PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Section Meetings Section Material and Equipment. None Required

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

East Central College

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

SECTION OPERATION AND MAINTENANCE DATA

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION SUBMITTAL PROCEDURES

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

submittals 1s e c t i o n

SUBMITTAL PROCEDURES

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

Chapter 1 General Design Information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

SECTION ADMINISTRATIVE REQUIREMENTS

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Jacksonville District Master

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

What Are Submittals?

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Answer: Qualification statement should be provided with the bid.

CHAPTER A-15 INTERIOR DESIGN INDEX

Section Project Closeout

PROCEDURE FOR PROCESSING WORKING DRAWINGS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION PROJECT MANAGEMENT AND COORDINATION

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

Facility Services Subgroup Preface for Divisions 21` through 28

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

AIA Continuing Education

SECTION SUBMITTALS

01100 SUMMARY OF WORK

Working Drawing Manual

SECTION LIGHTING PART 1- GENERAL

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee

PLANNED SIGN PROGRAM CHECKLIST

Construction Phase Project Management and Documentation

SECTION PANELBOARDS

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

SECTION ARCHITECTURAL WOODWORK

Working Drawing Procedure

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

1. ASME A Scheme for the Identification of Piping Systems.

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

Solid Surface Countertops

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

Engineering Drawing System

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

*********************************************************************************************************

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SPECIFICATIONS SPECIFICATION TYPES

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

January, 2014 Page 1 of 5

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Cloud Based Plan Review Process (Applicant)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

UNIFIED FACILITIES GUIDE SPECIFICATIONS

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

Transcription:

SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog Cut Submittal form necessary to satisfy requirements specified. B. Related Sections: 1. 01310 - Construction Schedule Critical Path Method (CPM). 2. 01600 - Material and Equipment. 3. 01700 - Contract Closeout. 4. 01740 - Warranties. 1.02 DATES FOR SUBMISSION AND REVIEW A. Designate in the CPM the dates for submission to A/E and review completion dates needed for shop drawings, product data, and samples to maintain the project schedule. 1.03 SHOP DRAWINGS/MANUFACTURER'S CATALOG CUTS A. Shop Drawings: Submit 2 prints and 1 reproducible sepia with the image on the back, for each required shop drawing. 1. Identify each shop drawing with the following information placed on each drawing: a. Name of the facility. b. Name of project at the facility. c. Board's project number. d. Name of company submitting the shop drawing. e. Date of drawing. 2. Provide a blank space 6 inches wide by 4 inches high in the lower right corner of each shop drawing page for the A/E's shop drawing stamp. B. Manufacturer's Catalog Cuts: Submit 8 copies of each catalog cut or 8 edited catalogs. C. The Shop Drawing/Product Data Submittal form shall be attached to each required Project No. SPECIFICATION GUIDELINES 01340-1

shop drawing, manufacturer's catalog cut, or other product data. D. Submittal of Samples, Color Charts, Color Chips, or Color Samples for Selection and Coordination: 1. Submit 3 copies of all material color charts, color chips, or color samples within 60 days after start of construction to allow for selection, color coordination, and final acceptance by A/E. Material color charts, color chips, or color samples shall be manufacturer's full color range and of standard sizes unless specified otherwise. 2. Where architectural precast or poured-in-place architectural concrete is required, submit at least 4 architectural concrete finish color and texture samples. 3. Where exposed unpainted concrete masonry units are specified, submit at least 2 sets of masonry samples in manufacturer's full color range. 4. Where roofing tiles or shingles are specified, submit at least 2 sets of finish colors and texture samples. E. Prints, samples, and color charts shall be at the expense of Contractor. F. Submit all color selection materials for complete coordination of color scheme. No individual color selections will be approved before receipt of all the colors. 1.04 SUBMITTAL IDENTIFICATION A. Submit only 1 item or system per letter of transmittal properly identified to include the appropriate specification section and section paragraphs. B. When shop drawings, edited catalog cuts of components, product data, diagrams, or charts are submitted with more than 1 type of specified product, identify the particular item, including options, intended for use in the Work. C. Resubmittals shall be identified with original shop drawing number and followed with a dash (-) and a letter A, B, etc. corresponding to the resubmittal sequence. 1.05 SUBMITTAL COMPLETENESS A. Submit catalog sheets, product data, shop drawings, material samples, color chips, color charts, test data, and warranties at the same time for each item. 1. Submit shop drawings with appropriate data and with the Drawing identification mark numbers as shown, specified, or scheduled. Project No. SPECIFICATION GUIDELINES 01340-2

2. Shop drawings without identification mark numbers or with incomplete performance information will not be reviewed until submission is complete. 1.06 PREPARATION A. Clearly mark each submittal to identify each appropriate product or model. B. Show performance characteristics and capacities. C. Show dimensions and clearances required. D. Show wiring or piping diagrams and controls. 1.07 IDENTIFICATION A. Identify details by reference to sheets and details, schedules, or room numbers as shown on Drawings. B. Manufacturer's standards, schematic drawings, and diagrams: 1. Modify drawings and diagrams to delete information not applicable to the Work. 2. Supplement standard information to provide information specifically applicable to the Work. 1.08 SAMPLES A. Submit samples of sufficient size and quantity to clearly illustrate: 1. Functional characteristics of product, integrally related parts, and attachment devices. 2. Full range of color, texture, and pattern. 1.09 FIELD SAMPLES AND MOCK-UPS A. Erect at project site, at a location acceptable to the A/E. B. Size and Area: As shown on Drawings or specified in respective specification section. C. Fabricate each sample and complete as acceptable to A/E. D. Remove mockups at completion of work and when acceptable to A/E. Project No. SPECIFICATION GUIDELINES 01340-3

1.010 CONTRACTOR RESPONSIBILITIES A. Review shop drawings, catalog cuts, product data, and samples before submission. Determine and verify: 1. Field measurements. 2. Field construction criteria. 3. Catalog numbers and similar data. 4. Conformance with Construction Documents. B. Coordinate each submittal with requirements of the Work and of Construction Documents. C. Notify the A/E, in writing at time of submission, of any deviations in submittals from requirements of Construction Documents. D. Shop drawings shall be stamped, approved, and signed by the Contractor before submittal to A/E, otherwise they will be sent back to the Contractor without being processed by the A/E. E. Do not ship apparatus or equipment from stock or fabricate until shop drawings have been reviewed and approved by A/E. F. Always maintain and have available for reference a field copy of accepted shop drawings at the job site. PART 2 NOT USED PART 3 NOT USED END OF SECTION Project No. SPECIFICATION GUIDELINES 01340-4

SHOP DRAWING/CATALOG CUT SUBMITTAL TRANSMITTAL NO. File Number For M-DCPS Use) DATE: PROJECT: CHECKED AND APPROVED FOR SUBMISSION BY: M-DCPS'S PROJECT NO. ITEM: CHECK ONE OF THE FOLLOWING: SPECIFIED ITEM. SUBSTITUTION* О О SPECIFICATION SECTION AND PARA. NO. PRIME CONTRACTOR: PRIME CONTRACTOR S PROJECT OR CONTRACT NO. SUB-CONTRACTOR: MANUFACTURER: SUPPLIER: MANUFACTURERS CATALOG NO. DRAWING NO. * If Substitution, submittal shall include information required by the General Conditions. Attach sufficient pages to this form to fully respond to the requirements of the General Conditions. (RESERVE THE SPACE BELOW FOR DATE AND SHOP DRAWING REVIEW STAMPS) ATTACH THIS PAGE TO EACH COPY OF THE SHOP DRAWINGS OR CATALOG CUTS. Project No. SPECIFICATION GUIDELINES 01340-5