PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:

Similar documents
PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:

PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:

Acceptable Standards of Domestic Construction

PRODUCT INFORMATION MANUAL SECTION: 16 FIXED METAL AWNINGS FIXED METAL AWNINGS

6x6 Shed Plans and Building Guide

CIVIL TECHNOLOGY. 9. For the purpose of this paper, the size of a brick should be taken as 220 mm 110 mm 75 mm.

A Shell construction

NEW equinox INSTALLATION GUIDE Issue

Installation guide for 20/20

10x10 Shed Plans and Building Guide

Material List for Log Complete Packages

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

GROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)

PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:

ENGINEERING DRAWING N1

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Dave's Glossary of Construction Terms. by Dave Osborne (

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

CONSTRUCTION / HOUSING

NEW equinox INSTALLATION GUIDE Issue

Sections & Details VOCABULARY

DUTCH GABLE FREESTANDING CARPORT

GRAAD 12 NATIONAL SENIOR CERTIFICATE GRADE 12

RESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

Knowledge of SCG Roof Installation

Twin plate stanchions supporting folded metal panels

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

ROOM smooth cement f.f FLOOR LAYOUT

GLOSSARY OF TERMS SECTION 8

12x12 Shed Plans and Building Guide

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES

Title: Construct and install straight flight stairs Level: 4 Credits: 10

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

Roofing Terms Explained

Queenslanders. Design + Documentation. A presentation on the structural elements in the style and how to document. Peter Latemore

Nepal Housing Reconstruction Programme

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

A Generic Sauna Room Assembly Manual

8x8 Shed Plans and Building Guide

How To Build Decorative. Timber Awnings

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

ENGINEERING AND DESIGN

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

Carpentry/Carpenter CIP Task Grid

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

WHY YOU SHOULD USE TUFFLOOR. components

Springville Period Revival

bedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.

Recommended Slating Tools

Introduction 1. Nutec fascias and barge boards are ideal to cover up or replace weathered or rotten timber fascias and boards on old buildings.

LOS ANGELES COUNTY FIRE DEPARTMENT RECRUIT TRAINING

4. Components and Stairs

HOW TO BUILD A 12X8 SHED

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

HIP AND GABLE ROOF COMPONENTS

About Everite and Nutec 2. Nutec Bigsix Tiles : Compsition and Product Quality 4. Installation Guide 5. Support Structure 6

Earth-ship based home graduation design for a modified earthship to encourage the method of building with soil-based materials

Timber to Timber - Timber to Concrete - Timber to Steel

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

INSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS

How-To-build guide carport

DESIGN GUIDELINES ARCHITECTURE STYLES DRAFT

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

INSTALL GUTTERING. 2 - Planning the work. Care is needed in setting out the guttering accurately, but actually fitting it is relatively easy.

24 X32 3 CAR GARAGE POLE BARN STYLE FRAME

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Practical Information Sheet. awnings. Public Information Sheet N 6

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Installation Instructions

COLORBOND steel clad. Details for bushfire-prone AS BAL-FZ sites

Determine the stairway pitch based on tread and riser dimensions. For the main stairway in a house, the pitch can be no greater than 37º.

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

HowtoPlans..org. Skyline 10'x14' Garden Shed Plan

MASONRY TOOLS 370-AF SURE. SURE GRIP-FIBERGLASS HANDLE Sure ridged handle grip provides for comfortable feel and shock resistance

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

F I X I N G B R O C H U R E

8x12 SpaceMaker Garden Shed Assembly Manual

CONSERVATORY ROOF INSTALLATION GUIDE Issue


PRODUCT CATALOGUE 2018 A WORLD CLASS,MULTI PURPOSE BALUSTRDE KIT SYSTEM

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

How To Build An. External Closed Staircase

ENGINEERING GRAPHICS AND DESIGN EXAMINATION GUIDELINES GRADE 12

Eurocell conservatory roof system. Installation manual Issue 3

Salter Industries Spiral Stair

CLEARSPAN GABLE STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. WITH GAZEBO END ATTACHED PATIO

BARCLAY SPIRAL STAIRCASE SPECIFICATIONS

CIVIL TECHNOLOGY GUIDELINES FOR PRACTICAL ASSESSMENT TASKS. These guidelines consist of 27 pages and an annexure.

4256HM JAMES HARDIE MONOLITHIC CLADDING

Truman Heritage District Design Guidelines. Glossary

SCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

PV16 True View. PV16 True View. PV16 True View. PV16 True View. PV16 True View. PV16 True View. Close-coupled pair of panels 2274mm

Transcription:

EKURHULENI TECH COLLEGE. No. 3 Mogale Square, Krugersdorp. Website: www. ekurhulenitech.co.za Email: info@ekurhulenitech.co.za TEL: 011 040 7343 CELL: 073 770 3028/060 715 4529 PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS: THANK YOU FOR DOWNLOADING THE PAST EXAM PAPER AND ITS MEMO, WE HOPE IT WILL BE OF HELP TO YOU. SHOULD YOU NEED MORE QUESTION PAPERS AND THEIR MEMOS PLEASE SEND US AN EMAIL TO INFO@EKURHULENITECH.CO.ZA AND WE WILL SEND YOU A FULL DOWNLOAD VERSION OF THESE. HOWEVER PLEASE NOTE THAT THESE ARE SOLD FOR A SMALL AMOUNT OF R300 PER DOWNLOAD PER SUBJECT. ABOUT REGISTERING WITH OUR COLLEGE CONSIDER REGISTERING WITH OUR COLLEGE AND WE HAVE THE FOLLOWING TYPES OF LEARNING: ONLINE OR CORRESPONDENCE LEARNING. THIS IS THE MOST PREFARED ONE BY THOUSANDS PART-TIME CLASSES DURING SATURDAYS IF NEAR OUR OFFICES IN KRUGERSDORP FULL-TIME CLASSES IF NEAR OUR CLASSES IN KRUGERSDORP ABOUT EXTRA TEXTBOOKS IF LOOKING FOR TEXBOOKS FOR CERTAIN SUBJECTS I N1-N6 ENGINEERING STUDIES PLEASE SEND US AN EMAIL ON INFO@EKURHULENITECH.CO.ZA ABOUT VIDEO MATERIAL WE HAVE VIDEO MATERIAL FOR EXTRA UNDERSTANDING ON CERTAIN ENGINEERING FOR A FEE. REQUEST A QUOTE. SEND US AN EMAIL ON INFO@EKURHULENITECH.CO.ZA Website: www.ekurhulenitech.co.za Email: info@ekurhulenitech.co.za

T180(E)(M29)T APRIL EXAMINATION NATIONAL CERTIFICATE (8090023) 29 March 2016 (X-Paper) 09:00 13:00 REQUIREMENTS: A2 drawing paper This question paper consists of 8 pages.

(8090023) -2- T180(E)(M29)T DEPARTMENT OF HIGHER EDUCATION AND TRAINING REPUBLIC OF SOUTH AFRICA NATIONAL CERTIFICATE TIME: 4 HOURS MARKS: 100 INSTRUCTIONS AND INFORMATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Answer ALL the questions. Read ALL the questions carefully. Number the answers according to the numbering system used in this question paper. Use BOTH sides of the drawing paper. ALL the drawings must be done to the required scale. All the drawings must be neatly finished off with descriptive notes, titles and scales to conform with the SANS Recommended Practice for Building Drawings. Use your own discretion where dimensions are not given. A balanced layout must be maintained. All work you do not want to be marked must be clearly crossed out. Work neatly.

(8090023) -3- T180(E)(M29)T QUESTION 1: PITCH ROOF WITH BROSELEY TILES A house needs to be provided with a pitch roof covered with Broseley tiles. Draw, to scale 1 : 10, a vertical section through ONE HALF of the roof. The drawing must include tile details up to the ridge tile, the ridge rafter and a section through the gutter, swan neck and downpipe. The wall below the wall plate must be equivalent to SIX layers of brickwork. SPECIFICATIONS Roof pitch : 45 degrees Rafters : 150 mm 50 mm Tie beam : 150 mm 50 mm Ridge rafter : 175 mm 38 mm Wall plate : 114 mm 38 mm Roof covering : Broseley tiles Battens : 38 mm 25 mm at 100 mm centre to centre Eaves battens : 38 mm 25 mm double layer External wall : 220 mm Eaves : Open Eaves overhang : 300 mm Ceiling : Not required Gutter : 100 mm half-round asbestos cement fibre Swan neck and down pipe : 75 mm round asbestos cement fibre Facia : 203 mm 32 mm Ridge tile : Hogs back [25]

(8090023) -4- T180(E)(M29)T QUESTION 2: WOODEN STAIRS WITH OPEN RISERS A mezzanine floor needs to be provided with a wooden staircase from ground floor to the mezzanine floor. The stairs consists of wooden treads and a square steel tube stringer with open risers. The treads are fixed to the stringer by means of mild steel angle-iron brackets. The angle iron is welded to the stringer. Draw, to scale 1: 10, a vertical section through the staircase. The drawing must include the details of the stringer, THREE treads, the angle-iron brackets, part of the mezzanine floor and part of the ground floor. SPECIFICATIONS Stringer : 70 mm 70 mm steel tube Treads : 270 mm 40 mm Risers : 250 mm open, measured from top to top of treads Brackets : 20 mm 20 mm 4 mm mild steel angle iron Balustrade : Not required [12]

(8090023) -5- T180(E)(M29)T QUESTION 3: REINFORCED CONCRETE BEAM Draw, to scale 1 :10, a cross section through a double-reinforced beam The beam consists of concrete, stirrups, FOUR compression bars and FOUR tension bars. The drawing must include the stirrups, the compression rods, the tension rods and the concrete cover. Do not include any hatching on the drawing. SPECIFICATIONS Reinforced beam : 300 mm wide; 300 mm deep Tensile rods : 20 mm diameter Compression rods : 20 mm diameter Stirrups : 10 mm diameter Concrete cover : 25 mm [9] QUESTION 4: PLUMBING Produce a neat, proportional freehand drawing of a water closet pan in position. The drawing must include part of the floor, mortar to set the closet pan, the closet pan and the water seal. [8]

(8090023) -6- T180(E)(M29)T QUESTION 5: QUOIN IN DOUBLE FLEMISH BOND Draw, to scale 1: 10, the isometric views of TWO alternative plan layers of a rightangled corner of a two-brick quoin built in double flemish bond. Label only the Queen closer. SPECIFICATIONS Bond : Flemish Wall thickness : 440 mm Bricks 220 mm 110 mm 75 mm Queen closers : 220 mm x 55 mm 75 mm Height : 75 mm both alternative layers Left-hand length : 880 mm Right-hand length : 1045 mm Stopped ends : Not required [12]

(8090023) -7- T180(E)(M29)T QUESTION 6: SECTION AT JAMB FIGURE 1 shows a front view of a wooden window built into a 270 mm thick cavity wall. The wall is built with face bricks on the outside and ordinary stock bricks on the inside. The wall is plastered on the inside. Draw, to scale 1 : 5, the horizontal section as shown at A A. A A FIGURE 1 SPECIFICATIONS Jamb : 100 mm 7 5 mm Sash : 44 mm 44 mm Wall : 270 mm cavity Plaster : 19 mm Wall ties : SABS approved Window board : 180 mm 30 mm External sill : Brick on edge [17]

(8090023) -8- T180(E)(M29)T QUESTION 7: BASEMENT CONSTRUCTION Draw, to scale 1 : 10, a vertical section through the basement floor and wall. The drawing must include the foundation, the concrete floor, the over-site concrete, the hard core and part of the basement wall with the vertical and horizontal damp proof courses. SPECIFICATIONS: Concrete foundation : 990 mm 270 mm Basement wall : 330 mm (show detail up to 1000 mm) Hard core : 150 mm Over-site concrete : 75 mm Concrete floor : 100 mm Ground level : 1800 mm above the top of the concrete floor Horizontal DPC : 230 micron sheeting Vertical DPC : Asphalt paint.. [17] TOTAL: 100

MARKING GUIDELINE NATIONAL CERTIFICATE APRIL EXAMINATION 29 MARCH 2016 This marking guideline consists of 22 pages.

MARKING GUIDELINE -2- T180(E)(M29)T QUESTION 1: PITCH ROOF WITH BROSELEY TILES VERTICAL SECTION THROUGH BROSELY TILE ROOF SCALE 1 : 10

MARKING GUIDELINE -3- T180(E)(M29)T Part of drawing Marking criteria Possible Remarks mark Wall Correct position 2 Wall plate Correct dimensions 2 Hatching 2 Wall plate and wall Correct shape 2 Labels 2 Neatness 2 Rafters Ridge rafter Battens Tiles Ridge tile Overhang Fascia Gutter Swan neck Down pipe Total 12 Correct position 2 Correct dimensions 2 Hatching 1 Ridge rafter Correct shape 2 Label 2 Neatness 2 Total 11 Correct position 3 Correct dimensions 3 Hatching 1 Battens Correct shape 3 Labels 3 Neatness 3 Total 16 Correct position 5 Correct dimensions 5 Hatching Correct shape 5 Labels 5 Neatness 5 Total 25 Total 64 Divided by 3,2 20 Overall impression 3 Title 1 Scale 1 TOTAL 25 NB: NO marks should be allocated for any part of the drawing in the incorrect position.

MARKING GUIDELINE -4- T180(E)(M29)T SUMMARY QUESTION 1 Marking criteria Possible mark Marker Internal moderator Correct positions 12 Correct dimensions 12 Hatchings 4 2 Labels 12 2 Total 64 Divided by 3,2 20 Overall impression 3 Title 1 Scale 1 TOTAL 25 External moderator

MARKING GUIDELINE -5- T180(E)(M29)T QUESTION 2: WOODEN STAIRCASE WITH OPEN RISERS VERTICAL SECTION THROUGH WOODEN STAIRCASE WITH OPEN RISERS SCALE 1 : 10

MARKING GUIDELINE -6- T180(E)(M29)T Part of drawing Marking criteria Possible mark Stringer Correct position 1 Correct dimensions 1 Hatching Labels 1 Total 5 Treads Correct position 1 Correct dimensions 1 Hatching 1 Label 1 Total 6 Risers Correct position 1 Correct dimensions 1 Hatching Labels 1 Total 5 Brackets Correct position 1 Correct dimensions 1 Hatching Labels 1 Total 5 Total 21 Divided by 1,9 11 Overall impression 2 Title 1 Scale 1 TOTAL 15 Remarks NB: NO marks should be allocated for any part of the drawing in the incorrect position.

MARKING GUIDELINE -7- T180(E)(M29)T SUMMARY OF QUESTION 2 Marking criteria Possible mark Marker Internal moderator Correct positions 4 Correct dimensions 4 Hatchings 1 Correct shape 4 Labels 4 Neatness 4 Total 21 Divided by 1,9 11 Overall impression 2 Title 1 Scale 1 GRAND TOTAL 15 External moderator

MARKING GUIDELINE -8- T180(E)(M29)T QUESTION 3: REINFORCED CONCRETE BEAM VERTICAL CROSS SECTION THROUGH DOUBLE REINFORCED CONCRETE BEAM SCALE 1 : 10

MARKING GUIDELINE -9- T180(E)(M29)T Part of drawing Marking criteria Possible mark Beam Correct position Correct dimensions 1 Hatching 1 Labels 1 Total 5 Tensile rods Correct position 1 Correct dimensions 1 Hatching Label 1 Compression rods Stirrup Concrete cover Total 5 Correct position 1 Correct dimensions 1 Hatching 1 Labels 1 Total 6 Correct position 2 Correct dimensions 2 Hatching 2 Correct shape 2 Labels 2 Neatness 2 Total 12 Total 28 Divided by 5,6 5 Overall impression 1 Title 1/2 Scale 1/2 TOTAL 7 Remarks NB: NO marks should be allocated for any part of the drawing in the incorrect position.

MARKING GUIDELINE -10- T180(E)(M29)T SUMMARY OF QUESTION 3 Marking criteria Possible mark Marker Internal moderator Correct positions 4 Correct dimensions 5 Hatchings 4 Correct shape 5 Labels 5 Neatness 5 Total 28 Divided by 5,6 5 Overall impression 1 Title 1/2 Scale 1/2 TOTAL 7 External moderator

MARKING GUIDELINE -11- T180(E)(M29)T QUESTION 4: PLUMBING VERTICAL SECTION THROUGH FLUSING SYSTEM SCALE 1 : 10

MARKING GUIDELINE -12- T180(E)(M29)T Part of drawing Marking criteria Possible mark Closet pan Correct position 1 Dimensions 1 proportional Hatching Labels 1 Total 5 Floor Correct position 1 Correct dimensions 1 Hatching 1 Label 1 Total 6 Mortar Correct position 1 Correct dimensions Hatching 1 Labels 1 Total 5 Water seal Correct position 1 Correct dimensions 1 Hatching 1 Labels 1 Total 6 Total 22 Divided by 4,4 5 Overall impression 1 Title 1 Scale TOTAL 7 Remarks NB: NO marks should be allocated for any part of the drawing in the incorrect position.

MARKING GUIDELINE -13- T180(E)(M29)T SUMMARY OF QUESTION 4 Marking criteria Possible mark Marker Internal moderator Correct positions 4 Correct dimensions 3 Hatchings 3 Correct shape 4 Labels 4 Neatness 4 Total 22 Divided by 4,4 5 Overall impression 1 Title 1 Scale TOTAL 7 External moderator

MARKING GUIDELINE -14- T180(E)(M29)T QUESTION 5: QUOIN IN DOUBLE FLEMISH BOND ISOMETRIC VIEW OF TRHEE-BRCK QUOIN BUILT IN DOUBLE FLEMISH BOND SCALE 1 : 10

MARKING GUIDELINE -15- T180(E)(M29)T Part of drawing Marking criteria Possible mark BOND Correct bond 1 Correct dimensions 1 Hatching Labels 1 Total 5 WALL: Height Length Correct position Correct dimensions 2 Hatching Correct shape 2 Label 2 Neatness 2 Total 8 Bricks Correct position 1 Correct dimensions 1 Hatching Labels 1 Total 5 Queen closer Correct position 1 Correct dimensions 1 Hatching Labels 1 Total 5 Total 23 Divided by 2,09 11 Overall impression 2 Title 1 Scale 1 TOTAL 15 Remarks NB: NO marks should be allocated for any part of the drawing in the incorrect position.

MARKING GUIDELINE -16- T180(E)(M29)T SUMMARY OF QUESTION 5 Marking criteria Possible mark Marker Internal Moderator Correct bond 1 Correct position 2 Correct dimensions 5 Hatchings Correct shape 5 Labels 5 Neatness 5 Total 23 Divided by 2,09 11 Overall impression 2 Title 1 Scale 1 TOTAL 15 External Moderator

MARKING GUIDELINE -17- T180(E)(M29)T QUESTION 6: FINISHING AT WINDOW OPENINGS HORIZONTAL SECTION THROUGH SECTION A A SCALE 1 : 5

MARKING GUIDELINE -18- T180(E)(M29)T Part of drawing Marking criteria Possible mark Jamb and sash Correct position 2 Correct dimensions 2 Hatching 2 Correct shape 2 Labels 2 Neatness 2 Total 12 Wall, plaster and ties Remarks Correct position 3 Correct dimensions 3 Hatching 2 Wall and plaster Correct shape 3 Label 3 Neatness 3 Total 17 Window board Correct position 1 Correct dimensions 1 Hatching Labels 1 Total 5 External cill Correct position 1 Correct dimensions 1 Hatching Labels 1 Total 5 Total 39 Divided by 3,5 11 Overall impression 2 Title 1 Scale 1 TOTAL 15 NB: NO marks should be allocated for any part of the drawing in the incorrect position.

MARKING GUIDELINE -19- T180(E)(M29)T SUMMARY OF QUESTION 6 Marking criteria Possible mark Marker Internal moderator Correct positions 7 Correct dimensions 7 Hatchings 4 Correct shape 7 Labels 7 Neatness 7 Total 39 Divided by 3,5 11 Overall impression 2 Title 1 Scale 1 TOTAL 15 External moderator

MARKING GUIDELINE -20- T180(E)(M29)T QUESTION 7: BASEMENT CONSTRUCTION VERTICAL SECTION THROUGH EXTERNAL BASEMENT WALL TO SHOW THE VERTICAL AND HORIZONTAL DPC SCALE 1 : 10

MARKING GUIDELINE -21- T180(E)(M29)T Part of drawing Marking criteria Possible mark Concrete foundation Concrete floor Over site concrete Hard core Correct position 4 Correct dimensions 4 Hatching 4 Correct shape 4 Labels 4 Neatness 4 Total 24 Wall and plaster Correct position 2 Correct dimensions 2 Hatching 2 Correct shape 2 Label 2 Neatness 2 Total 12 Floor finishing Correct position 1 Correct dimensions 1 Hatching 1 Labels 1 Total 6 Vertical and horizontal dpc Ground level Remarks Correct position 3 Correct dimensions Hatching 1 Ground level Correct shape 3 Labels 3 Neatness 3 Total 13 Total 55 Divided by 4,6 12 Overall impression 2 Title 1 Scale 1 TOTAL 16 NB: NO marks should be allocated for any part of the drawing in the incorrect position.

MARKING GUIDELINE -22- T180(E)(M29)T Marking criteria Possible mark Marker Internal Moderator Correct positions 10 Correct dimensions 7 Hatchings 8 0 Labels 10 0 Total 55 Divided by 4,6 12 Overall impression 2 Title 1 Scale 1 TOTAL 16 External Moderator TOTAL: 100

EKURHULENI TECH COLLEGE. No. 3 Mogale Square, Krugersdorp. Website: www. ekurhulenitech.co.za Email: info@ekurhulenitech.co.za TEL: 011 040 7343 CELL: 073 770 3028/060 715 4529 REGISTERING WITH OUR COLLEGE CONSIDER REGISTERING WITH OUR COLLEGE AND WE HAVE THE FOLLOWING TYPES OF LEARNING: ONLINE OR CORRESPONDENCE LEARNING. THIS IS THE MOST PREFARED ONE BY THOUSANDS PART-TIME CLASSES DURING SATURDAYS IF NEAR OUR OFFICES IN KRUGERSDORP FULL-TIME CLASSES IF NEAR OUR CLASSES IN KRUGERSDORP ABOUT EXTRA TEXTBOOKS IF LOOKING FOR TEXBOOKS FOR CERTAIN SUBJECTS I N1-N6 ENGINEERING STUDIES PLEASE SEND US AN EMAIL ON INFO@EKURHULENITECH.CO.ZA ABOUT VIDEO MATERIAL WE HAVE VIDEO MATERIAL FOR EXTRA UNDERSTANDING ON CERTAIN ENGINEERING FOR A FEE. REQUEST A QUOTE. SEND US AN EMAIL ON INFO@EKURHULENITECH.CO.ZA Website: www.ekurhulenitech.co.za Email: info@ekurhulenitech.co.za