Installation Instructions Stainless Steel Wall Panels

Similar documents
Installation Instructions Palladium Square Edge Panels

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

Installation Instructions

ELiTE ProPanel Installation Guide

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Curium 19.4H Installation Instructions & Parts List

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

HR175 Sash Replacement Kit Installation Instructions

Nanton Grain Mill Assembly

Curium 19H Installation Instructions & Parts List

Aluminum Clad Wood Window Field Mulling and Stacking Instructions

Fixed Upper Sash Replacement Guide for Andersen 400 Series Woodwright Springline Single-Hung Windows

Installation Instructions Recommended Tools

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Wall Panel Installation Instructions

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Repairs. Chapter 10 Repairs 10. 1

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Figure #1 - VSNEO Shower Door Assembly

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Eagle clad double-hung window installation instructions

IMPORTANT: Please read completely before you begin.

FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

B A T H R O O M G L A S S

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Dubnium 11 Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List

Chapter 22 - Cabinets & Vanities

UNIT 5: EXTERIOR DOORS AND WINDOWS

Installation Instructions

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Please read through the entire document before starting your installation process to better understand what is required.

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

How To Install Windows: Nail-Fin Application

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Radon 07 Installation Instructions & Parts List

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

Installation Guide. Aspect Stone Peel & Stick Tile. proper surface preparation is essential for a successful project. Installations Methods

Portofino Installation Guide

Deauville Installation Guide

Frameless Inline Door With Return QCI5263

Xenon 05 Installation Instructions & Parts List

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

Installation Instructions

Installation Instructions and Details

Wood Hinged Patio Door Installation Instructions

Deauville Installation Guide

Argon 02 Installation Instructions & Parts List

Sash Replacement Guide for Andersen 400 Series Tilt-Wash Transom Windows

Non-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows

ANCHOR PLATE ATTACHMENT STEEL STUD FRAMING OR FURRING CONSTRUCTION WITH ACCESS FROM PANEL SIDE ONLY

Palladian/ Keystone Models 202/204 Maintenance Kit

I n s t a l l a t i o n I n s t r u c t i o n s

Step by Step Wing Bagging

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

INSTALLATION MANUAL STORAGE

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

Installation Instructions

Chapter 17 - Porch Trim

Jeep Cherokee Door XJ Set Part # Revision J

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Wall Panel Installation

A-935 RODA WALL MOUNT HINGES

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

Installation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit

Installation Guide for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows

English Professional Installation Guidelines

The Rubley Building Instructions for Assembly of the N scale kit. v1.1

Sun Windows General Information New Construction Hinged Door Installation Instructions

Installation Instructions 800/800W/855/G2-800 Continuous Bracket Handrails

IMPORTANT: Please read before you begin installation.

FIG. #1 - ASD & USD 180/280 Shower Door Assembly

JANUARY 2002 ARMADILLO

ARMADILLO STAINLESS VAULT CLOSURE REPLACEMENT KIT

Panel Installation Instructions

FrameSaver Jamb Bottom Replacement Instructions

Non-Reinforced Joining Guide (Horizontal/Vertical)

INSTALLATION INSTRUCTIONS

Frameless Inline Door QCI5248

Preface MouldeX Mouldings Application Planning/estimation Marking out Measuring Applying Adhesive...

Installing 3M DI-NOC Architectural Finishes on Doors

Jeep Cherokee 4-Door XJ Set Part # Rev

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

WindowSeal. Installation Instructions. Prep & General Conditions

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Portofino Case2 Installation Guide

MUDGUN Drywall Finishing System

September 10, 2009 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

Tapecoat. Application Guideline

Hotel Belvedere Instructions for Assembly of the HO scale kit. v1.1

Frameless Inline Door QCI5254

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Frequently Asked Questions

Transcription:

Please read all instructions before installing wall panels. Always plan before you place! 1. Before installation: a. Acclimate Stain Steel Panels, Trim, adhesives and wall substrates to room temperature 24 hours before installation. Ensure panels and trim are on a level surface while acclimating. b. 24 hours before, during and 48 hours after installation, maintain a building temperature between 70-80 F (21-26 C) and keep humidity below 80%. c. Substrate must be dry, well sealed and free of dirt, loose paint, wax and grease. Glossy surfaces may require sanding or priming to help promote adhesion. d. Remove any coatings designed to improve clean- up as these coatings may affect adhesion. e. If available review related project drawings for the install Recommended tools: Chalk Line or Laser Level, Level, Metal Straight Edge, Tape Measure, Drop Cloth, Painter Tape, PL Premium Adhesive, Double Sided Foam Tape, Face Shield /Safety Glasses, Electrical 16 Gauge Sheet Metal Nibbler, Set of Metal Files Specifically for Stainless Steel, Color Matched Vinyl Seal or Aluminum Colored Sealant, Suction cup lifters, Plastic Putty Knife. Field Cutting Tips: 1. All panels are pre-sized according to architect/installers supplied dimensions. 2. If a field cut is required, use a 16 gauge sheet metal nibbler for cuts. ALWAYS wear a face shield or appropriate protective gear when cutting metal. 3. After completing the field cut it may be necessary to finish the cut edge using a metal file. Ensure the edge of the cuts are free of burs or other sharp projections. Installation 1. Before beginning installation remove any wall covering which may affect panel adhesion. Begin installation by matching panel sizes to their associated wall, once correct panel to wall locations have been found, lay out panel locations on the wall. PANEL LAYOUT LINES IPC.1664/REV.2

2. Apply two (2) strips of double sided foam tape, vertically 2-3 [50-76mm] from each edge and 8 [203mm] from the bottom edge. 3. Apply 1/4 [6mm] bead of PL-Premium horizontally between the strips of foam tape, evenly space the beads of adhesive down the height of the panel. BACK 1/4 BEAD OF ADHESIVE 8 [203MM] 4. If conditions permit, begin installations at inside corner conditions; otherwise install panels so seams face away from the flow of traffic. When installing panels it is critical to ensure the panel is installed flush with the layout lines, first using the suction cup grabbers, position bottom edge of panel along bottom layout line. Ensure the flat edge of the panel (the non-recessed flange edge) is flush with the surface next to it. 5. Slowly tilt panel into position ensuring the panel aligned with the layout. Firmly press panel into position once tape has made contact with the wall. IMPORTANT: Once tape contacts the wall it cannot be cleanly repositioned, and should be considered permanent. INSIDE CORNER SEAM TOWARDS INSIDE CORNER OR AWAY FROM TRAFFIC ALIGN BOTTOM EDGE WITH LAYOUT LINE STAINLESS STEEL DIAMOND PLATE PANELS ABUTT ONE ANOTHER

6. Repeat steps 2-5 to continue installation along entire length of the layout/wall, over laying the flat edge of each panel over the recessed flange of the one installed next to it. Ensure the top edge of each panel is flush and continuous with the panel next to it. OVERLAP EACH PANEL STAINLESS STEEL DIAMOND PLATE PANELS ABUTT ONE ANOTHER 7. After installing a complete run of panels, continue installation along any adjoining wall or layout sections, continuing to ensure the panels are installed level with the panels on the adjoining wall. Do not install corner trim pieces until the entire installation is complete.

8. For corner trims, apply a single strip of foam tape to one of the backsides of the corner trim wings, then apply two (2) 1/4 [6mm] beads of PL-Premium on back of the opposing wing. Position trim piece close to the corner, adhere the wing with the PL-Premium to the panel first, then slide the trim piece into the corner so the wing with foam tape sets squarely into the corner; press the trim piece into the corner so the tape firmly against the panel to ensure adhesion. 9. Immediately clean up an PL-Premium that may have squeezed out from underneath the wing. 1 2 3 1/4 [6mm] BEADS OF PL-PREMIUM 1 2 3 1/4 [6mm] BEADS OF PL-PREMIUM 10. After installation is complete, line all outside edges using blue painters tape, make sure the tape is straight, and the bottom edge of the tape sits slightly above (1/32-1/16 [1-1.5mm]) the top edge of the panel in front of it. PAINTERS

11. Apply a bead of vinyl seal, or similar color matched sealant to any exposed edge on the installation. Ensure the caulk penetrates into the gap between the panel and wall. After an edge has been sealed, use a plastic putty knife to scrape any excess sealant off of the panel face, then carefully remove the blue painters tape from the entire edge, by pulling back and away. Repeat for all exposed edges. VINYL SEAL OR ALUMINUM COLORED CAULK FILL ANY IRREGULARITY AT TRANSITIONS 12. Finished Installation