Super 2.5-EZ. Sheetrock Wall. Sheetrock Wall 10'-10" 2.5V-EZ 2.5V-EZ 2.5A-EZ

Similar documents
2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5QS

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Installation Instructions

MUDGUN Drywall Finishing System

How to Install Elite Bayside Beadboard

Tape Measure Metal Clippers Screw Bit Set With Extensions

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

Wall Installations. Chapter 16 Wall Installations 16. 1

Installation Instructions

Installation Instructions

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

Installation Guidelines

HAND TOOL NOTES For each tool picture and name, please write what it s used for. You will have a quiz on this.

Installation Instructions for. Before You Begin TOOLS REQUIRED

SMARTfit Functional and Brain Fitness Training Multi-Station Trainer Installation for Stud and Concrete Walls (US)

All Terrain Flares 2014 Chevy Silverado

Rebuilding Together Alexandria s Volunteer Training February 11 th, 2017

Closet System Installation Manual

INSTALLATION MANUAL STORAGE

SMARTfit High Intensity Cognitive Training. SMARTfit Trainer Installation Manual for Stud and Concrete Walls Revision 1.3

Balustrade Systems / Installation Instructions

Flash Coving. Chapter 8 Flash Coving 8. 1

CUSTOM SHUTTERS IN-A-BOX

Installation Instructions Palladium Square Edge Panels

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Dura-Lock Roof System

Salter Industries Spiral Stair

Installation Instructions

NX7 SERIES 5-1/2 HANDRAIL

10 Octagon Cedar Gazebo Assembly Instructions

Installation Manual Flat Track Series

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue

Installation Instructions for. Handrail Component System

FlowBar Architectural Linear Diffusers F L- 1 0 / F L-15 / FL-2 0 F L- 2 5 / F L-30 I NSTA LL AT IO N & OPER AT I ON M AN UA L

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

Grand Garden Chalet 6X3 Assembly Manual - Costco

Classic Woodworking. Installation Guide SW Jacktown Rd, Beaverton, OR Toll Free (800) Phone (503) Fax (503)

Cabinetry Installation

Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

MyStudio VS53 Versa Sweep Setup Instructions

Safety First! Review the Safety Checklist before performing tasks in this chapter.

How-to-Install. Laminate Countertops and Sheet Laminate. FREE brochure Reverso en español

How To Install Windows: Nail-Fin Application

Installation Instructions and Details

Repairs. Chapter 10 Repairs 10. 1

BARRIER FREE SHOWER PAN INSTALLATION INSTRUCTIONS

Traditional Undermount: S Method (Undermount):

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

Installation Instructions

Exterra Installation Guide

Installation And Care Instructions. Vertical Honeycomb Shades

#70 grit sand Putty knives, sized as needed #1 fine gray sand Corner tools Milestone acrylic liquid

Repairing Sheet-Molded Compound (SMC) With Epoxy

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Desk/Wall-Mount Rack

176 S. New Holland Road Gordonville, PA Tel: Fax: Playhouse Loft

INSTALLATION AND CARE INSTRUCTIONS

Frameless Inline Door With Return QCI5263

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

Aluminum Clad Wood Window Field Mulling and Stacking Instructions

Canadian Installation Guide

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

WOODWORKS Walls. Installation Instructions WALL

Drill Press Storage Cart

Wallbeds Northwest ENDURA CABINET PLANS AND INSTRUCTIONS

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

1. TOOLS + MATERIALS REQUIRED

176 S. New Holland Road Gordonville, PA Tel: Fax: Castle Loft

PORTA-FAB Cleanroom Wall Systems

Laminate Cabinet Installation Instructions

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

INSTALLATION AND CARE INSTRUCTIONS

Locker Installation Guide. Lockers Available From CES Company Phone: Fax:

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

I n s t a l l a t i o n I n s t r u c t i o n s

HR175 Sash Replacement Kit Installation Instructions

Independent Containment System (ICS)

Frameless Inline Door QCI5248

Sawn Baluster Sizing and Installation Guide

ATLANTIS RAIL Contact Information

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

RECOMMENED TOOLS FOR MACHINING COUNTERTOPS

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

Installation Instructions Stainless Steel Wall Panels

Installation Instructions. Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX

Steel Sound Enclosure

Install Like the Pros

FIXED PANEL SLIDER QCI5241

Transcription:

Super 2.5-EZ Company: 30 Vertical Radius Phone: 36 Horizontal Radius w/12 Wide Flat Expansion in Corner Non-Parabolic Corner Easy Installation Built-In System Date: 24'-1/2" 20'-1/2" 16'-1/2" 12'-1/2" 8'-1/2" 4'-1/2" 2.5V-EZ 4'-1/2" 8'-1/2" 12'-1/2" 16'-1/2" 20'-1/2" 24'-1/2" 10'-10" Sheetrock Wall 2.5V-EZ Sheetrock Wall 10'-10" 6'-10" 2'-10" 2.5B-EZ 2.5B-EZ 2.5B-EZ 2.5B-EZ 2.5B-EZ 2.5A-EZ 2.5B-EZ 2.5B-EZ 2.5B-EZ 2.5B-EZ 2.5B-EZ 6'-10" 2'-10" Studio Dimensions (L x W x H) 2.5A-EZ 2.5B-EZ 2.5V-EZ www.procyc.com

Pro Cyc s new System Super 2.5EZ * is an economical way to achieve professional results! *Patent Pending Create the most affordable professional quality cyc wall/studio on the market, backed by Pro Cyc s outstanding engineering, design and reputation. System Super 2.5EZ is ideal for: Small-to-medium size green screen and video studios where consistent lighting and superior sound are important Small-to-medium size photography studios that require consistent lighting to achieve an infinity effect ProCyc.com

N E W 2.5V-EZ The Pro Cyc Advantage System Super 2.5EZ is less expensive than other non-parabolic cycloramas constructed using two or more columns of modules in the corner. A single column of System Super 2.5EZ modules creates a non-parabolic corner that is easy to light and less likely to reflect sound than traditional cycloramas with continuous curves in the corner. 30-inch vertical-radius floor coves combine with a 36-inch horizontal radius in the corner. This 36-inch radius has a 12-inchwide flat expanse in the center. The resulting non-parabolic corner renders excellent results as a green screen or infinity studio for video. Pro Cyc s new System Super 2.5EZ is made out of High-Impact ABS Plastic. This is the same tried-and-true material we use to make System Super 1.5EZ, System Super 1.5QS, System 3EZ, System Super 3EZ, System 4BI, System 4FS and System 4QS. 2.5B-EZ 2.5A-EZ The EZ trim installation allows you to build a cyc wall into your existing walls with very little invasive construction. The transition from floor-to-wall and/or wall-to-wall is smooth and requires less space than our larger radius systems. Because the corner is nonparabolic with a 12-inch flat center expansion, it reduces noise reflection and provides a longer sweep horizontally for smoother lighting. All of the modules in System Super 2.5EZ are trimmed and ready to assemble and install into your wall. These modules have a tapered edge for an even transition to adjacent surfaces. This creates an absolutely seamless joint after taping and mudding. Typical Users of System Super 2.5EZ Small-to-medium TV/video/green screen production studios In-house corporate video/green screen production studios Photographers with small-to-medium studio environments ProCyc.com sales@procyc.com 503-723-7448

ASSEMBLY INSTRUCTIONS SYSTEM SUPER 2.5 EZ Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your cyc, so please take a minute to visually inspect the packaging before you sign the receipt to accept the shipment. Are there any signs of damage, including puncture holes or signs of crushing? If there is visible damage, insist that the damage be noted on your bill of lading and that either the delivery person or a representative from the delivery company be present when you open the packaging. Pro Cyc will not honor claims for damage if the bill of lading has been signed without noting and alerting the carrier of damage. The only exception is if the damage is internal. In that case, keep the packaging so it can be inspected. Review your Pro Cyc shipment to make sure all items listed on your quote match up to the items shipped. If there is a discrepancy, please call us right away to get the problem resolved. Let s Assemble Your Cyc: 1. Tools You will need the following tools & supplies for assembly of the cyc: Circular saw Stud finder Sockets and drivers; 7/16 Clamps or vise grips Chalk line 24 long level Carpenter s square 1/8 drill bit Drift pin to align 9/32 holes Drill motor Roto-hammer with 5/32 masonry drill bits (only if attaching cyc to concrete wall or floor) Canned air Framing hammer Screwdriver (Phillips & flat) Palm sander w/60-grit sandpaper Clean shop towels or cloths 4 minimum width horizontal furring strips or plywood enough to match up to total length of floor cove cyc-to-wall contact area Vertical furring strips or plywood - same width as the distance on center between studs in your wall. The height of these strips needs to be 24 inches less than the overall height of your finished cyc. You should have two furring strips or pieces of plywood this size for every corner in your cyc. (L-shaped cycs have one corner; U- shaped cycs have two corners.) All furring strips or plywood should be the same thickness as the sheetrock in your wall Sheetrock knife Drywall tools Pro Cyc s Grey Bonding Primer Paint Paint supplies ABS plastic glue or cement (Available in plumbing supply stores. This adhesive is only required if you need to trim your cyc to fit your studio.) 2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion. Be sure to also sand the outside edges and the side flanges with 60-grit sand paper. This will provide for better joint compound adhesion and help create a nonslip surface when bolting the modules together. Sanding before assembly will help make sure outside edges coming in contact with the joint compound are not missed. After sanding, clean each module with a damp cloth. Dust from the sanding process can interfere with paint and joint compound adhesion. This is also a good time to clean the sanding dust from your studio. 3. Framing Begin in the corner of the wall where you will remove two strips of sheetrock and replace them with furring strips or plywood so you have a solid surface to which you attach your Pro Cyc corner modules. When installing a Super 2.5 EZ corner, you will need to assemble the corner modules prior to measuring for your wood furring strips. Bolt together Part #2.5A-EZ and #2.5V-EZ using 1/4-20 x 1 Bolts, nuts and washers. Make sure there are two washers used for each hole. Before tightening the bolts completely, make sure the faces of these corner modules are aligned perfectly. When the corner assembly is complete, slide it into the corner of the room and mark where the #2.5V-EZ coves meet the wall with vertical lines. Make sure that both sides are equidistant from the corner and are approximately 40 inches from the corner. Pull the corner assembly away from the walls, so you have room to work. Next, using a stud finder, locate the studs in your existing wall. From the lines marking the PATENT PENDING Page 1 of 5

vertical edges of your corner section, locate the closest stud inside each line and outside each line. Remove the sheetrock between the two studs on the left and the two studs on the right. Begin this process by cutting the sheetrock with a knife or circular saw 24 inches above the floor and up to the planned height of the top vertical module. (BE CAREFUL NOT TO CUT COMPLETELY THROUGH THE SHEETROCK WITH A CIRCULAR SAW. IF THE STUDS ARE METAL THE DAMAGE CAN BE STRUCTURAL. COMPLETE THE CUT WITH A SHEETROCK KNIFE.) Make the cuts through the sheetrock, along the center of each stud. Remove the sheetrock between the studs and replace it with plywood or furring strips that are the same thickness as the sheetrock you removed. Now you need to remove horizontal strips of sheetrock along the top of the floor coves length and width of your cyc and replace them with plywood or furring strips so you have a solid surface to which you attach the top of your floor-cove modules. Begin in the corner and measure out at least as long and wide as your cyc. Terminate each strip into the stud that is equal to or longer/wider than your cove unit. Each strip should butt up to the outside edge of the furred out vertical strips you have in place. Measure up from the floor 24 inches and mark the wall at either end of your cyc. Next, mark the wall 4 inches above your first mark. Use a chalk line to mark the area to be removed. Using a sheetrock knife or a circular saw, remove the sheetrock between your two lines and replace it with plywood or furring strips that are the same thickness as the sheetrock wall. (AGAIN, BE CAREFUL NOT TO CUT COMPLETELY THROUGH THE SHEETROCK WITH A CIRCULAR SAW. IF THE STUDS ARE METAL THE DAMAGE CAN BE STRUCTURAL. COMPLETE THE CUT WITH A SHEETROCK KNIFE.) NOTE: Adding an additional layer of sheetrock (on top of your existing sheetrock with furring strips) will help with soundproofing and it will also render an improved fire rating. If you choose to install a second layer of sheetrock make sure to use drywall screws that are long enough to reach the furring strips when you attach the Pro Cyc modules to the wall. 4. Trimming Your Cyc to Fit Your Studio (See Figure L) Snap a chalk line at the desired length and use a circular saw to cut the module to the size. Next, cut the remaining part one inch from the flanged end so you can re-attach the flange. Clean off any burrs or debris from the plastic before using ABS adhesive or cement (available in plumbing supply stores) to fasten the flanged end behind (under) the cut-to-length module. Clamp the parts together until the glue is dry. You will need to trim the floor and/or wall side of the flange back to the point where it will allow you to align the face of the trimmed module with the face of the adjoining module. 5. Assembly With your plywood or furring strips in place, begin to assemble your Pro Cyc modules. Before assembly, make sure that the flanges on the modules do not prevent the cyc from fitting flush to the floor or wall. If a flange holds a cove end off the floor or wall, simply grind down the flange in that area. Assemble your cyc away from the walls so you have adequate space to work. Begin by standing a #2.5B-EZ module on its flanged side. Next, place a second #2.5B-EZ on top of the first one and align the holes with an alignment tool such as a drift pin, or even a bolt. LOOSELY bolt the two parts together using a 1/4-20 x 1 bolt, washer, washer and nut. When all of the holes are loosely fitted, tighten the bolts one by one, making certain that the face of the coves remain flush. Repeat this process with all #2.5B- EZ cove pairs that form each wall of the cyc. Attach any remaining #2.5V-EZ vertical cove modules above the corner module(s). Install the 1/4-20 x 1 bolts, nuts and washers using two washers for each bolt. Before final tightening, use the straight edge to make sure the modules are flush on the face. Repeat this procedure for each corner module. Next, use as many people as necessary to fasten one pair of bolted-together #2.5B-EZ floor cove modules to the corner group assembly. Bolt the pair to the corner group making certain that the faces remain flush when tightening the bolts. This should be done on both sides of the corner assembly; and both sides of all corner assemblies if the cyc has more than one corner. 6. Attach the Cyc Corner(s) to the Wall After the first pairs of #2.5B-EZ floor modules have been attached to the corner group(s) and you have checked to make sure the modules are all flush on the face push the cyc unit into place in the corner and along the wall. When the entire unit is in place, continue to shift the cyc back and forth until all areas seem to be aligned correctly against the wall and floor. Use a level and snap chalk lines along the perimeter of the cyc making sure it is aligned perfectly PATENT PENDING Page 2 of 5

vertical in the corner and perfectly horizontal as it progresses along the floor. These chalk lines will be used for reference as more modules are added to the cyc. Next, attach the corner modules to the wall. Make sure the modules remain perfectly vertical and do not drift left or right as you move up the corner and proceed to the top of the corner-cove assembly. Use a 1/8-inch drill bit to drill through the holes in the modules and into your plywood or furring strip. Work your way up the corner and attach the cyc to the wall with 1-1/4 Phillips drywall screws. After attaching the corner and vertical modules, install 1-1/4 Phillips drywall screws in the first five holes along the top of the #2.5B-EZ floor coves that are closest to the corner assembly. Make sure the modules remain perfectly horizontal and do not drift up or down as you move from the corner assembly. It is now time to attach the next pair of #2.5B-EZ floor coves. Gently pull the first pair of floor coves just far enough away from the wall to allow access for bolting the flanges to the next pair. Make sure the modules are all flush on the face before tightening the 1/4-20 x 1 bolts, washers and nuts. Continue to install 1-1/4 Phillips drywall screws along the top of the #2.5B-EZ floor coves and repeat the above steps until all floor coves are attached to the wall(s). 7. Fastening the Bottom Edge to the Floor After the top and sides of the corner modules and the top of your floor coves have been attached, it is time to position and fasten the bottom of your cyc to the floor. Using both hands, grab the cyc from underneath, pull it forward, and then let it fall gently into place. To secure the cyc to the floor, begin in the corner and work toward each end of the cyc. Drill through the cove modules into the floor. If you are attaching to concrete, you should use a rotohammer and 5/32 carbide masonry drill bits to install 3/16 x 1-1/4 flat-head Phillips concrete screws. Drill the holes a minimum of 1-1/2 deep. If you are fastening into a wood floor, you should use 1/8 drill bits to install 1-1/4 Phillips drywall screws. Before installing the screws blow out each hole with canned or compressed air. 8. Finish the Joints and the Tapered Edge at the Floor The tapered edge at the floor may be done either simultaneously with the joint mudding or subsequent to the joints. The completed feathered edge at the cyc-tostudio-floor transition will typically extend 4 to 6 in front of the front edge of the cyc modules. This feathered edge completes the radius of the cove module. Make sure that the surfaces of all modules are properly sanded (see Step 2) and wiped down in order to remove sanding dust. Use a self-adhesive fiberglass mesh tape on the joints that transition from the coves to the wall and from the coves to the floor. Be sure to press the tape into the crack with your finger as you apply the tape. DO NOT USE FIBERGLASS MESH TAPE AT THE JOINTS BETWEEN MODULES. THESE AREAS ARE NOT RECESSED ON THE MODULES TO ACCOMMODATE TAPE. Use a 90-minute drywall mud such as Durabond 90 Setting Type Joint Compound to mud the joints. DO NOT USE EASY SAND JOINT COMPOUNDS, AS THEY HAVE POOR TACKING QUALITIES. ALLOW PLENTY OF TIME FOR THE MUD TO COMPLETELY DRY BEFORE APPLYING SUBSEQUENT COATS. This is because moisture can only escape through the face of the joint. Wet sand or dry sand the joints and re-coat with the 90-minute mud. Wet or dry sand again. For the third and final coat, use a regular box or bucket mud, such as Beadex All Purpose Joint compound, to float out the seams. Sand and wipe down the cyc one last time before painting. Do not cap off the ends or the top of the corner on your cyc. It is important to allow the free flow of air behind the cyc. Temperature differences between the front and the back of the cyc can create uneven expansion and contraction. This can cause drywall mud to crack. 9. Prime & Paint the Cyclorama Wipe the entire cyc with a clean damp cloth including the sheetrock wall. It is now ready to be primed. Apply one generous coat of Pro Cyc s Grey Bonding Primer using a 9 roller with a 3/8 nap. Use a 3 roller in the corner area. Paint your cyc with either a roller or an airless spray gun. See Pro Cyc s Helpful Construction Hints (available for download on our website) for useful tips on painting your cyc with a roller. Repaint as often as necessary over the life of the cyc. Clean between each coat. Wearing surgical booties and/or putting plastic on the floor coves during rehearsal or studio prep will prolong the time between new coats of paint. PATENT PENDING Page 3 of 5

10. Questions? Please give us a call at: (503) 723-7448. You can also email us at: info@procyc.com Instructions, schematics, helpful construction hints and other recommendations can be found on our website: www.procyc.com System Super 2.5 EZ Existing Studs PATENT PENDING Page 4 of 5

PATENT PENDING Page 5 of 5

To prevent cracking in Pro Cyc joints Pro Cyc Helpful Construction Hints Fiberglass System 1.5EZ and System 5 Only: Grind flanges and surface where joint mud goes before bolting modules together. o Pro Cyc recommends a very rough grind using a palm sander with 30-grit sandpaper. Drill and bolt flanges as close to face of cyc modules as possible. Be sure to allow for width of washers. Use bonding agent in joint area this helps mud bond to cyc modules. o Pro Cyc recommends a light spray mist of 3M Super 77 Spray Adhesive in the joint area. Pro Cyc Systems Super 1.5EZ; Super 1.5QS; 3EZ; Super 3EZ; 4BI; 4FS and 4QS: Grind flanges and surface where joint mud goes before bolting modules together using a palm sander with 60-grit sandpaper. (Same grit used to prep surface of modules before priming and painting.) All Pro Cyc Systems: Use Durabond 90-Minute Sheetrock Setting Type Joint Compound for the first two coats of mud. o Do not substitute other products for Durabond 90-Minute Sheetrock Setting-Type Joint Compound. o Do not use Easy Sand or Light varieties. o Let dry up to 24 hours (in high humidity) between each coat. When it is dry it will turn white. (This could be as little as just a couple of hours in very low humidity.) The top coat (third coat) of mud, use topping mud or regular wallboard compound. o Pro Cyc sells Beadex All-Purpose Joint Compound. At the floor, sweep dry mortar mix behind the floor modules and then mist the backside for hardening. o This step reinforces the leading edge of the floor modules. Pro Cyc s Virtual Green Chroma Key Paint & Grey Bonding Primer System Other chroma key paints may vary significantly in color or shading from Pro Cyc s Pro Matte Flooring failing to produce the intended result. Pro Cyc s Grey Bonding Primer o One generous coat. o Apply using a 9 roller with 3/8 nap. o Use a 3 or 4 roller with 3/8" nap to prime Pro Cyc s corner parts. Pro Cyc s Virtual Green Chroma Key Paint o Minimum two generous coats (possibly three coats). o Use a 9 roller with a 3/8 nap on the first coat and a 3/4 nap on the final coat(s). o Use a 3 or 4 roller to paint Pro Cyc s corner parts. o Make sure to keep extra paint on hand for touchups. When Painting White or Other Color: Primer Pro Cyc s Grey Bonding Primer o One generous coat. o Apply using a 9 roller with 3/8 nap. o Use a 3 or 4 roller with 3/8" nap to prime Pro Cyc s corner parts. Paint Use any high quality, flat (non-glossy) interior latex paint. o Recommended three generous coats of paint using a 5/8 to 3/4" nap roller. o Use a 3 or 4 roller with 5/8 to 3/4" nap to paint Pro Cyc s corner parts. o Make sure to keep extra paint on hand for touchups.