ULT R A S PACE SAV E R SQ UA R E D

Similar documents
ULT R A SPAC E SAV E R

ULTRA SPACE SAVER SQUARED Installation Instructions

ULTRA SPACE SAVER Installation Instructions

Ultra Space Saver American Bicycle Security Company

TO O L K IT. Public Bike Repair

S W E RV E RAC K. Simple Security. Simple Stability.

CYCL E STAT IO N. High Capacity

Secure Bike Parking. Patent Pending Dero

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.

DERO BIKE LOCKER 33. Maximum Security

H O O P RAC K. Simple Security

Bike Locker Model DBL1 & DBL2

KO LO SH E LT E R. High Capacity and Flexibility

Safe and secure Dero

Today s Service Station

AIR KIT 3. Heavy-Duty Public Bike Pump

PRODUCT INFORMATION Dero Space Saver Bike Racks

Today s Service Station

Downtown Rack. Custom logo option available

BIKE FILE (301)

Swerve Rack CUSTOM RACKS AVAILABLE

H O O P RAC K. Simple Security

96 (Standard Length)

Track Rack. * Track Racks are not lockable

Pocket Shelter. Covered bike parking earns your site LEED credits.

SADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.

STRATUS SHELTER. Take bike parking to new heights

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

Allow 60 from door face

Desk/Wall-Mount Rack

Independent Containment System (ICS)

Ripple Hanger ASSEMBLY INSTRUCTIONS

KOLO SHELTER Installation Instructions Parts List

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

TABLE OF CONTENTS REQUIRED TOOLS

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Pillar Hanger ASSEMBLY INSTRUCTIONS

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

Contour Hanger ASSEMBLY INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

AUXILIARY FRAMING AND ACCESSORIES

Installation Instruction

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

Rockwell 4-in-1 Sliding Door

TWIG Hanger ASSEMBLY INSTRUCTIONS

Cellar Hanger ASSEMBLY INSTRUCTIONS

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Spoked GARRICK HANGER

Pergola Installation Instructions

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

Heavy Duty I-Beam Trolley

ADJUSTABLE MOUNTING POST

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Dura-Lock Roof System

Stag Hanger ASSEMBLY INSTRUCTIONS

Box Track INSTALLATION INSTRUCTIONS

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

May 14, Installation Manual

Installation Instructions for: Saris Cycle Aid. Saris Cycle Air. Saris Cycle Air HD

Leveling Feet, Base Plates and Casters

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

ESA-100 Fixed Sidelite/Non Breakout

LPR System Installation instructions

INSTALLATION INSTRUCTIONS

Installation Instructions for Bike Fixtation Public Work Stand and Floor Pump Manual RevH

Top Mount Ultra Modern Hanger

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

STEEPLE GATE BARRIER SET INSTRUCTIONS

SHELTON THERMOSTATIC SHOWER PANEL

New Product Release: October 2014 Boone Racks

Roll In W/L Dock PAGE 1

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.

Installation Instructions

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Double Beam Freestanding Pergola Installation Guide

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

Motorcycle Lift Assembly Instructions

INSTALLATION INSTRUCTIONS

WADE 2-1. Universal Carrier. Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains.

Installation Manual Flat Track Series

Art Rack Assembly Instructions:

COMPONENTS INSTALLATION

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

User Instructions Multiline Otter Scoreboard Caddy Assembly

CAELI THERMOSTATIC SHOWER PANEL

ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit

MONKEY BARS OVERHEAD RACK INSTALLATION

19 to 39 TV WALL MOUNT - FULL MOTION

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

30 wide track Adjustable Tire Rack

Mount to the Wall INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

Transcription:

ULT R A S PACE SAV E R SQ UA R E D Hip to be Square Dero s Ultra Space Saver Squared offers high-security, vertical bike parking. Adjustable sliding arms make it easy for customers to best utilize their space. It also creates flexibility to make sure bike spacing follows city requirements as they evolve. Pipe-cutter resistant squared steel tubing makes the Ultra Space Saver Squared more secure than the original Ultra Space Saver. Patent D774,441

ULT R A S PACE SAV E R SQ UA R E D Modular design fits nearly any space U-lock compatible Easy assembly Double your capacity Square tubing for greater security Spacing between arms may be varied FINISH OPTIONS MOUNT OPTIONS Floor Powder Coat White Black Light Gray RAL 7042 Deep Red RAL 3003 Yellow RAL 1023 CNH Bright Yellow Orange RAL 2004 Blue RAL 5005 Sky Blue RAL 5015 Hunter Green RAL 6005 Light Green RAL 6018 Green RAL 6016 Sepia Brown RAL 8014 Bronze Silver 9007 Dark Purple Flat Black Wine Red RAL 3005 Beige RAL 1001 Iron Gray 7011 Thermoplastic Galvanized Black Green www.dero.com Red Blue Gray Brown 1-888-337-6729 Wall

Submittal Sheet CAPACITY Modular construction 1 biker per arm 81 30 Single Sided 81 56 Double Sided MATERIALS Hanger is 1 square tube with steel slider head with tamperproof locking bolts. Upright is 2 square tube. Feet are AISI C3 x 4.1 galvanized steel channel. Crossbeams are 2 sched. 40 galvanized pipe. Wall Mount FINISHES Powder Coat (Interior Use) Our interior powder coat finish assures a high level of adhesion and durability for indoor use by following these steps: 1. Sandblast 2. Final thick TGIC polyester powder coat 30" 42" min. ceiling 87" 36" 36" 57.5" 56" 47.5" 76" 116" Powder Coat (Exterior Use) Additional Cost Our exterior powder coat finish assures a high level of adhesion and durability for outdoor or exposed air use by following these steps: 1. Sandblast 2. Epoxy primer electrostatically applied 3. Final thick TGIC polyester powder coat Galvanized An after fabrication hot-dipped galvanized finish is our standard option. Optional wheel stops are available MOUNT OPTIONS Floor Mount Ultra Space Saver Squared have steel channel feet (30 for single sided and 56 for double sided units) which must be anchored to the floor. Wall Mount A wall mounted unit which contains special brackets is also available for CMU or solid concrete walls. Cannot be used on sheetrock without additional support. WHEEL STOPS Include optional wheel stops 8 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 42 Aisle 36 19 4 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 As a general rule of thumb, this space can fit approximately 60 bicycles. 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Aisle 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 The Ultra Space Saver Squared parks one bike every 16 with a typical bike extending out 40 from the wall. 21 8

Installation Instructions The Ultra Space Saver Squared has several steps for installation. Note that the single and double sided setups and parts are different. Make sure you follow the instructions according to the model you ordered. Recommended Base Materials: Solid concrete is the best base material for installation. Make sure nothing is underneath the base material that could be damaged by drilling (i.e. post-tension cable). Use the 3.75 wedge anchors that are included to install the rack into the concrete (wall anchors are 3 ). Installation: Sort out the parts to the rack and identify each of them accordingly. The 1 carriage bolts are for assembly of the rack and the 3.75 wedge anchors are for mounting the rack to the floor. Upright: SS-U Hanger Arm: USS-SQ Crossbeams 30 : SS-B2 46 : SS-B3 62 : SS-B4 78 : SS-B5 94 : SS-B6 Single Sided Parts Single Sided Foot: FT30 Reading your Dero designed layout Ultra Space Saver Squared come in varying configurations, making it very important that you carefully follow the layout provided by Dero when installing the racks. If you do not follow the diagram, you may well end up short of parts. The length of each Ultra Space Saver Squared unit is indicated by a number ranging from B2-B7 in the layout. This number corresponds to the length of crossbeams to be installed. In the example provided below the Ultra Space Saver Squared is to be installed starting with two B4 units, which have 62 crossbeams, followed by a B5, which has 78 crossbeams. 13'7 Note: All other part numbers are the same as the single sided unit above Double Sided Foot: SS-DF Double Sided Parts B4 B4 3' B5 B5 10'-3" These numbers indicate the number of arms between brackets for each Ultra Space Saver Squared unit to be installed. Wall Mounting Bracket (Wall Mounted Only) - SS-W

Installation Instructions Wall Mount TOOLS NEEDED 9/16 Wrench/Socket 3/8 or 1/2 Masonry Drill Bit (Depending on anchor type) Tape Measure Drill (Hammer drill recommended) Hammer Level Marker or pencil Pin-in-hex tool (provided) NOTE Before installing make sure the wall is strong enough to accommodate the rack fully loaded with bikes. Steel stud walls are not suitable for installation 1 Lay out parts on the floor where unit is to be installed and be sure you have all necessary parts. 2 3 3 On cross beams, Place a mark three inches from each end. This mark will show you how far to slide the cross beam into the wall bracket. 3 4 Mark holes Wall Bracket Nut 50 to ground Washer Place first wall bracket on wall where you want to install the bike rack. The lowest hole of bracket should be 50 from the ground. Mark holes for drilling. Drill Holes into wall, put the wall bracket back up and insert wall anchors through holes in bracket and set the anchors. For setting the anchors and diameter and depth of holes, follow instructions sent with the anchors. Make sure bracket is level.

Installation Instructions Wall Mount 5 Stagger height of arms Thread 3/8 by 3/4 tightening bolts into holes in bracket. Insert crossbeams into bracket. Slide on arms and make sure arms are staggered. Secure the arms with the set screws 16 apart on-center. Install end bracket, making sure cross beams are level. 6 If installing more than one set of Ultra Space Saver Squared arms, continue from last installed wall bracket and repeat steps 3-5 above.

Installation Instructions Floor Mount TOOLS NEEDED 9/16 Wrench/Socket 3/8 Masonry Drill Bit Tape Measure Drill (Hammer drill recommended) Hammer 1 2 Mount single-sided rack at end of foot Place crossbeams into brackets. Finger-tighten bolts to hold crossbeams loosely in place. Mount double-sided rack at center holes Measure out space. Attach feet to uprights with carriage bolts provided.

Installation Instructions Floor Mount 2 3 16 Tape measure slots Carefully slide first hanger arm onto crossbeams. For single-sided racks leave a 3 space between the hanger arm and mounting bracket. Tighten set screw to hold hanger arm in place. Gently slide on remaining arms making sure to stagger height of each arm and tighten each set screw. Standard spacing between arms is 16. For double sided model slide arms on opposite each other. Repeat until the crossbeams are full. 4 5 Wedge anchor runs through rail into concrete Attach the second upright. Tighten bolts to secure crossbeams in brackets. For add-on units repeat steps. Anchor rack to floor with 3.75 wedge anchors. Anchor holes (Use only two anchors) Single Sided

Installation Instructions Tire Stop (Optional) 1 2 Attach tire stop to uprights with supplied hardware Continue attaching tire stops if using a modular system

ULTRA SPACE SAVER Installation - Metal Stud Wall 1 2 Use ¾ x 16 board as a substrate to mount the racks. White Melamine board works well. Lay out the wall mounting brackets on the board and mark the (3) holes per bracket on the board. Drill at marks with a ½ drill and press 3/8-16 Tee Nuts in the back of the board. 3 4 52 Place the board on the wall and attach with (3) 3/16 x 3 self-drilling screws at each metal stud. The center of the board should be 52 from the ground. 4 wood screws may be used for wood studs. Attach the USS racks to the board with (3) 3/8-16 x 1 bolts and washers at each wall mounting bracket. Dero is not responsible for verifying installation surface and location. Installer assumes all liability for secure installation.