(AMMA) American Maritime Modernization Association

Similar documents
MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

MIL- B Rev NAVSEA 0900-LP

Engineering Drawing System

Engineering Drawing System

MATERIALS DIVISION MEMORANDUM

Weldment Visual Inspection Requirements

Standards and Competencies

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

Engineering Policy & Procedure

PRACTICAL UNDERSTANDING AND INTERPRETATION OF TECHNICAL STANDARD TS30a WELDING SPECIFICATION

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

Scope/Purpose of SI Training:

Optional Training Courses - January 26, 2015

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

STANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS

WELDING FABRICATION NYS

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

SECTION SUBMITTAL PROCEDURES

East Central College

AWS C3.9M/C3.9:2009 An American National Standard. Specification for Resistance Brazing

Welding Inspection Management

Update on the Developments in Government Auditing Standards Yellow Book Revision

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

ISO INTERNATIONAL STANDARD

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

Welding Symbols. Faculty of Engineering Mechanical Dept.

CORPORATE QUALITY SYSTEM PROCEDURE

WHO WE ARE. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA.

Welding Fabrication - California Regionals 2019 Quench Tank

DNVGL-CP-0212 Edition March 2016

SECTION SUBMITTAL PROCEDURES

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

GSFC CONFIGURATION MANAGEMENT MANUAL

SUBSEA PIPELINE SYSTEMS AND RISERS

Inspection and Test Plan for Battery Charger

SEI Certification Program Manual

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Inspection and Test Plan for Water Tube Boiler

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

(Non-legislative acts) DECISIONS

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Welding Qualification/Certification

Listing Report: AB Reissue Date: 01/21/16 This report is subject to annual review

New Mexico Welding Fabrication 2018 Purpose:

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

INS Process Outline Requirements

ISO ISO ISO ISO TC 8888/SC 1111/ WG 1/ N393N

AAR SPECIFICATION M-214 INSPECTION CHECKLIST

UNIT TO COURSE COMPARISON (UCC) FORM. Welder Level 1

QUALITY ASSURANCE SPECIFICATION

Technical Standard Order

SECTION SUBMITTAL PROCEDURES

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

Electroimpact Supplier Inspection Documentation

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

(R) Aerospace First Article Inspection Requirement FOREWORD

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

ASME BPV XI Interpretation Handout May 10, 2017

PART QB BRAZING ARTICLE XI BRAZING GENERAL REQUIREMENTS

ANNEX F HM/AHC/F March 2014 BUREAU OF INDIAN STANDARDS ASSESSMENT OF RECOGNIZED ASSAYING AND HALLMARKING CENTRE.

CHAPTER 75 STEELWORKER (SW)

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

UTAH S 2016 WELDING FABRICATION COMPETITION

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

Waukesha Foundry. Industry Experience Engineering Expertise

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Welder Harmonization Transition Plan

INSPECTION AND TEST PLAN

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

SECTION IX. ASME Boiler and Pressure Vessel Code An International Code ASME B PVC.I X-2017

Controlling Changes Lessons Learned from Waste Management Facilities 8

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure

This document is a preview generated by EVS

1 SERVICE DESCRIPTION

AAI CORPORATION D/B/A TEXTRON SYSTEMS

Bell Helicopter Safety Management System Implementation

DNVGL-CP-0338 Edition October 2015

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

GENERAL DESCRIPTION OF THE CMC SERVICES

Internal Controls: The Basics National Grants Management Association May 17, 2017

SPECIAL SPECIFICATION 8802 Radio Communication Tower Inspection, Maintenance, and Repair

WELDER ONTARIO PRACTICAL ASSESSMENT

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

for industry.com

Test Lab Requirements. Version NFC Forum TM Test Lab Requirements [LABREQS]

Aws Visual Inspection Workshop Reference. Manual Pdf >>>CLICK HERE<<<

Meeting of October 21, 2014 Columbus, Ohio

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

Transcription:

(AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT Audit Team Leader Representative of: Técnico Corporation, Quality System Director 1 Purpose Provide overview and guidance for performing external audits for the sole purpose to enhance AMMA Member s Welding, Brazing, and NDT Programs and Processes. 2 Authority to Change this Document AMMA Quality Assurance (QA) Subcommittee 3 Responsibility for Ensuring Implementation AMMA Subcommittee Chairman and Audit Team Leader This information herein and audit reports are intended for the AMMA and its members. Retransmission, dissemination, or other use of, or taking of any action in reliance upon this information by person or entities other than the intended recipient is prohibited. April 1, 2004 1 REVISION D

REFERENCES: (a) (b) (c) (d) (e) (f) (g) (h) (i) NAVSEA Standard Item 009-12, Welding, Fabrication and Inspection Requirements NAVSEA Standard Item 009-04, Quality System; Provide NAVSEA T9074-AD-GIB-010/1688, Requirements for Fabrication, Welding and Inspection for Submarine Structure MIL-STD-1689, Requirements for Fabrication, Welding and Inspection for Ships Structure NAVSEA S9074-AR-GIB-010/278, Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping and Pressure Vessel NAVSEA 0900-LP-001-7000, Fabrication and Inspection of Brazed Piping Systems NAVSEA S9074-AQ-GIB-010/248, Requirements for Welding and Brazing Procedure and Performance Qualification MIL-STD-2035, Nondestructive Testing Acceptance Criteria NAVSEA S9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods 1. GENERAL. AMMA QA Subcommittee is performing external audits of AMMA member s Welding, Brazing, and NDT Programs and Processes to ensure compliance with references (a) through (i). Program Evaluation and/or audit results shall remain confidential with the AMMA QA Subcommittee. 2. PURPOSE The purpose of these audits is to determine member s compliance with established directives and to serve as a tool to reduce rework, improve efficiency, and produce permanent improvements. The QA Subcommittee will issue the audited AMMA Member an evaluation report with specific deficiencies or concerns with recommendations and opportunities to improve. April 1, 2004 2 REVISION D

3. DEFINITIONS A. Audits. Audits are systematic comparison of records and requirements to ensure compliance with technical and administrative specifications. Different types of audits may be performed depending on the area to be audited and the purpose of the audit. These audit categories are as follows: 1. Surveillance/In-Process Monitoring. Surveillance involves observation of actual work in progress or specific areas of concern. 2. Evaluation Report. Evaluations provide the company with an external review of the overall adequacy and effectiveness of the program or subject being audited. 4. KEY ELEMENTS. As a minimum, the following key elements should be used to assure the effectiveness of the audit: A. Conduct training on techniques for preparation, execution, and the evaluation of findings prior to conducting audits for the first time. This training will be conducted and documented by the AMMA Subcommittee. B. Use the AMMA Welding/Brazing/NDT Audit Checklist. This checklist is based on key attributes from the source documents and is not meant to limit the scope of the review. If an area of concern is identified further review should be initiated by the QA Subcommittee audit team. C. Deficiencies, areas of concern, recommendations, and/or opportunities to improve shall be documented on the AMMA Welding/Brazing/NDT Audit Checklist and the evaluation report for the member company. 4. RESPONSIBILITIES A. Scheduling: The Audit Team Leader is responsible for working with the AMMA members to schedule audits and train auditors. B. Audit Team Leader: Is responsible to assemble the audit team, assign areas of coverage, supervise the audit, prepare the audit report and conduct an out brief (if required). April 1, 2004 3 REVISION D

C. Audit Team: It is the Audit Team s responsibility to provide an objective review of processes, controls, procedures, and associated functions used for performing welding, brazing, and NDT tasks. D. Audited Company: The audited company should open the audit by providing the audit team with points of contacts and a quick overview of quality plan in respect to the subject being audited. In addition, ensure that source reference documents, local procedures and records are available for review. E. Evaluation Report: The Audit Team Leader will submit a final audit evaluation report to the QA Subcommittee Chairman for reporting to the committee. A copy will be forwarded to the audited organization Quality Assurance Manager. The report will include the following: 1. Organization Audited 2. Audit Team Names and Contact Information 3. Overall Evaluation of Audit Areas 4. List of Deficiencies or Concerns 5. Recommendations or Opportunities to Improve April 1, 2004 4 REVISION D

AMMA PRE-AUDIT, DURING AUDIT, POST-AUDIT BRIEF ATTENDANCE SHEET DATE: COMPANY NAME: LEAD AUDITOR: _ Name, Title, Representative Company and Telephone No. OTHER AUDITORS: _ Name, Title, Representative Company and Telephone No. PRE-AUDIT BRIEF: (Other than Auditors) PRINT NAME E-MAIL TELEPHONE DURING AND POST-AUDIT BRIEF: (Other than Auditors) PRINT NAME E-MAIL TELEPHONE April 1, 2004 5 REVISION D

Section I General Information A. What does the company customer base consist of? ASME SUPSHIP SPAWARS NSWCCD NUWC NAVFAC Other Define Other: B. What Welding and Brazing processes does the company employ? SMAW _ GMAW GTAW FCAW _ SAW Brazing Stud Welding Other Define Other: C. What Non-Destructive Testing Processes does the company employ? VT MT PT UT ET RT_ Define Other: D. Does the company use internal or external Level III Examiner oversight? Internal _ External_ Specify Qualified Person or Organization: E. Does the company have appropriate revision of the fabrication documents? F. Does the company have a way to obtain the latest changes of the fabrication documents? (Distribution of changes?) April 1, 2004 6 REVISION D

Section II Welder and Brazer Performance Qualifications A. Is the welder and brazer training and qualification program approved by a Level III Examiner or other NAVSEA approved individual? (Para. 5.2.3.1 of the 248) B. Does the company have a written procedure covering all aspects of training and associated responsibility? (Para. 5.2.3.1.a of the 248) C. Does the welder qualification records include the following? (Para. 5.5.1 of the 248) (Example: Figure 18 of the 248 and 4.3.6 of the 7000) Welder or Operator Identification Date of Test Qualification Procedure Number Process Base Material Type Filler Material Type Signature of Fabricator Written Examination Records D. Have all welders passed written examinations covering the detailed workmanship and visual inspection requirements in accordance with the fabrication documents with a grade of 75% or greater? (Section 4 of the 1689 and 1688) (Para. 5.2.3.1.b and 5.2.3.1.c of the 248) E. Have all welders passed an annual visual test? (Para. 5.2.12 of the 248) April 1, 2004 7 REVISION D

F. Are Weld and Braze Procedures qualified and approved by the appropriate governing activities based on the customer base specified in Section I. G. Are detailed records available for the maintenance of qualification for the current and preceding calendar quarter? (Para. 5.5.3 of the 248 and 4.3.5 of the 7000) H. Are welders retested every three years? (Para. 5.2.11.1.1 of the 248) Section III Workmanship Inspection (WI)Requirements A. Does the company have a written procedure for the performance of workmanship inspection? (Section 4 of the 1689 and 1688) B. Does the written procedure specify the following? (Para. 4.8.1 of the 1689 and 4.9 of the 1688) Actions required ensuring conformance Organization element responsible for inspections Signatures certifying that WI will be based on Personal observation Detailed documentation requirements ensuring records are maintained April 1, 2004 8 REVISION D

C. Are all personnel qualified to perform WI trained to the use of the written procedure in accordance with a documented program? (Para. 4.8.2 of the 1689 and 4.9 of the 1688) D. Does workmanship personnel qualification consist of the following? (Para. 5.2.5 of the 1689 and 4.9 of the 1688) Workmanship Inspector Identification Procedure Trained In Dates of Training Certifying Signature attesting to Qualification E. Does the record of accomplishment include at least the following items? (Para. 5.3.1 of the 1688) Note: (1) The 1689 does not specify what is required as a record of accomplishment. (2) The record of accomplishment may take several different forms at an activity, including a detailed record, a technical work document or a separate log. Item and Location of Inspection Identification of procedure used for the inspection Organizational Element Responsible for the Inspection Certification Signature April 1, 2004 9 REVISION D

Section IV Audit, Surveillance and Monitoring A. Does the company have an Audit plan for the monitoring and surveillance of welding and Brazing in accordance with the fabrication documents? (Para. 6.3.1 of the 1689 and 1688) B. Has the companies entire welding and brazing program been audited by a Level III examiner or other NAVSEA approved individual to ensure adequacy every two years? (Para. 5.2.3.1.g of the 248) N/A If N/A specify reason: C. If applicable, does the company have records for ensuring that its subcontractors have qualified weld procedures based on approved qualification data? (Para 4.2.4 of the 248 and 7000) D. Are Inspection and Records audited? The personnel performing the brazing operation shall not perform these audits. (Para. 6.5.1 of the 7000) April 1, 2004 10 REVISION D

E. Do the records for surveillance and monitoring contain the following attributes at the time it is performed? (Para. 5.8.1 of the 1688 and 5.2.8 of the 1689) Base Material Identification Welding Process Being Used Filler Material Type Heat Input (Sat/Unsat) Preheat/interpass Temperature (Sat/Unsat) Location of work being performed Type of Weld (Original or Repair) Date of Inspection Signature of Inspector Record of any discrepancies Joint Prep (Sat/Unsat) Joint Configuration and Fit-up (Sat/Unsat) Root Cleaning and Contour (Sat/Unsat) Slag Removal (Sat/Unsat) Welder Identification and Process Repair excavation contour (Sat/Unsat) Heat Soak(Sat/Unsat) F. Does the companies audit procedure consist of the following? (Para. 6.5.1 of the 7000) Lot of Sampling definition Sampling Plan to include audit frequency Attributes Records or reports of audits including ship number and system identification Performance evaluation Corrective Actions where discrepancies are found April 1, 2004 11 REVISION D

Section V Non-Destructive Testing (NDT) A. Are approved NDT procedures certified by signature by the cognizant Level III examiner for the company? (Section 1.7 of the 271) B. Does the company have a Written Practice for the control of experience, training, examination and certification of NDT personnel per the 271? (Para. 1.6 of the 271) C. Are NDT personnel (Level I & II) recerification performed at an interval no greater than three years and examiners (Level III) no greater than 5 years? (Para. 1.6.3 of the 271) D. Do records for NDT personnel contain the following information? (Para. 1.6.6 of the 271) Training and Experience Results of current examination Record of visual examination noting Corrective aids used Satisfactory completion of training in accordance with companies Written Practice April 1, 2004 12 REVISION D

Section VI Support Procedures and Programs A. Do work documents (i.e., TIPS, Travelers, work packages) refer welder and NDT personnel to applicable weld, NDT and acceptance criteria? B. Are COCs for materials available and are they ordered to military specifications? C. Can the materials be traced from the time they are purchased, received and end use? D. Does the company issue welding wire and electrodes per section 10 of the 1689 and 1688? E. Are holding ovens used? (Section 10 of the 1689 and 1688) F. If yes, are calibrated temperature thermometers installed to monitor oven temperatures? YES NO April 1, 2004 13 REVISION D