VANITY INSTALLATION INSTRUCTIONS

Similar documents
INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Vanity Installation Instructions

Vanity Installation Instructions

POSH SOLUS VANITY - ACRYLIC

BATHROOM CABINETRY INSTALLATION GUIDE

White Matte Solid Surface (15mm) MDF MR E0 (Medium Density Fibreboard, Moisture Resistant, Rated Emission Level E0) Textured Woodgrain: Riven:

INSTALLATION INSTRUCTIONS

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Step-by-Step Installation Instructions for

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

tile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:

Argon 02 Installation Instructions & Parts List

Mirror Cabinets. Planning & Installation Information

IMPORTANT READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Radon 07 Installation Instructions & Parts List

Retrofit Apron Front Farm Sink With Dual Mount Capability Installation Instructions

1200mm Offset. 900mm Offset

Curium 19.4H Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List

MACHINTO FLOATING DOUBLE VANITY SINK ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in its crate until installation.

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

VANITY SET: LV4 INSTALLATION INSTRUCTIONS VANITY CABINET + VANITY TOP + MIRROR. DRAWER BASE SINK BASE LV4-24 LV4-30 LV4-36

SHOWERAMA BRISTOL ON KICK VANITY

MONTEREY WALL MOUNT FLOATING DOUBLE EXTRA-WIDE VANITY ASSEMBLY INSTRUCTIONS

Xenon 05 Installation Instructions & Parts List

A-935 RODA WALL MOUNT HINGES

Double Frameless Swing Door QCI5247

VALENCIA RONDO DOOR WITH RETURN

Dubnium 11 Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List

HUTTON FLOATING SINGLE EXTRA WIDE VANIT Y A SSEMBLY INSTRUCTIONS

Step-by-Step Installation Instructions for

Frameless Heavy Glass Door with Wall Mount Hinges

VALENCIA CORNER DOOR WITH RETURN

Frameless Inline Door QCI5248

QWALL 5.2 (2 Back Panels)

Frameless Door QCI5284

Fitted Furniture Installation and Aftercare Guide

FOLIO COUNTERTOP LAVATORY

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

INSTALLATION INSTRUCTIONS FOR STANDING SHOWER CABIN OWNER'S MANUAL PLEASE READ INSTRUCTIONS BEFORE PROCEEDING Packing List. Door (pc) 2. Hinge (2pc) 3

Frameless Inline Door QCI5254

VANITY CABINET + MIRROR VANITY SET: LV1-30 INSTALLATION INSTRUCTIONS. Version 1.1

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Step-by-Step Installation Instructions for

Bathroom Installation Manual

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

SHOWERAMA ESPIRE ON KICK VANITY

Step-by-Step Installation Instructions for

FLEX SHOWER DOOR INSTALLATION INSTRUCTIONS

Links System Installation Instructions

City Trim Range. Installation Guide

ASPEN FRENCH OAK SINGLE EXTRA-WIDE VANITY ASSEMBLY INSTRUCTIONS

Toilet Vanities: Sub & Nes 400. Planning & Installation Information

FIXED PANEL SLIDER QCI5241

Installation Instructions

FLEX 28 / 32 / 42 x 72

Frameless Inline Door With Return QCI5263

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

UNIDOOR (STYLE B & C)

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

Frameless Inline Door QCI5288

FLEX ENCLOSURE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

CORNERVIEW / FRENCH CORNER

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Balustrade Systems / Installation Instructions

AQUA ULTRA SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTION. MODEL #s 01-Chrome

Frameless Fixed Panel Slider QCI5279

Frameless Inline Door QCI5250

UNIDOOR X (STYLE L1)

600mm 3 drawer base cabinet

FLEX 48 x 72 / 60 x 72

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

FRENCH LINEA PANEL SHOWER PANEL INSTALLATION INSTRUCTIONS

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

DURASTALL SHOWER STALL ASSEMBLY INSTALLATION REPAIR PARTS FOR ONE OF THE FOLLOWING MODELS:

ACQUA WALL HUNG VANITY SINGLE HEIGHT

Installation Guide. brighter. lighter.

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Frameless Heavy Glass Door with Header

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Step-by-step Installation Guide

PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

SHOWER DOOR INSTALLATION & CARE GUIDE

Solid Laminate Worktops Installation and Aftercare Instructions

APRON FRONT STAINLESS STEEL SINK Installation & Care Instructions

Installation Guide 1

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

CABINET INSTALLATION Please read prior to installation.

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Chapter 22 - Cabinets & Vanities

Standard Sectional Installation Instructions Gelcoat & Solid Surface Bathware

Install Instructions for Torrance Jurastone #4004 Mantel

Transcription:

VANITY INSTALLATION INSTRUCTIONS Congratulations and thank you for your purchase. These cabinets have been designed and assembled to a very high standard and if installed correctly will provide you with many years of reliability. Some or all of the following instructions will be required for installing your new vanity, please read all of these instructions carefully before starting the installation. This will ensure the best possible result and avoid missing or overlooking any appropriate installation procedure which could invalidate your warranty. CONTENT Installation Instructions for all vanity cabinets Page 2 Additional Instructions when using Wall Hung cabinets Page 3 Special Installation Instructions for Poly Marble Tops Page 4 Special Installation Instructions for Vitreous China Tops Page 5 Cleaning and Maintenance Page 6 Page 1

Installation Instructions for all vanity cabinets INSPECTION AFTER OPENING Before installation, remove all packaging and check that the unit is in good working order and that no damage has occurred in transit. If damage has occurred, or a defect is noticed DO NOT continue with installation, contact your supplier ASAP. INSTALLATION TOOLS REQUIRED Power Drill Drill Bits Tape Measure Pencil Spirit Level Hole Saws Screws Screw Driver Silicone Caulking Gun STEP 1, To help in the installation, label and remove the doors fronts and drawers (If removable), store them in a safe place where they will not get damaged. STEP 2, Check that the unit will fit into the location allowing for the top to overhang the unit 10mm on each side. On timber walls, mark the positions of the studs so to be able to fix the unit to these later. Measure and mark the hole centre of the water supply and waste outlet on the back and/or bottom of the unit. Check that the pipes will not interfere with the drawers. STEP 3, Use a slightly larger hole saw, drill the holes for the water supply and waste outlet. Position the unit into its correct place and check unit fits correctly. Re-drill if required. STEP 4, Re-attach door panels and drawers. Check that the unit is sitting level, and is not twisted and that the drawers and doors are not racked or out of alignment. Wedges can be used if required. (NOTE: Door hinges can be adjusted to help in the realignment) STEP 5, Drill holes and fix the back of the unit to the wall. Align holes with stud if fixing to a timber wall. If no studs are accessible a toggle type system is required (fixings not supplied). STEP 6, Once unit is fixed to the wall, re-check that the doors and drawers are aligned and working correctly. Adjust screws and wedges if required. Use silicone to seal around the unit between the cabinet and the floor, and the cabinet sides and the wall (not the top). Page 2

Additional Instructions when using Wall Hung cabinets These additional instructions are numbered to work in conjunction with the Installation Instructions for all vanity cabinets. Please combine these 2 pages to ensure the appropriate installation steps are followed. STEP 1b, The recommended installation height to the top of the basin (front edge) is between 850-950mm off the finished floor. Extra timber supports are required in the wall if fixing this unit to a timber wall. (NOTE: A solid horizontal support in the wall just below the top of the unit is recommended) STEP 2b Position the unit against the wall (or an alternate wall) with additional support packers and check that the unit is sitting at the correct height and that it is level and is correctly positioned against the wall. Adjust if required and re-check pipe markings. (NOTE: Re-adjustment of the pipes maybe required if these are now exposed under base) STEP 5b, Position the fixing so the back panel is well supported. It is highly recommended 3-4x 75mm Coach Screws are used on a timber wall, and 3-4x 75mm Masonry Anchor on a solid wall. (NOTE: To help support and spread the load, washers should be used with each fixing) STEP 6b, Remove additional support packers and re-check that the doors and drawers are aligned, adjust if required. Use silicone to seal the sides of the cabinet and the wall (not the top). Page 3

Special Installation Instructions for Poly Marble Tops INSPECTION AFTER OPENING Before installation, remove all packaging and check that the top is the correct model and that no damage has occurred in transit. If damage has occurred, or a defect is noticed DO NOT continue with installation, contact your supplier ASAP. STEP 1, Check that your selected tapware and waste fit correctly, place the top into its correct position on the cabinet and check that it overhangs the cabinet on both ends and the front. If not, DO NOT continue with the installation, and contact your supplier ASAP. Small adjustments can be made to the back of the top with a belt sander If the back does not fit completely flush against the wall. STEP 2, Remove top and attach the waste and tapware according to their manufacturer s directions. STEP 3, Apply a continuous bead of silicone around the top edge of the cabinet. STEP 4, Place top onto the cabinet ensuring that it is overhanging evenly on both sides and that the back rests flush against the wall. Wipe off all excess silicone. STEP 5, Connect the water supply and the waste outlet as per their manufacturer s directions, run both hot and cold water and check for leaks. Repair if necessity. STEP 6, Use silicone to seal between the top and the wall. To create a professional finish use masking tape on the wall and the top allowing a big enough gap between the two to apply the silicone. Run a gloved finger along the silicone to smooth it out and cover both edges of the masking tape. Peel the masking tape away before the silicone starts to set. (NOTE: Allow 48 hours for the silicone to dry before using) Page 4

Special Installation Instructions for Vitreous China Tops INSPECTION AFTER OPENING Before installation, remove all packaging and check that the top is the correct model and that no damage has occurred in transit. If damage has occurred DO NOT continue with installation, contact your supplier ASAP. (NOTE: In the process of manufacturing vitreous china tops, the product shrinks significantly, and can sometimes lead to the product being slightly uneven, this is standard characteristic s of a vitreous china top) STEP 1, Check that your selected tapware and waste fit correctly, place the top into its correct position on the cabinet and check that it overhangs the cabinet on both ends and the front. If not, DO NOT continue with the installation, and contact your supplier ASAP. (NOTE: Check that the top does not rock on the cabinet more than 4mm, if so cabinet adjustments maybe required) STEP 2, Remove top and attach the waste and tapware according to their manufacturer s directions. STEP 3, Apply a continuous bead of silicone around the top edge of the cabinet. STEP 4, Place top onto the cabinet ensuring that it is overhanging evenly on both sides and that the back rests flush against the wall. Wipe off all excess silicone. STEP 5, Connect the water supply and the waste outlet as per their manufacturer s directions, run both hot and cold water and check for leaks. Repair if necessity. STEP 6, Use silicone to seal between the top and the wall. To create a professional finish use masking tape on the wall and the top allowing a big enough gap between the two to apply the silicone. Run a gloved finger along the silicone to smooth it out and cover both edges of the masking tape. Peel the masking tape away before the silicone starts to set. (NOTE: Allow 48 hours for the silicone to dry before using) Page 5

Cleaning and Maintenance IMPORTANT NOTICE This cabinet is made from water resistant board only (not water proof), so it is important that care is taken to clean up all water spillage. For personal and product safety, ensure that the HOT water supply is regulated to a maximum of 55 C. Daily Care: To protect the finish of your vanity, use a non-abrasive soap or liquid detergent to clean. Using an abrasive cleaner will dull the finish of your vanity top and cabinet and continued use may cause permanent damage to their finish. Staining: Do not use strong chemicals such as bleach or ammonia to clean your vanity. The finish on your vanity is highly resistant to staining by most household agents, but repeated exposure to strong chemicals may cause discoloration. Scratches and Dents: Your vanity top, although hard, can be scratched with a hard or sharp object. Most small surface scratches can be easily removed by applying a fine automotive rubbing compound and buffing. Deeper scratches may require sanding lightly with a 600+ grit wet sandpaper, followed by rubbing compound and automotive wax to restore the finish. Page 6