EMC TEST REPORT 2G-2S.0.3.FC-BOX. METEL s.r.o., Žižkův Kopec 617, Česká Skalice. Measured Date Type Version DPS SN

Similar documents
EMC TEST REPORT For MPP SOLAR INC Inverter/ Charger Model Number : PIP 4048HS

EMC standards. Presented by: Karim Loukil & Kaïs Siala

TEST SUMMARY. Prüfbericht - Nr.: Test Report No.: Seite 2 von 25. Page 2 of 25

2620 Modular Measurement and Control System

Immunity Testing for the CE Mark

EMC TEST REPORT. For. Switching Mode Power Adaptor. Model No.: 9W/14.4V/EU(18V/1.0A), 19W/14.4V/EU(12V/1.5A)

EMC TEST REPORT. Report No.: CE10-LIE040101E

EMC TEST REPORT. for. Coliy Technology Co.,Ltd. Fluxgate Gaussmeter

Overview of EMC Regulations and Testing. Prof. Tzong-Lin Wu Department of Electrical Engineering National Taiwan University

LS200 TEST DATA IEC61000 SERIES

TEST SUMMARY Seite 2 von 27. Prüfbericht - Nr.: Test Report No HARMONICS ON AC MAINS RESULT: Passed

EMC Seminar Series All about EMC Testing and Measurement Seminar 1

TEST SUMMARY. Prüfbericht - Nr.: Test Report No.: Seite 2 von 27. Page 2 of 27

TEST REPORT... 1 CONTENT...

Schlöder GmbH - EMC Test and Measurement Systems Model #

EMC TEST REPORT. For. Soma Medical (Sabah) Sdn Bhd ( D) UVGI AIR STERILIZER. Model No.: SM 20

EN61326 EMC COMPLIANCE REPORT on the LP Series Ultrasonic Transmitter Remote Amplifier and Transducer for Hawk Measurement Systems Pty Ltd

Combination Wave Test System

Introduction EMC. Filter parameters. Definition of EMC / EMI. X-Capacitor. Sources of EMI. Coupling mechanism. Y-Capacitor.

EN 55022: 2010+AC:2011 Clause 6.1 Pass. Harmonic Current EN :2006+A1:2009+A2:2009 Class A N/A

Test Report. Guangdong East Power Co., Ltd. Fully Automatic AC Voltage Regulator. Brand Name:

Test Report GUANGDONG EAST POWER CO., LTD

Discontinuous Disturbance (Click) EN :2006+A1:2009+A2:2011 Clause N/A** Radiated Emission, 30MHz to 1000MHz

EMC Test Report. Report Number: M030826

EN 55015: 2013 Clause Pass. EN 55015: 2013 Clause Pass. EN 55015: 2013 Clause Pass

Communication Certification Laboratory

Technical Specification

High precision measurement system for current and voltage IHC-A/B-RM01/03

IEC Electrical fast transient / Burst immunity test

TEST SUMMARY. Prüfbericht - Nr.: Test Report No.: HARMONIC CURRENT EMISSIONS ON AC MAINS RESULT: Pass

Harmonic Current emission EN :2014 Class A Pass. Voltage Fluctuation and Flicker EN :2013 Clause 5 Pass

EMC TEST REPORT. Report No. : EM/2004/10096 Page : 1 of 19

BS EN TESTS ON THE IT TOXIC GAS DETECTOR MODULE

MCR-VAC-UI-0-DC. Voltage transducer for AC voltages. INTERFACE Data sheet _en_02. 1 Description

Telecom Test System. Lightning Tests

EMC TEST REPORT for LEDELS LIGHTING CO., LTD. LED module Model No. : LL-F12T4815X6B

A) Documentation Page(s) Test report 1-17 Directory 2 Test Regulations 3 General Remarks and Summary 17 Test-setups (Photos) 18-23

ITUNER NETWORKS CORPORATION EMC REPORT Fremont Blvd. Fremont, CA

EMC Test Report. Product. Model Number. Prepared for : Shenzhen top technology co., LTD Address : No 2.First Rd Of Lucky,Longgang Ping Shenzhen China

Sign: Replace: Date:

E M C T E S T Y O U R SOURCE FOR TOP Q U A L I T Y TEST EQUIPMENT & E M C. w w w. h v t e c h n o l o g i e s. c o m

Trees, vegetation, buildings etc.

1 SUMMARY OF STANDARDS AND RESULTS

EMC TEST REPORT For INNOKIN TECHNOLOGY CO., LIMITED. ITaste vv. Model No.: ITaste vv

r(oilgln TEST REPORT 'AGREB 6 %P\l Br EMC10001 sasa Gros, B.s"{h-$ INSTITUTE EMC and Safetv Laboratorv

Novità sulla IEC ; -10; -12

APPLICATION FOR EMC DIRECTIVE. On Behalf of. Shenzhen Qinhan Lighting Co., Ltd. led flood light. Trade Name:

EMC TEST REPORT for SHENZHEN MUST ENERGY TECHNOLOGY CO., LTD

C B. Models. Models 2MOPP

Analog signal converters CC-E I/I

EMC Test Report FATEK AUTOMATION CORP. FATEK. FBs-TBOX N/A

Report for Excelsys EMC Measurements for 6Xgen Purchase Order: by Project Number EMT08J027

ALPHA 20 MULTIFUNCTION METER (ALPHA SERIES)

83 Series - Modular timers 16 A. Features

Insulation Test System

EMC TEST REPORT For ShenZhen ZhangQing Electronic LTD poe tester Model No.: WS POE Tester/Detector Additional Model No: Please Refer to Page 8

VOLTAGE DETECTING SYSTEMS

DIRECTORY - EMISSIONS

UCS 500N7 MULTIFUNCTIONAL TESTGENERATOR FOR TRANSIENTS (EFT/BURST, SURGE & POWER FAIL) UP TO 7KV

CE EMC Test Report GUANGZHOU DMKEMOTOR CO. LTD

EN :2007+A1:2011 Electromagnetic compatibility Emission standard for residential, commercial and light-industrial environments

satech SynchroStar GPS 200 Series

EMC TEST REPORT. For. Boardcon Technology Limited. MINI9G45 Computer on Module. Model No. : MINI9G45

By order of American Power Conversion Holdings Inc. at New Taipei City, Taiwan

DATASHEET - ETR4-70-A. Delivery program. Timing relay, 2W, 0.05s-100h, multi-function, VAC/DC, potentiometer connection

CE-EMC TEST REPORT. Prepared for : T&T Assoociates London LTD Suite#306 CityGate House, Bussinedd Centre Stratford, Romford Road, London

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 AMETEK CO., LTD. NAGOYA OFFICE. (Main Laboratory) Onna, Atsugi-shi, Kanagawa-ken, Japan

Guangdong East Power Co., Ltd. Uninterruptible Power Systems

ETSI EN V2.2.0 ( ) ETSI EN V2.1.1 ( ) TEST REPORT. United GULF GATE Co.

UCS 500N5T SERIES MULTIFUNCTIONAL TESTGENERATOR FOR CONDUCTED TRANSIENTS (EFT/BURST, SURGE, TELECOM-SURGE & POWER FAIL) UP TO 5.

83 SERIES. 83 Series - Modular timers A. Features

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment

TEST REPORT. Report No. : EM/2008/80003 Page : 1 of 54

Contents. 1 Introduction. 2 System-Level Electrostatic Discharge (ESD) and Electrical Fast Transient. 3 Electromagnetic Interference

CAR - TEST - SYSTEM 14

High-set undervoltage stage with definitetime. or inverse definite minimum time (IDMT) characteristic. Low-set undervoltage stage with definitetime

EMC Test Report For Changzhou Airwheel Technology Co.,Ltd. Airwheel Model: A6S,A6,A6P,A6PS,A6T,A6TS

UCS 500N7.2 MULTIFUNCTIONAL TRANSIENT SIMULATOR FOR RENEWABLE ENERGY

Report No.: 9A042401C2 Page 1 of 36. Test Report EN : Prepared for

Current clamps for AC current

EMC TEST REPORT. ADDRESS : #2 Creation Rd. 4, Science-Based Ind. Park Hsinchu Taiwan, R.O.C.

TEST REPORT. Product: Thermo-Hygrometer Model No.: FL-201, FL-201W Trade mark: N/A Report No.: TCT151014E001 Issued Date: Oct. 15, 2015.

Multi-function (MI, ME, M2, M1) 2 NO (2 SPST-NO) 12 / / 400 3,000 1, / 0.3 / (5 / 5) AgNi

EMC VERIFICATION SUMMARY Report No.: SZHH

REK 510 Current injection device for earth-fault protection of a synchronous machine rotor. User s Manual

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit.

Passive Current Transducers for Sinusoidal Alternate Currents From A/0...5 A MCR-SLP-1/5-UI-0(-SW)

AC/DC current clamps (1/2) E N series

Energy Management Energy Meter Type EM110

Electromagnetic Compatibility

EMC REPORT. ShenZhen KY Technology Co.,Ltd. No.369, BaoTian 1st RD, TieGang Industrial Park, Xixiang Town, Baoan District, ShenZhen, PRC.

SWT 3000 Teleprotection technical data siemens.com

400 (±2,5 V/ V/ ,3% V4A

Harmonizing the ANSI-C12.1(2008) EMC Tests. Harmonizing the ANSI-C12.1(2008) EMC Tests

WIRELESS INSULATOR POLLUTION MONITORING SYSTEM

TABLE OF CONTENTS Page 1 of VERIFICATION OF CONFORMITY SYSTEM DESCRIPTION PRODUCT INFORMATION SUPPORT EQUIPMENT

87 Series - Modular timers 5-8 A. Features

IRIG-B Interface (De-modulated) External clock synchronization signal IRIG format B00X

TEST REPORT. Table of Contents

P331-2 set ESD generator (IEC )

Transcription:

EMC TEST REPORT METEL s.r.o., Žižkův Kopec 617, 55203 Česká Skalice 2G-2S.0.3.FC-BOX - 1 -

Immunity Testing - Electrostatic Contact Discharge Test No. 1: EN61000-4-2 ed.2 Device Used: SRG200LC Description of Connection: The EUT "2G-2S.0.3.FC-BOX" was connected sequentially from the ports G1 and G2 (1000Base-FX) with EXFO-P1 (1000Base-FX) and from the ports P1 to P3 was connected sequentially through media converter (2G- 1S.1.0) with EXFO-P2 (1000Base-FX). The media converter and EUT were connected with EXFO 1m long SM fiber. The EUT and media converter were connected with 1m long UTP cable. The EUT was separately powered from a 48VDC separate power supply (isolating transformer 230AC / 230AC, 230AC power supply / 42-56VDC). Other device was supplied from an external source. The test was used to demonstrate, resistance to electrostatic discharge. Universal Connection Scheme: Power supply Insulating support Direct discharge to EUT Indirect discharge to VCP Indirect discharge to HCP HCP Protective conductor EUT VCP 470kΩ 0,1 m 0,1 m Horizontal copling plane (HCP) 470kΩ Ground reference plane (GRP) 470kΩ 470kΩ Power supply Non-conducting table - 2 -

Scheme: Results: Level Of Test kv Result Comment 2 4 (-)b / (+)b 5x negative pulses / 5x positive pulses 3 6 (-)b / (+)b 5x negative pulses / 5x positive pulses 4 8 (-)b / (+)b 5x negative pulses / 5x positive pulses Measured Date Type Version DPS SN Ivo Humeňuk 1st November 2016 2G-2S.0.3.FC-BOX 2G-2S03_PWRIO_11062014 / 0-3- Unknown

Immunity Testing - Electrostatic Air Discharge Test No. 2: EN61000-4-2 ed.2 Device Used: SRG200LC Description of Connection: The EUT "2G-2S.0.3.FC-BOX" were involved similarly to resistance tests - Electrostatic contact discharge (Test No. 1). The test demonstrated the resistance to electrostatic discharge. Results: Level Of Test kv Result Comment 2 4 (-)a / (+)a 5x negative pulses / 5x positive pulses 3 8 (-)b / (+)b 5x negative pulses / 5x positive pulses 4 15 (-)b / (+)b 5x negative pulses / 5x positive pulses Immunity Testing Electrical Fast Transient / Burst Test No. 3: EN61000-4-4 ed.3 Device Used: Generator RG451, Capacitive Coupling Clamp KK 401 Description connection: The EUT "2G-2S.0.3.FC-BOX" using the same connection scheme as the test "EN61000-4-2" only for application BURST with coupling clamp we using a 2m length UTP cable. The EUT was separately powered from a 48VDC separate power supply (isolating transformer 230AC / 230AC, 230AC power supply / 42-56VDC). The other equipment was supplied from an external source. For the application interference BURST we used capacitive coupling clamp connected to the coaxial HV output on BURST tester. The length of each test was 60 seconds. - 4 -

Scheme: EUT line Electrical Fast Transient / Burst Coupling Clamp line AUX EQUIP. 0,1 m insulating support 0,1 m insulating support Ground reference plane (GRP) Generator BURST GND Grounding connection according to the manufacturer s specifications Results: BURST on PORT 1 Level Of Test kv / KHz Result Comment 2 1 / 5KHz (-)b / (+)b (-)/(+) length 60sec 3 2 / 5KHz (-)b / (+)b (-)/(+) length 60sec 4 4 / 5KHz (-)b / (+)b (-)/(+) length 60sec BURST on PORT 2 Level Of Test kv / KHz Result Comment 2 1 / 5KHz (-)b / (+)b (-)/(+) length 60sec 3 2 / 5KHz (-)b / (+)b (-)/(+) length 60sec 4 4 / 5KHz (-)b / (+)b (-)/(+) length 60sec BURST on PORT 3 Level Of Test kv / KHz Result Comment 2 1 / 5KHz (-)b / (+)b (-)/(+) length 60sec 3 2 / 5KHz (-)b / (+)b (-)/(+) length 60sec 4 4 / 5KHz (-)b / (+)b (-)/(+) length 60sec - 5 -

Immunity Testing Surge Pulse Test No. 4: EN61000-4-5 ed.2 Device Used: Generator RG451 Description of Connection: The EUT "2G-2S.0.3.FC-BOX" using the same connection scheme as the test "EN61000-4-2 (Test No. 1)". For surge pulse application (SURGE No. 1) with output impedance 42 Ohms we using modified UTP cable connected to the generator (UTP cable with brought-out twist coule for connection to the generátor). Test (1,2) x (PE) / (3,6) x (PE) / (4,5) x (PE) / (7,8) x (PE) / (1,2,3,6,4,5,7,8) x (PE). After surge impulse we controlled the functioning EUT using the auxiliary equipment (EXFO). (SURGE No. 1: level 2 procedure 11 20, level 3 procedure 21 30). Tested ethernet ports P1, P2, P3 are equipped only with low surge protection, thus have been tested only to level 3. Scheme: Generator combined wave Ancillary Equipment Protection Equipment Separation Network Reference Ground - 6 -

Results: PORT P1 Wire (1,2)-(PE) Wire (3,6)-(PE) Wire (4,5)-(PE) Wire (7,8)-(PE) Wire (1,2,3,4,5,6,7,8) -(PE) - 7 -

Results: PORT P2 Wire (1,2)-(PE) Wire (3,6)-(PE) Wire (4,5)-(PE) Wire (7,8)-(PE) Wire (1,2,3,4,5,6,7,8) -(PE) - 8 -

Results: PORT P3 Wire (1,2)-(PE) Wire (3,6)-(PE) Wire (4,5)-(PE) Wire (7,8)-(PE) Wire (1,2,3,4,5,6,7,8) -(PE) - 9 -

Immunity Testing Static Magnetic Field 50 Hz Test No. 5: EN61000-4-8 ed.2 Device Used: Autotransformer 2,3kW / Conversion transformer 2KVA, Ring coil 20mH/1m; 2x Tripod for mounting coil; insulation pad Description of Connection: The EUT "2G-2S.0.3.FC-BOX" was exposed a static magnetic field. The EUT using the same connection scheme as the test "EN61000-4-2" only to ensure the remoteness of the test device from the neighborhood we using 5m UTP cables and 3m SM optical fiber. The equipment tested was separately powered from a 48VDC separate power supply. We gradually changed position the EUT to the reference surface (0 / 45 / 90 ) during the test. The length of each test was 60 seconds. During the test we controlled the functioning of the EUT. Scheme: L ATR ITR N A EUT PE Results: Level Of Test A/m Result Comment 2 3-3 10 (-)a / (+)a length 60sec (0 /45 /90 ) 4 30-5 100 (-)a / (+)a length 60sec (0 /45 /90 ) - 10 -

Immunity Testing Pulse Magnetic Field Test No. 6: EN61000-4-9 Device Used: Generator RG451 output COIL; Square coil 0,6m x 0,6m; insulation pad; tripod for mounting coil Description of Connection: The EUT "2G-2S.0.3.FC-BOX" was exposed to pulsed magnetic field. The EUT using the same connection scheme as the test "EN61000-4-2 (Test No. 1)" only to ensure the remoteness of the test device from the neighborhood we using 5m UTP cables and 3m SM optical fiber. We gradually changed position the EUT to the reference surface (0 / 45 / 90 ) during the test. During the test we controlled the functioning of the EUT. Chosen procedure SRG1 No10. Scheme: Generator EUT (GRP) Twisted cable length maximum 2 m GND Separate source Results: Level Of Test A/m Result Comment 3 100 (-)a / (+)a 5x negative pulses / 5x positive pulses (period 1sec)(0 /45 /90 ) 4 300 (-)a / (+)a 5x negative pulses / 5x positive pulses (period 4sec)(0 /45 /90 ) 5 1000 (-)a / (+)a 5x negative pulses / 5x positive pulses (period 6sec)(0 /45 /90 ) - 11 -