Challenger II Aircraft Construction Manual

Similar documents
LSS Section I PREFACE TO ASSEMBLY

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

WRIGHT FLYER 1 INSTRUCTIONS FOR THE D10LC KIT

12. Wings, Flaps, Ailerons and Struts

Corvus Racer CC

10. Wing prep and subassembly

Frameless Inline Door With Return QCI5263

Citabria Pro. Aerobatic Parkflyer. by Joel Dirnberger

Nanton Grain Mill Assembly

LUNAR EXPRESS. Little

Edge 540 V3 35CC. Scheme A. Item No:L G Specifications. Flying Weight

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above.

Piper Cherokee /3 scale. Construction Manual

Curium 19H Installation Instructions & Parts List

Side and rear window, assembly overview

11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410).

Frameless Inline Door QCI5254

RFS Class II Rocket Assembly Instructions

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

Dubnium 11 Installation Instructions & Parts List

Frameless Inline Door QCI5248

APACHE HINGE REPLACEMENT PROJECT

EXTRA 330SC 60CC. Item No:H G Specifications cc gas DA50,DA60, DLE55, DLE60(twin), 3W55. Description

ParkJet Builder s Manual

FLITZEBOGEN-2 Assembly instructions

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:

Radon 07 Installation Instructions & Parts List

Palladian/ Keystone Models 202/204 Maintenance Kit

Hobby Lobby Zip Supplementary instructions Please refer to the included drawings while using these assembly instructions

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

From "American Woodturner" the Journal of the American Association of Woodturners, April 2015, vol 30, no 2 - CUSTOM - TOOL HANDLES

PAT installation of a Sun Dome over a in-ground

Frameless Door QCI5284

EXTREME LOAD no. TWO

SZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES

All Terrain Flares 2014 Chevy Silverado

Building Tips This model can be built using the following types of adhesives:

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

Surf-N-Skim and Surf Pad System Installation Instructions

PITTS S2S CONSTRUCTION

Frameless Heavy Glass Door with Wall Mount Hinges

EZYSTONE WORKSURFACES

UPPER DOOR KIT P/N

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

TIGER MOTH 120 ASSEMBLY INSTRUCTIONS

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

Zeon PDF Driver Trial

THE APOGEE A 100-INCH AMA DURATION SAILPLANE FROM DYNAFLITE

PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE PROCEEDING

FLEXITEEK INSTALLATION INSTRUCTIONS

Max Launch Abort System Prod. No *Kevlar is a registered trademark of Dupont

Tools and Tips: ( 1 )

Frameless Inline Door QCI5250

SCULL HANDLES AND GRIPS INSTRUCTION BOOKLET

Curium 19.4H Installation Instructions & Parts List

The Virgo/Libra Steam Engine

Corvus Racer Colour schemes. AeroPlus RC Copyright 2013 All Rights Reserved

(2) 25mm x 20mm x 5mm Adhesive Backed Foam Pads. 100mm x 50mm x 1.0mm Adhesive Backed Foam. (2) Spacer Plates. Passenger/Right Side Frame Mounting

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

Retrofit Apron Front Farm Sink With Dual Mount Capability Installation Instructions

EXPRESS ASSEMBLY MANUAL SECTION 3 F5-RG/FT WING ASSEMBLY. Procedure 3.155A WING CLOSE-OUT PROCEDURES

Installation Instructions

1/6 PA-25 PAWNEE. *Specifications are subject to change without notice.*

Installation and Care Instructions: Rear Windshield - CFMOTO UForce 800

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

RESolution V2 Manual

FUSELAGE CONSTRUCTION

WPS crew Doors Installation instructions

Instruction Manual book

14401 NE Keil Road, Aurora, Oregon, USA PHONE FAX

STYLE BAR & TONNEAU COVER INSTALLATION

Double Frameless Swing Door QCI5247

A-935 RODA WALL MOUNT HINGES

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

MXS R 30CC. Item No:L G Specifications. 67 1/2"(1720mm) (2C) (4C) 26 35cc gas DLE 30/35RA MLD35 JC30Evo.

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

CIRRUS AIRPLANE MAINTENANCE MANUAL

Bushwacker Jeep Flat Style Fender Flares Front Pair

Traditional Undermount: S Method (Undermount):

SGTalon s Enterprise-A Foamie Build Guide. SGTalon s. Enterprise. Enterprise--A. Assembly Instructions

2.1 Parts List Tool requirement Before you start assembling the Stabiliser Front Spar Center Doublers...

JAMISON SPECIAL. Building Guide

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

EPP Rebel Z 35. White Red w/ Blue Orange w/ Blue Orange w/burgundy Other. Specs. Color - Bottom White Black Checkers Silver Checkers Other Checkers

FIXED PANEL SLIDER QCI5241

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Gallium 03 Installation Instructions & Parts List

Standard Kit #1 (3-way switch)

CUSTOM SHUTTERS IN-A-BOX

Balustrade Systems / Installation Instructions

SERVICE LETTER SL REV B

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Repairs. Chapter 10 Repairs 10. 1

C-180 Builder s Manual

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Included in Hardware Kit. Jeep Cut-Out Fender Flare Set of 4 Set Part # Rev STEP 1 PRIOR TO INSTALLATION

Cardboard Model Buildings

QWALL 5.2 (2 Back Panels)

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

PROJECT PLANS WOODEN GIFT BOX

Transcription:

Page 1 Quad City Ultralight Aircraft Corporation Challenger II Aircraft Construction Manual Covering the following models: Challenger II Standard Challenger II Clipped Wing Special

PREFACE TO ASSEMBLY Page 2 Your Challenger Kit has been supplied to you with most of the major construction completed. Each section of the aircraft has been checked by our quality control process to ensure the section meets our high standards. It is important, however, for you to also examine each component and part of the kit as a double quality control inspection. There is an old adage that applies very well to the project you are about to undertake: If all else fails read the instructions! This certainly is important in this case. If you have any questions about any phase of assembly of the Challenger, contact the factory.. We are glad to assist in every way. We are as concerned about your completed Challengers Appearance and structural integrity as you are, so please take time to Perform each task carefully and according to instruction. Pre-reading each step before beginning the step will also help in understanding WARNING: The parts and hardware in the kit making up the Challenger are of special aircraft grade! DO NOT attempt to substitute any part or hardware yourself. Contact the factory for assistance when replacement is necessary. Your life may depend on it! Quad City Ultralight Aircraft Corp. 3810-34th Street. P.O.Box 370 Moline, IL 61265 Phone (309) 764 3515 Fax (309) 762 3920

Section I Inventory Page 3 Please conduct a complete and thorough inventory check prior to commencing your build. Contact Quad City Ultralight for any defects or deficiencies to your Section I kit. CHECK QUANTITY DESCRIPTION ( ) 1 Instruction Manual (sect. 1,2,3 & 4) ( ) 1 Challenger retail parts price list ( ) 1 Qt Poly-Tak Adhesive ( ) 1 Qt M.E.K. (Methyl Ethel Keytone) ( ) 1 Set of heat shrinkable Dacron socks for Elevators, Stabilizers, Rudder, vertical fin, Dorsal fin. ( ) 1 EMP-100 Rudder frame ( ) 1 EMP-200 Vertical fin frame ( ) 2 EMP-300 Horizontal stabilizer frames. ( ) 2 EMP-400 Elevator frames ( ) 20 ST-16L stainless steel hinge brackets. ( ) 60 AD64ABS 3/16 Aluminum rivets ( ) 2 EMP-7R & EMP-7L control horns elevator ( ) 2 EMP-8R & EMP-8L control horns rudder ( ) 6 AN525-10R20 3/16 Phillips head bolts ( ) 6 AN365-1032 3/16 Nyloc nuts ( ) 4 AN960-10 3/16 washers ( ) 4** Cotter pins ( ) 4** 7/8 Rony Brkts (black alum. U Brackets) ( ) 2** AN4-15A 1/4 bolts (for Rony Brackets) ( ) 2** AN364-428 1/4 Nyloc nuts (thin) ( ) 4** AN4-14A bolts (for attaching stabilizers) ( ) 4** PW-4 (black plastic washers) Note: ** These parts are shipped in pre-assembled form. IMPORTANT NOTE Make notes on how the hardware is pre-assembled and the sequence of Assembly, so they may be re-installed properly. Refer to fig 10. in this section.

ASSEMBLY INSTRUCTIONS Introduction Page 4 Tail Feathers CHALLENGER II SECTION 1- Tail section (Empennage) We supply a Heat Shrinkable Dacron material to cover the tail section. It is lightweight at 1.8oz per sq yard and has a tight weave. Using heavier fabric requires extreme care to avoid distorting airframe members when shrinking, and does not have the fine finish as offered by the lighter material. The assembly of your Challenger II Kit will be TAIL FIRST. This will give you the opportunity of getting the feel of working with shrinkable covering material. OBJECTIVE of SECTION I Upon Completion of SECTION 1 the tail surfaces (Rudder, Elevators, Horizontal Stabilizers and Vertical Fin) will be finished with most of the tail surface hardware installed. Tools Required: (not supplied) Hammer Good camel hair brushes 1/2-1 brush Razor blades Scissors (also pinked edged scissors if available) Household clothes iron 3/16 pop rivet gun Electric drill 3/16 drill bit Metal file De-burring tool Medium grit sandpaper Suitable filtered breathing mask Other Materials: (not supplied in kit). 3/4 Masking tape Paint mixing cups Paint filter Paper towels Sponge brushes 1 1/2 to 2 Protective gloves (rubber) Conduct a full and careful inventory check using the list on page 4. Typical completion time: 8 Hours

How to cover the tail surfaces using Heat shrinkable material TIPS: 1. Have a large, flat and clean surface on which to build your tail section. A large flat panel on two saw horses works well. 2. It is preferable to pre-fit the elevator and rudder hinges BEFORE covering. It is much easier to drill the rivet holes accurately this way and less likely to damage fabric later. See How to install the hinge assembly HNG100 pages 8 & 9. Covering: 1. Remove sharp edges of gussets and tubes ends with a file 2. Sand perimeter of tubes with 220 Wet or Dry abrasive paper. Page 5 3. Clean all tubes with MEK (remove all printed lettering from tubes, or this will bleed through the fabric at a later stage). 4. Tape over the rivets and sharp corners with chafe point tape or masking tape. See diagram. 5. Apply two coats of ADHESIVE to outside perimeter of frame and the cross tube also. Try not to go beyond the top and bottom center line of tubes. This helps prevent gluing the fabric too far around the frame. Allow to dry. 6. Slip on sock ( SEAMS INSIDE AND STRAIGHT ). Use of spring clamps come in handy to hold sock in position. 7. Glue down and seal open end of sock and allow to dry. Have a 2 to 3 inch overlap. Be sure to have overlap on underside of the horizontal stabs and elevators. 8. Tauten fabric with a household iron set to 300 deg. The use of a high temp thermometer is recommended. Attempt to shrink fabric in an EVEN manner from both sides of panel while keeping the seams in place. DO NOT OVER TIGHTEN as this will distort the frame. 9. Dilute the adhesive (in a metallic container) with MEK to 50/50, or until it attains the consistency of melted butter. Observe all breathing and skin protective procedures. 10.Apply the mixture to all the previously glued surfaces (over the fabric). This will re-activate the previously applied two layers of glue and form a bond to the fabric. Allow to dry. Use a good quality 1/2 or 1 brush or a Glue master. 11.Use the iron and set to 350 deg. Tighten the fabric for the final time. Ensure the fabric is ironed evenly. Also, run the iron over the glued edges to remove any wrinkles. Be careful not to hold the iron on any one place for longer than a second or two. It is possible to burn holes in the fabric. A residue will collect on the iron face, this can be removed using MEK (when iron is cold) or an abrasive medium such as Green scrubbing pads when iron is still warm.

TIP: Fabric adhesive and 50/50 mix. Page 6 To re-activate previously applied glue, a mixture of Methyl Ethyl Keytone (MEK) and Adhesive is applied to fabric as it is laid over the glued tubing. This dries quickly and provides a very strong bond once cured. The mixture should have the approximate consistency of melted butter and should not be allowed to dry out, or this mixture will congeal and will become in-effective as a re-activating agent. The mixture should be applied to the fabric and tubing in such quantities that it soaks through and turns the fabric to a wet looking grey color. TIP: Use a clean container (paper paint cups work well) to mix the components in and mark on the outside 50/50 mix It is advisable to use a similar container for the 100% adhesive (also mark on outside 100% ). Keep the container covered as much as possible. This will limit the amount of evaporation that naturally takes place. TIP: Clean brushes with MEK or Acetone. Adhesive MEK 50/50 mix

Description Rudder Vertical fin Horizontal stabilizers Elevators Dorsal fin Hinge assembly Tail Section Schematic Part number EMP-100 EMP-200 EMP-300 EMP-400 DF-100 HNG-100 Page 7 Location of HNG-100 hinge assemblies Elevator horn assy. location 5 5 5 Eye bolt location for lower hinge assy. on rudder Rudder Horn location

How to install the hinge assy. HNG100 Page 8 The components that make up a single hinge assy. 4 ST16L Tangs 12 AD64ABS 3/16 Rivets 1 Dummy bolt 1 Dummy nut 1 AN363-13 Clevis pin 1 LSR (large safety ring) This picture (right) shows the correct orientation of the ST-16L tangs. For correct positioning of the hinge refer to Tail Schematic on previous page (page 7.) Be sure to center the ST-16L tang on the center line of the frame tube. Tape the hinge to the leading edge of elevator. Use tape and clamps (as shown) before drilling 3/16 holes. Pop rivet the two outer holes of the tang and carefully align the second ST-16L tang alongside the first. Proceed to drill the two outer holes as before. Pop rivet the outer holes then drill but DO NOT pop rivet the center Drill 3/16 holes and pop rivet out holes only Drill 3/16 hole here but do not pop rivet Tube centerline holes. This process is repeated for the second stabilizer and for the top hinge assy. on the rudder. Next, drill out and remove all 3/16 rivets and lay the ST-16L tangs aside until the covering and painting process has been completed..

How to install the hinge assy. HNG-100, Cont: Page 9 Once the tail section is covered and painted, locate the drilled holes with the use of an X-acto knife and carefully cut the fabric out of these holes. Line up the ST-16L brackets with the holes and rivet in place using 3/16 aluminum long rivets 1/4 grip. Check alignment of the stabilizer, elevator pairs and install clevis pins and safety rings. Note: The lower rudder fin hinge assembly will be left to final assembly in Section 3 due to the nature of the method of connection. Ref. Fig 1. below Fig 1. Rudder Longeron How to align hinges. Location of bottom hinge Fig. 2. Set Square 6 4 1/2 Elevators Leading edge Stabilizers Trailing edge Stabilizers Mark each panel along this line for hinge alignment. Use felt tip pen Elevators Top view

Step # 1 How to cover the tail section framework Page 10 A) Select the rudder frame from kit. If any sharp edges or burrs exist on pre-drilled holes and tube ends, remove them using a suitable metal file. Use a medium grit sandpaper (220) to lightly sand the entire frame. Wipe down the frame using a clean cloth and MEK (also Acetone works well). Remove all sanding and filing residue. This will ensure a good bond for the adhesive. B) Apply masking tape to all sharp edges of gussets to prevent fabric envelope from being snagged or torn when slipped on. Do not cover any more aluminum than is necessary since the adhesive will not adhere to masking tape as well as to aluminum. (See Fig 2. below). C) Use a soft 1/2 to 1 brush to apply a coat of adhesive to the entire outside perimeter of the tubing and the cross tube. Let this dry for approx 5 to 10 minutes. (See Fig 3. below). Typical gusset Masking tape over sharp edges Fig 2. Rudder leading edge tube Apply 1 smooth coat of adhesive to the perimeter of frame and to the cross tube. Rudder Arrows indicate outside perimeter of Rudder frame. Fig 3.

Page 11 Rudder frame leading edge Fig 4. Pull How to cover the tail section framework, cont: Pull Pre-sewn Dacron rudder sock Sewn seam Step #2. A. All pre-sewn socks are shipped inside-out. Turn the Rudder sock outside-in before applying to frame. B. Slide sock onto frame (Fig.4). Ensure all inside surplus fabric is on one side of the frame for smoother finish. C. Pull open end of sock over the leading edge and fold one side over, trim any excess fabric and attach with 50/50mix. See Fig 5. How to glue open end of socks. Fold fabric around tube & glue with 50/50 glue / MEK mix 1/2-1 Camel Hair brush Fig 5. Note: The thinned adhesive will penetrate the fabric and reactivate the dried glue already on the tubing. Avoid getting glue on any other part of the fabric or too far around the tube. Once dry, iron out any fabric wrinkles on the leading edge tube (350 deg). Trim excess fabric with razor (allow at least 3/4 fabric to contact tube) DO NOT IRON OPEN AREAS AT THIS TIME

How to glue open end of socks. Cont. Page 12 Step #3 Fig 6. A. A. Fold fabric edge over & trim with pinking scissors. Allow at least 3/4 overlap. B. B. Fold fabric back open and apply 1 coat of 100% adhesive C. C. Fold fabric back over and attach with 50/50 mix as before. Allow at least 10 minutes to dry. D. Set clothes iron between 300 and 350 deg. to heat shrink fabric sock. Ensure wrinkles on perimeter edge are removed. Shrink fabric until a smooth, wrinkle free covering is achieved. Shrink each side progressively to keep sewn seam centered.. DO NOT heat excessively, you may melt a hole in the fabric. E. After shrinking apply 50/50 mix to the perimeter and cross tube BUT NOT THE OVER- LAP!. This will reactivate the adhesive that was applied earlier. Quickly wipe off any drips on the open fabric.

Clean up Page 13 Step #4. Use a brush and apply 50/50 adhesive and MEK mix to the perimeter of frame. This will soften any surplus glue that has accumulated during the build process. Wipe off surplus drips or lumps of glue on the frame perimeter and open fabric areas with a lint free cloth while it s still wet. If necessary, use 100% MEK, especially on stubborn and dried glue drips. Be careful not to dilute the adhesive that holds the fabric on the frame. Use the iron to smooth out any lumps or wrinkles that are left. Tip : Any lumps are easier to fix now than later. Tip : Un-even edging can be covered over using the 2 pinked finishing tape. 1.7oz Cut the to the required length and apply along the seam using a thin coat of poly brush. Make sure the tape is soaked through and good adhesion is obtained. To smooth the pinked edge of the finishing tape, use the iron set to 300 Deg and run it along the edge of the tape. Use bias tape if applying around curves. Step #5. Covering the stabilizers, vertical fin and elevators is accomplished in the same manner as the rudder. Follow each previous step, using the same techniques, for the particular frame being covered. Cover all the aforementioned surfaces at this time. Upon completion of this step, covering of the tail surface frames will be complete and ready for painting. Tip : The Hinge assemblies can be riveted into place once the paint job is complete. Tip : On two seat Challengers, keep the tail light (not too much paint) to avoid requiring nose ballast. DF-100 Dorsal Fin. To expedite shipping, the dorsal fin DF-100 is shipped with the fuselage and is not part of the Section 1 package. Remember to repeat the same process for covering, making sure the sewn seam is centered on the bottom of dorsal fin frame. Refer to this drawing (fig 7.) when completing section 3. Top Pull Dorsal Frame Pre-sewn sock Pull Fig 7. Sewn seam on bottom

How to apply fabric sealant, UV protection and paint Step #6 Fabric Sealant A good fabric sealant is required to seal the weave. We have had success with a product called POLY BRUSH. POLY BRUSH is available from most reputable aircraft parts suppliers in quarts and gallons. Read instructions on the can before applying. Page 14 Apply POLY BRUSH to fabric with the use of sponge brushes or fine paint brushes. One thin coat is carefully and evenly applied. Be careful not to apply too much. This will only soak through and collect in large drips on the inside of the fabric. Be sure to spread out any thick accumulations of Poly Brush as quickly as possible. This will save a lot of work later. Note, it is recommended to spray a second coat of Poly Brush, thinned by 20% to 50%. Have a proper paint mask when using Poly Brush, and the operation be carried out in a well ventilated area. UV Protection Poly Spray is recommended as UV protection for the fabric. This will reduce the harm and damage done to the fabric from the suns UV rays. This is a paint that is silver in color. It has very little odor and can be applied with the use of a HVLP spray paint system. It is supplied in Quarts and Gallons and available from most reputable aircraft parts suppliers. Apply one good coat, being careful not to over spray and accumulate any excess or runs. Once this is dry apply one more thin coat if necessary. The tail section is now ready for your paint job. Paint There are various paint systems out there. We have used Poly Fibers - POLY TONE system. Apply paint using any good high volume, low pressure spray paint system. It is recommended that you apply 2 coats of Poly Brush 2 coats of Poly Spray 2 coats of color. THEN STOP!! No more should be applied to the aircraft due to weight considerations. If, however, you wish to complete your aircraft to Airshow quality, you can continue your paint job as necessary.

Page 15 Step #7 HOW TO INSTALL RUDDER HORNS Side View Front View Fig 8. Front & Rear channel bracket location. (7/8 Rony Bracket) Rudder Horns EMP-8L & EMP-8R Install control horns on elevator and rudder, as shown, using hardware supplied. 6 AN525-10R20, 6 AN365. Locate the pre-drilled attach points (see tail section schematic For approx location), use and X-acto knife and carefully cut out the fabric in the holes. Attach the relevant control horn with the bolts and nyloc nuts provided. These should be snug. with a minimum of one thread and maximum of three threads showing. Note: the ELEVATOR horns may require one washer under each of the 3/16 nyloc nuts. HOW TO INSTALL ELEVATOR HORNS Rudder Elevator Stabilizer Fig 9. Elevator horns EMP-7R & EMP-7L Side view Front view

Page 16 Top View of Stab attach points on vertical fin Step #8 Install 7/8 U-bracket assemblies in pre-drilled holes in vertical fin. Reinstall hardware in U-brackets as shown in this TOP view drawing. Set aside until needed in Section III. AN4-15A 1/4 bolts AN364-428 1/4 Thin nylocs Stab L.E. Notch out here so tail will fold up for transportation. AN4-14A 1/4 bolts Stab T.E. Fig 10. 1/4 Thin Nyloc REAR Black Plastic Washers. PW-4 REAR BRACKET ONLY Your Section I should now be complete and ready to attach to your Section III

and finally Page 17 Inspection: We did not use inspection covers as most areas are accessible with out them. Drain holes at the back edges of bottom surfaces are a good idea, particularly if aircraft is operated on floats or tied down outside. Assembly final notes: It is considered proper procedure to insert all aircraft bolts either with the bolt threads down, pointing outboard or toward tail when possible. This is done in case the nut should somehow be removed, the forces (gravity inertia) will tend to keep the bolt in place. It is wise to observe this procedure in the assembly of any aircraft. Also, when using locknuts, at least one bolt thread should be visible on the outside end of the nut after tightening. Locknuts should be tightened and loosened no more than twice or replaced with a fresh aircraft grade locknut to insure proper locking action. Bolts that pass through tubes with no solid internal support should be tightened until the tube shows a slight distortion (5%). Where castle nuts are used be certain to lock with a safety pin, cotter pin or safety ring. Bolts that pass through U-brackets should compress the U-bracket no mare than 1/16 NOTE: In later assembly, check engine owners manual for proper torque values of engine bolts