CONVEYANCE PIPELINE AND PUMP STATION

Similar documents
Construction Phase Project Management and Documentation

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Scope of Work Temecula Valley Regional Water Reclamation Facility 23 MGD Expansion Engineering Services During Construction

This specification describes the general requirements for Engineering Services provided to Vale.

MnDOT Contract Exhibit A - Scope of Services

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

MnDOT Contract Exhibit A- Scope of Services. Project Information -

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Street Acceptance Guidelines

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

Bid No. B14-02 Building 100 HVAC Improvements

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Answer: Qualification statement should be provided with the bid.

A. Section includes administrative and procedural requirements for project record documents, including the following:

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Architectural Design Process

Detail Design for State Project

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

SECTION III SUBMITTALS AND APPROVALS

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION ADMINISTRATIVE REQUIREMENTS

SCOPE OF WORK AND DELIVERABLES T.H.

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

Washington County Road Engineering Plan Submittal/Review Checklist

Merrick Pet Care New Distribution Center Hereford, Texas

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

REQUEST FOR PROPOSAL

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Section Meetings Section Material and Equipment. None Required

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

SECTION PROJECT MANAGEMENT AND COORDINATION

APPLICATION FOR SITE PREPARATION PERMIT

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

i. Shoring layout. ii. Shoring sections and details (including anchor details, if required).

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

SECTION SUBMITTAL PROCEDURES

APPLICATION DESIGN REVIEW Please Print or Type

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

Exhibit A Scope of Services and Deliverables West Swan River Bridge Approaches

Section XV - PER, Design, and Construction Submittal Requirements

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

PLANNING AND DEVELOPMENT

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

SECTION 2 GENERAL REQUIREMENTS

Pohlcla Coslelanos Anthony Plrozzl, Jr. Edward R. Renwick. Vice President

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

State College Area School District

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SUBMITTAL PROCEDURES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

LIVELIFE.TRAVELWELL. DesignStandardsManual GeneralStandardsandCriteria DenverInterna onalairport AirportInfrastructureManagement

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

Harris County Capital Projects Electronic Submittal Guidelines for Consultants

SECTION SUBMITTALS

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Street Acceptance Guidelines

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

A. Dewatering observation wells are part of dewatering allowance.

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

SECTION SUBMITTAL PROCEDURES

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

Facility Services Subgroup Preface for Divisions 21` through 28

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

PRELIMINARY PLAT CHECK LIST

Public Works City of Lebanon, Tennessee; Department of Public Works

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

SECTION TRACER WIRE FOR NONMETALLIC PIPE

Minor Site Plan Application and Checklist Land Disturbing Activities

Transcription:

SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station to convey advanced treated water from the Regional Wastewater Treatment Facility to the intersection of General Jim Moore Boulevard and Eucalyptus for injection into the Seaside Groundwater basin. This scope of work includes the pipeline from the connection point at the treatment facility to Normandy Road and the 5th Avenue Pump Station. MCWD has existing 20-inch pipe in the ground south of Normandy that will be used for this project. This scope also includes connection of the Blackhorse and Bayonet Golf Course. Task 1 - Project Management and Coordination Carollo will provide project management as necessary for proper planning, execution, monitoring, and reporting of the project progress. The following key subtasks have been identified: Task 1.1 - Project Administration Carollo will monitor project progress, manage subconsultants, develop and maintain the schedule, and prepare and submit monthly invoices and progress reports. Task 1.2 - Project Meetings Carollo will prepare agenda and meeting minutes for the following project meetings, which are anticipated to take place at MCWD offices: Kick-Off Meeting Monthly Project Coordination Meetings (4 meetings anticipated) Design Development review meetings for the 95% design deliverable. Task 1.3 - Coordination with MRWPCA Projects Carollo will coordinate with MRWPCA's Design Engineer on the AWTF and GWR Injection Well Facilities, which are anticipated to be designed concurrently, and other MRWPCA consultants as necessary to ensure all projects are integrated. As part of this task, Carollo has included a workshop with other consultants. Carollo will prepare a decision log to track key project decisions. Task 1 Assumptions 7 month duration (December 2015 thru June 2016) Task 1 Deliverables Monthly Invoices and Progress Reports Project Meeting Agenda and Meeting Minutes Baseline schedule and schedule updates Decision Log (continuously updated) Task 2 - Data Gathering and Review Carollo will review available reports, records, data, maps, and other documents for design development. Carollo will identify information needed to complete the design.

Task 2 Assumptions All available data on system configuration and operational strategies will be provided by the District. Task 2 Deliverables List of information needs Task 3 - Permits, Rights-of-Way, Easements Carollo will develop a matrix of all needed permits and rights-of-way/easements and property acquisition to complete the project. Carollo will then outline the steps needed to obtain all project permits and land rights. Status of permits and easements will be reviewed monthly at a minimum with regularly scheduled project coordination meetings. Carollo will develop exhibits as needed to obtain required permits and land rights. Development of up to 4 legal descriptions and plat maps has been budgeted. Carollo will assist in revising and submitting the California Division of Drinking Water Engineer's Report for recycled water use sites. Task 3 Assumptions District will lead easement acquisition efforts District will lead the permit acquisition efforts Task 3 Deliverables Matrix identifying needed permits and land rights, status, and next steps Exhibits needed to obtain required permits and easements Up to nine (4) legal descriptions and plat maps Engineer's Report Task 4 - Funding Support Carollo will revise the Project Report to reflect the new project components and use as well as the project cost estimates and O&M costs. Carollo will provided as needed support for the funding process through design and bidding of the project. Task 4 Assumptions None Task 4 Deliverable Revised Project Report Revised Cost Estimates Task 5 - Environmental Support Carollo will provided revised design information and figures as needed to support any additional environmental work required for the project. Task 5 Assumptions None. Task 5 Deliverable As needed figures or work descriptions

Task 6 - Design Plans and Specifications Carollo will revised the current plans, specifications, and cost estimate to reflect the current project configuration and sizing. Plans will be develop in AutoCAD. Carollo technical specifications will be used in conjunction with MCWD front end documents. Survey. Carollo's survey subconsultant will review the existing topographic survey against current field conditions and suggest locations for survey augmentation if existing conditions have changed substantially. Survey will be provided on an as needed basis. Potholing/Utility Location. Carollo will send all of the existing utilities in the project vicinity a letter requesting mapping of their facilities within the project limits. We will review existing pothole data for the project. Based on information received from the utility companies and on existing pothole data, we will create a new potholing plan. Up to two (2) days of potholing has been budgeted. Task 6.1-95% Design Package: Plans, Specifications, and Cost Estimate Carollo will submit a 95% design package A meeting to review the 95% design documents will be conducted. Meeting notes and comments will be captured and recorded, with responses to comments provided as needed. Task 6.2 - Final Bid Documents Carollo will submit final bid documents including plans, specifications, cost estimate, and project calculations. The submittal will include a list of 95% comments and responses to comments Task 6 Assumptions: Alignment will follow the existing RUWAP alignment. 5th Ave Pump Station will sited at the currently designed location. Task 6 Deliverables: Five (5) hard copies and 1 electronic copy of the 60% half size drawings, 5 hard copies of the technical specifications. Updates of the project schedule and matrix of permits and land rights will be provided. Five (5) hard copies and 1 electronic copy of the 95% half size drawings, 5 hard copies of the technical specifications. Updates of the project schedule and matrix of permits and land rights will be provided. Two (2) hard copies of half-sized drawings and two (2) hard copies of full sized drawings of the Final Bid Documents; Two (2) hard copies of the specifications; Electronic copies (editable and non-editable) of the drawings and specifications; and design calculations binder. Task 7 - Bids Services Carollo will prepare for and attend a pre-bid meeting, respond to all bidder inquiries, and prepare addenda to the bid documents, as needed. Carollo will also assist in evaluation of the bids, if requested. Task 7 Assumptions None

Task 7 Deliverables Pre-Bid meeting agenda and meeting minutes Responses to Bidder Questions and Addenda (2 assumed) Task 8 - Engineering Services During Construction Carollo will provide engineering services during construction including submittal review, responding to contractor requests for information, attending a pre-construction meeting and up to 3 field visits, reviewing change orders, providing design modifications and clarifications, and providing specialty inspection, as required, including corrosion monitoring facility testing. Task 8 Assumptions Project administration for 14 months Reviewing and commenting on up to 150 submittals/resubmittals Responding to up to 20 RFIs Attendance at the preconstruction meeting Up to 3 field visits Review of up to 2 change orders Preparation of up to 10 design clarifications Specialty inspection for cathodic protection system Task 8 Deliverables Submittal review comments Responses to RFIs Design clarifications Task 9 - Record Drawings Carollo will provide record drawings for the project based on a single set of red-lined drawings received from the Contractor or MRWPCA. Task 9 Assumptions MCWD will provide contractor redlines Task 9 Deliverables One set of full size drawings One pdf AutoCAD files OPTIONAL Task 10 - Design of Pipeline to Injection Well Site The current scope does not include the design of the pipeline from General Jim Moore Boulevard to the injection well site. The following scope of work can be added if the District would like to include this segment of pipeline in the design. Survey. Topographic survey will be provided along the pipeline alignment from General Jim Moore Boulevard to the injection well site (~0.75 miles). Geotechnical Investigation. Carollo's geotechnical subconsultant will perform a desktop geotechnical investigation utilizing existing geotechnical data available within the vicinity of the project. A boring plan will be prepared identifying locations where additional borings are needed based on the review of existing information. Laboratory analysis will be conducted on material from the geotechnical investigations including soil resistivity testing to determine corrosion

potential. Conclusions and recommendations will be developed. An addendum to the existing geotechnical report will be developed to summarize all the geotechnical data, analysis, and recommendations. Cathodic Protection Services. Carollo's corrosion subconsultant will review available existing information for the area as well as current site conditions. The work will be coordinated with the geotechnical subconsultant to provide soil samples for corrosivity testing. Resistivity testing will be performed. Extent of cathodic protection design services will be dependent on the selection of pipe material. This task includes development of details and specifications based on corrosion facilities recommended. The design will be incorporated in the design submittals. Permitting and Easement Assistance. The pipeline outside of General Jim Moore Boulevard will likely require an easement either from the City of Seaside or from the Army. We will assist the District in obtaining these easements. Task 10 Assumptions Survey for the well sites will be performed by MRWPCA's consultant Field work is for approximately 0.75 miles of pipe. 2 geotechnical borings 2 legals and plats Task 10 Deliverables Topographic Survey Draft and Final Addendum to the Geotechnical Report. Cathodic Protection Recommendations Technical Memorandum Incorporation of design elements into the 95% design submittal Figures/legals and plats to support permitting and easement acquisition Task 11 - Construction Management and Inspection of Pipeline and Pump Station Carollo will provide construction management services during pre-construction, construction and post-construction of the Regional Urban Water Augmentation Project Recycled Water Pipeline Project. Task 11.1 Pre-construction Services Carollo will schedule, facilitate and document the preconstruction meeting. Carollo inspectors will visit the site to document existing conditions along the alignment using photographs and videos. Task 11.1 Deliverables Preconstruction site videos and photographs Task 11.2 Construction Services Carollo will provide a Construction Manager to perform a wide range of services during construction including but not limited to: contract administration, facilitate and document project meetings, quality assurance, safety monitoring, change and claims mitigation, document control including processing of submittals, RFIs, and other project communications, labor compliance assistance if needed, processing of contractor progress pay estimates, review of contractor schedules, support for SRF documentation and reimbursement requests, and coordination of Carollo and Owner provided subconsultants working on the project. Carollo will review the contractor's SWPPP and perform compliance inspections during construction. Carollo will

coordinate with the contractor and owner for all start up testing, commissioning and training that is required. Task 11.2 Assumptions 18 month contract duration Construction meetings held weekly Carollo (through sub consultants where necessary) to provide materials and specialty inspections such as concrete sampling and testing, backfill and compaction testing, masonry inspections, coating inspection, electrical inspections, and cathodic protection inspections and testing, Agency to provide environmental consultant services Task 11.2 Deliverables Monthly progress report, Record of Discussions for all meetings Weekly update to owner if requested on project issues and progress Monthly contractor progress payment requests Change orders for signature with supporting documentation All project files at the end of the project SRF reimbursement requests and quarterly DBE reporting Task 11.3 On-Site Inspections Carollo will be on site daily to inspection construction to verify the work is proceeding in accordance with the Contract Document. Observations will be documented in daily reports that are sufficiently detailed to document project conditions, production rates and contractor activities, contractor labor, equipment and materials that are engaged in the work. Photographs will be obtained daily to document existing conditions, work activities and progress. Carollo inspectors will confirm daily that traffic control plans are properly implemented and recommend immediate correction or modification when necessary. Carollo inspectors will be the first line of defense for addressing complaints/concerns/questions of the public and will work with the contractor to address issued brought forth by the public and property owners. Task 11.3 Assumptions Full time inspection will be necessary on the pipeline work Half time inspection will be necessary on the pump station construction Task 11.3 Deliverables Daily reports documenting work progress, labor and equipment. Reports can be provided daily, weekly or kept in project files for access when needed. Photo documentation provided at end of project. Task 11.4 Post-Construction Services Carollo will develop a punchlist of remaining items after the work is substantially complete and monitor contractor efforts to complete items. Carollo will coordinate and conduct a final project review with designer owner and other agencies impacted by the work. Upon satisfactory completion, Carollo will recommend project acceptance. Carollo will prepare and submit a project documentation in an organized and timely manner at the conclusion of the project. Carollo will assist in preparing final documentation for the SRF loan and the final DBE utilization report. Task 11.4 Deliverables

Project acceptance documentation Project files