APPLICATION MANUAL. application manual >> ARMA-CHEK R. application manual

Similar documents
ARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)

Fitting & User Instructions

Array chip resistors size ARC241/ARC242 ARV241/ARV242

LEXUS IS250/IS350 FRONT SPOILER Section I - Installation Preparation. Part Number: Section I - Installation Preparation.

* TURNING SPACE ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * TURNING SPACE ** RAMP

application manual >> ARMA-CHEK S+ application manual

Tubing Spacers. Backing Plate. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a a. a a. a a

application manual >> ductwork

ET 51 EXTERIOR ROOF DRIP SIDE FINISH MOULDING INSTALLATION

WETROOM WALK-IN AWL1500 AWL1200 AWL900 AWC850

Extremely small "footprint" and the highest circuit density available AK550. Front Wire Entry

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES

ARK CHEVRON INSTALLATION GUIDE

Geometric quantities for polar curves

The Discussion of this exercise covers the following points:

ASSEMBLY INSTRUCTIONS

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your

Radiant systems 0801EN March 2016 Radiant plasterboard ceiling and/or floor system ISO /7

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your

Example. Check that the Jacobian of the transformation to spherical coordinates is

Rectangular type APS-10 to 15 Series

Harmer Roof Drainage The Modulock Raised Deck Support Ranges

First Round Solutions Grades 4, 5, and 6

Exercise 1-1. The Sine Wave EXERCISE OBJECTIVE DISCUSSION OUTLINE. Relationship between a rotating phasor and a sine wave DISCUSSION

JUMO Wtrans B Programmable Head Transmitter with Radio Transmission

Spiral Tilings with C-curves

001CK CK0012 FR-001CK0013 FR EN English

Aquauno Select MINUTES. (duration) FREQUENCY LED. OFF 8h AQUAUNO SELECT 5 MIN FREQUENCY. the timer is being programmed;

TUR DOORS SHOWER DOORS

How to remove BRNS/BRFS series from a PWB

Innovative plate solutions for flexographic printing. nyloflex printing plates

General Instructions 03HEL1010DDFW-V3. Please retain product label and instructions for future reference. 10x10 Helios Summer House

670 Freestyle/Style Door with In-Line Panel

Products no longer available

SAMPLING S Y S T E M S. w w w. s a m p l i n g. c o m. Label Solutions. Labels for Production and Quality Control use

Please Do Not Return Product to Store!

(CATALYST GROUP) B"sic Electric"l Engineering

Large Commercial Trunking

Multi-Point Astragal Prehanger Installation Instructions

Series Door with In-Line Panel (GIH / AHD)

Power rating at 80 C watts R0005 ohms R0006 to R01. R001 to R01 Power. to R015. (mω) 1 0.2, 0.25, 0.3, 0.

Ultra Low Cost ACCELEROMETER

Synchronous Machine Parameter Measurement

9.4. ; 65. A family of curves has polar equations. ; 66. The astronomer Giovanni Cassini ( ) studied the family of curves with polar equations

Connection Technology

TP Series - Triple PV Top of Pole Solar LED Lighting System

Polar Coordinates. July 30, 2014

A Development of Earthing-Resistance-Estimation Instrument

ABB STOTZ-KONTAKT. ABB i-bus EIB Current Module SM/S Intelligent Installation Systems. User Manual SM/S In = 16 A AC Un = 230 V AC

PB-735 HD DP. Industrial Line. Automatic punch and bind machine for books and calendars

MAXIMUM FLOWS IN FUZZY NETWORKS WITH FUNNEL-SHAPED NODES

1, 1.5, 2, 2.5, , 0.75, 1, 1.5, , 3, , 4.5, 5, 5.5, , 4.5, 0.5, 5, , , 6.

Make Your Math Super Powered

Synchronous Machine Parameter Measurement

Student Book SERIES. Fractions. Name

Seven Sisters. Visit for video tutorials

Controls. Solid-State Switching Devices. Reference Manual April Low-Voltage Controls and Distribution

* * 33/3549A CS 33/3549A. 2-Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions

Lecture 20. Intro to line integrals. Dan Nichols MATH 233, Spring 2018 University of Massachusetts.

SOLVING TRIANGLES USING THE SINE AND COSINE RULES

DP400 / DM350. Inverter. Total Solutions from the Single Source Provider DP400 PULSED MAG - PULSED MIG CO2 - MAG - MIG - FCAW

MATKI ONE MOWP - WETROOM PANEL & BRACE BAR MOWV - WETROOM PANEL & CEILING BAR

INSTALLATION MANUAL ARMA-CHEK D, ARMA-CHEK S, ARMA-CHEK R AND ARMA-CHEK T

10.4 AREAS AND LENGTHS IN POLAR COORDINATES

Incremental encoders Solid shaft with clamping or synchro flange pulses per revolution

CHAPTER 2 LITERATURE STUDY

ABOUT THIS MANUAL ABOUT THIS MANUAL

Highlights. Opto Proximity Switches. Introduction. Opto proximity switches fast and accurate sensing with light and laser PXO100

Operation Manual. Addendum. Embroidery Machine. Product Code: 884-T13

Engineer-to-Engineer Note

On/off valves with spool position monitoring

CAL. NX15 DUO-DISPLAY QUARTZ

Ultra Low Cost ACCELEROMETER

Compared to generators DC MOTORS. Back e.m.f. Back e.m.f. Example. Example. The construction of a d.c. motor is the same as a d.c. generator.

application manual >> DUCTWORK application manual >> DUCTWORK

Three-Phase Synchronous Machines The synchronous machine can be used to operate as: 1. Synchronous motors 2. Synchronous generators (Alternator)

Enhanced performance compression solutions

Joanna Towler, Roading Engineer, Professional Services, NZTA National Office Dave Bates, Operations Manager, NZTA National Office

Frami transport hook Art. n models onward

Ultrasonic Level Measurement DU 60 Z and DU 61 Z Sensors

application manual application manual >> ARMAFLEX TUFFCOAT

Module 9. DC Machines. Version 2 EE IIT, Kharagpur

IPA FITTINGS FOR REHAU NORDIC

Canopy Bed Frame. Date: 8 Jun 15 www. potterybarn.com Page 1 of 12 Rev:

Whole House Fan. WHF 1500, GF 1500, WHF 3000 Installation Instructions. Parts List * Required Tools:

Experiment 3: Non-Ideal Operational Amplifiers

MSRS90. Hi efficiency Notched and No-hand insert for MSRS90

NORTH STAR 2-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

Section 16.3 Double Integrals over General Regions

NP10 DIGITAL MULTIMETER Functions and features of the multimeter:

TOOLS NEWS CRN ENDMILL FOR COPPER ELECTRODE

* * 98/9949 CS 98/ Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions

PROGRAMMING MANUAL MTMA/01 MTMV/01 FB00329-EN

FP2 POLAR COORDINATES: PAST QUESTIONS

CABLE MANAGEMENT. Parts List

Math Circles Finite Automata Question Sheet 3 (Solutions)

Experiment 3: Non-Ideal Operational Amplifiers

NORTH STAR 4-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

S-Class Integration Deluxe S-Class Integration

FOR DEVICES SOLD PRIOR TO

Transcription:

APPLICATION MANUAL R ppliction mnul >> ARMA-CHEK R ppliction mnul R

R APPLICATION MANUAL 1 GENERAL 3» Working with Arm-Chek R 3» Tools for instlling Arm-Chek R 3» Correct use of Armflex dhesive 4» Applying Arm-Chek mstic 4» Applying Arm-Chek R outdoors 5» Temperture limits of Arm-Chek R 5» Use of Arm-Chek R on different Armflex mterils 5» How to hndle pipe supports, pressure guges nd metl protrusions 5 5 Useful hints 22» Templtes for irregulr shpes 22 6 REFERENCES 23 In ddition to this mnul Armcell provides dditionl documents, freely vilble from www.rmcell.com or on our ArmPlus CD. These documents contin further detiled dvice for specific pplictions. 23 7 ALL ARMA-CHEK PRODUCTS 24 ppliction mnul >> ARMA-CHEK R 2 Arm-Chek R pre-covered tubes 7» Insulting stright pipes OD < 80mm 7» Fbriction of fittings 8» Insultion of pipe reducers 8 3 Covering Pipes & Fittings 9» Working with Arm-Chek covering 9» Covering of cylindricl bodies 9» The Fethering Technique 9» Horizontl pipework OD < 500 mm 10» Pipework OD > 500 mm nd ll verticl lines 10» Fittings mde of Arm-Chek R 11 Step-by-step guides for covering of - Segmented bends 11 - Two-Piece bend 12 - Neck-T, Pipe-T, Spindle neck of vlve 13 - Offset ngles 14 - End cps nd termintion points 15 - Concentric reducers 17 - Anchor points nd other metl protusions 4 Covering Rectngulr shpes, ductwork, vessels & tnks 19» Covering of insulted rectngulr shpes 19» Covering of insulted ductwork bends & irregulr shpes 19» Covering of insulted circulr ductwork 20» Covering of insulted vessels & tnks 20 R (2)

The instller should hve generl knowledge of the instlltion techniques relting to Armflex tube nd sheet products. Use high qulity tools. A shrp knife, good brushes nd fresh Armflex dhesive, Arm-Chek Mstic nd Armflex Clener / Locl solvent re required. Use clen mteril. No dust, dirt, oil or wter should be present on the surfce. Clen using Armflex clener where necessry. Use correctly dimensioned mteril! Never pull glued joints when seling. When using pre covered Arm-Chek R tubes lwys push joints to gether nd fit under compression. On externl /internl instlltions lwys provide the Arm-Chek mstic sel to ll exposed sems nd joints fter the ppliction of the specified Armflex dhesive. For internl instlltions where the instlltion my be wshed down instll the Arm-Chek R covering s for n externl ppliction, including the provision for the ppliction of Arm-Chek Minimize joints where possible nd stgger. On externl instlltions pply Arm-Chek covering within 3 dys of instlling Armflex insultion. Helth & Sfety Never insulte instlltions nd systems tht re in opertion! Only strt insulted plnts fter 36 hours, fter this time the dhesive is fully cured. All bonded contcting surfces require Armflex dhesive pplied. Arm-Chek coverings re esily cut with shrp crft knife. Such knives should be hndled with due cre. Tke cre to void ir/ solvent pockets being trpped on the underside of the covering when pplying to lrge flt surfce re. Do not bond down contcting surfces when they re wet. Allow open time, pply when touch dry. When using dhesive nd mstic selnts, the mnufcturer s recommendtions should be strictly followed. Detils vilble from your locl Armcell Technicl Services Deprtment. Tools For instlling Arm-Chek R Folding rule / tpe mesure Alwys clen the sem nd joint detils using Armflex Clener before pplying Arm-Chek Chlk for mrking irregulr shpes Clen wy unwnted Armflex dhesive from the Arm-Chek R surfce using Armflex Clener. Silver ink mrker pen Do not use Arm-Chek mstic s the only fixing solu tion for butt nd longitudinl joints nd sems. Do not pply Arm-Chek covering on sems nd joints which re glued using Armflex dhesive until the dhesive hs been given time to fully cure (typiclly 36 hours). Dividers Fbricte Arm-Chek fittings on workbench s you would use when working with metl jcketing. Cllipers Avoid instlling in very humid or wet conditions. Tent nd wether protect where possible. Knifes * Avoid instlling Arm-Chek covering under tension. When using Arm-Chek R covering on Armflex substrte ensure ll sems/joints re fully seled using the correct Armflex Adhesive before commencing instlltion. No gps shll be present within the insultion systems. Sfe edge crft knife Shrpening stone Alwys use the correct Armflex Adhesive s speci fied. Do not ssume ll dhesives perform identiclly! If in doubt, consult the Armcell technicl deprtment On externl instlltions lwys ensure wtershed is present on ll sems nd joints. T-Ruler Templte (printed on every Armflex crton) Siccors Brush with short, firm bristles Smooth sptul for smoothing down covering Shrpened pipe ends for the most common pipe dimeters Pint fbric rollers for surfce gluing nd smoothing down covering Gluemster Mstic gun * A three knife set plus shrpening stone re vilble together s tool kit R (3) Generl >> Working with Arm-Chek R Working With Arm-Chek R R APPLICATION MANUAL 1 Generl >> Working with Arm-Chek R

R APPLICATION MANUAL 1 Generl >> Working with Arm-Chek R Correct use of Armflex Adhesive Applying Armflex Adhesive Generl >> Working with Arm-Chek R Armflex Adhesive 520 Armflex Adhesive 520 hs been specilly developed to bond ll Armflex except HT/Armflex. Arm-Chek R nd ArmSound RD my lso be bonded using Armflex Adhesive 520. It joins the surfces relibly nd sfely t medium tempertures of up to +105ºC. The bond is resistnt to wethering nd ging. Armflex Adhesive HT625 Armflex Adhesive HT625 hs been specilly developed to bond HT/Armflex. Arm-Chek R nd ArmSound RD my lso be bonded using Armflex Adhesive HT625. When using HT/Armflex only Armflex Adhesive HT625 should be used. It joins the surfces relibly nd sfely t medium tempertures of up to +150ºC. The bond is resistnt to wethering nd ging. Prepring for work Check condition of Armflex Adhesive. Cns of Armflex Adhesive should hve been stored in cool environment wherever possible. Cns must lso hve been kept free from frost. Dmge due to frost cn be reversed by storing in wrm conditions, or for immedite use by plcing the cn into bucket of hot wter. Shelf life pprox. 1 yer. 1. Where instlltion surfces re soiled with dust, dirt, oil or wter ll of these contminnts must be removed nd, where pplicble, clened with Armflex clener before strting work. In ddition ll surfces to be joined must be dry before gluing begins. 2. Py close ttention to the instlltion instructions on the dhesive cn. Use smll cns during work so tht the dhesive does not thicken too quickly. Refill from lrger cns when necessry nd keep closed when not in use to void thickening. 3. Plnts must not be in opertion during the instlltion process! 4. Do not use dhesive under 0 C. If the dhesive is too cold it cn be wrmed in bucket of hot wter. At tempertures below 5 C, condenstion cn pper on the surfces to be glued or the dhesive film. If this occurs the mterils cn be glued only with difficulty. Check whether this hs hppened by pplying bsorbent pper. When working in res with high tmospheric humidity nd high tempertures see Hot Climtes dvice on www.rmcell.com/uk or Armflex Appliction Mnul. 5. Stir dhesive well fter opening. If left to stnd, hevier components in the dhesive my settle in the bottom of the cn. These must be mixed thoroughly before use in order to effectively ctivte the dhesive. 1. Plnts must not be in opertion during the instlltion process! 2. Use brushes with short, stiff bristles. Alterntively the Armflex dhesive glue mster cn be used when working with the dhesive. A short pile fbric pint roller/lrge pintbrush my be preferred on lrge circulr nd flt surfce res. 3. Where ll over dhesive coverge is required pply dhesive in thin, uniform lyer to both the Armflex surfce nd the inner fce of the Arm-Chek R. Alwys ensure there is ll over dhesive coverge to both surfces with no signs of dry spots. 4. Allow the dhesive to tck-dry on overlpping detils. This tck time is dependent on number of fctors including the humidity of the ir. All overlpping contcting surfces shll be fully covered with Armflex Adhesive. 5. If surfces re left too long to dry they will not bond when pressure is pplied. When this hppens you cn re-ctivte by pplying further film of Armflex Adhesive. 6. Do not use dhesive under 0ºC (for further informtion see Armflex ppliction mnul pge 3). 7. Use Armflex clener to clen your tools, contminted metl surfces nd surfces which hve hd tlc pplied. Fingernil Test Test for tck-dryness by using the fingernil test : touch the surfce with fingernil, if the fingernil does not dhere to the surfce nd the surfce itself does not feel tcky the covering cn be positioned nd fixed using hnd pressure. Correct use Of Arm-Chek Mstics Arm-Chek mstic is n dhesive nd seling product designed to give dditionl nd long life protection to ll Arm-Chek R glued sems nd joints in externl environments. Arm-Chek mstic cn lso be used to vpour sel connecting metl prts ttched to piping equipment, within the service temperture limits of the product. Alwys use the pproprite Arm-Chek mstic for the colour of covering: Arm-Chek Grey mstic for use with Arm-Chek R Grey nd Arm-Chek Blck mstic for use with Arm-Chek R Blck. Check ll sems nd joints re securely fixed with the correct type of Armflex dhesive before pplying Arm-Chek (4) R

1 Generl >> Working with Arm-Chek R In ll situtions the re round the sem nd jointing detils shll lwys be clened using Armflex Clener or loclly pproved solvent clener, before pplying the Arm-Chek Mstic to Arm-Chek R covering. Clening of the re, removes the mnufcturing swff tht is nturlly present on the surfce of the product llowing for greter dhesion. Applying Arm-Chek Mstics APPLICATION MANUAL R Applying Arm-Chek R Outdoors (Wter-Shed - Roof Tile Effect) All sems nd joint detils should be rrnged so s to eliminte ny direct pths which my llow wter ingression into the insultion system. On stright-line pplictions, the min fixing sems shll be stggered with the overlp fcing downwrd offset the joint s shown. Note: Prticulr ttention is required on fittings such s elbows nd tee s. 1. Ensure ll under-lying fixing sems/joints re fully bonded nd secured using Armflex dhesive nd check tht ll sems nd joints re clen, dry nd free from contmintion before pplying the 3. Smooth the mstic with the use of mstic spoon. The finish of the mstic cn be enhnced by msk ing off 5 mm either side of the sems nd joints, prior to the ppliction of the Proceed to remove the msking tpe while the mstic is in its wet stte. 4. In generl, the ppliction of the mstic should not be crried out when the mbient temperture is below +5 C or the reltive humidity is higher thn 80%. Temperture limittions of Arm-Chek R 5. The Arm-Chek mstic should not be used on stnd lone bsis to fix nd bond the coverings (see pr grph 1 of this section). Arm-Chek R my be used to cld insultion on pipes of ny temperture provided the insultion surfce temperture is below 125ºC. Arm-Chek R should not be plced in direct contct with surfces exceeding 125ºC. Use of Arm-Chek R on different Armflex mterils To get smoother nd more even finish to the mstic joint msking tpe cn be used Arm-Chek R is fully comptible for use with Clss O Armflex, NH/Armflex nd HT/Armflex nd my be bonded directly to ArmSound RD or ArmSound Brrier s prt of n ArmSound Industril System. How to hndle pipe supports, pressure guges nd metl protrusions All metllic prts directly ttched to the min piping surfce, including pipe loding supports nd pressure guge connections, should be fully insulted nd cld using Arm-Chek R. It is importnt tht ll connections re fully vpour seled using both Armflex Adhesive nd the relevnt Arm-Chek R (5) Generl >> Working with Arm-Chek R 2. For ll sems nd joints llownce should be mde for minimum 10 mm wide nd 3 mm thick mstic bed ing to be pplied.

R APPLICATION MANUAL 1 Generl >> Working with Arm-Chek R Generl >> Working with Arm-Chek R R (6)

2 Pipes & Fittings >> Using Arm-Chek R pre-covered tubes APPLICATION MANUAL R Arm-Chek R pre-covered tubes Arm-Chek R pre-covered tubes (slit) re vilble in blck nd grey nd re supplied in 1 metre lengths. The covering finishes pproximtely 10 mm before one end of the tube in order to gurntee tht the insultion mteril is instlled under tension round butt joints. The other butt end hs 50mm overlp of covering mteril. The Arm-Chek R pre-covered tube rnge is vilble for pipes with n outer dimeter of up to 89 mm. Note: Due to the semi-flexible nture of the products sleeving round bends is not possible! INSULATING STRAIGHT PIPES (OD < 89 MM) WITH Arm-chek R pre-covered tubes 1. Clen the pipe surfce with Armflex clener removing ny dust or other contmintion. 2. Snp the tube onto the pipe. 3. Apply the correct type of Armflex dhesive to ech side of the Armflex sem detil. Allow to touch dry nd with firm pressure close the dhesive sem. Note: Alwys check the sem is fully bonded before proceeding further. 4. Apply second tube of pre-covered Arm-Chek R following procedures 1-3 nd ensuring the uncoted 10 mm end of one tube fces the 50 mm overlp end of the second tube. 5. Roll bck the 50 mm Arm-Chek R covering t the tube end reveling the Armflex butt joint s shown. 6. Apply Armflex Adhesive to the fcing Armflex butt joints nd crete wet sel to the pipe s described in the Armflex Appliction Mnul. Note: Remember to sel the two butt joints under compression. 7. Peel bck the self-dhesive fixing strip of the Arm-Chek R coting which will be covered by the overlp for pproximtely 50-100 mm. Fix the Arm-Chek R covering using this self-dhesive strip. Note: Do not relese the whole length of the fixing strip t this point. 8. Apply Armflex Adhesive to the outer surfce of the Arm-Chek R covering which will be covered by the overlp (pproximtely 50 mm). Peel bck the self-dhesive fixing tpe on the Arm-Chek R which will form the overlp for pprox. 50 mm. Apply Armflex Adhesive to the Arm-Chek R which will form the overlp for pproximtely 50 mm. Roll bck the Arm-Chek R covering nd pply pressure to complete the overlp. 9. Relese the self-dhesive strips long the complete longitudinl length to sel the Arm-Chek R long its entire length. 10. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying Pipes & Fittings >> Using Arm-Chek R pre-covered tubes 11. Sel ll sem nd jointing detils of the covering R (7)

R APPLICATION MANUAL 2 Pipes & Fittings >> Using Arm-Chek R pre-covered tubes Pipes & Fittings >> Using Arm-Chek R pre-covered tubes Fitting fbrictions elbows, tees nd other fittings. It is generlly more efficient when insulting elbows, tees nd other fittings to use plin, uncovered, Armflex tubes with the Arm-Chek R covering fbricted nd instlled in distinct second stge. For detils on how to fbricte covers for different fitting types plese refer to section Using Arm-Chek R covering of this mnul. A full rnge of pre-fbricted fittings for bends, end cps nd T-piece s is vilble with prices on request. Specil ppliction instructions re vilble on www.rmcell.com or from our technicl service tem. Insultion of pipe reducer using Arm-Chek R pre-covered tubes s b 1. Select two different sized Arm-Chek R pre-covered tubes: one to fit the smller bore pipe nd one to fit the lrger bore pipe. 2. Push the Arm-Chek R tube designed to fit the smller bore pipe to the point where the pipe begins to increse in dimeter nd sel s described on pge 7 of this mnul. 25 mm 3. Sleeve the lrger Arm-Chek R tube over the lrger pipe. The tube should overlp the tube on the smller pipe by 25 mm.sel s described on pge 7 of this mnul. 6. Using Arm-Chek covering crete templte by mrking out 2 circles with the sme center nd the mesurements bove. One of the hlf circles requires n dditionl 50 mm overlp (v) 7. Cut the pttern from Arm-Chek R covering. 8. Apply Armflex Adhesive to one side of the Arm-Chek R pttern nd to the exposed Armflex surfce on the end of the lrger Arm-Chek R tube. Allow the dhesive to tck dry before pplying. 9. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 10. Sel ll sem nd jointing detils of the covering of minimum of 10 mm wide nd 3 mm thick mstic 4. Sel the butt joint with Armflex Adhesive ½ b x x b ½ b + v 5. Mesure the following dimeters to produce cover for the remining Armflex: - smll bore insulted pipe outer dimeter b - lrge bore insulted pipe outer dimeter (8) R

3 Pipes & Fittings >> Coverings mde of Arm-Chek R APPLICATION MANUAL R Working with Arm-Chek R covering. Armflex should hve been instlled ccording to the recommendtions of the Armflex Appliction guide. Ensure the Armflex insultion surfce is clen, dry nd free from ll oils, greses nd other contminnts, with ll sems nd joints secured using Armflex dhesive. b. Armflex dhesive is required on the Armflex surfce nd on the fcing underside of the overlpping Arm-Chek R covering. Covering of cylindricl bodies (pipes, vessels, ductwork,...) Determine the circumference the insulted pipe nd dd n dditionl minimum 50 mm to this length to function s n overlp. (for more detils on the minimum overlp required plese see the section working with Arm- Chek R covering ) Trnsfer this mesurement onto sheet of Arm-Chek R nd cut the covering sheet s required. c. It is required to fully dhere both the Armflex surfce nd the fcing Arm-Chek surfces (ll over dhesive coverge) for cylindricl bodies with pipe outer dimeter > 500 mm. For pplying ll over dhesive coverge short pile fbric pint roller my be preferred over stndrd brushes. d. Sel ll sem nd jointing detils of the covering Note: An dditionl minimum overlp llownce shll be dded to ll circumference-fixing sems. For piping equipment with sizes bove 150mm, the circumference overlp is incresed. For other sizes see overlp llownce tble below. All butt jointing nd fethering detils - require minimum of 50mm. outer-ø insulted pipe (mm) min. required overlp (mm) 10-150 50 150-200 75 200-400 100 400-500 125 500 nd bove 150 Flt surfce 50 e. For outdoor instlltions: Check the dhesive sems nd joints on the covering for ny defects nd rectify Allow for wtershed where pplicble The Fethering Technique c 50 mm In order to chieve smooth fit on some surfces prticulrly when the Arm-Chek covering is terminting on convex or concve surfce - it my be necessry to fether the Arm-Chek R covering long the edge. Fethering is chieved by cutting the scheduled overlp t regulr intervls into fethers or tssels s shown below: These tssels will then ccurtely nd smoothly fit onto convex or concve surfce without cresing the Arm- Chek covering. Decresing the width of ech fether will ensure more ccurte fit but will increse the lbour time. Note: The fethering process is pplicble when fbricting nd instlling most Arm-Chek R fittings - including bends, tees, off-set tees nd cp ends. Pipes & Fittings >> Coverings mde of Arm-Chek R f. Allow 36 hours curing time before turning on the equipment. R (9)

R APPLICATION MANUAL 3 Pipes & Fittings >> Coverings mde of Arm-Chek R Pipes & Fittings >> Coverings mde of Arm-Chek R Horizontl Pipework with n outer-ø < 500 mm (mesurement of outer-ø incl. insultion) 50 mm 50 mm 50 mm 1. Apply minimum 50 mm glue line with the correct type of Armflex dhesive to the surfce of the Armflex nd the underside of the Arm-Chek R covering. Correctly position the covering long this line nd, when stisfied, pply firm pressure. Smooth the covering round the circumference for clen finish. Note: Alwys ensure the Arm-Chek R covering overlps by minimum of 50 mm. 50 mm 50 mm 2. When the covering hs been smoothed in position, mrk the overlp position on the under fce re using pen. Apply dhesive on the underside of the overlpping Arm-Chek R nd lso onto the surfce to be covered by the overlp. Allow to touch dry (use the fingernil test ) before fixing down the overlp. 3. Sel the overlpping butt joints of the covering using Armflex dhesive. 4. Check sems nd joints on the covering for ny defects nd rectify s required. Remove unwnted dhesive using Armflex clener. Pipework with n outer Ø > 500 MM nd ll verticl lines. (mesurement of outer-ø incl. insultion) All over dhesive coverge is required for pipework > 500 mm, nd ll sizes of pipework in verticl position. In ll other respects the ppliction procedure remins s for insulted pipework less thn 500 mm in dimeter. Note: Check the Armflex dhesive specifiction tble when instlling Arm-Chek coverings. Use only the pproprite Armflex dhesive for the substrte. Cre should be tken to void solvent/ir bubbles when instlling Arm-Chek R coverings to lrge surfce re. The Arm-Chek R covering shll be smoothed to eliminte bubbles by using smooth sptul or pint roller. 5. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 6. Sel ll sem nd jointing detils of the covering (10) R

3 Pipes & Fittings >> Coverings mde of Arm-Chek R APPLICATION MANUAL R Fittings mde of covering mteril Arm-Chek R fittings cn ll be fbricted using trditionl metl cldding working methods nd techniques. Those experienced with metl working prctices my choose to work following sid prctices. The methods detiled below provide strightforwrd, step-by-step, instructions to fbricte pproprite fitting templtes nd re recommended for instllers of ll levels of experience. Covering for segmented bends (for smll bore piping) 1. Mesure the width of the throt (A) nd bck (B) of segment of the ssembled segment bend nd determine the circumference (C). A = B = C = B A Length of the inner (throt) sem of the bend divided by the number of segments + 2 x 10 mm overlp on ech side of every segment Length of outer sem of bend divided by the number of segments + 2 x 10 mm overlp on ech side of every segment Length circumference pipe incl. insultion C C A B 50 mm overlp 2. Trnsfer the circumference mesurement C to the Arm-Chek covering mteril nd drw perpendiculr bisecting line of length B (plus n dditionl 10-20 mm) t the mid point. Now extend the circumferentil line by n dditionl 50 mm on one side. 3. At ech end of the circumferentil line drw perpendiculr line of length A (plus n dditionl 10-20 mm). 7. Instll the segments using Armflex Adhesive s stndrd. Note: To ensure tht the overlp sits tidily, the mteril cn be fethered. On externl instlltions, rrnge the segments to provide wtershed. C 8. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 9. Sel ll sem nd jointing detils of the covering C Pipes & Fittings >> Coverings mde of Arm-Chek R 4. Extend the circumferentil line by n dditionl 50 mm on one side creting rectngle of width A (plus n dditionl 10 20 mm) s shown. 5. Connect the lines to crete fishtil outline s shown. Remrk: Where mny identicl fishtils re required it is recommended to trnsfer this shpe onto durble templte in order to llow for esy repliction. 6. Optimise the shpe of the curve t the widest point of the cut-out segments by rounding slightly with pir of scissors or crft knife. R (11)

R APPLICATION MANUAL 3 Pipes & Fittings >> Coverings mde of Arm-Chek R Covering for two-piece bend mde of Armflex Bb A C templte to fbricte further segments. 7. Fbricte initil pieces for the beginning of the bend with hlf segment. These form strter nd finishing items. 8. Instll the segments using Armflex Adhesive s stndrd. Note: To ensure tht the overlp sits tidily, the mteril cn be fethered. On externl instlltions, rrnge the segments to provide wtershed Pipes & Fittings >> Coverings mde of Arm-Chek R 1. Mesure the inner (throt) (A) nd the outer (bck) (B) lengths of the bend nd determine the number of segments required. The number of segments should be chosen to chieve n exct fit on the outer side (bck) of the bend (recommendtion: min. segment width in the throt re > 20 mm.) 2. Determine the circumference of the insulted pipe nd trnsfer this to the covering mteril. A = B = C = B A Length of the inner (throt) sem of the bend divided by the number of segments + 2 x 10 mm overlp on ech side of every segment Length of outer sem of bend divided by the number of segments + 2 x 10 mm overlp on ech side of every segment Length circumference pipe incl. insultion C 50 mm overlp 3. Drw perpendiculr bisecting line of length B divided by the number of segments t the mid point. Now extend the circumferentil line by n dditionl 50 mm on one side. At ech end of the circumferentil line drw perpendiculr line of length A divided by the number of segments. Note: The Arm-Chek Fishtil clcultor my be used to help determine the required dimensions for ech fishtil. 4. Connect the lines to crete fishtil outline s shown. 9. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 10. Sel ll sems nd jointing detils of the covering 5. Extend the circumferentil line by minimum dditionl 50 mm on one side creting rectngle of width A (plus n dditionl 10 20 mm) s shown. 6. Cut out the finished segment. This cn be used s R (12)

3 Pipes & Fittings >> Coverings mde of Arm-Chek R APPLICATION MANUAL R Covering of Neck-T / Pipe-T / Spindle neck of vlve C 1. Determine the totl outer circumference of the T- brnch (including insultion). B H 5. After cutting the end overlp to crete fethering effect pply Armflex dhesive to one side of the Arm-Chek R pttern nd lso to the Armflex instlled on the Vlve. Allow to tck dry before pplying s shown. v = 50 mm overlp for fethering v B H 2. Trnsfer the height (H) nd the width (B) of the vlve neck spindle (end cp) to sheet of Arm-Chek R s shown in the bove drwings. Add 50 mm overlp round the circumference nd fether this s shown. The dded llownce for the fethering shll be minimum of 25mm. Apply Armflex dhesive to the underside of the Arm-Chek R covering nd the outer surfce of the Armflex on the vlve neck spindle (end cp) cover. Allow the dhesive to tck dry before pplying the covering with firm even pressure. 3. Mesure the minimum height () nd mximum height (e) of the insulted T-brnch. Trnsfer this height to the mrked out covering. 4. Trnsfer mesurements s illustrted below: (for more informtion see Armflex Appliction Mnul) e h c 6. Mesure h = height of insulted vlve body = dimeter of insulted T-Neck h c v = 50 mm overlp for fethering detils c = circumference of insulted vlve body 7. Trnsfer these mesurements to sheet of Arm-Chek R s shown in the drwing bove leving 50 mm overlp on one side. Cut the pttern using pir of scissors or crft knife 8. Apply Armflex dhesive to one side of the Arm-Chek R pttern nd lso to the Armflex instlled on the min body pipe. Allow to tck dry before pplying s shown. 9. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying v v v Pipes & Fittings >> Coverings mde of Arm-Chek R e e ¼ C ¼ C ¼ C ¼ C = minimum length (height) e = mximum length (height) C = circumference C e v = 50 mm overlp v 10. Sel ll sem nd jointing detils of the covering 11. For vlve body cps ends - see cp ends nd termintion points. R (13)

R APPLICATION MANUAL 3 Pipes & Fittings >> Coverings mde of Arm-Chek R Offset Angles c d 50 mm overlp ½c 50 mm overlp h h m b k 1 ½c 2 d Pipes & Fittings >> Coverings mde of Arm-Chek R d 1. Determine the circumference (c) of the Armflex insulted offset ngle, the min. () nd mximum (b) heights, nd the totl outer dimeter of the insulted pipe (d) to which the offset ngle connects. b v + 1/4 D 1/2 C v = 50 mm overlp for fethering detils 2. Cld the insulted pipe run up to the termintion point using Arm-Chek R covering s stndrd. 3. Mrk the minimum height () of the offset ngle from the mid point of the circumferentil line t right ngles. Mrk the mximum height (b) from either end of the circumferentil line t right ngles. 4. Drw circle with dimeter equl to qurter of the totl dimeter of the min insulted pipe (1/4 d). 5. Extend the circumferentil line by 50 mm on one side to provide n overlp. 6. Drw the jcket line by mrking two rcs (rdius = hlf circumference) between tngent of the circle stnding on the mid point line nd the points t distnce () from either end of the circumferentil line. Continue the rc into the 50 mm overlp. 7. In order to chieve plesing finish fethering cn be crried out s described elsewhere in this guide. When fethering remember to llow t lest 10 mm prllel to the jcket line. Cut out the pttern using pir of scissors or crft knife. v b 50 mm overlp 9. Mesure the circumference of the min body pipe nd the points t which the offset pipe joins the min body. Trnsfer these mesurements to sheet of Arm-Chek R s shown in the drwing bove leving 50 mm overlp on one side. Cut the pttern using pir of scissors or crft knife 10. Apply Armflex dhesive to one side of the Arm-Chek R pttern nd lso to the Armflex instlled on the min body pipe. Allow to tck dry before pplying. 11. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 12. Sel ll sem nd jointing detils of the covering 8. Apply Armflex dhesive to one side of the Arm-Chek R pttern nd lso to the Armflex instlled on the offset pipe. Allow to tck dry before pplying. (14) R

3 Pipes & Fittings >> Coverings mde of Arm-Chek R APPLICATION MANUAL R Covering end cps nd termintion points (stndrd tempertures < 125 C) 6. Apply both semi-circles to the Armflex surfce 50 mm b 50 mm 1. Mesure the following dimeters of the end cp: - smll (insulted) pipe dimeter nd b - the lrge bore insulted body. 2. Cld the insulted pipe run up to the termintion point using Arm-Chek R covering s stndrd. x ½ b + v x ½ b 3. Using Arm-Chek covering crete templte by mrking out 2 sets of semi-circles with the sme centre nd the mesurements s shown. One set of semi-circles shll extend to include n dditionl 50 mm overlp (v). Note: on lrger bore pipework it my be necessry to use 1/4 or 1/8 circles in plce of semi-circles. A 50 mm overlp should be incorported into ech section. 4. Cut the two prts of the collr from Arm-Chek R covering. 7. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 8. Sel ll sem nd jointing detils of the covering Pipes & Fittings >> Coverings mde of Arm-Chek R 5. Apply Armflex Adhesive to one side of the Arm-Chek R pttern nd to the exposed Armflex surfce t the end of the lrger insulted pipe. Allow the dhesive to tck dry before pplying. R (15)

R APPLICATION MANUAL Covering end cps nd termintion points (high tempertures > 125 C) 3 Pipes & Fittings >> Coverings mde of Arm-Chek R 9. Sel ll sem nd jointing detils of the covering with bed of the pproprite Arm-Chek Pipes & Fittings >> Coverings mde of Arm-Chek R 1. Ensure tht ll sems & joints re seled with Armflex Adhesive HT625 2. Instll n pproprite high temperture bndge tight to the pipework with min. of 50mm overlp. Secure with insultion wire. 3. Cut collr from Arm-Chek R covering s for stndrd temperture pipework, llowing n dditionl 50 mm on the outer dimeter to form fethered overlp. 4. Cut the outer 50 mm into fethers s described in the section The fethering technique. 5. Apply Armflex Adhesive to one side of the Arm-Chek R pttern nd to the exposed Armflex surfce t the end of the lrger insulted pipe. Allow the dhesive to tck dry before pplying. 6. Cld the insulted pipe run using Arm-Chek R covering s stndrd. Ensure ll fethered tssels of the end cp re over covered by the cldding on the liner pipework run. 8. Using Armflex Adhesive pply wet sel round the circumferentil sem. (16) R

3 Pipes & Fittings >> Coverings mde of Arm-Chek R APPLICATION MANUAL R Covering of Concentric Reducer d2 6. Cld the smller insulted pipe run using Arm-Chek R covering s stndrd. Ensure ll fethered tssels of the reducer re over covered by the cldding on the liner pipework run. h d1 1. Mesure the following: h = height of reducer d1 = dimeter of lrger pipe d2 = dimeter of smller pipe 2. Cld the lrger insulted pipe using Arm-Chek R covering s stndrd. Allow for fethered tssels onto the insulted reducer s shown. d h X X d 2 X d 1 X b X c 3. Using Arm-Chek covering crete templte by mrking out reducer pttern. See the Armflex ppliction mnul for more detils. v = 50 mm overlp for fethering detil D' 50mm overlp A' c1 4. Modify the templte by dding n dditionl 50 mm overlp onto one side of the sem nd n dditionl 50 mm long the length of the shorter rc. This overlp shll be cut into fethered tssels s described elsewhere. V c2 B' X C' 7. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 8. Sel ll sem nd jointing detils of the covering Pipes & Fittings >> Coverings mde of Arm-Chek R 5. Cut the pttern nd pply Armflex Adhesive to both the underside of the Arm-Chek pttern nd to the insulted reducer surfce. Allow the dhesive to tck dry nd pply to the surfce. R (17)

R APPLICATION MANUAL Covering of Anchor shoes nd other metl protrusions 3 Pipes & Fittings >> Coverings mde of Arm-Chek R 7. Sel ll sem nd jointing detils of the covering with bed of the pproprite Arm-Chek Pipes & Fittings >> Coverings mde of Arm-Chek R 1. Mesure the shpe of the protrusion nd, using Arm-Chek R covering, cut pttern to mtch the requirements Note: Add minimum 50 mm overlp on ll sides. When overlpping onto curved surfces this overlp my need to be cut into fethered tssels s described elsewhere. 2. Apply Armflex Adhesive to both the underside of the Arm-Chek pttern nd to the insulted surfce. Allow the dhesive to tck dry nd pply to the surfce. 3. Smooth ny ir bubbles or pockets by using smooth sptul or pint fbric roller 4. Using Arm-Chek R covering cut pttern to cover the min insulted body voiding the shoe or pro trusion. 5. Cld the min body of the insulted pipe run using Arm-Chek R covering s stndrd. Ensure ll fethered tssels of the shoe or protrusion re over covered by the cldding on the min body of the pipework run. 6. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying (18) R

4 Covering >> Ductwork, Irregulr Shpes, Vessels & Tnks APPLICATION MANUAL R Covering of insulted rectngulr shpes (ductwork, tnks nd flt surfces) To reduce lbour time it is recommend to instll the Arm-Chek coverings to the ductwork in single complete wrp-round : 1. Mesure the circumference of the ductwork nd cut the Arm-Chek coverings to the correct dimension, llow for 50 mm overlp of the fixing sem. Note: for lrger duct surfces step-by-step ppliction of the coverings in 2 or 4 seprte sections my be the preferred option where there is only one instller on the ppliction. 2. Apply the Armflex dhesive directly to both the Armflex nd the Arm-Chek R surfces in thin nd even mnner using lrge pint brush/ fbric pint roller. Allow the dhesive to touch dry. 3. Position the coverings nd fix to the Armflex sheet. Ensure the covering is in-line nd in the desired position. Apply firm even pressure nd smooth the covering round the surfce of the insultion voiding ny ir/ solvent pockets or crese s nd crinkles. Use plstic crd to enhnce the edges t the corners of the duct. Pinch nd smooth long the covering, s its being pplied. 4. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying Ductwork bends nd irregulr shpes b 1. Mesure the length of the inner nd outer ductwork bend. Cut the Arm-Chek R covering to the correct dimensions, llowing n dditionl 50 mm overlp long ech edge for fethering. Note: Contour lines of duct nd other irregulr shpes cn lso be plotted by pplying chlk to the duct nd plcing piece of the covering directly onto the outline to crete n ccurte imprint (see section Hints ). 2. Cut the overlp into tssels using the fethering method. 3. Apply Armflex dhesive to one side of the Arm-Chek R pttern nd lso to the Armflex instlled on the duct. Allow to tck dry before pplying. 4. Apply the cut pieces following the procedures described (see chpter rectngulr shpes on this pge). 5. Smooth the covering using sptul to remove ny ir gps. Use roller to smooth the fethered tssels round the edge s shown. Covering >> Ductwork, Irregulr Shpes, Vessels & Tnks with Arm-Chek R 6. Sel ll sem nd jointing detils of the covering R (19)

R APPLICATION MANUAL 4 Covering >> Ductwork, Irregulr Shpes, Vessels & Tnks Covering >> Ductwork, Irregulr Shpes, Vessels & Tnks with Arm-Chek R 6. Apply n dequte piece of covering on the lterl fce of the insulted ductwork bend. Cut this covering longside the edges of the duct chnnel. 7. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 8. Sel ll sem nd jointing detils of the covering Circulr ductwork Apply the Arm-Chek R covering on circulr ductwork s for lrge bore pipework instlltions. (Refer to the section on lrge bore pipework instlltions on pge 10 of this mnul.) (20) R

4 Covering >> Ductwork, Irregulr Shpes, Vessels & Tnks APPLICATION MANUAL R Covering of Vessel body tngent line tngent line c 50 mm overlp 1. Apply covering mteril to the Armflex insulted vessel (jcket), beginning from the butt jointing to the dome end cover. Where pplicble, instll the jcketing pnels using the roof tile method. tngent line tngent line 2. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 3. Sel ll sem nd jointing detils of the covering Covering of vessel dome ends When covering n Armflex-insulted vessel dome end with Arm-Chek R covering mteril it is necessry to cut out segments. Use enough segments to ensure tht the mteril cn be pplied without wrinkles. tngent line curve length 1. Determine the curve length () of the insulted vessel dome end using tpe mesure. 2. Clculte or mesure the circumference C = rc length x p nd divide the circumference by the number of segments to be used. 3. Drw the segment shpe on piece of crdbord to crete templte. The dome end segments must be fbricted llowing minimum 50 mm overlp (see drwing). The overlp should be fethered if required or pplicble. c 4. Use this templte to drw nd cut out the other segments. 5. Apply ll over dhesive coverge using Armflex dhesive to both side of the Arm-Chek R pttern nd lso to the Armflex instlled on the vessel. Allow to tck dry before pplying. Note: for externl instlltions first insulte the vessel body s described before the dome ends. Position the overlp over the body pnels to crete wtershed. tngent line tngent line 6. Butt-up ll vessel dome segments until the whole dome end is covered with Arm-Chek R. tngent line tngent line 5. Clen ll sem nd joints with Armflex Clener or loclly pproved solvent clener before pplying 6. Sel ll sem nd jointing detils of the covering Covering >> Ductwork, Irregulr Shpes, Vessels & Tnks with Arm-Chek R R (21)

R APPLICATION MANUAL 4 Covering >> 5 Ductwork, Useful hints Irregulr >> Working Shpes, with Vessels Arm-Chek & Tnks R USEFUL HINTS Templtes for irregulr shpes Covering >> Ductwork, Useful Irregulr hints >> Shpes, Working Vessels with Arm-Chek & Tnks with R Arm-Chek R 1. Plce piece of crd next to the insulted duct feture nd trce the shpe. 2. Using crft knife cut this shpe from the crd. 3. Using this s templte drw the shpe directly onto the Arm-Chek covering. 4. Add the required 50 mm overlp for fethering nd cut the resulting shpe. R (22)

APPLICATION MANUAL R REFERENCES In ddition to this mnul Armcell provides the following documents, freely vilble from www.rmcell.com/uk (or s prt of our ArmPlus CD). These documents contin further detiled dvice for specific pplictions. OTHER APPLICATION GUIDES New Appliction Guides for Arm-Chek S+, Arm-Chek T, Arm-Chek D» Armflex Appliction mnul MECHANICAL PROTECTION AND OUTDOOR APPLICATIONS WITH ARMAFLEX Explntion of the issues rising when instlling Armflex outdoors nd evlution of solutions to protect Armflex from mechnicl dmge. insulting COLD lines with line tempertures between -50 C to -196 C (-58 F to -320 F) Instlltion dvice on issues rising when insulting low temperture lines below -40 C. New ARMAFLEX UNDERGROUND Explntion of the theory underlying insulting underground pipes, including dvice on insulting underground pipes using Armflex nd lso including clcultion tool to clculte the impct of insultion on the time until pipe freezing occurs. TRACE HEATING Explntion of the theory underlying insulting trce heted pipes, including dvice on selecting correctly dimensioned insultion tube. ARMAFLEX ON RECTANGULAR & CIRCULAR DUCTWORK Additionl detiled instlltion dvice when instlling Armflex onto rectngulr or circulr ductwork. ARMAFLEX IN CONCRETE Instlltion dvice when burying pipes insulted in Armflex directly in concrete. GLUING ARMAFLEX ONTO CELLULAR GLASS Instlltion dvice when instlling Armflex directly onto cellulr glss surfce.» Specil Appliction Advice for NH/Armflex» Specil Appliction Advice for HT/Armflex» Appliction Hints for Armflex Underground» Appliction hints for Armflex TuffCot» Appliction of Armflex DuoSolr VA» Armflex ppliction guide for plstic pipes New» Armflex Protect R-90 ppliction guide New New Appliction guide for Armflex on ductwork» Appliction guide for ArmSound Industril Systems» Armflex & Arm-Chek ppliction video CALCULATION TOOLS» Armfinish FR pint - Coverge Clcultor New New New Arm-Chek T - Coverge Clcultor» keytec. ISO 15665 Determine the right ArmSound Industril Systems» keytec. Armflex Underground Clculte the impct of insultion on the time until pipe freezing occurs. keytec. Arm-Chek R fishtil clcultor Clculte the exct shpe nd mesurements for fishtils used to cover bends insulted with Armflex keytec. Unit converter metric / imperil Clculte the most common units from metric to imperil mesurements ppliction mnul >> ARMA-CHEK R» ArmWin AS Armwin AS is the technicl clcultion progrm to determine insultion thicknesses required to prevent surfce condenstion nd limit energy losses. It lso llows users to clculte U-vlues, het flows nd temperture chnges for pipes, ducts nd tnks. R (23)

ARMA-CHEK COVERING SYSTEMS R APPLICATION MANUAL Arm-Chek S+ The insultion system resistnt to mechnicl impct with bright silver finish. S S Arm-Chek D The lightweight nd esy to pply insultion system resistnt to mechnicl impct. D D Arm-Chek R The insultion system with extr system security tht minimises the risk of under insultion corrosion (UIC) R R Arm-Chek T The esy to pply nd highly relible solution for irregulr shpes nd hrd to ccess res. T T ppliction mnul >> ARMA-CHEK R Select the right Arm-Chek Covering System for your ppliction... Equipment Type Generl Construction Process Industries Shipbuilding Office & Commercil buildings Plnt buildings / Wrehouses Hevy Industry & Offshore (incl. Petrochemicl / LNG) Phrm & Food industries HVAC - Plnt rooms D S D D R T S D T HVAC - Service Shfts D S D D R D S T HVAC - Suspended Sub-Flooring D S D R D S T AC ductwork, indoors (exposed to view) S D S D D R S D AC ductwork, outdoors D R S D R S R D R D S Pipe work, indoors D S R D S R Pipe work, outdoors D S D S R T D R T T R Process Pipework R T S R T R T Process pipe work, Dul Temp (intermittent) R R R Vessels & Tnks, indoors S D D R S R D S R T R Vessels & Tnks, outdoors D S R D S R T R T T R Engine rooms T Where letter ppers in full shded circle in the tble bove this implies tht the corresponding Arm-Chek system is prticulrly suited to this ppliction. A letter in non-shded circle lso implies high level of suitbility for the corresponding Arm-Chek system, lthough this is not the stndrd Armcell recommendtion for this ppliction. Arm-Chek products my lso be used in res not indicted bove nd s such the tble represents indictive dvice only. Armcell UK Limited Mrs Street Oldhm, Greter Mnchester OL9 6LY Tel 0161 287 7100 Fx 0161 633 2685 www.rmcell.com/uk info.uk@rmcell.com Armcell provides this informtion s technicl service. To the extent the informtion is derived from sources other thn Armcell, Armcell is substntilly, if not wholly, relying upon the other source(s) to provide ccurte informtion. Informtion provided s result of Armcell s own technicl nlysis nd testing is ccurte to the extent of our knowledge nd bility, s of dte of printing, using effective stndrdized methods nd procedures. Ech user of these products, or informtion, should perform their own tests to determine the sfety, fitness nd suitbility of the products, or combintion of products, for ny foreseeble purposes, pplictions nd uses by the user nd by ny third prty to which the user my convey the products. Since Armcell cnnot control the end use of this product, Armcell does not gurntee tht the user will obtin the sme results s published in this document. The dt nd informtion re provided s technicl service nd re subject to chnge without notice. Armcell UK Ltd. Subject to ltertions Printed in UK 037-005-0109-EN (UK,ROI,ZA)