MBR CITY. PARK Heights I

Similar documents
MBR CITY. PARK Heights I

AT DUBAI HILLS ESTATE

AT DUBAI HILLS ESTATE

CONVENIENCE OF A BUSINESS PARK AND HOTEL

THE PERFECT BALANCE OF FAMILY & SPORTING LIFESTYLES

TABLE OF CONTENTS ABOUT EMAAR DESTINATION INTERIOR DESIGN AMENITIES FLOOR PLANS CONTACT US

A NEW VISION FOR COSMOPOLITAN LIVING BY THE SEA

DESTINATION ABOUT EMAAR INTERIOR DESIGN PROJECT OVERVIEW LOCATION AMENITIES FLOOR PLANS CONTACT US

WITH THE BEAUTY OF NATURE ALL AROUND

Grand Living Experience in the Heart of Business Capital BUSINESS BAY DUBAI BY:

A lively community, built around your life

PETROLEUM ENGINEERING. Meetings International. August 06-07, 2018 Dubai, UAE.

After more than three decades of setting standards in civil engineering,

Grade 5 Term 1 Sample

PETROLEUM ENGINEERING. Meetings International. August 06-07, 2018 Dubai, UAE.

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES

MARKET REPORT. Welcome to UAE The fastest growing healthcare Tourism destination in the world. Arab International Dental Conference & Exhibition

Abu Dhabi In context. 9% World s Oil. 87% Land Mass. 4% World s Gas 65% UAE GDP. Reserves. Reserves

AL MAZAYA PROFILE TABLE OF CONTENTS TABLE OF CONTENTS

Weathering the Storm The Case of Abu Dhabi

Edward Sunna. Curriculum Vitae. Contents

The BURJ CEO Awards 2017 The Dorchester Hotel, London, United Kingdom 10 th October 2017

Gastroenterology. International Conference on. November 05-06, 2018 Dubai, U.A.E. Gastro Meetings. International

Expo 2020 Dubai Team Members


Union Properties PJSC

AN EXCLUSIVE ISLAND IN A CLASS OF ITS OWN

ADCED Holds Panel Discussion on Leadership Communication to Promote Open Dialogue Between Executives and Employees WHAT S INSIDE.

[ DIRECT INVESTMENTS ] investalk A QUARTERLY NEWSLETTER OF DUBAI INVESTMENTS PJSC2018ISSUE

START YOUR STORY SAFI APARTMENTS

General Education Department Course Syllabus Semester: Spring 2009/2010

WEDNESDAY, SEPTEMBER 5, 2018 THE OBEROI

POST SHOW REPORT.

CQWW CW A61AJ, Dubai, United Arab Emirates George Briggs, K2DM

- 2016/2017. CA Sri Lanla UAE Chapter (2016/2017) 1

UAE Swiss Workshop Cleantech and Environment

SPONSORSHIP OPPORTUNITIES

AN EXCLUSIVE ISLAND IN A CLASS OF ITS OWN

Turkey Property Show.

Dubai Investments PJSC Fiscal Year 2016 Investor Presentation

THE LEADING SMART CITY EVENT IN THE MIDDLE EAST

Redefining the future for people and places 1


Awareness. Game using. Virtual Reality. Game.

Mr. Eissa Mohamed Ghanem AlSuwaidi (Chairman) Mr. Mohamed Sultan Ghannoum Al Hameli (Vice Chairman Independent Director)

Hospitality Procurement Solutions PROCUREMENT PROJECT MANAGEMENT ADVISORY NEW YORK DUBAI

Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018


Abu Dhabi Economic Forum* Emirates Palace, Abu Dhabi 5-6 February 2007

Dubai, UAE April 24-26, Conference Secretariat

AFRIWOOD POST SHOW REPORT E A S T A F R I C A. East Africa s Largest International Trade Exhibition On Woodworking & Furniture Manufacturing

HYPERTENSION & HEALTHCARE

Introduction. The latest circulation figure for AL IDARI is copies per month, making it the most successful Arabic business monthly magazines.

Introduction to Istithmar World Capital. October 2008

United Arab Emirates Business Law Handbook: Strategic Information And Laws READ ONLINE

Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, October 26, 2017

PROPINSIGHT A Detailed Property Analysis Report

Terence Gilbert. Passion and versatility A PORTRAIT OF

The American Women s Network of Abu Dhabi February Happy Valentine s Day! Susan Foster AWN Co-President. *Quoted from Lee Nichols

Anthropocene. David Thomas Smith. The Copper House Synge Street Dublin 8 Ireland tel fax

Dubai Investments PJSC Q Investor Presentation

LIST OF SPEAKERS. Anshul Srivastav Chief Information Officer and Digital Officer Union Insurance, UAE

Etihad Museum Project. Case study and lessons learnt. dipmf.ae 1

ADCED, the first Abu Dhabi entity to receive R4E Certification from EFQM

Land Use Change Explanation Guide

شركة الوقت للكهرباء والمقاوالت ذ.م.م.

The Legal 500 Europe, Middle East and Africa. The clients guide to law firms

ADFG Innovation Value Agility

Abu Dhabi (Head Office) Dubai: Iraq:

The Future of Fitness

Sàlim Javed Environment Agency Abu Dhabi PO BOX 45553, United Arab Emirates Bird Conservation Programme

CURRICULUM VITAE CARLO PIANESE I PARTNER BIOGRAPHY REPRESENTATIVE EXPERIENCE*

Mubadala Development Company PJSC 2010 Full Year Results 24-March-2010

Retail Space for Lease Le Quest (TOP 2020)

المجلس العالمي EXPO 2020 DUBAI WORLD MAJLIS. Sustainability through new eyes Offical Programme Launch

VAT

A Higher Status 6901, 6903, 6905 ROCKLEDGE DRIVE BETHESDA, MARYLAND

The 3D Documentation of Al-Jahili Fort in Al-Ain, United Arab Emirates (UAE): A Virtual Reality Application

MEC-DE-E : Mechanical Technical Office Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

DIT SMEs Forum. holding. V INSME Annual Meeting. April 20 23, 2009 Jumeirah Emirates Towers, Dubai, United Arab Emirates AGENDA

Participant List 2012

The Department of Transport in Abu Dhabi Elected As Vice Chair, UITP MENA Executive Board

NMC Healthcare plc counsel on structure and investments in multiple hospitals and medical centers in Saudi Arabia.

2 nd Edition OCTOBER, 2016 MADINAT JUMEIRAH, DUBAI, U.A.E. Strategic Partner Strategic Partner. Organised by. Consulate General of India, Dubai

GLOBAL SHAKEHANDS UAE is captivating ASPIRE CHINESE Persona buyers Aspire NEWS BEAT

U.S. Arab Chamber Organizes Pumps & Pipes Seminar in the United Arab Emirates

Nabil A. Issa. Matters

DUBAI SILICON OASIS AUTHORITY FOSTERING SMART CITY DEVELOPMENT THROUGH INNOVATIVE STRATEGIES

FPSO Design and Technology

CONNECTING MINDS, CREATING THE FUTURE. A short guide to Expo 2020 Dubai

AI TALKS. Artificial intelligence talks led by world experts, demonstrating what the potential ROI is to your organisation adopting AI.

STRATEGY, SELECTION AND TECHNOLOGY FOR MIDDLE EASTERN INVESTORS AND FUND MANAGERS

MOE125 Offshore Well Construction

PARK 12 45K RESIDENTIAL 73K+ 860+

PARK 12 45K RESIDENTIAL 73K+ 860+

Osama Audi. Matters. Osama is fluent in Arabic and English.

TREE 2 PROTECTION DISTANCE M TREE PROTECTION DISTANCE- SHALLOW WINDOW WELL (UNDER 4', FROM GRADE) OPEN TO ABOVE OPEN TO ABOVE MECHANICAL ROOM

Not for sale or distribution

Transcription:

MBR CITY PARK Heights I

7 Minutes Walk to the MALL Direct AcCess to Boulevard 5 Minutes Walk to The central park

PARK Heights I at Dubai Hills Estate... 01 - Community Park 02 - Regional Park 03 - Golf Club 04 - Golf Academy 05 - Driving Range 06 - Tennis Academy 07 - Schools 08 - Hotels 09 - Juma Mosque 10 - Metro Station 11 - Townhouse Community 12 - Townhome Community 13 - Private Hospital 14 - Government Hospital 15 - Civil Defence 16 - Police 17 - Community Retail 18 - Golf Villas 19 - Golf Apartments 20 - Park Heights 1

The World Islands Ali The Dubai Mall 10 Minutes Jumeirah Beach 12 Minutes Burj Khalifa 10 Minutes Dubai Marina 10 Minutes The Tower - DCH 15 Minutes Dubai Marina Sheikh Zayed Road The Palm Jumeirah Sheikh Zayed Road Al Khail Road Mall of The Emitares Dubai Hills Estate Burj Al Arab Umm Suqeim Umm Suqeim PARK HEIGHTS I Sheikh Zayed Road Al Khail Road Al Wasl Road Burj Khalifa Jumeirah Jumeirah Al Wasl Road The Dubai Mall Bur Dubai Karama Al Khail Road DFC Deira Deira Dubai International Airport Dubai Intl Airport 20 Minutes Al Maktoum Airport 35 Minutes Expo 2020 Dubai Land The Tower Sheikh Mohammad Bin Zayed Road Al Maktoum International Airport Sheikh Mohammad Bin Zayed Road Sheikh Mohammad Bin Zayed Road DISTANCES ARE APPROXIMATE Silicon Oasis Emirates Road

PARK HEIGHTS I Post-handover Special Payment Plan 1st Installment Purchase Date 2nd Installment 10 Oct 2017 3rd Installment 5% 10 Apr 2018 20% Construction Completion 50% Construction Completion 80% Construction Completion 100% Completion & Handover 5% 15 Oct 2018* 15 Apr 2019* 15 Sep 2019* 31 Mar 2020* 6 Months Post-handover 12 Months Post-handover 18 Months Post-handover 24 Months Post-handover 30 Sep 2020* 30 Mar 2021* 30 Sep 2021* 30 Mar 2022* * Estimated construction completion date

FLOOR PLANS

1 BEDROOM APARTMENT PARK HEIGHTS I N 1. All dimensions are in imperial and metric, and measured to structural elements and exclude wall finishes and construction tolerances. 2. All materials, dimensions, and drawings are approximate only. 3. Information is subject to change without notice, at developer s absolute discretion. 4. Actual area may vary from the stated area. 5. Drawings not to scale. 6. All images used are for illustrative purposes only and do not represent the actual size, features, specifications, fittings, and furnishings. 7. The developer reserves the right to make revisions/ alterations, at its absolute discretion, without any liability whatsoever.

2 BEDROOM APARTMENT PARK HEIGHTS I N 1. All dimensions are in imperial and metric, and measured to structural elements and exclude wall finishes and construction tolerances. 2. All materials, dimensions, and drawings are approximate only. 3. Information is subject to change without notice, at developer s absolute discretion. 4. Actual area may vary from the stated area. 5. Drawings not to scale. 6. All images used are for illustrative purposes only and do not represent the actual size, features, specifications, fittings, and furnishings. 7. The developer reserves the right to make revisions/ alterations, at its absolute discretion, without any liability whatsoever.

2 BEDROOM APARTMENT PARK HEIGHTS I N 1. All dimensions are in imperial and metric, and measured to structural elements and exclude wall finishes and construction tolerances. 2. All materials, dimensions, and drawings are approximate only. 3. Information is subject to change without notice, at developer s absolute discretion. 4. Actual area may vary from the stated area. 5. Drawings not to scale. 6. All images used are for illustrative purposes only and do not represent the actual size, features, specifications, fittings, and furnishings. 7. The developer reserves the right to make revisions/ alterations, at its absolute discretion, without any liability whatsoever.

3 BEDROOM APARTMENT PARK HEIGHTS I N 1. All dimensions are in imperial and metric, and measured to structural elements and exclude wall finishes and construction tolerances. 2. All materials, dimensions, and drawings are approximate only. 3. Information is subject to change without notice, at developer s absolute discretion. 4. Actual area may vary from the stated area. 5. Drawings not to scale. 6. All images used are for illustrative purposes only and do not represent the actual size, features, specifications, fittings, and furnishings. 7. The developer reserves the right to make revisions/ alterations, at its absolute discretion, without any liability whatsoever.

CONTACT DETAILS Get Direction Head Office Tel: 02 205 2999 Tel: 600 548 200 P.O.BOX 109537, Abu Dhabi, UAE Abu Dhabi Al Muhairy Centre, M Level Al Khalidiyah, Abu Dhabi, United Arab Emirates Get Direction Al Reem Island Office Amaya Tower, G Floor, Al Reem Island, Shams Abu Dhabi, United Arab Emirates www.propertyshopinvestment.com info@psinv.net