SENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...

Similar documents
SENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...

SENC 150. Cross Feed Installation... Mounting Information... Center reading head... First Steps...

SENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...

SENC 150 Encoder Installation. SENC 150 Encoder Installation. Vertical Knee Mill X axis... First Steps: Mounting Information: Before proceeding:

SENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...

SENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...

ENC 125 T/E. Quill Installation... Mounting Information... Center reading head... First Steps...

Warranty. RBS-T Linear Encoder Installation Manual and Owner s Guide

Quill Stop V2 Installation Guide 11/16/2014

Bluetooth DRO Installation for Bench Mills

Chain Drive Vise. Installation Instructions. (revised 11/29/2018)

Series 1500 Aluminum Door Canopy

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

Installation Manual for the Rockmeister Roof Ladder

ABM International, Inc. Navigator Assembly Manual

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

(Clearance > 10mm) Fig. 1

Shapeoko XXL Assembly Guide

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

Hatchback Wing Riser Kit

Arc Trainer Main Frame Assembly

Series 1100 Aluminum Door Canopy

INSTALLATION INSTRUCTIONS Horizontal And Vertical Table Stands and Accessories Model: KTP-Series

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

Jenny Legs Assembly Instructions

Installing flat panels on the MPL15 wall mount

CRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 9/11/2014 SHEET 1 of 25

4-Door Rear XHD Armor Fenders

Giraud Tool Company, Inc.

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

Assembly Instructions

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

WEIGHT ADJUSTABLE ESPREE. Model 2ESP-WA-C48- Model 2ESP-WA-C60- 2ESP-WA Rev B 8/17 ASSEMBLY AND OPERATION

Clearview Railing System Installation Instructions

Mounting the 6 or 12 Indexer on PRS Gantry Tools

SmartView Mounting Frame 3 Wide x 3 Deep Video Wall Display Installation Guide

Sliding Door Hardware Installation Instructions ROB ROY

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

SERIES I MILLING MACHINES

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

a.k.a. casegoods instructions

Setup. The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on series tables.

Installation and Assembly: In-wall Mount for 32" to 71" Flat Panel Screens

INSTALLATION INSTRUCTIONS Horizontal And Vertical Table Stands and Accessories Model: KTP-Series

LCD/Plasma Mount Manual

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

MultiTable Mod-E 2 Electric Standing Desk

User Instructions Multiline Otter Scoreboard Caddy Assembly

CRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 10/24/2014 SHEET 1 of 24

Leveling Feet, Base Plates and Casters

SHG-A* Absolute, SHG-TC, SHG-TS & SHG-VS Linear Encoders

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS 27694B

A524 ASSEMBLY & INSTALLATION INSTRUCTIONS BELLADONNA PENDANT CASTLETON, VERMONT USA SYNCHRONICITYLIGHTING.COM Rev A 1 OF 7

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Assembly Instructions Nevins Phone Booth

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Deck Mount Installation with Bench

Installation Instruction

Operating Instructions

AndyMark DART 12.

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

3 wide x 3 deep Video Wall Display Installation Guide

Mod-E Pro Electric L-Shaped Standing Desk

Chevy Tahoe Utility Vehicle

Kai Installation Instructions

INSTALLATION INSTRUCTIONS

SYSTEM 42 SCREEN CASSETTE WITH 30mm SIDE RAIL

How to Install Custom Real Wood and Faux Wood Blinds

Height Adjustable Benching End Panel and Utility Pole

IN-30000_F. Installation Instructions

MAG-CONV Basic, 48, 48R & Midline Front Mount

RTI TECHNOLOGIES, INC.

Installation Guide. Spherosyn & Microsyn Linear Encoders

INSTALLATION INSTRUCTIONS FOR PLASCORE NARROW STILE DOORS

Installation Instructions

Tail Vise. Installation Instructions. (revised 10/11/2017)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Ford Pick Up Rear leaf Spring Kit Installation Instructions

GANTRY SYSTEM ASSEMBLY MANUAL

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

40670 Transit Connect/NV200/City Express/ProMaster City Partition

S6 User s Manual USER S MANUAL ver. 1.0

TH Place, Maspeth, NY Instruction Manual for UNO Exit Signs

F l a t S c r e e n A R M S I n s t a l l a t i o n

Referencing 0,0 position

VIT SB-16SS Pedestal. Conversion Guide

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:

TITAN2-EDGE Public Access Computer Station Dual Track

(2) Plastic Plugs (2) Frame Bracket. Spacers. License Plate Bracket. (2) 12mm Single Bolt Plates. (2) 12mm Double Bolt Plates

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

TRIUMPH-LX ELECTRIC TABLE BASE

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Isuzu D-Max Part Numbers Black Polished

Workbench Instructions for Assembly

TURBO DRIVE INSTALLATION MODEL 1582T KNEE FEED Lagun Mill

Transcription:

Installation Manual For: Vertical Knee Mill Longitudinal X Axis on Rear of Longitudinal Installation... * Supplied with encoder hardware **Supplied with center support hardware 5/16-18 x 3/4 SHCS Stop ** Center support bracket * M6 Flat washer (2).017 thick ** M6 Flat washer.017 thick ** 1/4-20 x 3/4 BHCS * 8-32 x 5/8 SHCS (2) * 1/4-20 x 1 BHCS (2) 1/4 Heavy flat washer (2).09 thick 1/4-20 x 3/4 BHCS (2) Mounting Information... These are application instructions for mounting the longitudinal X axis SENC 150 encoder. Before proceeding: Please read the instructions completely. Mount X axis prior to installing the cross feed. Insure that the correct length encoder is being used for the total axis travel. Keep the reading head centered during installation. Clean the mounting surfaces. Save the alignment brackets with the Reference Manual after installation is completed. First Steps... Machine Move the table to its center of travel. Mark the axis so that it can be re-centered easily. Move the saddle completely forward on the knee. Unpack encoder in a safe, convenient location. Do not remove the reading head alignment brackets until instructed. Center reading head... Alignment bracket (2) Align center marks Slide the reading head and brackets along the scale case until the center marks on the scale case and reading head are aligned. Installation Manual 385072-38 P.N. 385072-208 Ed B 2/06 1 Acu-Rite Companies Inc.

Installation Manual For: Vertical Knee Mill Longitudinal X Axis on Rear of orientation... Back Side of Installation... bracket Center support Assembly Note orientation Underside of stop These instructions will guide you through installing the encoder as shown in this view. stop... bracket 8-32 x 5/8 SHCS (2) Temporarily attach the bracket to the reading head. Stop 5/16-18 x 3/4 SHCS Underside of table bracket Locate the stop approximately 1/2 down from the top edge of the saddle, in line with the column way. Drill and tap location for 5/16-18 x 1/2 deep. Cable exit... Vinyl cable grommet With the table at its center of travel, set the encoder against the table and the reading head bracket against the saddle. Note: Raise the assembly above the way cover plate if the bracket interferes with it. The step in the bracket can not be above the underside of the table Mark end mounting hole Plug Underside of table Cover plate T-10 Torx screw (2) Armor cable hex crimp Determine the cable exit direction before installing the encoder. To change the cable exit direction; remove the cover plate and rotate the cable 180. Center the encoder on the back side of the table. Position the underside of the end caps flush with the underside of the table (see note above) or parallel with the table top. Mark one end mounting hole location to the back side of the table and remove the assembly. Drill and tap hole location for a 1/4-20 x 1/2 deep. Installation Manual 385072-38 P.N. 385072-208 Ed B 2/06 2 Acu-Rite Companies Inc.

Installation Manual For: Vertical Knee Mill Longitudinal X Axis on Rear of Align to within.010 TIR of the axis travel or table top surface Center support installation... Center support Transfer punch other end mounting hole * 1/4-20 x 1 BHCS and flat washer Fasten the encoder assembly at one end. Align the top of the encoder to the axis travel or table top surface. Transfer punch the second end mounting hole, and remove the encoder. Drill and tap hole location for a 1/4-20 x 1/2 deep. Insert the center support to the top of the scale case above the center location tag. Ensure that the center support interlocks with the scale case. **Center support **1/4-20 x 3/4 BHCS & Flat washer * 1/4-20 x 1 BHCS and Flat washer (2) Attach the encoder to the table. Align to within.010 TIR of the axis travel or table top surface Align the center of the scale case to within.010 to the ends, and transfer punch the support hole location. Remove the center support, drill and tap the hole location for an 8-32 x 1/2 deep. Attach the center support to the scale case and table. Align the center of the scale case with each end to within.010 and secure in place. installation... Align center marks Align the top of the encoder to within.010 TIR. Secure the encoder in place maintaining alignment. Transfer punch mounting slot centers Return the table to its center of travel. Transfer punch bracket mounting slot centers to the saddle. Remove the bracket from the reading head. Drill / tap hole locations for 1/4-20 x 1/2 deep. Installation Manual 385072-38 P.N. 385072-208 Ed B 2/06 3 Acu-Rite Companies Inc.

Installation Manual For: Vertical Knee Mill Longitudinal X Axis on Rear of button up... bracket Attach the reading head bracket to the saddle, and align the bracket tapped holes to the reading head mounting holes. Secure the bracket in place. Leveling screw adjustment... *Leveling set screw (3) 1/4-20 x 3/4 BHCS and flat washer (.09 thk) Slide brackets back away from the reading head and cable Twist brackets 45 to remove Use allen wrench from set screw adjustment to slide alignment brackets away from the reading head. Remove alignment brackets and save. Move the axis through its full travel. Confirm that the assembly does not interfere with the machine movement. Proceed with the Cross Feed installation Gap * 8-32 x 5/8 SHCS (2) A gap will exist between the reading head and the bracket. Insert the two *8-32 x 5/8 SHCS. Insure the bracket is adjusted to provide proper screw head clearance. Do Not Tighten Screws at this time. Set each leveling set screw by placing a.001 -.003 feeler gage between the set screw and the bracket. Adjust each set screw until a slight drag is felt on the feeler gage. Evenly tighten the two 8-32 SHCS. Acu-Rite Companies Inc. One Precision Way Jamestown, NY 14701 Installation Manual 385072-38 4 P.N. 385072-208 Ed B 2/06

Installation Manual for: Bridgeport Series I - Vertical Knee Mill Cross Feed Y Axis - Right hand side Cross Feed Installation... * Supplied with encoder hardware Spacer (2) Spar 1/4 Flat washer.09 thk. (2) * 1/4-20 x 1 BHCS (2) * M6 flat washer (2).017 thick 1/4-20 x 1-1/4 BHCS (2) ENC 150 * 8-32 x 3/4 SHCS (2) Low head screw mtg. brkt. Mounting Information... These instructions are for mounting the 13 encoder to the Series 1 knee mill. Bridgeport machines have the encoder mounting holes provided since 1985. These instructions assume these holes are present. Unpack encoder in a safe, convenient location. Do not remove the reading head alignment brackets until instructed. Center reading head... Before proceeding: Please read the Procedure completely. Mount X axis prior to installing the cross feed. Clean the mounting surfaces. Save the alignment brackets with the Reference Manual after installation is completed. First Steps... Machine Move the table to its center of travel. Mark the axis so that it can be re-centered easily. Move the saddle completely forward on the knee. Alignment bracket (2) Align center marks Slide the reading head and brackets along the scale case until the center marks on the scale case and reading head are aligned. Installation Manual 385072-41 P.N. 385072-214 Ed C 11/05 1 Acu-Rite Companies Inc.

Installation Manual For: Bpt. Vert. Knee Milll Cross Feed Y Axis - Right hand side orientation... Spar Assembly Spacer bracket Knee These instructions will guide you through installing the encoder as shown in this view. Cable exit... Plug Vinyl cable grommet 1/4-20 x 5/8 FHCS Align to within.010 TIR of the axis travel or top surface of ways Align the spar top and front surface to the axis travel. M4 Set screws Cover plate T-10 Torx screw (2) Determine the cable exit direction before installing the encoder. To change the cable exit direction; remove the cover plate and rotate the cable 180. / Spar installation... Armor cable hex crimp Flush side (1 & 2) Insert and center the encoder in the spar from end to end as done previously. Tighten set screws to secure in place. 1/4-20 1-1/4 BHCS (2) Standoff (2) * 1/4-20 x 1 BHCS &.09 Flat washer (2) Spar *M6 Flat washer (2) Attach the spar to the knee with the standoffs. Much older Bridgeport machines were tapped for a 3/16-18. Two threaded inserts are provided for these older mills. Some machines have the spot faced surfaces epoxied over and will need to be cleaned out completely. With the saddle at its center of travel, attach the bracket to the saddle. Installation Manual 385072-41 P.N. 385072-214 Ed C 11/05 2 Acu-Rite Companies Inc.

Installation Manual For: Bpt. Vert. Knee Milll Cross Feed Y Axis - Right hand side installation... Alignment bracket removal... mounting holes (2) Adjust the bracket so that the reading head mounting holes align with the reading head casting. Secure the bracket in place. Slide brackets back away from the reading head and cable Twist brackets 45 to remove Use allen wrench from set screw adjustment to slide alignment brackets away from the reading head. Remove alignment brackets and save for possible future use. Move the axis through its full travel. Confirm that the assembly does not interfere with the machine movement. *8-32 x 3/4 SHCS (2) A gap will exist between bracket and reading head. Leveling set screws (3) Insert the two *8-32 x 5/8 SHCS. Insure the bracket is adjusted to provide proper screw head clearance. Do Not Tighten Screws at this time. Set each leveling set screw by placing a.001 -.003 feeler gage between the set screw and the bracket. Adjust each set screw until a slight drag is felt on the feeler gage. Evenly tighten the two 8-32 SHCS. With the longitudinal axis installation complete, route the cables providing sufficient slack loops for machine movement to the readout. Secure cables by fastening with clips or ties. Attach the linear encoder connectors to the readout. Complete the installation by following the steps in Checking Your Installation section in the encoder Reference Manual. Installation Manual 385072-41 P.N. 385072-214 Ed C 11/05 3 Acu-Rite Companies Inc.