ENVIRONMENTAL IMPACT ASSESSMENTS RECEIVED FOR THE PERIOD ENDING August 31 st 2017 Click on the hyperlinked CEC# for more details No. CEC # 154 2824 / 2010 06-10-2010 Ministry of Works and Transport Consultants Ltd. Assessment for the upgrade and development of the Southern Main Road from Paria Suites to St. Mary s Junction The upgrade and development of the Southern Main Road from Paria Suites to St. Mary s Junction 29.11.10 07.01.11 155 2863 / 2010 04-04-2011 Niko Resources ( & Tobago) Ltd. Consultants Ltd. Assessment for Exploratory Drilling of Three Wells in Block 2(ab), Offshore East Coast, The drilling of three (3) exploration wells (A, B and C) within 2(AB) 23.05.11 24.06.11 156 2943 / 2010 27-04-2011 Bayfield Energy (Galeota) Coastal Dynamics Assessment for Exploratory Drilling of Three Wells in Block 2(ab), Offshore East Coast, The drilling and completion of seven (7) exploration wells 11.07.11 12.08.11 157 3045 / 2011 27-04-2012 Voyager Energy (T dad) Consultants Assessment for Exploration drilling in the Guayaguayare, onshore south, Exploration drilling in the Guayaguayare, onshore south, 21.05.12 22.06.12
158 3047 / 2011 30-09-2011 BGTT Coastal Dynamics Ltd. The development of the Starfish field for natural gas production including the drilling of five (5) development wells The development of the Starfish field for natural gas production including the drilling of five (5) development wells 14.11.11 16.12.11 159 3060 / 2011 19-04-2012 Voyager Energy (T dad) Consultants Assessment for Exploratory Drilling of One Well in Guayaguayare Block, Offshore South East Coast, The Drilling and Well Testing of One Exploratory Well in the Off shore Section of the Guayaguayare Block, South-East 14.05.12 15.06.12 160 3077 / 2011 07-02-2013 Ten Degrees North Energy Environmental Services Development Drilling Project for Brighton/Guapo Block, Southwest Coast, The Drilling of 30 Infill/Step-out Wells for Oil and/or Gas in the Brighton and Guapo Marine Blocks, Offshore the South-west coast of 11.03.13 19.04.13 161 3270 / 2011 04-06-2013 Los Bajos Oil Los Bajos Oil Drill 40 Shallow Wells for Oil and/or Natural Gas, the Expansion, Modification and/or Maintenance of Existing Facilities and Utilization of Enhanced Oil Recovery within the Beach-Marcelle Block. The Drilling of 40 Shallow Wells for Oil and/or Natural Gas, the Expansion 01.07.13 02.08.13
162 3302 / 2011 02-07-2012 Bestcrete Aggregates Consultants Mining of 84.5 hectares (209 acres) of sand and gravel at Pine Road, Matura, within the Melaj3439esteo Forest Reserve The Mining of 209 Acres of Sand and Gravel at Pine Road, Matura, within the Melajo Forest Reserve 06.08.12 02.09.12 163 3368 / 2012 23-01-2013 Niko Resources (NCMA2 Caribbean) and Niko Resources (NCMA3 Caribbean) CSA International Inc. ( and Tobago Branch) NCMA2 (Caribblean) and Niko Resources (NCMA3) Assessment for the drilling of Ten (10) Exploration wells in the NCMA2 and NCMA3 Blocks, Offshore and Tobago The Drilling of Ten (10) Exploration Wells within the North Coast Marine Area (NCMA) 2 and NCMA 3 Blocks, Located Offshore the North Coast of 25.02.13 28.03.13 164 3399 / 2012 04-03-2013 Voyager Energy () CSA International Inc. Assessment for Drilling of Three Exploration Wells in the Mayaro-Guayguayare Block, Offshore The Drilling of Three (3) Exploration Wells within the Mayaro-Guayaguayare Block, located Offshore the South-east Coast of 08.04.13 10.05.13 165 3400 / 2012 06-08-2013 Niko Resources (Block 4B Caribbean) Environmental Sciences Assessment for the Drilling of Four (4) Exploration Wells within Block 4(b) Offshore, East Coast, The proposed drilling of four (4) exploration wells within Block 4(b) offshore the east coast, 07.10.13-08.11.13
166 3407 / 2012 07-01-2013 Voyager Energy (T dad) Consultants Exploration drilling in the Mayaro-Guayaguayare Block, Onshore, Southeast, The drilling of three (3) exploratory wells to identify the presence of gas, condensates and/or oil in the Mayaro- Guayaguayare Block for commercial production 04.02.13 08.03.13 167 3439 / 2012 13-08-2014 BP and Tobago LLC (BPTT) - Environmental and Social Impact Assessment The establishment of the Juniper Platform, the installation of a subsea production system inclusive of five subsea development wells, import flexible multiphase flowlines, umbilical and 10 km 26- inch diameter subsea pipeline within the Corallita and lantana Fields, offshore South east The establishment of the Juniper Platform, the installation of a subsea production system inclusive of five (5) subsea development wells and a 30.5 cm (12-inch) diameter import flowlines, a single manifold, umbilical and 30.5 cm diameter import risers and a 66 cm diameter subsea pipeline, 2 km in length 29.09.14 31.10.14 168 3455 / 2012 26-10-2012 Centrica Energy Coastal Dynamics Drilling of three (3) exploration wells within the NCMA-4 Block, offshore, Tobago Drilling of three (3) exploration wells within the NCMA-4 Block, offshore, Tobago 26.11.12 28.12.12
169 3500 / 2012 13-02- 2013 Trinity Exploration and Production Environmental Services Trinity Exploration and Production and Tobago (Trinity) Exploration Drilling Project for Brighton/Guapo Block, Southwest Coast, The Drilling of Three (3) Exploratory Wells within the Brighton and Guapo Blocks, Offshore the South-west Coast of 19.03.13 19.04.13 170 3774 / 2013 17-06-2013 Repsol E&P T&T Environmental Services TSP Step Out Drilling Project, TSP Block, East Coast, The drilling of three (3) appraisal wells (Arima, Cocorite and West Block) within the Teak, Samaan and Poui Block located offshore the south-east coast, 22.07.13 23.08.13 171 3775 / 2013 03-06-2013 Repsol E&P T&T Environmental Services Drilling of Pinta 1 and Cascadoux Appraisal Wells, TSP Block, East Coast, The drilling of three (2) appraisal wells, Pinta 1 and Cascadoux, within the Teak, Samaan and Poui Block located offshore the south-east coast, 08.07.13 09.08.13 172 3804 / 2013 25-07-2014 Oldendorff Carriers and Tobago Coastal Dynamics Environmental and Impact Assessment The expansion of an Existing Transhipment facility for Dry Bulk Material Handling (To include Iron ore, Coal and Bauxite), within the gulf of Paria The expansion of an existing transshipment facility for dry Bulk Material Handling (To include iron ore, coal and Bauxite) 15.09.14 17.10.14
173 3859 / 2013 19-03-2014 Caribbean Gas Chemicals Rapid Environmental Assessments (2003) Ltd Assessment study for a proposed Petrochemicals Complex at Union Industrial Estate, La Brea,, The Establishment Of A Methanol Plant, A Di-Methyl-Ether Plant And A Desalination Plant At The Union Industrial Estate, La Brea 19.05.14-20.07.14 174 3887 / 2013 13-02-2015 Caribbean LNG Consultants Assessment for the Establishment of a Midscale LNG Liquefaction facility at the Labidco Estate, La Brea The establishment of a 1,000,000 tonne per annun mid-scale LNG liquefaction facility 27.04.15-29.05.15 175 4000 / 2013 15-07-2014 Range Resources Upstream Management Assessment CEC4000/2013 The drilling of 60 shallow wells for crude oil 29.09.14 31.10.14 176. 4067 / 2013 04-11-2014 Tucker Energy Services Consultants Environmental and Impact Assessment in respect of CEC Application 4067/2013 Establishment of a fruit and vegetable crop farm and an energy services facility at the Picton IV Estate,Debe Establishment of a fruit and vegetable crop farm and an energy services facility on 56 ha of land 09.02.15 13.03.15
177 4227 / 2014 11-08-15 Petrotrin N/A Assessment Drilling of Ten Exploration Wells in North Marine Area. Drilling of Ten Exploration wells in North Marine Area 11.01.16 12.02.16 178 4238 / 2014 08-09-15 BHP Billiton Petroleum CSA Ocean Sciences Inc. Assessment for Drilling of ten(10) oil and gas exploration wells including associated subsurface evaluations within Blocks TTDAA5 and TTDAA6, offshore east coast and Tobago The drilling of ten (10) exploration wells within the offshore Blocks TTDAA5 and TTDAA6 and associated subsurface evaluations including vertical seismic profiles 26-10-15 27-11-15 179 4244 / 2014 06-11-15 BHP Billiton Petroleum CSA Ocean Sciences Inc. Environmental and Social Impact Assessment Block TTDAA 14, TTDAA28, TTDAA29, 23 (a) and 23 (b) Exploration Drilling Programme. The drilling of 20 Oil and Gas Exploration Wells Including Associated Subsurface Evaluations and Vertical Seismic Profiles (VSP s) Within Block TTDAA 14,28,29 and Blocks 23 (a) and 23 (b) Offshore, east Coast and Tobago. 04.01.16 05.02.16 180 4381 / 2014 12-05-15 BG 5(a) and BG International CSA Ocean Sciences Inc. Assessment for Drilling of Two Exploration Wells in Block 5a and 5d, East Coast Marine Area [ECMA], Offshore. The drilling of two (2) exploration wells within Block 5(a) and 5(d), off the ECMA, offshore 29.06.15 31.07.15
181 4413 / 2015 18-09-15 EOG Resources Coastal Dynamics Assessment for the Sercab Development Project within the East Manzanilla Joint Venture (EMZJV) Development Block The Installation of six (6) Well slots wellhead Protector Platform, a 35.6cm 14" Subsea Pipeline and the drilling and completion of six(6) developmental wells 02.11.15 04.12.15 182 4678/2015 17-07-2017 BP and Tobago LLC (BPTT) - Environmental and Social Impact Assessment for the Angelin Field Development Project Easy Coast,. The Installation of a new platform and associated infrastructure within the Angelin Field, within the TSP BPTT Retained Block, Offshore the East Coast of. 04.09.17-06.10.17 183 4827 / 2016 21-09-16 De Novo Energy Coastal Dynamics Assessment Development of blots 1(a) and 1(b) in the Gulf of Paria, The development of blocks 1(a and 1(b) to include installation of four (4) unmanned production platforms, drilling of one (1) appraisal, 15 production and two (2) exploration wells within the Gulf of Paria and the installation of 66.1 KM natural gas pipeline 21.10.16 25.11.16 184 4905 / 2016 09-12-2016 De Novo Energy Coastal Dynamics De Novo Energy Assessment The Establishment of a Natural Gas Processing Facility to Handle up to 90 MMSCFD of Natural Gas Produced by the Proposed Blocks 1(A) and 1(B) Offshore Development Programme, Caspian Drive Extension Road, Couva. 20.02.17-24.03.17
185 4952 / 2016 30-01-2017 Ministry of Works and Transport National Infrastructure Development Company (NIDCO) Assessment for The Establishment of a 5000 Metre Highway Segment from Cumuto to Sangre Grande Assessment for The Establishment of a 5000 Metre Highway Segment from Cumuto to Sangre Grande 27.03.17-28.04.17 186 5028/2016 31-07-2017 BHP Billiton Petroleum CSA Ocean Sciences Ltd Environmental and Social Impact Assessment for TTDAA 3 and TTDAA 7 Exploration Drilling Programme The Drilling of up to ten (10) oil and gas exploration wells within offshore blocks TTDAA 3 and TTDAA 7 and associated subsurface evaluations including vertical seismic profiles 11.09.17-13.10.17
OIL AND GAS INDUSTRY / NON-RENEWABLE CONSTRUCTION / HOUSING INDUSTRY PORTS AND COASTAL WORKS Exploration Drilling Production Pipelines Housing Estates Commercial Centres / Malls Industrial Estates Petrochemicals Aluminium Smelter Steel Paper Mill Prefab Panels Power Generation Wastewater Plants Dredging Pier / Terminal Facilities Coastal protection TOURISM Hotel & Villas MINING AND QUARRY Quarrying HIGHWAY Highways