CONSULTANT ACCREDITATION SCHEME WATER SUPPLY

Similar documents
CONSULTANT ACCREDITATION SCHEME SEWER DESIGN

Office use only: Application Date: UT No.: EA No.: Property Address: ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK

SECTION 2 GENERAL REQUIREMENTS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

Delivery of Developer Funded Infrastructure A New Model

City of Aspen Water Review for Pitkin County Permits Submission Packet

1. Land survey Work. 2. Civil and Structural engineering services.

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

PRESSURE SEWER CODE OF AUSTRALIA AGENCY REQUIREMENTS PART 1 - DESIGN

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

KC Water Rules and Regulations For Water Main Extensions and Relocations

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Charlotte County Utilities DESCRIPTION

List of Figures. List of Forms

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Design submission using DTC or Engineering Certified solution.

South African Distribution Code

TOWN OF NORTH BRANFORD

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

Chapter 1 General Design Information

Specification For. Asset Information Pr8701

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Checklist for Minor Plan Modification

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

ELECTRONIC DRAFTING GUIDELINES

Item 2. September 28, 2017

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Land Development Manual

SECTION III SUBMITTALS AND APPROVALS

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

Section Meetings Section Material and Equipment. None Required

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

Plan Submittal and Review Checklist

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

PRELIMINARY PLAT CHECK LIST

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

OAK RUN BUILDING PERMIT

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Checklist for Tentative Subdivision Map

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

APPENDIX D: DRAWING SUBMISSION STANDARDS

TOWN of LAKESHORE SITE PLAN CHECKLIST

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

AVENTUS TENANCY DESIGN REVIEW PROCESS

Engineering Department DRAWING STANDARD SPECIFICATIONS

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

Peters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Section XV - PER, Design, and Construction Submittal Requirements

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

TECHNICAL DESCRIPTION

Signalling Documentation and Drawings

SEWERAGE CODE OF AUSTRALIA AGENCY REQUIREMENTS PART 1 - DESIGN

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

PEDIGREE Publication Policy & Procedures

Lincoln County Public Works Water and Sewer Submittal Application

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

STS 903 WORK AS CONSTRUCTED INFORMATION

Yavapai County Development Services

SUBDIVISION PLAT APPLICATION

SECTION SUBMITTAL PROCEDURES

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

CONCEPT REVIEW GUIDELINES

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

CHAPTER 11. Plan Standards

SECTION SUBMITTAL PROCEDURES

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

Transcription:

CONSULTANT ACCREDITATION SCHEME WATER SUPPLY DESIGN DRAWING CRITERIA AND CHECKLIST Produced by SA Water Reticulation Networks Jan 2015 Pg. 1 of 8 Jan 2015

Contact Information Details For both water design and recycled water design Land Developer Agreements Sharyn Tyson Manager Major Process Phone (08) 7424 1135 E-mail sharyn.tyson@sawater.com.au Design Issues Tom Galek Manager Reticulation Networks Phone (08) 7424 1996 E-mail tom.galek@sawater.com.au Adam Debicki Senior Engineer Reticulation Networks Phone (08) 7424 1266 E-mail adam.debicki@sawater.com.au Design Drawing Auditing Terry Masters Senior Officer Reticulation Networks Phone (08) 7424 1078 E-mail terry.master@sawater.com.au Pg. 2 of 8

MAJOR LAND DEVELOPMENT WATER INFRASTRUCTURE FLOWCHART Application received from DAC Planning Report Treatment & Network Planning Initial Proposal Investigate Concept plan Engineering Determine SA Water requirements technical, financial, augmentation Reply to DAC Req. letter sent to client Request for agreement & drawing no s Agreement Consulting Engineer understands Engineering requirements Design received Developer Agreement requirements finalised Consulting Engineer submits water design Audit of design Engineering Engineering Developer pays Agreements issued Contractor works on site SA Water audits work on site Operations / Infrastructure Delivery Construction As constructed details submitted CPC issued Work complies Mains gazetted Operations / Infrastructure Delivery Customer Final Certificate issued Customer Pg. 3 of 8

GENERAL 1. When a land division proposal is lodged, SA Water technical staff prepare a Concept Design to ensure that all internal subdivision and approach mains are sized accordingly and all link-up points are identified, whilst at the same time ensuring that SA Water s long term planning requirements are met. 2. A copy of this concept design is available to the Consulting Engineer. Alternative designs are acceptable providing SA Water s long term planning requirements are catered for and the alternative does not include an increase in easements and/or additional water main length. 3. A standard drawing template for Consulting Engineers is available from the SA Water website. Consulting Engineers will be advised when a change to the template or additional information is required on the drawings. All drawing attributes (e.g. line thicknesses, line types, layouts, etc.) must match those set out in the template. 4. Appendix A is a copy of the Audit Checklist, which will be used to ensure submitted designs meet the required criteria. It is recommended that Consulting Engineers also use the checklist to ensure everything has been covered prior to submitting the drawings for audit. 5. Example drawings are available on the SA Water website under Wastewater Examples (zip file). REQUIREMENTS 1. Clarity of drawings is essential. Consulting Engineers design drawings need to be scanned and reproduced therefore the need to provide the line thicknesses, styles and general layout as per the standard drawing template. 2. Drawing layout should be oriented so that the drawing text can be read looking from the bottom right of the drawing. Where possible the North Point should be upwards on the drawing sheet. 3. Scales: Only the following plan scales will be accepted: Locality Plans 1:1000 or 1:2500 Layout Plans 1:500 4. The Location Plan, Limit of Contract, Total Length of mains and a Tally of Fittings are to be included on sheet 31. 5. Drawings are to be submitted for initial auditing on A1 size sheets. 6. All design drawings submitted, including the initial submission, must be checked and signed by the responsible Consulting Engineer. Drawings will be returned immediately if they have not been signed by the Consulting Engineer. Pg. 4 of 8

7. When the Consulting Engineer has submitted drawings that are represented, by the designer, to comply with SA Water Standards the drawings, (one copy at A1 size and one copy at A3 size), will be signed by SA Water for construction. As SA Water only performs a partial audit of the design the Consulting Engineer accepts full responsibility for the conformity of the design to SA Water Standards. If nonconformity is discovered by SA Water s Audit Inspectors on site, then the contractor is to refer the issue to the Consulting Engineer in order to initiate steps to remedy the situation. 8. As a minimum, design drawings must be submitted on good quality (80 gsm) paper. Drawings submitted for issue should not be folded or tightly rolled, as it creates problems during auditing and copying (Multiple copies of the drawings are required for contract documentation, and for issue to various contractors, inspectors and regional staff). 9. The Consulting Engineer s Title block is to contain the company s current information e.g. phone number, fax number, printed name below signature etc. No company logos are permitted AS CONSTRUCTED DRAWINGS 1. As Constructed drawings shall be updated electronically. 2. As Constructed drawings to be submitted on A1 sheets at the same plan scales as the issued design drawings. 3. Drawings are to be submitted on good quality paper of 80 gsm minimum thickness. 4. As Constructed drawings are to be signed off by the responsible person - either a Licensed Surveyor or the Chartered Consulting Engineer. Pg. 5 of 8

SUPPORTING DOCUMENTATION Appendices A Audit Checklist Pg. 6 of 8

Appendix A AUDIT CHECKLIST FOR LAND DEVELOPMENT WATER SUPPLY DESIGNS THE WATER SUPPLY CODE OF AUSTRALIA SUPPLEMENTED BY THE SA WATER STANDARDS IS TO BE ADHERED TO FOR ANY WATER SUPPLY DESIGN PROPOSAL. Water Supply Design Drawings will ultimately be utilised as the permanent SA Water record of assets constructed. Clarity, neatness and accuracy are of utmost importance. 1. PRELIMINARY PROCEDURES All drawings to - Conform to the current sheet layout. - Clearly and neatly provide the appropriate design information. - Contain correct drawing numbers. - Contain correct docket numbers. - Contain correct land development numbers. - Contain correct contract numbers. - Possess appropriate scales. - Bear the signature of a Chartered Engineer 2. LOCALITY / LAYOUT SHEETS Do the Locality / Layout sheets: Meet the required drafting standards Provide an accurate and complete limits of contract Work by Constructor and Work by SA Water (at Developer s Expense) Contain accurate and complete foot notes e.g. conformation with common service trench, or special connection Provide the Total Length of Mains Provide a Tally of Fittings Contain a North Point Provide a drawing of the Subdivision at a scale of 1: 500 Pg. 7 of 8

Appendix A Provide Land Division/Stage Boundaries Provide road names and lot numbers Provide ties to all buried and surface fittings (e.g. Tees, Bends, FPs, SVs, etc) Provide chainages to all buried and surface fittings (e.g. Tees, Bends, FPs, SVs, etc) Show cross referencing to existing infrastructure and reference to any future water main (size) and ensure future water mains commence from the subdivision boundary Provide information about existing and proposed services and meters (i.e. size, number, location, to be cut-off or shifted, installed by, etc) Show that all allotments in the subdivision/ stage are serviced by the design Show services to the correct size and type according to the SA Water and WSAA Standards Show that water appurtenances are in their correct allocated space Show that there is no conflict between water mains and other existing or proposed services e.g. Sewers, stormwater etc Indicate all easement requirements and the correct sizes Contain appropriate amendment notices where an amendment has been made Pg. 8 of 8