FRAMED CABINETRY INSTALLATION MANUAL

Similar documents
BUILDERS ONE Framed Cabinet. Installation Manual

Cabinetry Installation

" BASE CABINET

Closet System Installation Manual

Install Guide. view our Install video guide online

The DeWils Guide to Designer Series Framed Cabinetry Installation

INSTALLATION GUIDE CABINETRY

Chapter 22 - Cabinets & Vanities

CABINET INSTALLATION INSTRUCTIONS

Installation Guide. Read this entire guide before starting installation. Failure to do so could result in serious injury or death

Installation Manual MODEL ANE-42

Safety First! Review the Safety Checklist before performing tasks in this chapter.

Installation Guide. Read this entire guide before starting installation. Failure to do so could result in serious injury or death.

Safety First! Review the Safety Checklist before performing tasks in this chapter.

PLEASE READ THE ENCLOSED THOROUGHLY. DO NOT DISCARD IMPORTANT INFORMATION INSIDE! Installation Guide

Installation Manual MODEL NE-42

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

installation AND CABINET CARE & MAINTENANCE GUIDE

t h e h e l p f u l g u i d e t o c a b i n e t i n s t a l l a t i o n

To prevent accidents and damage please read these instructions before installation or use. Installation Instructions

Adjustable Countertop Installation

Manufactured and Distributed by Multi-Housing Depot. Acacia Cabinetworks. Installer Pro Training

CABINETRY INSTALLATION

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)

GE Monogram. Installation. Instructions. 27" Built-In Ovens. Models ZEK757WW ZEK757BW ZEK737WW ZEK737BW

Installation Manual MODEL AE-46

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models.

Cabinet Installation Guide

CABINET INSTALLATION Please read prior to installation.

HAND TOOL NOTES For each tool picture and name, please write what it s used for. You will have a quiz on this.

Laminate Cabinet Installation Instructions

UNIT 12: INTERIOR DOORS AND TRIM

KITCHEN INSTALLATION GUIDE

KITCHEN INSTALLATION GUIDE

inspired colors. innovative organization. incredible strength. INSTALLATION AND CABINET CARE & MAINTENANCE GUIDE

Murphy Door DIY Hardware Installation Manual

CABINETRY Assembly Instructions

Installation Manual MODEL E-42

Synthesis TM Casework Collection Installation

INSTRUCTION SHEET U19

Installation Instructions

129 KITCHEN BASE CABINET 480

Installation. Instructions. Built-In Microwave/Convection and Microwave Ovens. Models ZMC1095 JEB1095 JEB1055

Preference Collection 5543 Central Console INSTALLATION GUIDE

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

Table of Contents. 1. Safety and Liability What You Should Know About Wood Tools and Supplies Installation Process...

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

MODELS: AE46, AE42, E46, E42, ANE46, ANE42, NE46, NE42

Installation Instructions Edge Storage System

SMARTfit Functional and Brain Fitness Training Multi-Station Trainer Installation for Stud and Concrete Walls (US)

Installation Instructions For Heavy Duty (FAS Models) and Median (FAM Models) Air Conditioners

x2 1/4 (6mm) Floor Anchor

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Chapter 20. Exterior Finish Work

SMARTfit High Intensity Cognitive Training. SMARTfit Trainer Installation Manual for Stud and Concrete Walls Revision 1.3

BUYING GUIDE. Available at:

Plans. Easy-to-Build Full-size Deluxe Murphy Bed Plan. For more plans, tools and hardware visit rockler.com

Assembly Instructions

Media Storage Systems Fixed Media Cabinets

Chapter 18. Interior Doors

NEXUS SERIES CABINETS

Best Barns USA Assembly Book Revised November 3, 2016

Locker Installation Guide. Lockers Available From CES Company Phone: Fax:

INSTALLA- INSTALLATION. A guide to install a new IKEA kitchen

Custom. Options Guide. and. Installation Instructions. GE Monogram 36" Built-In Refrigerators. Models: ZIS36NY ZISW36DY ZISB36DY

Preference Collection and Treatment Console INSTALLATION GUIDE

From all of us, thank you for choosing. John McDonald, Founder

Frameless Inline Door QCI5250

Installation Instructions

Installation Instructions

Installation Manual Installation Manual

Household Appliances. Over-the-Range Microwave. Installation Instructions. For Models: HMV9302, HMV9305, HMV9306, HMV9307

How to Install Custom Real Wood and Faux Wood Blinds

INSTALLATION GUIDE MICROWAVE OVEN UPMC3084ST. MFL _00

W INE S TORAGE INSTALLATION INSTRUCTIONS

Installation Instructions for. Hy-dit. Toilet Plunger Storage. English. Patent # 7,156,476 B2. Manufactured by:

BASE & WALL CABINET SETUP GUIDE BY SUNSTONE

Kentucky 4H Wood Science Plans Notebook. Plans Level 3

Assembly and Installation Guide

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

USER GUIDE 3060ZWC. 60 cm Wine Cellar Model. Modular 3000 Series RIGHT PRODUCT. RIGHT PLACE. RIGHT TEMPERATURE. SINCE 1962.

Arlington Linen Shaker Kitchen Cabinets Price List

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

Chapter 19. Interior Finish Work

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

10 Octagon Cedar Gazebo Assembly Instructions

Overlay Installation Guide

ATLANTIS RAIL Contact Information

USER GUIDE & SERVICE MANUAL

Qwik-Fence Installation Instructions

Frameless Heavy Glass Door with Header

STEP-BY-STEP MEASURING GUIDE

Steel Sound Enclosure

Metallaire Installation Instructions

Installation Instructions

E R I E S I O N G U E A L L A T I D II N S T

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

RLP Flat Track Hardware sliding door hardware/ barn door track

1 ¼-inch Pocket Screws Brad Nailer or Hammer 1 ¼-inch Brad Nails Clamps

Transcription:

FRAMED CABINETRY INSTALLATION MANUAL AN INDUSTRY GUIDE FOR PROFESSIONAL INSTALLATION RESULTS TO AVOID DAMAGE OR INJURY, READ IN ENTIRETY BEFORE STARTING MATERIAL & TOOL LIST FOR INSTALLATION Safety Glasses Design Layout Framing Square Hammer Pry Bar Phillips Screwdriver Flathead Screwdriver Level Tape Measure Pencil Straight Edge Drill Extension Cord 3/32" Drill Bit 7/32" Drill Bit Table or Jig Saw Miter Box "C"-Clamps Stud Finder 6' Step Ladder Wood Shims Pin Nailer/Gun Finishing Nails 1" x 2" Furring Strips Circuit Tester Pipe Wrench #10x2-1/2" Pan Screws #8x2-1/2" Trim Screws Scrap Lumber for Construction of "T" Brace BEFORE YOU BEGIN: Check your cabinetry against your design plan to ensure that you have all required cabinetry, moldings, fillers, and accessories to complete the installation. SAFETY FIRST: To avoid injury, explosion or shock, make sure that all water supplies, gas supplies and pertinent circuit breakers are shut off. Double check electrical using circuit tester to confirm power is off. If you are uncertain that utilities have been properly shut off, consult your utility company or service professional. CAUTION: It is essential that you use the recommended screws for your cabinetry installation. Under no circumstances, should you use nails or drywall screws as they do not have the strength or holding power to ensure that cabinets stay on the wall. Failure to use specified screws will render warranty null and void. Installation detailed in this manual is for wood stud construction only. Attachment to any other surface material such as concrete block, brick, stucco or poured concrete require special fasteners. Consult with your local home center, hardware store or installation specialist for recommended fasteners.

STEP #1 After you have confirmed the all utilities are shut off, you may begin removing appliances and sink. We recommend moving these out of the kitchen to provide maximum work space. Continue by removing cabinetry, countertops and any moldings or baseboard that may interfere with installation. STEP #2 You can expect that your floors and walls will have some uneven areas. Begin by locating the floor s highest point. Place a level at the base of the wall and move around the perimeter of wall until you locate the high point (ILLUSTRATION A). Mark this location for reference. Repeat this process at a point 21-1/2 away from the wall (front of cabinet toe kick), and compare to previously identified high point. Use whichever high point is greater for next step. ILLUSTRATION A STEP #3 Measure up from the highest point 34-1/2 and draw a level line around the room perimeter to receive cabinetry. This is your base cabinet level line to which you will align the top of the base cabinets. Now, measure up from the original high point 84 if you are installing 30 high wall cabinets, or 96 if you are installing 42 high wall cabinets and draw a level line around room perimeter to receive cabinetry. This is your wall cabinet level line to which you will align the top of the wall cabinets. Lastly, measure down 30 from the 84 line if you are using 30 high cabinets, or 42 down from 96 line if you are using 42 high cabinets and draw a level line around the room perimeter to receive cabinetry. This is your wall cabinet bottom level line. STEP #4 Locate wall studs with stud finder and mark their locations for your installation reference (ILLUSTRATION B). Use a straight 2 x 4 and carpenter s level to check walls for any uneven spots. High spots should be removed by sanding or scraping and low spots should be shimmed. ILLUSTRATION B 1

STEP #5 Attach 1 x 2 furring strips directly below the furring strips wall cabinet bottom level line with wood screws (ILLUSTRATION C). These temporary support strips will help to support the weight of the cabinets during installation, and insure that the cabinets are level. You are now ready to begin the cabinetry installation and it is recommended that you remove all Floor doors, drawers, shelves and roll-out trays from each cabinet prior to installing to ILLUSTRATION C prevent damage. Consult your cabinetry manufacturer s website for door/drawer removal and adjustments. For ease of installation, begin by installing wall cabinets first. STEP #6 Refer to your design layout to determine what wall corner cabinet to start with (if there is a corner cabinet), and place it on the floor below where it will be installed. Measure from the corner to the first wall stud and transfer this measurement to the inside of the wall cabinet. Repeat for next stud location. Now measure down 3/4" from inside top of cabinet, and 3/4" from inside bottom of cabinet and intersect these measurements with the stud location measurements. Drill through the wall cabinet back using a 3/32 drill bit. Repeat process for adjacent corner back panel. Raise cabinet into place resting on temporary rails and fasten the cabinet to the wall with #10 x 2-1/2 pan head screws but do not fully tighten. Check for level and shim where necessary (ILLUSTRATION D). You may also construct a support wood T brace to hold the front edge of cabinet in place until you have attached to wall (ILLUSTRATION D1). Shim Floor ILLUSTRATION D ILLUSTRATION D1 ILLUSTRATION E If your design includes a blind wall cabinet (ILLUSTRATION E) instead of a wall corner cabinet, consult your design to determine the distance the cabinet is to be installed from the wall corner. Always measure distance using the front frame width of the cabinet and not the end panel width of the cabinet. Place cabinet on floor below where it will be installed and repeat all measuring and pre-drilling as detailed in Step #5. Raise cabinet into place resting on temporary rails and fasten to wall with #10 x 2-1/2 pan head screws but do not fully tighten. Check for level and shim where necessary. 2

STEP #7 Determine next wall cabinet to be installed and repeat measuring, pre-drilling and installation but again, do not fully tighten. Carefully align the face frames of each cabinet with each other and C -clamp or Quick-Grip together (ILLUSTRATION F). Drill a 3/32 pilot hole in three places along hinge side of frame and secure with #8 x 2-1/2 trim screws. Continue around the room until all wall cabinets have been installed. Return to each cabinet for one last check of level and plumb and tighten screws. C-clamp This same method of attachment is also to be used for fillers. Fillers may need to be cut to size to fill an odd open dimension between the cabinet and the wall. Hold the filler in place where it is to be installed. Turn it over and mark at top and bottom where it needs to be cut. Connect the two marks using a straight edge and draw a line to create your cut line. Once cut, install as described above. STEP #8 Base cabinets are installed in much the same manner as wall cabinets. Refer to your design layout to determine what base corner cabinet to start with (if there is a corner cabinet), and place it on the floor where it will be installed. If your design includes a base easy reach or base easy reach lazy susan (ILLUSTRATION G), measure from the corner to the first wall stud and transfer this measurement to the inside of the base cabinet. Repeat for next stud location. Now measure down 3/4" from inside top of cabinet and intersect these measurements with the stud location measurements. Drill through the base cabinet back using a 3/32 drill bit. Repeat process for adjacent corner back panel. Move cabinet into place and check for level and plumb. Shim where necessary and fasten the cabinet to the wall with #10 x 2-1/2 pan head screws but do not fully tighten. Floor ILLUSTRATION F Wall Level ILLUSTRATION G If your design includes a blind base cabinet (ILLUSTRATION H) instead of a base easy reach corner cabinet, consult your design to determine the distance the cabinet is to be installed from the wall corner. Always measure distance using the front frame width of the cabinet and not the end panel width of the cabinet. Place cabinet on floor where it will be installed and repeat all measuring and pre-drilling as detailed in Step #7. Move cabinet into place and check for level and plumb. Shim where necessary and fasten the cabinet to the wall with #10 x 2-1/2 pan head screws but do not fully tighten. ILLUSTRATION H 3

STEP #9 Determine next base cabinet to be installed and repeat measuring, pre-drilling and installation but again, do not fully tighten. Carefully align the face frames of each cabinet with each other and C -clamp together (ILLUSTRATION F). Drill a 3/32 pilot hole in three places along hinge side of frame and secure with #8 x 2-1/2 trim screws. Continue around the room until all base cabinets and fillers have been installed. Return to each cabinet for one last check of level and plumb and tighten screws. NOTE: You will need to create cutouts for electrical and plumbing in some cabinets. Carefully measure each location and transfer to BACK of cabinet. Accurately cut holes BEFORE installing cabinetry. STEP #10 You may now install any tall cabinets (ILLUSTRATION I), base end panels or tall refrigerator panels, if included in your design. Tall cabinets are installed in the same manner as wall and base cabinets. If your tall cabinet requires an end panel skin, attach to end panel before installing cabinet (ILLUSTRATION J). NOTE: If you are installing an oven cabinet, be sure to consult the appliance manufacturer s installation instructions for cutout size and additional bracing or reinforcement requirements. Base end panels and tall refrigerator panels are installed in the same manner. Determine location of panel and draw a line on floor that represents the INSIDE edge of the end panel. Attach a wood cleat to floor to create an anchor point for securing end panel. Attach three (3) L brackets to panel at back. Test fit panel and determine if there is a stud where L brackets will attach to wall. If no stud is present, install plastic wall anchors. You are now ready to install skins and matching toe kick cover. This is a simple measure and cut operation. Attach matching skins or toe kick cover with finish nails or pin gun. Construction adhesive may be used as an alternative (ILLUSTRATION J). C-clamps ILLUSTRATION I Finishing Nails ILLUSTRATION J 4

STEP #11 You are now ready to install any moldings included in your design. Crown moldings give your kitchen a custom look so, take your time and measure carefully. We recommend a miter box or compound miter saw to insure accurate cuts. Remember, the proper position for cutting molding in a miter box or compound miter saw is upside down with the bottom edge of the molding resting against the miter box fence. If your cabinetry selection features a standard overlay door, molding may be attached directly to the cabinet face frame with finish nails or a pin gun. If your cabinetry selection features a full overlay door, use of molding support strip is required (ILLUSTRATION K). Your cabinetry supplier may have included this strip so be sure to check for it. If it was not included, a 1 x 2 can be secured to the top of the cabinets for molding attachment. ILLUSTRATION K STEP #12 It is now time to reinstall all shelves, doors, drawers and roll-out trays. Consult your cabinetry manufacturer s website for door/drawer adjustments procedures. Make sure that all doors and drawer fronts are adjusted to your satisfaction BEFORE installing decorative hardware. STEP #13 You can now safely remove the wall cabinet support strips and patch any screw holes in wall. Consult your cabinetry manufacturer s website for initial care and cleaning instructions and begin enjoying your new kitchen cabinetry! 5