDARD

ANNEXURE-I. Documents to be uploaded 1 Certificate of Registration with Industries 2 VAT Certificate 3 Service Tax Certificate

MATERIALS DIVISION MEMORANDUM

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

A CONTRIBUTION TO QUANTIFYING THE SOURCES OF ERRORS IN PAUT

GEOTEXTILE INS TALL ATION GUIDE

TECHNICAL SPECIFICATION FOR 11KV, 3C x95mm mm 2 AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED)

SERVICE SPECIFICATION. Certification of subsea equipment and components DNVGL-SE-0045: DNV GL AS

SECTION DISTRIBUTION SWITCHBOARDS

PERFORMANCE SPECIFICATION SHEET

Standard Specification for High-Strength Bolts for Structural Steel Joints [Metric] 1

SECTION METAL FABRICATIONS

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing Part 1: X- and gamma-ray techniques with film

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

American Petroleum Institute Task Group Line Pipe

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

ESP Advisors with a clear focus on improving run life

Asset Integrity. Management. Myanmar. Azerbaijan. Russia. Brunei. Ghana. Singapore HQ. Australia. Malaysia

SECTION 16322B SUBSTATION TRANSFORMERS DRY-TYPE

Specifications for EA31002 U Tube Bundle for CDU 3

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS)

HSB Global Standards ASME Code Changes and Discussions

Delmec Engineering Limited

Section Meetings Section Material and Equipment. None Required

Drexan Energy Systems Inc.

SPECIFICATION: ALUMINUM SLIDE GATES

MANUFACTURING GUIDELINES FOR PLC (LEVEL-1 AUTOMATION)

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Listing Report: AB Reissue Date: 01/21/16 This report is subject to annual review

Transcription:

Inspection and Test Plan for Battery Charger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Remark Manuf. TPI Client 1 Pre Inspection Meeting Spec. Spec. MOM H H H Before Manufacturing 2 DWG, Design, Calculation Document IEC and ISO IEC and ISO DWG, Calculation book H R A 3 WPS&PQR ASME IX ASME IX Welding Book H R A 4 Welder Qualification ASME IX ASME IX H R 5 NDT procedures ASME V ASME V s H R A 6 NDE Personnel ASME IX ASME IX H R 7 Insulation Resistance Test 8 Withstand Voltage Test 9 Sequence Test 10 Protection Relay Test 11 Temperature Rise Test 1

12 Operational Test 13 Performance and Functional Test 14 Painting SSPC SSPC H R A Materials 15 Raw Material Inspection ASTM ASTM Original Material H H 16 Review of ASTM ASTM H H 17 Material Identification ASTM ASTM Report H H During Fabrication 18 Assembly Inspection DWG DWG Report H SW 19 Welding Inspection for Required Welding Components WPS WPS Report H SW 20 Checking of Outline Dimensions, Interface Dimensions, Bus Bar Dimensions and Clearances and other Specified Dimensions DWG DWG Report H SW 2

21 22 Tightness/Torque of Terminals and Degree of Protection checks that all instruments, compartments, control switches etc. are correctly rated and are correctly located, with specified labeling. DWG/Spec DWG/Spec Report H SW DWG/Spec DWG/Spec Report H SW 23 Insulation Resistance Test Report H H 24 Withstand Voltage Test (Dielectric Test) Report H H 25 Sequence Test Report H H 26 Protection Relay Test Report H H 27 Temperature Rise Test Report H H 28 Operational Test Report H H 29 Performance and Functional Test Report H H Final Inspection 3

30 Final Visual & Dimensional Check DWG DWG Report H H 31 Surface Preparation and Painting Report H W 32 Check of Final Book Spec. Spec. DWG/ P.O H R Documentation 33 Inspection Reports Spec./DWG Spec./DWG Report H R 34 NCR Spec./DWG Spec./DWG Report H R 35 Review Final Data Report Spec./DWG Spec./DWG Report H R Pre shipment Inspection 36 Preservation and Packing Spec. Spec. Report H H 37 Marking Spec. Spec. Report H H 38 Loading Inspection Spec. Spec. Report H H 39 Shipping Document Control Spec. Packing List H H Abbreviations: H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production; Client can waive this inspection based on his discretion and informs TPI Inspector accordingly. R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT s and etc. A: Approval SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring; For example one random visit for whole UT tests or one or two visits for whole surface preparation works for painting. MOM: Minute of Meeting 4

P.O: Purchase Order for more information review following articles: http:///third party inspection for battery charger.html http:///inspection and test plan for battery charger.html 5