S W E RV E RAC K. Simple Security. Simple Stability.

Similar documents
H O O P RAC K. Simple Security

H O O P RAC K. Simple Security

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

Swerve Rack CUSTOM RACKS AVAILABLE

Downtown Rack. Custom logo option available

TO O L K IT. Public Bike Repair

SADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.

AIR KIT 3. Heavy-Duty Public Bike Pump

ULT R A SPAC E SAV E R

ULT R A S PACE SAV E R SQ UA R E D

Today s Service Station

DERO BIKE LOCKER 33. Maximum Security

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.

Bike Locker Model DBL1 & DBL2

Secure Bike Parking. Patent Pending Dero

CYCL E STAT IO N. High Capacity

Today s Service Station

Safe and secure Dero

KO LO SH E LT E R. High Capacity and Flexibility

BIKE FILE (301)

ULTRA SPACE SAVER Installation Instructions

Ultra Space Saver American Bicycle Security Company

96 (Standard Length)

Track Rack. * Track Racks are not lockable

Allow 60 from door face

ULTRA SPACE SAVER SQUARED Installation Instructions

STRATUS SHELTER. Take bike parking to new heights

Pocket Shelter. Covered bike parking earns your site LEED credits.

PRODUCT INFORMATION Dero Space Saver Bike Racks

KOLO SHELTER Installation Instructions Parts List

Installation Instructions for: Saris Cycle Aid. Saris Cycle Air. Saris Cycle Air HD

Installation Instructions for Bike Fixtation Public Work Stand and Floor Pump Manual RevH

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT

Spiral Slide

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

New Product Release: October 2014 Boone Racks

Wave Bike Rack specs SPECS AND INSTALL INSTRUCTIONS. Deluxe Wave Style Bike Rack. Series Names & Model # s. Product maintenance. Thermoplastic Coating

ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

RELINER INSIDE DROP SYSTEM SPECIFICATIONS

INSTALLATION, ASSEMBLY & OPERATIONAL MANUAL

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

UP139 CRUISE-A-LONG (STANDARD) NATURAL COATED DECK COATED RAMP DESCRIPTION SQUIRREL PANEL BACK WALL CLEAR BUBBLE CRUISE RAIL SQUARE SPIRAL WHEEL 90 AN

Leveling Feet, Base Plates and Casters

PERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

UP133 CRAWL & TODDLE (STANDARD) NATURAL COATED DECK COATED RAMP FRONT WALL BACK WALL DESCRIPTION COATED STEPS 90 ANGLE BRACKET LEFT WALL RIGHT WALL CL

Installation Instruction

Motorcycle Lift Assembly Instructions

ALL SEASON PATIO COVER

STEEL PIPE GUIDERAIL 01/01/

Double Beam Freestanding Pergola Installation Guide

ALUMINUM PIPE GUIDERAIL 01/01/

Bollards, Column Guards, Corner Guards, Wheel Stops, Speed Humps & Fixings. Lockinex. ea i, ea u i

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

TABLE OF CONTENTS REQUIRED TOOLS

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #

Independent Containment System (ICS)

Bumper Sign INSTALLATION INSTRUCTIONS

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

INSTALLATION INSTRUCTIONS FOR #101NS & #101QR FIXED BASE

Building a 30 Turntable

Installation Manual for Gate Guard

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg

Fastener Basics. Common Fastener Types. Fastener Materials. Grade / Class and Fastener Strength

ADJUSTABLE MOUNTING POST

SHELTON THERMOSTATIC SHOWER PANEL

2015 Feeney (8/15) # D. Aluminum Railing Systems

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

STEEPLE GATE BARRIER SET INSTRUCTIONS

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

PART MATERIALS. Section Fencing Materials. Description

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS

INSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT

Installa on Guide: Fence Distributors. YourNextFence.com

Outdoor equipment. Barrier posts. Stainless steel. Barrier elements. Barrier poles. Outdoor equipment - pages

AUXILIARY FRAMING AND ACCESSORIES

Max. Rec. Load. Wt. Per Inch lbs. kn lbs. kn lbs. kg. Wt. Per Inch lbs. kn lbs. kn lbs. kg 750 F (399 C)

Hex Head Bolt Set N - Includes lock nut. Used to connect male and female T connectors. Galvanized. 3/4" x 3-1/2". Standard Grade (f) Part #24279

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

2013 Feeney (2/14) # B. Aluminum Railing Systems

Balustrade Systems / Installation Instructions

PLAY HOUSE IMPORTANT

s71 cycle stand description 316 grade stainless steel with a brushed polish finish.

CSS Central Mount System

CAELI THERMOSTATIC SHOWER PANEL

The Festival Assembly Instructions

POWER-Skru Large Diameter Concrete Screw

s23ss sloped bollard with reflective bands

Contractors Rack Assembly and Installation Instructions

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

The Queen Quilter Professional Quilters Kit Frame

Sunrise Deck Assembly Instructions for Kingston Left

How to make a template to mount your plaque to a surface

1. Layout. Step 1. Step 2. Step 3. Fig. 1

WALCOOM. Walcoom Corporation GARRISON FENCE.

The following instructions will guide you through the installation of your new vinyl railing.

A 1 Vertical Pole I 1 BA47/47A/47P Backboard (2 req d on Model BA872)

SECTION CONCRETE ANCHORING. Display hidden notes to specifier. (Don't know how? Click Here)

Transcription:

S W E RV E RAC K Simple Security. Simple Stability. The Swerve Rack is a proven design that provides high security and easy bike parking. The Swerve Rack uses thick pipe construction and the full radius of the bend makes the Swerve an attractive and functional bike rack. The Swerve Rack supports the bicycle at two points and allows for the wheel and frame to be secured using a u-style bike lock. Each Swerve Rack parks two bikes.

S W E RV E RAC K YOUR LOGO HERE Customize the Swerve Rack and brand your bike parking FINISH OPTIONS Galvanized Stainless MOUNT OPTIONS PVC Dip Surface Powder Coat White Black Light Gray RAL 7042 Deep Red RAL 3003 Yellow RAL 1023 CNH Bright Yellow Orange RAL 2004 Blue RAL 5005 Sky Blue RAL 5015 Hunter Green RAL 6005 Light Green RAL 6018 Green RAL 6016 Sepia Brown RAL 8014 Bronze Silver 9007 Dark Purple Flat Black Wine Red RAL 3005 Beige RAL 1001 Iron Gray 7011 Thermoplastic Black Green www.dero.com Red Blue Gray 1-888-337-6729 Brown In-Ground Rail

Submittal Sheet CAPACITY 2 Bikes 34" 21.5" 1.9" MATERIALS Standard 1.9 OD schedule 40 pipe Lightweight 1.9 OD schedule 10 pipe 44 6" FINISHES Galvanized An after fabrication hot dipped galvanized finish is our standard option. 250 TGIC powder coat colors, thermoplastic coating, PVC dip, and stainless steel finishes are also available as alternate options. Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sandblast 2. Epoxy primer electrostatically applied 3. Final thick TGIC polyester powder coat IN-GROUND Thermoplastic In addition to an increased thickness (8-10mils), the thermoplastic finish covers a galvanized layer and offers superior impact resistance over powder coating. IN-GROUND MOUNT SURFACE MOUNT Stainless Stainless Steel: 304 grade stainless steel material finished in either a high polished shine or a satin finish. 12 36 18 MOUNT OPTIONS In-ground In ground mount is embedded into concrete base. Specify in ground mount for this option. Surface Foot Mount has two 2.5 x6 x.25 feet with two anchors per foot. Specify foot mount for this option. 24 10 Rail Rail Mounted Swerve Racks are bolted to two parallel rails which can be left freestanding or anchored to the ground. Rails are heavy duty 3 x1.4 x3/16 thick galvanized mounting rails. Specify rail mount for this option. RAIL MOUNT

Setbacks WALL 36" WALL 28" STREET 36" 62" STREET

Installation Instructions Surface Mount TOOLS NEEDED Tape Measure Marker or Pencil Masonry Drill Bit Drill (Hammer drill recommended) Hammer Wrench 9/16 Level RECOMMENDED BASE MATERIAL Solid concrete is the best base material for installation. To ensure the proper anchors are shipped with your rack, ask your Dero Rack representative which anchor is appropriate for your application. Be sure nothing is underneath the base material that could be damaged by drilling. 1 2 Place the rack in the desired location. Use a marker or pencil to outline the holes of the flange onto the base material. Drill 3/8 diameter holes 3 deep into surface. Make sure the holes are at least 3 away from any cracks in the base material. 3 4 Place rack (and washers to level rack if necessary) over holes. Thread nuts onto anchors, leaving approximately 1/4 of the anchor protruding, and tap into surface. Tighten nuts down to secure rack.

Installation Instructions In Ground Mount TOOLS NEEDED Level Cement mixing tub Shovel Trowel Hole coring machine with 4 bit Access to water hose Materials to build brace (see Install Tip at bottom of page) INSTALLING INTO EXISTING SIDEWALK Core holes no less than 3 diameter (4 recommended) and 10 deep into sidewalk. Fill holes with Por-Rok or epoxy grout. Place rack into holes, making sure the rack is level. 33-36 of the rack should remain above the surface. If the rack is less than 33 high, it will not support the bike adequately. Make sure the rack is level and held in place until the grout has set. INSTALLING INTO A NEW SIDEWALK Final grade level 1 2 Poured concrete (4-7 deep) Sand pour bed Place corrosion resistant sleeve (min. 3 inside diameter) in sand pour bed in exact location where rack will be installed. Make sure top of sleeve is at same level as desired finished concrete surface. Fill sleeve with sand to keep it in place and prevent it from filling with concrete. Pour concrete and allow to cure. 3 After appropriate cure time, dig out sand from sleeves and insert racks, making sure they are level and at the appropriate height. Pour in Por- Rok or epoxy grout and allow to set. INSTALL TIP An easy way to brace the rack while the grout sets is to bolt two 1x4 boards together at one end and clamp them onto the rack like a clothes pin.

Rail Mounted Options RAIL MOUNTED SWERVE RACKS Rail mounted Swerve Racks are standard foot mounted Swerve Racks attached with bolts to a rail as in the diagram at left. Rail mounted racks provide more flexibility than other mounting options while providing the same degree of security. Rail mounted Swerve Racks can be left freestanding, or they can be anchored to the ground using several anchors. This option allows for easier snow removal and sweeping. Installation of Rail mounted Swerves is also much less expensive than embedding the racks into the ground. * Note: Though racks may be painted, the rails will remain with only a galvanized finish ADVANTAGES: Anchor runs through rail into base install surface Easier and inexpensive installation Can be left freestanding or anchored to the ground Easier to remove for sweeping and snow removal APPLICATIONS: Installation to pavers Asphalt Installations Ground, dirt, or mulch Situations where the rack needs to be moved occasionally 3 Unit Rack 69 Long Parks 6 Bikes 4 Unit Rack 108 Long Parks 8 Bikes 5 Unit Rack 132 Long Parks 10 Bikes 6 Unit Rack 181 Long Parks 12 Bikes

Installation Instructions TOOLS NEEDED 9/16 Socket set Two 4 x4 x28 (or larger) blocks 4 bolts, nuts and washers for every Swerve (included with rack). If using a tamper resistant nuts, install two tamper resistant nuts with each rack. ANCHORING THE RAILS To anchor the rails to concrete, place 3.75 wedge anchor through holes in the rail into the concrete. Secure with nut. 1 2 Lay out the two channel beams where the rack will be placed. Place the two beams on top of the two blocks of wood so that the open part of the channel faces the ground. Place Swerve Racks on beams so holes in rack flanges line up with beam slots 3 3/8 Bolt 4 Nut Put bolts through Swerve Rack flange holes and beams so bolt head faces up. HAND tighten the nuts using new flange nuts. Once nuts are on, tip assembled rack over and use a 9/16 socket to tighten nuts. Before fully tightening nuts, make sure the racks are straight on beams. If using tamper resistant nuts, use access tool to tighten nuts. Do not overtighten the tamper resistant nuts. Tip rack upright.