PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

Similar documents
Business reform Action Plan Rec # 299 to 303 Certification of Electrical Installation by Electrical inspectorate

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

SECTION - II BID DATA SHEET

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

TECHNICAL SPECIFICATION FOR 11KV, 3C x95mm mm 2 AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED)

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

ANNEXURE-I. Documents to be uploaded 1 Certificate of Registration with Industries 2 VAT Certificate 3 Service Tax Certificate

Amateur Radio Club Licence

ACCESS TO HIGH VOLTAGE APPARATUS

012: 2015 CEB SPECIFICATION GALVANIZED STEEL WIRE (EXCEPT SHIELDING WIRE FOR TOWER LINE APPLICATION)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVER JEWELLERY/ARTEFACTS FOR FINENESS MARKING AS PER IS 2112

TECHNICAL SPECIFICATION

MGVCL/MM/ /2082/11KV AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES

SECTION 2 GENERAL REQUIREMENTS

Sanjay Lalit, FCS Practising Company Secretary, Mumbai

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

VI 3 - i TABLE OF CONTENTS

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR , INDIA

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.


Technical Specification. for 1.1 KV Copper Control Cable

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

ECP HV INSULATION TESTING

KENYA ELECTRICITY GENERATING COMPANY LTD

GENERAL TECHNICAL SPECIFICATION

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)

NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS

GENERAL TECHNICAL SPECIFICATION (Turnkey Work)

ECP HV INSULATION TESTING

JAWAHAR VIDYA MANDIR, SHYAMALI, RANCHI-2

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK

POTENTIAL TRANSFORMER

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697.

RELEVANT ELECTRICAL STANDARDS

BIHAR ELECTRICITY REGULATORY COMMISSION

SUB: EMPANELMENT OF CONSULTANCY AGENCIES FOR BUILDING PROJECTS/WORKS.

Residential Construction Checklist Single and Two Family Construction

SECTION SUBMITTAL PROCEDURES

LIGHTNING ARRESTOR. September 2017 WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED

No. COA/BHL/2018/293 Dated: REQUEST FOR QUOTATIONS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

त न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments

APPLICATION FORM TO OPERATE WIRELESS LINK/NETWORK UNDER INDIAN TELEGRAFPH ACT 1885 (To be submitted in triplicate)

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Delhi Regional Office, F-8-11 Flatted Factory Complex, Rani Jhansi Road, NEW DELHI ===========================================================

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

TAMIL NADU GOVERNMENT GAZETTE

SPECIFICATION No SS-135/ kv METAL OXIDE SURGE ARRESTERS WITHOUT GAPS

Section Meetings Section Material and Equipment. None Required

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)

INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL CONSULTANCY SERVICES FOR THE UPGRADATION OF A GOVERNMENT HOSPITAL IN KERALA

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

001: 2007 CEB STANDARD

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

FORM OF APPLICATION FOR RENEWAL OF REGISTRATION CUM MEMBERSHIP CERTIFICATE (RCMC)

SPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS

1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured)

South African Distribution Code

TENDER SPECIFICATION No.CESU/P&S/331/

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

TECHNICAL SPECIFICATION OF LT SHACKLE BOLT (G. I. BOLT) WITH NUT AND SPRING WASHER

WP197 Capacity Market Metering Test

LOCOMOTIVE ENGINEERING DEPTT.

UNIVERSITY OF ENGINEERING AND TECHNOLOGY, TAXILA (PROCUREMENT CELL)

PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SUPPLY OF CARRIER PROTECTION COUPLER TYPE NSD-50

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation

Table of Contents. Introduction... 1

Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date:

INSTRUCTION FOR BIDDERS FOR

TECHNICAL SPECIFICATION FOR 22 KV CURRENT TRANSFORMERS

DNVGL-CP-0338 Edition October 2015

ANNEX F HM/AHC/F March 2014 BUREAU OF INDIAN STANDARDS ASSESSMENT OF RECOGNIZED ASSAYING AND HALLMARKING CENTRE.

CONTENTS. 1. Introduction Generating Stations 9 40

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS

GENERAL ACCOUNTS & AUDIT DEPARTMENT HEAD OFFICE, 2 N.S. ROAD,KOLKATA Ref.No. HO/Gen. Accts/Silver Coins(Memento) / dated

Embedded Generation Connection Application Form

THE HILLCREST VILLAGE HOMEOWNERS ASSOCIATION, INC. RULES FOR INSTALLATION OF ANTENNAS

SUBJECT HEADING: Switching Programmes ISSUE: 18

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION

Ref No: HOlTaarangan/SMS/ /-1763 Date: 16 th Dec, 2013

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

DEPARTMENT OF ARCHITECTURE

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

The RSM shall be extensively used in field & laboratory for verification of the accuracy of all types of single-phase energy meters.

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

-Submit in duplicate- Company: Address: Category of Booth. Tel: Fax: Authorized by: Signature: Date: Exhibition Name: Hall / Booth No.

CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR

Transcription:

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval by Electrical Inspector for the installation before commencement of supply or recommencement after shutdown for six months) of Central Electricity Authority (Measures relating to safety and electric supply) Regulation-2010. So, electrical inspection is divided in to two parts, one periodical & other initial. The inspection / drawing approval fees are to be deposited through treasury challan (e-challan only) under proper Head of Account in the name of the owner of installation & the purpose should be mentioned in the remarks column of treasury challan. The fees for inspection / drawing approval etc. are as per Notification No.21610 dt.28.12.2001 which is available on our official website (as1.ori.nic.in/eicelectricity). 1. Periodical Inspection & testing of installations (a) Every owner of electrical installation shall deposit the inspection fees on or before the date stipulated in the inspection fee demand notice and the copy of the treasury challan be submitted to the concerned Inspector with request for inspection. (b) Extend due co-operation for inspection such as safe access to equipment, installation & records. (c) After inspection, the report will be issued by the concerned Inspector within a week. (d) Compliance to the defects i.e. rectification report to be submitted within the stipulated time mentioned in the inspection report. 2. Initial Inspection The installations are divided into three basic categories. A. Substation / Switchyard / Transmission line & installations other than generating stations. (i) Submission of drawings for approval. (a) All the requisition for approval of drawings shall be made in the prescribed format (Annexure-A). (b) All the LT, MV, HV & EHV drawings as indicated in the requisition form shall be submitted in duplicate. 1

(c) Required fees in shape of treasury challan for approval of drawings shall be accompanied along with requisition. (d) Necessary permission letter from DISCOM, OPTCL etc. shall be submitted. (e) The copy of work order issued by the owner of the installation to the licensed electrical contractor, who will execute the work, shall be submitted. (f) All the drawings shall be signed by the Owner of installation, Electrical Contractor and the Supervisor (ii) The drawings will be approved & one set sent to owner for reference. (iii) After completion of work submit the requisition for inspection to the concerned Inspector with following documents. a) Deposit the initial inspection fees in shape of treasury challan in the respective head of account 0043-00-102-0034-01001-000 available in the website as1.ori.nic.in/eicelectricity. b) Completion report in the prescribed format (Annexure-B) duly signed by the Owner, Contractor & Supervisor. c) Detail equipment list to be inspected in the format given in item 5A of completion certificate. d) Manufacturer s test certificates of all important equipments signed by owner. e) Pre-commissioning test results of all the installations duly signed by the Owner, Contractor and Supervisor on the following points. (i) Insulation resistance values of all the installations. (ii) Basic insulation level of all the installations. (iii) Name-plate details of all the equipments / installations. (iv) One write-up on inter-locking arrangements. (v) Test-results of all the relays and meters. (vi) Earth-resistance of individual earth electrodes of each installation. (vii) Combined earth resistance of earth mat. (viii) Test reports of transformer oil, if any, from Standard Testing Laboratory, Bhubaneswar / NABL Accredited Laboratory. f) Details of safety provisions as per CEA (Measures relating to safety & supply of electricity) Regulation-2010. 2

g) List of authorised persons proposed to be engaged for operation and maintenance of the installations. h) In case of transmission lines the following additional requisites are to be furnished. (i) Copy of approval letter of State Govt. for installation of overhead line under section-68 of the Electricity Act-2003. (ii) News paper advertisement details about charging of transmission line. (iii) Certificate from Executive Engineer regarding Jungle Clearance, drum biting in different locations. (iv) Statement of ground clearance. (v) Statement on all power line crossing, telephone line crossing, railway line crossing, roads and N.H. crossing, river, pond and canal crossings. i) P.T.C.C. approval. j) Railway line clearance from Railway Department. k) Take-off arrangements in the Grid Sub-stations situated at both the ends of the transmission line. iv) Extend due co-operation for inspection such as safe access to equipment, installation & records. v) Inspection report shall be issued within a week of inspection. vi) Compliance to the defects i.e. rectification report to be submitted within the stipulated time mentioned on the inspection report. vii) Final charging order shall be issued by the Inspector within three days from the date of receipt of compliance & satisfaction thereof. B. Generating stations with associated installations. (i) Submission of drawings for approval (a) All the requisition for approval of drawings shall be made in the prescribed format (Annexure-C). (b) All the LT, MV, HV & EHV drawings as indicated in the requisition form shall be submitted in duplicate. (c) Required fees in shape of treasury challan for approval of drawings shall be accompanied along with requisition. (d) Copy of the permission from State Pollution Control Board, the copy of water allotment letter from Water Resources Department, 3

copy of the permission from Forest & Environment Department, Govt. of India etc. as the case may be shall be submitted. (e) The copy of work order issued by the owner of the installation to thelicensed electrical contractor, who will execute the work, shall be submitted. (f) All the drawings shall be signed by the Owner of installation, Electrical Contractor and the Supervisor (ii) The drawings will be approved & one set sent to owner for reference. (iii)after completion of work, submit the requisition for inspection to the concerned Inspector with following documents- (a) Deposit of initial inspection fees in shape of treasury challan (e-challan only) in the respective head of account 0043-00-102-0034-01001-000 available in the website as1.ori.nic.in/eicelectricity. Submit the copy of the challan. (b) Completion report in the prescribed format (Annexure-B) duly signed by the Owner, Contractor & Supervisor. (c) Detail equipment list to be inspected. (d) Manufacturer s test certificate of all importance equipments signed by owner. (e) Pre-commissioning test results of all the installations duly signed by the Owner, Contractor and Supervisor on the following points. (i) Insulation resistance values of all the installations. (ii) Basic insulation level of all the installations. (iii) Name-plate details of all the equipments / installations. (iv) One write-up on inter-locking arrangements. (v) Test-results of all the relays. (vi) Earth-resistance of individual earth electrode installation. (vii) Combined-earth resistance of earth-mat. (viii) Test reports of energy meter, CT & PT from Standard Testing Laboratory, Bhubaneswar. (ix) Test reports of transformer oil, if any, from Standard Testing Laboratory, Bhubaneswar / NABL Accredited Laboratory. (iv) Extend due co-operation for inspection such as safe access to equipment, installation & records. 4

(v) Inspection will be conducted during which all the energy metering unit of generating set will be sealed by the Inspector concerned. (vi) Inspection report will be issued within a week. (vii) Compliance to the defects i.e. rectification report to be submitted within the stipulated time mentioned on the inspection report. (viii) After receipt of the compliance report & satisfaction of Inspector concerned, the permission for commissioning of generating set will be issued. In case of thermal power plant consent to operate from Pollution Control Board to be submitted for consideration. (ix) If, date of commissioning of the generating unit is required, then due prior intimation may be submitted to the concerned Inspector to witness commissioning either by him or his authorised representative. (x) Apply for declaration of date of commissioning to the concerned Inspector with the witness certificate of commissioning of the unit. (xi) Concerned Inspector will declare the date of commissioning of the unit. C. Temporary Electrical Installation. The organiser / event manager shall submit the required documents such as completion certificate, inspection fee, drawings etc. at least 48 hour before the event so as to enable the Inspector to inspect the temporary electrical installation in time and issue safety certificate. 5

ANNEXURE-A APPLICATION FORMAT FOR SUBMISSION OF DRAWINGS FOR APPROVAL To.... Sub Submission of Drawings for approval. Sir, With reference to the above captioned subject, find enclosed herewith the following drawings of our proposed EHV/HV/MV installation for the purpose of Industrial / GP / Bulk Domestic / etc. along with the treasury challan No dated for Rs (Rupees.....) only. The drawings may be checked and approved early, so that, the work can be started soon. The drawings for the proposed electrical installations have been distinguishly marked from the existing one. The list of drawings and other required information as applicable are given below. (A) LIST OF DRAWINGS Sl. No. Description of Drawings Voltage level Quantity (in No.) Rate (in Rs.) Amount (in Rs.) (1) (2) (3) (4) (5) (6) 1. General arrangement and schematic drawings 2. Single line diagram of the Sub-station (For Licensee, metering arrangement for auxiliary consumption must be accompanied) 3. Plan & Elevation of Switchyard 4. Drawing of Power Transformer / distribution transformer showing the clearances 5. GA of control room and other floors showing clearances 6. GA of control panel 7. Protection drawings of Switchyard / transformers / Lines 8. Earth mat drawing 9. Earth mat calculation 10. Earthing arrangement drawing of the total installation including Earth Pit section 11. Lighting arrangement drawings 12. DC supply / Battery room drawings 13. Cable routing / drawing 14. Write up on inter-locking 15. Drawing for lines (Profile & Root alignment) 16. Any other drawings TOTAL Rs. 6

(B) Capacity and location of other existing generating sets (owned by the same owner (C) Status of inspection of construction power supply (D) Status of payment of inspection fees against the existing electrical installation (B&C) above, up to the date of application along with date of last inspection (E) Status of construction work against the proposed equipment / installation (F) Name of the Electrical Contractor to whom work has been awarded. (Copy of the detailed work order enclosed) (G) License / Project license No. of the Contractor with period of validity Yours faithfully, Encl As above Signature Name Designation Name & address of the Firm 7

ANNEXURE-B COMPLETION CERTIFICATE We certify that the installation below has been installed by me/us and tested and that to the best of my knowledge and belief it complete with CEA (Measures relating to safety and electric supply) Regulation, 2010 as well as 732-1963 code of practice for Electrical wiring installation System voltage upto 650V / 11KV / 33KV / 66KV / 132KV / 220KV / 400KV and is ready for inspection. 1 Name and address of the Owner of the Electrical installation. 2 Location of the Electrical Installation. 3 Purpose of the Electrical Installation. 4 Voltage and System of Supply 5 A. Details of Equipments. Sl. No. Name of App. Make / Sl. No. Capacity Current Voltage Control equipment Make & Capacity B. Type of the System of Wiring C. Conductor size D. If the work involves installations of overhead lines/or underground cables. E. Conductor / Cable size F. Type & specification of support of overhead line i. Length of line ii. Average span length iii. State if clearance are maintained as per relevant regulation of CEA (Measures relating to safety and electric supply) Regulation, 2010 6 Earthing A. Type one Electrodes B. Size of Earth Wire/ Flat C. Size of earth electrodes provided 8

7 Test result i.insulation resistance for the whole installation ii. Between each conductor and earth iii. Between each conductor Insulation resistance for each apparatus i. Between each conductor and earth ii. Between each conductor Earth resistance for the system earthing 8 Name & address of the contractor with License No. & grade. License of the Supervisor under whose Supervision work has been executed. 9 Name & permit No. & Grade of the Lineman/Wiremen/Electrician engaged in the work 10 Date of the completion and final checking of the work by the Supervisor. 11 If the work has been taken up with specific authority of the Electrical inspector in the absence one required competency/contractor/supervisor of the authority quoted. 12 Detail of Pre-commissioning tests & setting has been furnished in the enclosed statement. Work executed by Owner (Contractor) Supervisor 9

ANNEXURE-C APPLICATION FORMAT FOR SUBMISSION OF DRAWINGS FOR APPROVAL To.... Sub Submission of Drawings for approval. Sir, With reference to the above captioned subject, find enclosed herewith the following drawings of our proposed generating unit / station along with the treasury challan No.. dated for Rs (Rupees....) only. The drawings may be checked and approved early, so that, the work can be started soon. The drawings for the proposed electrical installations have been distinguishly marked from the existing one. The list of drawings and other required information as applicable are given below. (A) LIST OF DRAWINGS Sl. No. Description of Drawings Voltage level Quantity (in No.) Rate (in Rs.) Amount (in Rs.) (1) (2) (3) (4) (5) (6) 1. General arrangement and schematic drawings including arrangement for Energy Meter Scheme 2. Single line diagram of connectivity 3. GA of control panel 4. Control circuits drawings 5. GA of control circuit room and other floors showing clearances 6. Earthing arrangement drawing including Earth Pit section and lighting installation 7. Earth mat drawing 8. Earth mat calculation 9. Generator transformer / auxiliary transformer showing the clearances drawings 10. Lighting arrangement drawings 11. DC supply / Battery room drawings 12. Cable routing / drawing 13. Write up on inter-lockings TOTAL Rs. 10

(B) Capacity and location of other existing generating sets (owned by the same owner (C) Status of payment of inspection fees against the generating sets at (B) above, up to the date of application along with date of last inspection (D) Status of payment of Electricity Duty against the generating sets shown at (B) above, up to the date of application (E) Status of construction work against the proposed equipment / installation (F) Name of the Electrical Contractor to whom work has been awarded. (Copy of the detailed work order enclosed) Yours faithfully, Encl As above Signature Name Designation Name & address of the Firm 11