William Howard Taft High School

Similar documents
Marcus Moziah Garvey Elementary School

Jackie Robinson Elementary School

Amos Alonzo Stagg Elementary School

John Milton Gregory Elementary School

Robert Fulton Elementary School

Charles N Holden Elementary School

John Spry Elementary Community School

Wendell Smith Elementary School

Morton School of Excellence

Everett McKinley Dirksen Elementary School

Philip Rogers Elementary School

Architecture, Construction, and Engineering Technical Charter

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

Daniel S Wentworth Elementary School

Brian Piccolo Elementary Specialty School

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Jonathan Burr Elementary School

Richard J Oglesby Elementary School

George Washington High School

Langston Hughes Elementary School

John Harvard Elementary School of Excellence

Disney II Magnet School

EPIC Academy High School

Alexander Graham Bell Elementary School

Cyrus H McCormick Elementary School

Andrew Carnegie Elementary School

University of Chicago Charter - Carter G Woodson

Amandla Charter High School

William Penn Elementary School

Rufus M Hitch Elementary School

John Hancock College Preparatory High School

Urban Prep Academy for Young Men - West

Joseph E Gary Elementary School

North Lawndale College Prep Charter - Collins

George Washington Elementary School

Arthur E Canty Elementary School

George W Tilton Elementary School

Walt Disney Magnet Elementary School

Theodore Roosevelt High School

Phoenix Military Academy High School

University of Chicago Charter - NKO

John L Marsh Elementary School

Richard T Crane Medical Preparatory HS

Arthur A Libby Elementary School

Norman A Bridge Elementary School

Academy for Global Citizenship Elementary School

Henry H Nash Elementary School

Betty Shabazz Intl Charter - DuSable Leadership

Legacy Charter Elementary School

John F Kennedy High School

Disney II Magnet High School

Multicultural Academy of Scholarship

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

James Shields Middle School 2611 W 48th St Chicago, IL 60632

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

James Otis Elementary School 525 N Armour St Chicago, IL 60642

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

OCPS Submittal Register for Product Data and Shop Drawing Reviews

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

U of I Facilities Standards Updates for 2017

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

BUILDING DEPARTMENT CURRENT

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Metal Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner 1 GRE 6 377 1 5 69 377 SF $9,073 $9,073 84 LF $61,347 $61,347 Assessment Date: 3/6/2013 Page 1 of 22

DOORS Exterior FRP Door Exterior Steel Door Overhead Rolling / Garage Door Side Lite Store Front Door Transom Lite 1 GRE 6 25 BLU 5 6 5 7 3 BLU 5 6 BLU 5 21 4 BLU 5 23 4 25 EA $13,921 11 EA $8,192 20 EA $17,457 6 EA $4,485 25 EA $56,581 27 EA $22,623 $123,258 ENTRANCE Concrete Exterior Stairs Concrete Ramp Power Door Operator and Controls Ramp Handrails Stair Handrails Stone Stairs 1 GRE 6 722 GRE 6 64 GRE 7 1 30 GRE 6 38 108 BLU 5 68 8 722 LF $77,435 64 LF $8,923 1 EA 130 LF 146 LF $305 76 LF $30,602 $117,265 FOUNDATION Concrete Foundation 1 GRE 6 330 2,920 3,250 LF $147,318 $147,318 LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 1 GRE 6 7 8 7 EA $3,504 18 EA $3,861 $7,365 Assessment Date: 3/6/2013 Page 2 of 22

LINTELS Lintels - Concrete Lintels - Steel Lintels - Terra Cotta PARAPET Coping - Terra Cotta Parapet > 30" Height Parapet 16" to 30" Height ROOF SYSTEM 1 GRE 6 35 2,122 0 635 1 6 30 2,742 BLU 5 654 517 GRE 6 942 2,090 1 LF 2,157 LF $95,375 645 LF $3,933 $99,307 2,788 LF $9,591 1,171 LF $396,514 3,032 LF $736,240 $1,142,344 Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping 1 GRE 6 4 65 1,145 90 GRE 6 2,360 146,090 GRE 7 78,250 GRE 7 69,820 4 LF $74 1,310 LF $17,696 190 SF $3,396 148,450 SF $1,061,940 78,250 SF 69,820 SF $1,083,107 SUPERSTRUCTURE Concrete Steel with Clay Tile Arch 1 GRE 7 262,500 GRE 7 121,000 262,500 SF 121,000 SF Assessment Date: 3/6/2013 Page 3 of 22

WALLS Brick Precast Panel Wall Stone - Cut Terra Cotta 1 GRE 6 275 36,385 37,375 GRE 6 27,180 GRE 6 2,932 GRE 6 700 790 74,035 SF $844,928 27,180 SF $179,567 2,932 SF $41,928 1,490 SF $197,769 $1,264,192 WINDOWS Storefront Windows Window - Guards perforated Windows - Casement Aluminum Double-pane Windows - Casement Lexan Windows - Casement Steel Windows - Decorative Windows - Sash Aluminum EXTERIOR ELECTRICAL EMERGENCY SYSTEM 1 BLU 5 600 285 GRE 6 450 5,185 YEL 4 29,973 YEL 4 54 GRE 6 736 YEL 4 88 885 SF $30,785 450 SF 15,185 SF $349,604 29,973 SF $3,451,199 54 SF $14,780 736 SF $4,210 88 SF $11,711 $3,862,289 $7,916,865 Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency generator 60 to 100 KW diesel - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs 1 GRE 6 4 4 GRE 6 8,123 GRE 6 58,218 GRE 6 36,961 1,771 GRE 6 7 GRE 6 63 8 EA $5,720 8,123 SF $11,035 58,218 SF $24,976 36,961 SF $19,556 11,771 SF $5,050 1 EA $8,151 7 EA $1,632 63 EA $14,685 Assessment Date: 3/6/2013 Page 4 of 22

Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection MAIN SERVICE Main Electrical service - Live Front - 2000 to 3000 A 120/208/3PH Main Electrical service - Live Front - 2000 to 3000 A 277/480/3PH Main Electrical service 2000 to 3000 A 277/480/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 277/480-120/208 ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 8 GRE 6 2 BLU 5 383,000 GRE 6 383,000 1 1 GRE 6 3 56 1 GRE 6 7 GRE 6 5 GRE 6 9 1 GRE 6 383,500 33,500 18 EA $4,196 2 EA $2,860 383,000 SF $547,690 383,000 SF $355,999 $1,001,548 1 EA $24,310 1 EA $30,388 1 EA $30,388 $85,085 59 EA $56,342 11 EA $15,730 7 EA $15,015 5 EA $6,078 9 EA $10,296 $103,461 $1,190,093 383,500 SF $137,101 133,500 SF $162,269 1 EA $2,145 $301,516 Assessment Date: 3/6/2013 Page 5 of 22

PUMP ROOM ASSEMBLY Fire Pump 25-50hp Jockey Pump SPRINKLER SYSTEM Sprinkler Heads Wet Sprinkler System FIRE PROTECTION MECHANICAL AIR CONDITIONING Chillers - Water Cooled - Centrifugal 201-300 tons Chillers - Water Cooled - Centrifugal greater than 400 tons Condensing - Ground Mounted less than 5 tons Cooling Tower - Spray Type - greater than 300 tons Heat Pump - Self Contained Window A/C AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Steam 4,000 to 8,000 cfm Air Handling Package - Single Zone - Steam 8,001 to 12,000 cfm Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Fan Coil - Electric 1 1 33,500 33,500 1 YEL 4 1 YEL 4 1 1 BLU 5 5 GRE 6 2 1 EA $3,718 1 EA $744 $4,462 133,500 SF $7,636 133,500 SF $76,362 $83,998 $389,975 1 EA $233,090 1 EA $35,750 1 EA $715 1 EA $55,770 1 EA $844 1 EA $215 $326,383 1 EA $15,730 1 EA $21,450 5 EA $80,080 2 EA $2,860 1 EA $1,187 Assessment Date: 3/6/2013 Page 6 of 22

Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling - Steam above 35,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam above 35,000 cfm Reheat Boxes With Hot Water Coils Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor greater than 20,000 CFM Roof Top - Multi Zone - Gas-Heating 10 to 20 tons Roof Top - Multi Zone - Gas-Heating greater than 45 tons Roof Top - Single Zone - Gas-Heating 21 to 30 tons Single Zone Built Up Air Handling - Steam above 35,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam above 35,000 cfm BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler greater than 200 HP Boiler Auxiliary - Steam Boiler greater than 200 HP Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System HEAT EXCHANGERS Heat Exchanger - Steam to Hot Water Shell Type BLU 5 2 BLU 5 3 BLU 5 2 BLU 5 3 25 GRE 6 500 1 YEL 4 4 YEL 4 1 BLU 5 9 GRE 6 2 1 GRE 6 3 GRE 6 3 GRE 6 2 1 GRE 6 3 GRE 6 2 1 1 2 EA $71,500 3 EA $171,600 2 EA $25,740 3 EA $64,350 125 EA $123,338 500 LF $31,460 1 EA $2,431 2 EA $11,011 4 EA $131,560 1 EA $50,050 9 EA $579,150 2 EA $12,870 1 EA $57,200 1 EA $17,160 $1,470,726 3 EA $89,661 3 EA $9,867 2 EA $4,290 2 EA $3,303 3 EA $858 2 EA $16,874 1 EA $1,087 $125,940 2 EA $25,883 $25,883 Assessment Date: 3/6/2013 Page 7 of 22

HEATING DEVICES Cabinet Heaters With Electric Coils Fin Tube Electric Fin Tube Hot Water Radiators - Steam Heater - Electric Heater - Gas Wall Heater - Electric MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Chilled Water 10 to 20 HP Pumps - Condenser Water 10 to 20 HP Pumps - Condenser Water 21-50 HP Pumps - Hot Water 21-50 HP Pumps - Hot Water less than 5 HP TEMPERATURE CONTROL Pneumatic System Thermostats - Pneumatic Zone Dampers 1 GRE 6 9 2 BLU 5 9 2 GRE 6 4 BLU 5 2 22 1 YEL 4 4,000 BLU 5 2,000,000 YEL 4 2 YEL 4 1 YEL 4 2 YEL 4 1 1 BLU 5 383,500 25 106 06 9 EA $4,505 12 LF $858 9 LF $772 12 EA $7,894 4 EA $5,720 1 EA $2,145 24 EA $13,385 $35,278 4 EA $114,400 1,000 LF $32,533 2,000 LF $98,956 1,000 LF $49,478 2 EA $53,625 1 EA $26,813 1 EA $5,720 2 EA $96,525 1 EA $10,725 $488,774 383,500 SF $1,645,215 231 EA $97,383 106 EA $15,158 $1,757,756 Assessment Date: 3/6/2013 Page 8 of 22

UNIT VENTILATION 1 Ventilators - Steam YEL 4 2 2 EA $31,460 $31,460 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof Mounted above 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM Lab Exhaust Hood Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen MECHANICAL 1 GRE 6 3 BLU 5 2 8 7 BLU 5 2 6 GRE 6 2 3 YEL 4 3 1 1 GRE 7 3 3 EA $1,502 17 EA $23,595 8 EA $12,298 5 EA $19,305 1 EA $1,030 4 EA $101,959 2 EA $1,716 3 EA $161,404 $4,423,605 PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR Storage Tank more than 500 gallons PIPING 1 1 3 5 EA $69,355 1 EA $11,440 $80,795 1 Domestic Piping - Cold Water from Risers to Fixtures YEL 4 250,000 133,500 383,500 SF $105,134 Domestic Piping - Cold Water Risers YEL 4 250,000 133,500 383,500 SF $204,783 Domestic Piping - Hot Water from Riser to fixtures YEL 4 250,000 133,500 383,500 SF $206,349 Domestic Piping - Hot Water Return Risers YEL 4 250,000 133,500 383,500 SF $143,036 Assessment Date: 3/6/2013 Page 9 of 22

Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping POOL SYSTEMS Pool Drain Piping Pool Filtration System Pool Hot Water Heater - Electric Pool Hot Water Heater - Steam Heat Exchanger Pool Supply and Return Piping PUMPS Domestic Booster Pump duplex Domestic Booster Pump simplex Sump Pump PLUMBING INTERIOR ADMINISTRATIVE SUITES YEL 4 250,000 133,500 YEL 4 250,000 133,500 YEL 4 250,000 133,500 YEL 4 250,000 133,500 BLU 5 383,500 BLU 5 383,500 BLU 5 383,500 1 50 YEL 4 2 GRE 6 200 1 BLU 5 2 1 1 BLU 5 2 3 383,500 SF $170,213 383,500 SF $715,386 383,500 SF $563,985 383,500 SF $358,544 383,500 SF $235,814 383,500 SF $180,974 383,500 SF $137,101 $3,021,318 150 LF $2,574 2 EA $434,720 1 EA $4,004 1 EA $1,301 200 LF $3,146 $445,745 3 EA $66,066 2 EA $18,876 5 EA $27,814 $112,756 $3,660,614 Ceiling - Lay-In Ceiling - Plaster/Drywall Ceiling - Splined 1 GRE 6 575 14,403 4,286,022 1,166 GRE 7 108 19,264 SF $34,151 2,188 SF $2,894 108 SF Assessment Date: 3/6/2013 Page 10 of 22

Flooring - Carpet Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile AUDITORIUM - DEDICATED GRE 6 646 4,286 2,258 GRE 6 78 GRE 6 905 2,369 10,890 28 4 53 GRE 6 4 38 282 GRE 6 3,114 6,691 50 11,102 4,938 GRE 6 200 830 7,190 SF $8,438 78 SF $199 14,164 SF $8,513 128 SF $966 67 SF $10 324 SF $37 9,805 SF $8,906 16,190 SF $26,903 1,030 SF $1,430 $92,446 Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System 1 GRE 7 213 GRE 6 498 GRE 7 8 GRE 7 1 213 EA 498 EA $18,330 1 EA $92,950 8 EA 1 EA $111,280 CORRIDOR Stairs - Terrazzo DOORS 1 GRE 6 26 26 LF $294 $294 Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door Transom Window 1 GRE 6 55 59 GRE 6 7 28 299 60 GRE 6 975 GRE 6 8 15,156 114 EA $15,573 394 EA $120,335 975 SF $18,125 23 EA $1,888 1,156 SF $21,490 $177,410 Assessment Date: 3/6/2013 Page 11 of 22

DRINKING FOUNTAINS Single Fountain 1 GRE 6 6 10 13 29 EA $15,444 $15,444 GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Exposed Ceiling - Plaster/Drywall Flooring - Sports Flooring Flooring - Wood Lighting - Lay-In Lighting - Metal Halide/Sodium Vapor Lighting - Pendant/Surface Scoreboards Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile 1 GRE 7 1,008,896 8,200 GRE 6 7,975 1,760,896 2,488 GRE 6 7,247 8,200 GRE 6 2 30 GRE 7 32 GRE 6 8 24 54 BLU 5 2 1 GRE 7 1,671 GRE 6 3,858 4,732 GRE 7 6,241 1,008 EA 10,096 SF $14,424 9,735 SF $68,197 4,384 SF $18,979 15,447 SF $54,718 32 SF $9 32 EA 86 EA $7,264 3 EA $15,780 1,671 SF 8,590 SF $95,770 6,241 SF $275,142 KITCHEN Ceiling - Splined Flooring - Concrete Lighting - Lay-In Wall - Concrete Block 1 GRE 6 890 3,060 460 BLU 5 4,410 GRE 7 75 GRE 6 3,300 2,120 4,410 SF $15,064 4,410 SF $20,811 75 SF 5,420 SF $9,438 $45,313 LIBRARY Flooring Carpet 1 GRE 6 6,370 6,370 SF $9,109 Assessment Date: 3/6/2013 Page 12 of 22

Lighting - Pendant/ Surface LOCKER/SHOWER ROOM GRE 7 126 126 SF $9,109 Benches Lockers Showers 1 8 34,346 334 GRE 6 2 32 14 52 LF $103 1,680 EA $66,058 48 EA $10,210 $76,372 LUNCHROOM Ceiling - Lay-In Ceiling - Splined Flooring - Carpet Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/Surface Serving Line Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile 1 8,445 15,605 5,330 195,430 GRE 6 335 35 GRE 7 108,200 54 562 GRE 7 1,973 18,445 SF $39,565 115 SF $247 1,605 SF $2,295 15,525 SF $21,922 1,430 SF $10,797 370 SF $240 108 LF 1,200 SF $3,432 716 SF $363 1,973 SF $78,860 MDF/IDF Finishes Ventilation and Cooling 1 GRE 7 450 GRE 6 450 450 SF 450 EA $630,630 $630,630 MECHANICAL/SERVICE ROOMS Janitor's Closet 1 GRE 6 2 6 8 SF $9 Assessment Date: 3/6/2013 Page 13 of 22

Mechanical/Service Rooms Storage Room STAFF RESTROOM GRE 6 43,820,579 3,739 43,820 SF $206,787 5,318 SF $7,451 $214,247 Accessories Ceiling - Plaster/Drywall Ceiling - Splined Floor Drain Flooring - Concrete Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet 1 GRE 6 294 3,758 2,458 GRE 6 4,412 2,990 3,913 04 132 GRE 6 22 30 GRE 6 3,372 GRE 7 14 80 3,079 4,728 GRE 6 92 84 GRE 6 2 2 16 29 GRE 6 3 35 29 GRE 6 62 66 0 59 4 108 1 1 GRE 6 6 18 63 4 53 GRE 6 250 444 2,236 GRE 6 246 1,093 265 GRE 6 492 9,982 GRE 6 780 816 7,936 5 86 6,510 SF $36,511 11,315 SF $33,450 236 SF $223 52 EA $6,607 3,372 SF $15,912 14 SF 7,987 SF $10,669 176 SF $132 49 EA $9,247 67 EA $18,590 128 SF $44 181 SF $130 3 EA $350 87 EA $6,660 58 EA $3,346 2,930 SF $3,157 1,604 SF $3,740 10,474 SF $3,518 9,532 SF $14,346 92 EA $3,718 $170,351 SWIMMING POOL Lighting - Pendant/ Surface Pool Basin Pool Deck 1 GRE 6 2 72 GRE 7 1,440 GRE 7 1,600 74 SF $83 1,440 SF 1,600 SF Assessment Date: 3/6/2013 Page 14 of 22

Pool deck drains Splined Ceiling including access Wall Tile THEATER GRE 7 12 GRE 7 3,040 GRE 7 1,981 12 EA 3,040 SF 1,981 SF $83 Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Lighting - Chandelier, Incandescent Lighting - Pendant/ Surface Lighting - Wall Mounted Stage Wall - Plaster/Drywall Wall - Structural Glazed Tile 1 GRE 6 8,217,481 GRE 6 4,202 25 YEL 4 11 GRE 6 48 11 YEL 4 18,290 2,288 30 8,217 SF $70,267 1,481 SF $2,118 4,202 SF $19,829 125 SF $179 11 EA $20,449 59 SF $79 18 EA $1,287 1,290 SF $36,156 12,288 SF $175,718 130 SF $930 $327,012 VOCATIONAL SHOP Work Sink INTERIOR 1 18 23 35 77 EA $47,490 $47,490 $2,271,485 ROOM ADMIN_WALL Administrative Office Walls 1 6,134 2,239 18,373 SF $38,068 $38,068 Assessment Date: 3/6/2013 Page 15 of 22

CASEWORK Casework 1 GRE 6 36 1,481 120 1,637 LF $59,381 $59,381 CEILING Lay-In/Drop Plaster/Drywall Splined Ceiling 1 GRE 6 80,526 12,798 GRE 6 435 4,014 980 GRE 6 3,295 93,324 SF $172,728 5,429 SF $13,829 3,295 SF $7,068 $193,625 CHALK BOARD 1 Chalk Board YEL 4 1,036 1,036 LF $125,926 $125,926 CLASSROOM Eye Wash Station Science Lab Elements 1 GRE 6 2 5 GRE 7 2 7 EA $5,363 2 SF $5,363 CORRIDORS Concrete Block Concrete Epoxy/Painted Drop/Lay-In Exposed Lay-In Metal Panel Pendant/Surface 1 GRE 6 5,154 5,251,321 GRE 6 54,098 586 GRE 7 82 GRE 6 2,943 33,824 BLU 5 8,482 8,475 19,641 12,148 10,405 SF $14,740 1,321 SF $6,234 54,684 SF $116,040 82 SF 36,767 EA $2,104 16,957 SF $314,574 31,790 EA $14,053 Assessment Date: 3/6/2013 Page 16 of 22

Plaster/Drywall Single Water Cooler Splined Stair Handrails Stairs Structural Glazed Tile Student Lockers Terrazzo Tile Ceramic/Porcelain Tile/Sheet Flooring Walls CORRIDORS CEILING GRE 6 43,561 GRE 6 3 9,471 GRE 6 861 500 GRE 6 4 110 0,823 12,035,666 84 GRE 6 3,744 13,722 28 372 GRE 6 46,266 947 9,750 4,076 43,561 SF $102,782 12 EA $1,845 1,471 SF $3,155 1,361 LF 114 EA $1,187 22,858 SF $77,384 1,750 EA $309,810 17,466 SF $21,202 500 SF $326 47,213 SF $66,160 23,826 SF $46,600 $1,098,196 Plaster/Drywall 1,825 4,769 6,469 13,063 SF $23,838 $23,838 FLOOR Carpet Floor Tile/Sheet Wood 1 GRE 6 2,067 790 1,858 1,853 GRE 7 1,150 GRE 6 5,647 40,392 44,877 BLU 5 2,860 6,568 SF $26,940 1,150 SF 90,916 SF $89,738 2,860 SF $40,489 $157,168 GYM_WALL 1 Gymnasia Walls BLU 5 7,696 7,696 SF $165,079 $165,079 Assessment Date: 3/6/2013 Page 17 of 22

KITCHEN_WALL Kitchen Walls 1 GRE 7 470 470 SF LIBRARY_CEILING Drop/Lay-In LIBRARY_WALL 1 GRE 6 6,370 6,370 SF $13,664 $13,664 Concrete Block Library Walls 1 GRE 7 625 GRE 6 2,242 625 SF 2,242 SF $6,412 $6,412 LIGHTING Lay-In Pendant/Surface 1 9 319 836 GRE 6 31 11 189 600 1,174 EA $29,873 831 EA $27,277 $57,150 LUNCH_WALL Lunchroom Walls 1 GRE 6 5,862 250 6,112 SF $16,765 $16,765 MARKER BOARD Marker Board 1 GRE 6 5 27 24 1,087 1,143 LF $2,839 $2,839 Assessment Date: 3/6/2013 Page 18 of 22

RESTROOM_CEILING Restroom Ceiling 1 80 180 360 SF $1,019 $1,019 RESTROOM_FLOOR Restroom Floor RESTROOM_LIGHT 1 80 180 SF $458 $458 Restroom Lighting 1 GRE 7 9 9 EA RESTROOM_WALL Restroom Walls 1 GRE 6 2,273 1,717 3,990 SF $5,786 $5,786 STAIRS Terrazzo 1 GRE 6 389 92 481 SF $4,406 $4,406 THEATER_FLOOR Auditorium Floor 1,025 1,025 SF $4,837 $4,837 Assessment Date: 3/6/2013 Page 19 of 22

WALL Concrete Block Metal/Folding Panel Plaster/Drywall Structural Glazed Tile Wall ROOM 1 GRE 6 3,052 16,296 GRE 6 744 24,394 1,214 GRE 6 740 4,872 35,828 34,470 GRE 7 48,525 1,390 19,348 SF $8,729 26,352 SF $94,795 75,910 SF $114,511 48 SF 2,915 SF $3,598 $221,633 $2,201,611 SITE ATHLETIC Baseball - Natural Basketball - Asphalt Metal Bleachers Tennis - Asphalt 1 GRE 7 78,600 GRE 7 6,400 GRE 7 90 GRE 7 13,600 78,600 SF 6,400 SF 90 LF 13,600 SF CIVIL/DRAINAGE Catch Basin Site Drain Site Manhole 1 15 GRE 6 2 2 GRE 7 20 16 EA $1,216 4 EA $2,002 20 EA $3,218 FENCING Chain Link Ornamental Iron 1 GRE 6 510 1,475 GRE 7 985 1,985 LF $54,698 985 LF $54,698 Assessment Date: 3/6/2013 Page 20 of 22

LANDSCAPE Asphalt Play Area/Hardscape Benches Grass Hardscape - Concrete Planting Beds/ Areas Retaining Wall - Concrete Retaining Wall - Masonry Trash Receptacles 1 GRE 7 68 GRE 7 6 GRE 7 376,000 GRE 6 500 55,000 GRE 7 16,800 GRE 6 20 1,400 1,460 BLU 5 96 GRE 7 8 68 SF 6 EA 376,000 SF 55,500 SF $9,438 16,800 SF 2,880 SF $34,590 96 SF $4,485 8 EA $48,513 PARKING LOT Asphalt Concrete Concrete Curbs Lights, Pole Mounted Parking lot interior plantings Trash Compactor Trash Enclosure Vehicular Screening 1 GRE 6 64,500 1,600 GRE 7 923 GRE 6 20 GRE 7 4 GRE 7 1 GRE 7 900 GRE 7 2,800 64,500 SF $55,341 11,600 SF 923 LF 20 EA $22,880 4 LF 1 EA 900 SF 2,800 LF $78,221 SERVICE GARAGE Garage - Underground 1 GRE 7 1 1 SF SIDEWALKS Perimeter Sidewalks 1 GRE 7 30,380 30,380 SF Assessment Date: 3/6/2013 Page 21 of 22

SIGNAGE Flag Pole Marquee - Free Standing Back Lighted w/ LED Monument Sign SITE Campus Need ² ³ 1 GRE 6 2 3 GRE 7 1 5 EA 1 EA 1 EA $28,600 $28,600 $213,249 $22,267,498 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 3/6/2013 Page 22 of 22