3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources

Similar documents
Integrating Design Through 3D Technology Why do Contractor s have all the fun?

Civil Product Update. Derricke Gray, Product Manager Bentley Civil Americas

Designing with BIM for Infrastructure on Large Transportation Projects

What s New in Bentley Civil SELECTseries 3

Programme TOC. CONNECT Platform CONNECTION Client MicroStation CONNECT Edition i-models what is comming

SHRP2 R15B Identifying and Managing Utility Conflicts

Advantages of Implementing StormCAD for OpenRoads (SUDA)

Automated Machine Guidance

OpenRail SELECTseries 4 - Managing Geometry and Corridor Modeling

Adam Walmsley, BG&E. Stop, Collaborate and Listen - How Digital Engineering will change the way we design and deliver projects

West Virginia DOT Designers Conference

OpenBridge Modeler: What is it and how can I use it today?

Old School Thinking 6/4/2014. Kentucky Transportation Cabinet s 3D Model Pilot Project. Which files are currently submitted? 2D Plans in a 3D world

Implementing BIM for infrastructure: a guide to the essential steps

Bentley s MicroStation Hydraulic Design/Analysis Software

3D Modeling Demonstration

670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6

NOW and NEXT BIM THE CONSTRUCTION PUZZLE- HOW TO MAKE EVERYONE WORK COLLABORATIVELY?

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Moving to Model-Based Design

Best Practice: Corridor Modeling

BIM FOR INFRASTRUCTURE THE IMPACT OF TODAY S TECHNOLOGY ON BIM

Developments in BIM Infrastructure Design. Barry Blake 3 rd June 2014

Peter Caplehorn Deputy Chief Executive and Policy Director Construction Products Association

MP BIM at the Heart of the MEP Subcontractor Business

Plant & Process Electrical Design Introduction to I&W, promis e & BRCM

AGENDA: BIM Introduction. Large-Scale Value. Value for Architects. Conceptual BIM / Small BIM. All-Out BIM. BIM Introduction

2014 NCLUG Summer Conference. Workshops

TABLE OF CONTENTS 1200 PLAN PREPARATION

BIM & Emerging Technologies. Disrupting Design process & Construction

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

How technology is changing the way we deliver Structural Steelwork. Brenden Picton Phil Shanks

MnDOT Contract Exhibit A - Scope of Services

BIM Workflow for Roads and Highways Using the Autodesk Portfolio

OpenRoads Designer Best Practices Project Management

What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl

Architectural Design Process

BG6 Design Framework for Building Services

Bentley Civil Update and Direction

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer

d e n v e r a r t m u s e u m

OpenRoads Best Practice - Civil Cells

2014 Bentley Systems, Incorporated. Industry Futures Dean Bowman, PE Bentley Fellow Bentley Systems

Augmented Reality in Transportation Construction

Skylands Learning is your trusted learning advisor. That is our promise your trusted learning advisor. Four simple words.

SECTION PROJECT COORDINATION VIA BIM

immersive visualization workflow

CHAPTER 15. Cross Section Sheets. None, except batch processing of an input file.

RRR Design & Modeling with the FDOT Civil 3D State Kit

MicroStation CONNECT Edition - Information Modeling for Infrastructure Professionals

Adapt or Fail coordination in different environments

What s Happening in (A)EC? Outline 2/1/2012. Bridge Information Modeling: Towards BIM/BrIM for the Bridge Lifecycle

WORKSHOP- 892 INNOVATIONS IN CIM FOR DIGITAL PROJECT DELIVERY TRB 96 th ANNUAL MEETING, JANUARY 2017, WASHINGTON, DC. BIM for Infrastructure

Automated Machine Guidance An Emerging Technology Whose Time has Come?

US Forest Service Standard Trail Plans and Specifications. Step By Step Guide

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

Getting started with AutoCAD mobile app. Take the power of AutoCAD wherever you go

Set Up Your Domain Here

Optimizing Digital Drawing Files and BIM Models for Measurement and Estimating

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

Don t Fall for Sub-Par Writing Jobs: Use This Handy 10-Point Job Evaluation Guide

OUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand.

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP

Session 3 _ Part A Effective Coordination with Revit Models

Using BIM to follow up milestones in a project plan during the design phase

Autodesk Inventor 11 Certified User and Expert Exam Preparation Class [Part 1]

Accelerated Bridge Construction (ABC) and the Utah Experience

AECOsim Building Designer. Quick Start Guide. Chapter A08 Space Planning Bentley Systems, Incorporated

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS

Bentleyuser.dk Årsmøde 2010 Nordic Civil 2010

Financial Plan/Marketing Plan

GRADE 3 SUPPLEMENT. Set C3 Geometry: Coordinate Systems. Includes. Skills & Concepts

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

MnDOT Contract Exhibit A- Scope of Services. Project Information -

Full Contents. InRoads Essentials

UT D Substation Design A Brownfield Approach

GEOPAK V8i SELECTseries 1, Road 2

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

National BIM Standard - United States Version 3

3.6 Implementation. Dr. Tarek A. Tutunji Philadelphia University, Jordan. Engineering Skills, Philadelphia University

Bentley Rail Track Update

A QUICK GUIDE TO ECONOMIC TOOLING SOLUTIONS

Virtual Engineering: Challenges and Solutions for Intuitive Offline Programming for Industrial Robot

Design, Drawing and Sheet Composition

VISUALIZATION DATA STANDARDS FOR PLANNING AND DESIGN

Any student may retake any class at any time and for any reason without additional charge.

Autodesk University Automating Plumbing Design in Revit

Building BIM in Australia: A Retrospective and Prospective Analysis

Computer Aided Design Basic Course

Practice Workbook. Cross Sections: Creating, Annotating, and Volumes

How Digital Engineering Will Change The Way We Work Together To Design And Deliver Projects Adam Walmsley, BG&E, Australia.

CHAPTER 8 Electronic Deliverables TABLE OF CONTENTS

Survey Data and TOPO Checklist

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Introduction A R E S. Amateur Radio Emergency Communications. Using IMS For Amateur Radio. Self Study Training Course. Amateur Radio Emergency Service

REPORT ON THE CURRENT STATE OF FOR DESIGN. XL: Experiments in Landscape and Urbanism

Transcription:

3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources

Brief History 2

Conveying the Design Old Way Reviewing Changes Schematic Intent Design Change 3

4

Conveying the Design New Way Reviewing Changes Schematic Intent Design Change 5

6

Conveying the Design New Way Reviewing Changes Schematic Intent Design Change 7

What is 3D Design? 8

What is 3D Design? 9

What is 3D Design? 10

What is 3D Design? X: Criteria Files 11

What is 3D Design? ITL: Template Libraries 12

What is 3D Design? 13

What is 3D Design? 14

Not Fake News Bentley is no longer developing GeoPak SS2 No more criteria Current products are centered around templates (visual criteria) and 3D corridor modeling OpenRoads is Bentley s new line of products embraced by DOT s around the country The industry is moving towards 3D data rich models. TxDOT will shift towards a 3D model centric deliverable in the coming years Contract language, policies, and procedures will be further refined and developed to allow for this FHWA is encouraging this through their EDC (Every Day Counts) program 15

16

Why are we doing this? Start at conveying the design intent in a more digestible format Build the relationships to build confidence in the design What exactly are we trying to model? 17

Why are we doing this? Cost of change raises the farther down the production line. We can create design rules so that if we were to change one part of the design, we can see it s effects throughout the rest of the design. We re building relationships within the software to help us do our job and automate some changes 18

OpenRoads Relationships (Rules) 19

OpenRoads Relationships (Rules): QC Geometry 20

Innovation & Time Savings: QC Model Clash Detection Make quick changes to a design to see it s impacts Show utility conflict after changing stack image with open bridge model in an all encompassing environment 21

Innovation & Time Savings Make quick changes to a design to see it s impacts Show utility conflict after changing stack image with open bridge model in an all encompassing environment 22

Innovation & Time Savings: QC Vertical Clearance Track, document, and verify clearance issues 23

Innovation & Time Savings: Slope QC Between Sections Display multiple views to analyze steep or flat slopes 24

Conveying the Design New Way 500 Yr WSE Insert Overlay 25

Innovation & Time Savings: Quick Quantities 26

Innovation & Time Savings: Quick Quantities 27

Innovation & Time Savings: Faster Earthwork 28

How does this help the developer for ATC s? Analyze multiple options faster and tweak to optimize 29

How does this help the developer for ATC s? Analyze multiple options faster and tweak to optimize 30

How does this help me with Alternative Technical Concepts (ATC)? ATC s what can we add to the process to help better evaluate and approve ATC s? ATC workshops/model Reviews Shows more detail. More detail shows the impacts to other disciplines. Shows consideration to other disciplines and builds confidence. Can be used to assess and lower risk. Doesn t take the place of design experience, but it better communicates design experience instead of the Trust me. It works tactic. Now we can trust, but we can verify 31

How does this help me with Alternative Technical Concepts (ATC)? Over The Shoulder reviews help build real time confidence Develop models with parametric switches and constraints to show quick/live changes The ability to prepare what-if scenarios to flip back and forth between options or have additional developed models to fly through. Show that it s much more intuitive than, show me the sections and give me time to walk through them, though we can still do this. 32

Schematic Design - RIDS 33

Alternative Technical Concepts (ATC) Example Insert Final Design picture from Erica 34

What does it take to get here? Training Easier than criteria We can train a 3 month EIT the basics of corridor modeling to produce better cross sections than an intermediate criteria writer with years of experience. Contractors are using this in conjunction with rovers and survey control networks in the field 35

What does it take to get here? Use of SS3 has been improved in SS4 for i- models and export to Trimble Business I-models (more advanced detail in XML) have more information than XSR s. Legislature Methods to sign and seal the model. This will lead to more detailed models as opposed to models just good enough to get cross sections every 50 or 100. 36

How does this help me with Alternative Technical Concepts (ATC)? Potential Workflow Centered around the 3D Model Provide 3D Model Over The Shoulder Review Proceed towards Final Design Feed AMG & Provide Construction Information Create 4D Scheduling for Analysis and Optimization Create 5D Cost Analysis and Optimization Develop Asset Management and O&M 37

Moving 3D Design Forward Construction with the plans as FIO (For information only) Requires support: change in legislation, policy & standards development DOT s with plans moving forward (Utah, Florida, Oregon, etc.) 4D = Design Model broken into Construction Phases + Schedule 5D = Design Model broken into Construction Phases + Schedule + Cost per Phase Comprehensive QA/QC Asset Management Virtual Reality/Augmented Reality for communication (Potential uses) 38

Potential Savings **UDOT IDC Guidance Document April 2017 39

How does this help me with Alternative Technical Concepts (ATC)? 40

How does this help me with Alternative Technical Concepts (ATC)? 41

How does this help me with Alternative Technical Concepts (ATC)? 42

How does this help me with Alternative Technical Concepts (ATC)? 43

Summary What can 3D Design in OpenRoads do for us as the client, designer, and contractor? Reduce risk by finding potential issues earlier Reduce time for alternative analysis exploration Run quicker gut check quantities Increase confidence in the design Convey design intent faster 3D model shows the considerations to other design elements (road to road, bridge column to utility to drainage, etc.) Can promote a closer relationship between the client, designer, and contractor at various stages for a successful project 44

Questions? Questions? See me after the presentation or email me at acesguerra@lan-inc.com 45