Top Installation Booklet

Similar documents
BJ8 Top Installation Instructions

Pocket Door Installation Instructions

Revision Date: April 01, Paramount Enclosure

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

Treviso POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Victorian Playhouse Manual

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Cape Cod Manual. Little Cottage Co. PO Box 455 Berlin, OH Little Cottage Co.

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

10x12 Victorian Manual

TUBULAR FRONT END KIT INSTALLATION INSTRUCTIONS MUSTANG

Tudor Webasto Sun Roofs

Dura-Lock Roof System

Building Instructions

Frameless Inline Door With Return QCI5263

NEXUS SERIES CABINETS

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

Jeep Cherokee Door XJ Set Part # Revision J

PAT installation of a Sun Dome over a in-ground

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

Make your own Blacksmithing Bellow By Bobby Floyd (Jan. 2014)

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

Kentucky 4H Wood Science Plans Notebook. Plans Level 1

Instructions for Installing Vinyl Stair Treads with Musson 3 Wide Double-Face Tape

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5QS

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

DECKING INSTALLATION GUIDE

Wood Duck Nest Box Design & Assembly Directions

How To Install Windows: Nail-Fin Application

Jeep Cherokee 4-Door XJ Set Part # Rev

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Country Cabin. Assembly Manual. HomePlace Structures

Land Rover Defender 90/110/ th Anniversary Style Front Cage Fitting Instructions

Installation Instructions for Siding

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Fabric Replacement Top and Doors

Chapter 18. Interior Doors

Underside Standard Installation Instructions For Existing Decks

SYSTEM 42 SCREEN CASSETTE WITH 30mm SIDE RAIL

COMPLIMENTARY WOODWORKING PLAN

Jabiru Aircraft. Fit Ailerons

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Frameless Inline Door QCI5248

Kentucky 4H Wood Science Plans Notebook. Plans Level 2

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

ARTS AND CRAFTS CHAIR

Assembly Instructions

McCue Bumper Installation Instructions

Sailcloth Fabric Replacement Top and Doors with Tinted Side and Rear Curtains Installation Instructions

DOCK WEDGE - STANDARD

10x12 Cape Cod Manual

Series 1100 Aluminum Door Canopy

Fitting the Roof Lining of a Traction Avant

Sliding Glass Door Assembly and Installation Guide

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

CUT OUT FLARES INSTALLATION INSTRUCTIONS FOR 20017, 20018, F100-F150 F250-F350 P.U. & BRONCO CUT OUTS

Parts List. Description. Installation Instructions

SIDE SLIDING/ FIXED WINDOWS

Installation Guidelines

Gambrel Barn with Overhang Manual

Blue Ridge Yurts Assembly Instructions 10 Walls

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

Installation Guidelines

Installation Guidelines

Installation Instructions

INSTALLATION INSTRUCTIONS FOR & Chevy CUT OUT FLARE

Adlonco Holdings. Owner s Manual

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Double Screen Door Installation Instructions


Heavy Wall Applied Stop Tube Frame and Door Installation

Sunhouse. Assembly Manual

3Insert the second rod no. 4

The Festival Assembly Instructions

Make every component count.

Linear Open Style Suspended Ceiling Installation Guide

Assembly Instructions 10 X 10 Aluminum Roof Support

Balustrade Systems / Installation Instructions

Shed Assembly Instructions

INSTALLATION INSTRUCTIONS

Oakland II POCKET BILLIARD TABLE INSTALLATION MANUAL

Installation for Full Size Polaris Ranger Crew Doors

!! " # $ % & '! ( ) * +, -

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

Roof drainage system

Installation Instructions for. Handrail Component System

Installation Instructions

Cowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers

Frameless Inline Door QCI5254

THE GREEN CLUB PROJECT

Series 1500 Aluminum Door Canopy

Tackling America s To- Do List: Project Steps

RATICAL HARD TOP INSTALL

Firehouse Manual. Tools Needed:

Installation Instructions PREMIUM Replacement Top (Part # )

Sailcloth Fabric Replacement Top and Doors Installation Instructions

Bushwacker Jeep Flat Style Fender Flares Front Pair

BUILDING A STORM DOOR

Transcription:

Top Installation Booklet. CUT-AWAY VIEW OF COMPLETED TOP INSTALLATION Before tackling the replacement of the top material on a Closed Cars, it is best to have all necessary materials for the job near at hand. This will eliminate delays due to waiting for parts which failed to be ordered and running back and forth for needed tools. Below are two lists, one for tools and another for materials which will be helpful or necessary to complete the top installation. TOOLS; Claw hammer, razor blades (single edge), scissors, drill & bits, hack saw with fine blade, file, rubber hammer, wire cutters, and tape measure. MATERIALS (universal); U-shaped nails for chicken wire, top material top padding, chicken wire, tacks, nails, hidem-welt, caulking, zinc chromate primer, wood parts (if needed), and wood screws (flat head). With all necessary items obtained, the actual replacement of the top can begin. T-1

The first step is the removal of all old top material. This includes all old top covering, padding, wire mesh (if it is to be replaced), old nails, tacks and tar that may have accumulated over the years. Inspect wood - replace if rotten. Nails will not hold in rotting wood. We recommend the use of wood screws. Replace chicken wire if out of shape or rusting. Use wire cutters to trim excess wire mesh. *"..r'* ''.< ' The aging top in need of replacement. Note the cracks and accumulation of top dressing through the years. The first step is to cut out the old top. T-2

The removal of the old top moulding. Note that all of the top bows are to be arched and uniform. Note also that one has been cracked and is sagging. This one should be replaced.

After chicken wire will come placement of top padding. Trim so the outer edge falls within about an inch inside of where the moulding will run after installation. Padding is neither nailed nor glued to wire mesh. For further protection and prevention of punctures through the roof, some restorers have used a wool blanket on top of padding. This will give the top more fullness. Excess blanket material can & should be left alone and trimmed later with a razor blade. If blanket is much larger than needed, it can be trimmed with scissors being sure to leave 2"-3" hanging over. If you use a blanket be sure to caulk area around where the moulding will be nailed. desired. The top caulking is available separately if more is needed or Caulking is something that should be used sparingly. In addition to having a nicely installed top when completed, you are also striving to have a top that will not leak. Any oozing of caulking from under top material or moulding can be cleaned up after all other steps are completed. Installation of chicken wire. Completed installation of chicken wire. Please note that all sharp wire ends should be removed or pointed in a downward direction as not to puncture the new top. T-4

Cutting & measuring of top padding. Since most top padding available on the market todayis not wide enough it will be necessary to splice them together using that form as shown above. You will not have any problem with the shifting of top padding or any final appearance that it has been spliced. It is best to use a top sealant for tacking down the top. Use this liberally. T-5

Now you are ready totacktop material to body. Be sure grain of top covering runs from front to rear of car. Make an initial tacking of material: center of both sides, front and rear, being certain it is tight. Work your way to the corners a little at a time (3"-5") on each side toward the corners. Be sure that the grain of the top is running from the front of the car to the back and is perfectly straight. Tack it down first starting in the center and working out to the ends. This will give you a uniform appearance and will safeguard against any wrinkles. Cutting off of the excess top material. This can be done before or after the moulding has been installed. The front strip of the top moulding is now ready to be installed. Measure the front strip on the car and cut the front moulding strip to the approximate length. Strip should be pre-drilled to ease installation. Holes can be 5" apart if wood is in good condition. Regular finishing nails work well for the top moulding. Holes can be drilled the sixe of the nail shaft. With such a small head on the nail it can be wedged into the moulding and will eliminate any countersinking. A light sanding may be necessary to get nail heads flush with moulding. To fasten the front strip to the body, start T-6

at the center of moulding with nailing operation. follow recession where old strip was previously. When nearing the ends, Excess can be cut with a hack saw and burrs removed with a file, The completed top. On Fordors, Coupes &: Victorias where the top is an insert type (top does not go over edge & down to a gutter strip) follow approximately the same procedure used for the front strip. When approaching a curve at the rear corners, shorten the distance between nails. This will enable you to form the curve a little at a time. A butt joint should be used in moulding installation. ILLUSTRATION OF BUTT JOINT ON TOP MOULDING T-7

After moulding has been cut, fitted and nailed around entire top, excess top material can be trimmed -with a razor blade. ILLUSTRATION SHOWING WHERE TO TRIM EXCESS TOP MATERIAL FORDORS. COUPES & VICTORIAS Pictures of the 1929 Tudor Sedan showing how the top moulding goes across the top, the metal portion between the sun vis or and the sunvisor itself. T-8

End tips as found on those cars whose top material covers all the -way down to the side rain gutters as opposed to that in the Coupe which was pictured before (generally known as the insert top). The insert tops do not require trim pieces. On Pick-ups, Tudor Sedans & Coupes where the top material goes over the body edge and down to the gutter, the top material should be tacked down tight and with no wrinkles before gutter retainer is installed. When installinggutter retainer, drillholes 4"-6" apart in the retainer. Follow the same procedures on curves as previously described with front moulding. Use a rubber hammer or other soft tool and attach rain gutter strip to top leg of gutter retainer and press over lower leg of gutter retainer until gutter snaps on. T-9

Since top material will be hanging down from lower edge of gutter it can be trimmed with a single edge razor blade. top covering TRIMMING OF EXCESS TOP MATERIAL ON TUDOR SEDANS Trim on lower edge On Sport Coupes the rain gutter is fastened onto retainer the same way as on Tudor Sedans except gutters and retainers need no contouring. Cut to correct length and deburr with fileo Nail or screw retainer to body in correct position parallel with top of door. Attach rain gutter strip to top leg of retainer and with rubber hammer press over lower leg of retainer until gutter snaps into position. Wire welt is available to complete in- SPORT COUPE TOP Bow Bow Wire welt Hard board side - Wire welt T-IO.

SUNVISOR The sunvisor was completely covered by top material. The binding was located on the outer edge as shown on the drawing. On the ends where the visor was against the body the material was not sewn but brought together and tucked between. A reinforcement material was used along the top of the visor to prevent the screws holding visor to wooden header from tearing the material. When installing the upholstered visor it is best to start in the middle at the top and work out to the ends equally, trimming excess when finished. Reinforcement / Screw to I I X ^ header For machine screws Tucked flap \ Rain gutter Crown Crown Wire welt Cross section of all mouldings available and supplied as required in our kits. T-11