CONSULTANT ACCREDITATION SCHEME SEWER DESIGN

Similar documents
CONSULTANT ACCREDITATION SCHEME WATER SUPPLY

1. Land survey Work. 2. Civil and Structural engineering services.

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

LAND DEVELOPMENT - SURVEY MANUAL 01

Office use only: Application Date: UT No.: EA No.: Property Address: ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK

SEWERAGE CODE OF AUSTRALIA AGENCY REQUIREMENTS PART 1 - DESIGN

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

KC Water Rules and Regulations For Water Main Extensions and Relocations

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

List of Figures. List of Forms

Grease Interceptor Design Checklist

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

PRELIMINARY PLAT CHECK LIST

1.1 GENERAL RECORD DRAWING REQUIREMENTS

PRESSURE SEWER CODE OF AUSTRALIA AGENCY REQUIREMENTS PART 1 - DESIGN

SECTION III SUBMITTALS AND APPROVALS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Land Development Manual

CITY OF MUSKEGO DRAFTING STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS

1 MUNICIPAL INFRASTRUCTURE

SECTION 2 GENERAL REQUIREMENTS

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Delivery of Developer Funded Infrastructure A New Model

Subdivision Application Checklist

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Engineering Department DRAWING STANDARD SPECIFICATIONS

B-PERMIT PLAN CHECK MANUAL

TABLE OF CONTENTS 1200 PLAN PREPARATION

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

Oil-Water Separator Design Checklist

STATE UNIVERSITY CONSTRUCTION FUND

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Clarifications in italics added July 2018

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

Peters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

Charlotte County Utilities DESCRIPTION

Washington County Road Engineering Plan Submittal/Review Checklist

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

Design submission using DTC or Engineering Certified solution.

TOWN OF NORTH BRANFORD

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Public Works City of Lebanon, Tennessee; Department of Public Works

ELECTRONIC DRAFTING GUIDELINES

DEVELOPMENT PLAN CHECKLIST

Lincoln County Public Works Water and Sewer Submittal Application

Babcock Ranch Water Utilities as operated by Town & Country Utilities and Babcock Ranch Irrigation

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

3. DESIGN SPECIFICATIONS

Council Policy Engineering Drawing Submission Requirements

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Essential Skills: Reading and Interpreting Maps and Plans

Record Drawing Standards for Projects Version 2.1

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Plan Submittal and Review Checklist

STS 903 WORK AS CONSTRUCTED INFORMATION

HAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS

For crossing under a railroad, contact the specific railroad company's engineering department.

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

Onslow Water & Sewer Authority

PRECISE GRADING PLAN CHECKLIST

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Checklist for Tentative Subdivision Map

CHAPTER 11. Plan Standards

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

Yavapai County Development Services

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

10010 RECORD DRAWING INFORMATION

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

Consultant s As Constructed Survey Certification Check List

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Sewer Line Extension Permit Design Checklist

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

Transcription:

CONSULTANT ACCREDITATION SCHEME SEWER DESIGN DRAWING CRITERIA AND CHECKLIST Produced by SA Water Corporation Asset Management Group June 2013

Land Developer Agreements Contact Information Details Sharyn Tyson Major Development Process Manager Phone (08) 7424 1135 Fax (08) 7003 1135 E-mail sharyn.tyson@sawater.com.au Design Issues Tom Galek Principal Engineer Water and Wastewater Networks Phone (08) 7424 1996 Fax (08) 7003 1996 E-mail tom.galek@sawater.com.au Design Drawing Auditing Geoff Hocking Supervisory Water and Wastewater Networks Officer Phone (08) 7424 1421 Fax (08) 7003 1421 E-mail geoff.hocking@sawater.com.au Terry Masters Senior Technical Officer Water and Wastewater Networks Phone (08) 7424 1078 Fax (08) 7003 1078 E-mail terry.masters@sawater.com.au CADD Database issues Christopher Dean Senior Technical Officer Water and Wastewater Networks Phone (08) 7424 1072 Fax (08) 7003 1072 E-mail christoper.dean@sawater.com.au Z:\Users\Networks Engineering\Standard Docs\consultant-contractors\Current lists\sewer Design Drawing Criteria 1 of 5 June 2013

MAJOR LAND DEVELOPMENT SEWER INFRASTRUCTURE MGMT & DELIVERY FLOWCHART Application received from DAC Initial Proposal Investigate Concept plan Infrastructure Mgmt & Delivery Determine SA Water requirements technical, financial, augmentation Reply to DAC and to Developer Determination fee paid Agreement Consultant understands Infrastructure Mgmt & Delivery requirements Design received Developer Agreement requirements finalised Consultant submits sewer design Audit of design Infrastructure Mgmt & Delivery Infrastructure Mgmt & Delivery Developer pays Agreements issued Contractor works on site SA Water audits work on site Operations Construction As constructed details submitted CPC issued Work complies Mains gazetted Operations / Infrastructure Mgmt & Delivery Final Certificate issued Z:\Users\Networks Engineering\Standard Docs\consultant-contractors\Current lists\sewer Design Drawing Criteria 2 of 5 June 2013

GENERAL 1. When a land division proposal is lodged, SA Water s technical staff prepares a feasibility Concept Design to ensure that all allotments can be serviced whilst at the same time ensuring that SA Water s long term planning requirements are met. 2. A copy of this concept design is available to consultants. The design is conceptual only and is not the only way the land division can be serviced. Alternative designs are acceptable providing SA Water s long term planning requirements are catered for and the alternative does not include an increase in easements and/or additional sewer length. 3. A standard drawing template for consultants is available free from SA Water and will be e-mailed to consultants on request. Consultants will be advised when a change to the template or additional information is required on the drawings and a new template can be forwarded. 4. Appendix A is a copy of the Checklist, which will be used to ensure submitted designs meet the required criteria. It is recommended that Consultants also use the checklist to ensure everything has been covered prior to submitting the drawings for audit. 5. Appendix B to this document is a copy of a typical Design Drawing showing the required line thicknesses and other layout standards. These criteria must be followed because clarity of the drawing is essential to SA Water, as the drawing needs to be scanned and reproduced for future reference. REQUIREMENTS 1. Clarity of drawings is essential. Consultant design drawings need to be scanned and reproduced therefore the need to provide the line thicknesses detailed in Attachment B. 2. Drawing layout should be oriented so that the drawing text can be read looking from the bottom right of the drawing. Where possible the North Point should be upwards on the drawing sheet. 3. Scales: Because of SA Water s digitising equipment set-up, only the following plan scales can be accepted: Locality and layout Plans 1:500 and 1:1000. Longitudinal Section 1:1000 horizontally and 1:100 vertically An additional location plan (i.e. Scale 1:2500) may be necessary for large developments. 4. The Location Plan, Limit of Contract and Total Length of mains are to be included on sheet 1. 5. Drawings are to be submitted for initial auditing on A1 size sheets. Z:\Users\Networks Engineering\Standard Docs\consultant-contractors\Current lists\sewer Design Drawing Criteria 3 of 5 June 2013

6. All design drawings submitted, including the initial submission, must be checked and signed by the responsible Chartered Consulting Engineer. Drawings will be returned immediately if they have not been signed. 7. When the consultant has submitted drawings that are represented, by the designer, to comply with SA Water Standards the drawings, (one copy at A1 size and one copy at A3 size), will be signed by SA Water for construction. As SA Water only performs a partial audit of the design the consultant accepts full responsibility for the conformity of the design to SA Water Standards. If nonconformity is discovered by SA Water s Audit inspectors on site, then the contractor is to refer the issue to the Consulting Engineer in order to initiate steps to remedy the situation. 8. As a minimum, design drawings must be submitted on good quality (80 gsm) paper. Film copies of the design drawings are also acceptable. Do not fold or tightly roll the drawings when submitting for issue, as it can create problems during printing of additional copies. (Multiple copies of the drawings are required for contract documentation, and for issue to various contractors, inspectors and regional staff.) 9. If drawings are submitted on film the drawing is to be submitted on quality film of 100microns thickness as a minimum. Tracing paper is not acceptable. 10. The Consulting Engineer s Title block is to contain the company s current information e.g. phone number, fax number, printed name below signature etc. No company logos are permitted AS CONSTRUCTED DRAWINGS 1. As Constructed drawings can be updated electronically. 2. It is no longer necessary to cross out the old text, distances, grades and levels; however this will still be accepted. 3. As Constructed drawings to be submitted on A1 sheets at the plan scales of 1:500 or 1:1000. See Appendix C for drawing requirement details. 4. Drawings can be submitted on good quality paper of 80 gsm minimum thickness or on film of 100 microns minimum thickness. Tracing paper is not acceptable. 5. As Constructed drawings are to be signed off by the responsible person, whether it is a licensed surveyor or chartered engineer. CONFIGURATION AND SPACINGS FOR MS s AND MH s MH MS MSJ MS MS MH Flow Up to 120 m Up to 120 m Up to 120 m Up to 120 m Up to 120 m 400 m Maximum Multiple MS s between consecutive MH s Z:\Users\Networks Engineering\Standard Docs\consultant-contractors\Current lists\sewer Design Drawing Criteria 4 of 5 June 2013

For reticulation sewers the maximum distance between any two maintenance structures shall be 120 metres VARIABLE BENDS Horizontal Short radius bends 635mm radius (1000mm available in the near future) up to 45 degrees can be used immediately upstream of straight through maintenance shafts and maintenance shaft junctions. Long radius bends 3000mm radius, up to 30 degrees total or combinations up to 30 degrees (i.e. 2 x 15degrees), are to be used for all variable bends located between maintenance structures. This is in addition to the 45 degree short radius bend mentioned above. Vertical Use long radius bends (R=3000) for vertical changes of grade. At this stage unlimited vertical changes of grade are allowable between maintenance structures. But anything out of the ordinary such as grading down steep slopes should be referred to SA Water before going too far into the design. USE OF VARIABLE BENDS - Deflections between consecutive MS s FLOW 45 Max 45 Max 30 Max FLOW MSJ 45 Max 30 Max DEFINITIONS AHD - Australian Height Datum Depth - Distance from the finished road level to the pipe invert level (in metres) Grade - Grade of the pipe in % (must be positive for gravity sewers) Longitudinal Section - Scales: - Horizontal 1:1000 and Vertical - 1:100 Plan (Sheet 01) - Scale: 1:500 OR 1:1000 Size - Pipe size (nominal diameter in millimetres) and class Invert EL - Invert level of the sewer pipe at the corresponding distance Centreline EL - Finished ground level at the centreline of the road or easement at the corresponding distance and invert level. Z:\Users\Networks Engineering\Standard Docs\consultant-contractors\Current lists\sewer Design Drawing Criteria 5 of 5 June 2013

Note: The Consultant Accreditation Process applies only to Wastewater designs greater than 100 metres in length Z:\Users\Networks Engineering\Standard Docs\consultant-contractors\Current lists\sewer Design Drawing Criteria 6 of 5 June 2013

Appendix A AUDIT CHECKLIST FOR LAND DEVELOPMENT SEWERAGE DESIGNS THE SEWERAGE CODE OF AUSTRALIA SUPPLEMENTED BY THE SA WATER STANDARDS ARE TO BE ADHERED TO FOR ANY SEWERAGE DESIGN PROPOSAL. Sewerage Design Drawings will ultimately be utilised as the permanent SA Water record of assets constructed. So clarity, neatness and accuracy are of utmost importance. 1. PRELIMINARY PROCEDURES. All drawings to - Conform to the current sheet layout. - Clearly and neatly provide the appropriate design information. - Contain correct drawing numbers. - Contain correct docket numbers. - Contain correct land development numbers. - Contain correct contract numbers. - Possess appropriate scales. - Bear the signature of a Chartered Engineer Sewer Design Handbook A1 of 4 10 March 11

Appendix A COVER SHEET Does the cover sheet Contain benchmark details Contain a north point Provide a drawing of the Subdivision at a scale of 1: 1000 or 1: 500 Provide Land Division/Stage Boundaries Provide road names, lot numbers, and ties to all structures (e.g. MHs, IOs, etc) Meet with the required drafting standards Show cross referencing to existing Infrastructure Mgmt & Delivery and reference to any future sewer (size and grade) and ensure future sewers commence from the subdivision boundary Provide accurate and complete limits of contract Contain accurate and complete foot notes e.g. conformation with common service trench, or special connection Requirements, also a variable bend cutting table and fitting schedule where appropriate Show that all allotments in the subdivision/ stage are served by the design Show connections to be the correct size and type according to the SA Water and Australian Standards Show invert and surface levels at each allotment s connection point Show that sewerage appurtenances are in their correct allocation of space Show that there is no conflict between sewers and other existing or proposed services e.g. Water mains, stormwater etc Provide chainages to structures and cross references to line / sheet numbers Contain a completed length set out column Indicate all easement requirements and the correct sizes Contain appropriate amendment notices where an amendment has been made Sewer Design Handbook A2 of 4 10 March 11

Appendix A LONGITUDINAL SECTIONS DRAWINGS Do the longitudinal drawings provide the following: Have completed columns detailing Connections Distances along the sewer Inverts along the sewer Pipe size Pipe grades Pipe depth below ground Show cross references of critical data with the cover sheet (e.g. Variable bend information, maintenance shafts, maintenance holes, etc.) Include a length set out box containing accurate data related to the specific sizes of sewers being designed. Contain information on easements (internal and external as required) for the development including Docket References and special conditions Show the following- Existing ground levels Final ground surface levels Proposed sewers Proposed structures (e.g. MH s, IO s, MS s, etc) Existing and proposed SWD s and connection depth indicators shown along the profile of the sewer. Future sewers proposed indicating size, grade, and ground profile (if known) Water seal requirements for connections to sewers 450 mm in diameter or larger SWD crossings with pipe sizes and inverts included, and with any appropriate notes Any large Jump Ups in the design. (are they designed as internal or external Jump Ups ) All appropriate notes required e.g. Soil compaction notes, concrete encasement details, tankering MH, notes, etc. Sewer Design Handbook A3 of 4 10 March 11

Appendix A Availability of sewer for serving adjacent areas Appropriate amendment notices where a sheet is being amended For pumping mains Are details of high points provided Are details of low points provided Are deflection details along the pipeline provided - including deflection at pipe joints Are pipe size and material details provided Has the pressure rating for the pipe system been specified Sewer Design Handbook A4 of 4 10 March 11