Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy 5 6 7 38 138 SF CHIMNEY Brick Chimney - Concrete/ Mortar Liner 5 6 BLU 5 20 15 7 35 LF $117,618 $117,618 Assessment Date: 3/12/2013 Page 1 of 15
DOORS Exterior FRP Door Exterior Steel Door Store Front Door Transom Lite 5 6 7 2 3 GRE 6 3 5 12 EA 13 EA $4,294 3 EA $1,557 15 EA $5,852 ENTRANCE Concrete Exterior Stairs Concrete Ramp Power Door Operator and Controls Ramp Handrails Stair Handrails Steel or Aluminum Stairs 5 6 7 GRE 7 32 GRE 7 28 2 GRE 6 6 GRE 6 6 32 LF 28 LF 12 LF 6 LF 6 LF $42 $42 FOUNDATION Concrete Foundation 5 6 7 GRE 7 858 858 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 5 6 GRE 6 4 7 2 4 EA $2,002 12 EA $2,002 LINTELS Lintels - Concrete 5 6 GRE 6 985 7 985 LF Assessment Date: 3/12/2013 Page 2 of 15
Lintels - Steel PARAPET GRE 6 36 36 LF $1,359 $1,359 Coping - Metal Parapet < 16" Height 5 6 7,818 GRE 7 69 1,818 LF 69 LF ROOF SYSTEM Asphalt Gravel Ballast Roof Exterior Downspouts Interior Downspouts Roof Structure: Concrete 5 6 GRE 6 300 34,058 7 GRE 7 22 GRE 6 297 GRE 7 34,358 34,358 SF $221,038 22 LF 297 LF 34,358 SF $221,038 SUPERSTRUCTURE Concrete 5 6 7 GRE 7 68,331 68,331 SF WALLS Brick Concrete Block Precast Panel Wall Prefabricated Metal Panel Wall 5 6 7 90 16,230 44 168 GRE 6 25 2,275 1,608 GRE 6 2,216 2,640 16,420 SF $4,304 312 SF $6,795 3,908 SF $15,817 4,856 SF $18,823 $45,739 WINDOWS 5 6 7 Skylite - Lexan YEL 4 32 32 SF $6,826 Assessment Date: 3/12/2013 Page 3 of 15
Window - Guards wire guard Windows - Decorative Windows - Sash Aluminum Double-pane Windows - Sash Lexan EXTERIOR ELECTRICAL EMERGENCY SYSTEM GRE 6 351 GRE 7 45 BLU 5 5,977 YEL 4 2,632 351 SF 45 SF 5,977 SF $206,413 2,632 SF $454,587 $667,825 $1,061,474 Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection YEL 4 1 5 6 7 0,782 GRE 7 4,331,350 9 GRE 7 2 GRE 7 8 9 GRE 7 6 GRE 6 68,331 GRE 6 68,331 GRE 7 68,331 $8,866 10,782 SF 4,331 SF 1,350 SF 19 EA 2 EA 8 EA 19 EA 6 EA 68,331 SF $41,040 68,331 SF $97,713 68,331 SF $147,619 MAIN SERVICE Main Electrical service 2000 A 120/208/3PH 5 6 7 Assessment Date: 3/12/2013 Page 4 of 15
POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp ELECTRICAL 5 6 BLU 5 3 5 7 GRE 7 3 8 EA $19,877 3 EA $19,877 $167,496 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION 5 6 7 GRE 7 68,331 GRE 7 68,331 68,331 SF 68,331 SF MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Scroll type - Roof Mounted 101 to 150 tons Window A/C 5 6 7 5 15 EA $3,218 $3,218 AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Hot Water 8,001 to 12,000 cfm Air Intake - Built Up Air Handling Fan Coil - Hot Water and Chilled Water Make Up Air - Roof Mounted - Gas-Heating 10,001 cfm - 15,000 cfm Return Fans - Indoor 5,000 to 10,000 CFM 5 6 GRE 6 2 7 GRE 7 2 GRE 6 53 GRE 6 2 2 EA $12,584 2 EA 53 EA $75,790 2 EA $3,432 Assessment Date: 3/12/2013 Page 5 of 15
$91,806 BOILER SYSTEMS Boiler Assembly - Condensing Hot Water Boiler 2,001MBH-3,000 MBH Boiler Auxiliary - Condensing Hot Water Boiler 2,001MBH-3,000 MBH Chemical Pot Feeder - Hot Water Glycol Feed System 5 6 7 1 GRE 7 2 2 EA $12,155 2 EA $12,155 HEATING DEVICES Cabinet Heaters With Hot Water Coils Fin Tube Hot Water Heater - Hot Water 5 6 7 12 4 GRE 6 40 GRE 6 4 1 17 EA $11,154 40 LF $686 5 EA $5,720 $17,560 MECHANICAL PLUMBING Piping - Hydronic Supply and Return - Copper Pumps - Dual Temperature Water 5 to 10 HP 5 6 GRE 6 600 7 1 600 LF $10,124 2 EA $2,002 $12,126 TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) 5 6 7 GRE 7 68,331 GRE 7 45 68,331 SF 45 EA VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm 5 6 7 GRE 6 2 3 5 EA $1,001 $429 Assessment Date: 3/12/2013 Page 6 of 15
Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Lab Exhaust Hood Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen MECHANICAL PLUMBING HOT WATER GRE 6 7 GRE 6 2 7 EA $1,602 2 EA $315 $1,716 $5,062 $141,928 Hot Water Heater - Gas more than 300,000 BTU/HR 5 6 7 PIPING 5 6 7 Domestic Piping - Cold Water from Risers to Fixtures 68,331 SF $11,726 Domestic Piping - Cold Water Risers 68,331 SF $22,474 Domestic Piping - Hot Water Return Risers BLU 5 136,662 136,662 SF $29,314 Domestic Piping - Hot Water Risers 68,331 SF $17,588 Domestic Piping Cold Water Horizontal lines 68,331 SF $60,582 Domestic Piping Hot Water Horizontal lines 68,331 SF $36,154 Domestic Piping Hot Water Return Lines 68,331 SF $37,131 Sanitary Piping 68,331 SF $42,017 Storm Piping 68,331 SF $32,245 Vent Piping 68,331 SF $24,428 $313,660 PUMPS Domestic Booster Pump simplex Ejector Pump 5 6 7 $1,716 $3,003 Assessment Date: 3/12/2013 Page 7 of 15
$4,719 PLUMBING $318,379 INTERIOR ADMINISTRATIVE SUITES Ceiling - Splined Flooring - Carpet Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lighting - Pendant/Surface Lighting - Wall Mounted Walls - Concrete Block Walls - Plaster/Drywall 5 6 7 GRE 6 271 4,751 718 GRE 6 2,809 1,569 GRE 6 408 GRE 6 31 GRE 6 923 13 76 38 GRE 6 5 GRE 6 8,113 820 GRE 6 2,132 5,740 SF $11,726 4,378 SF $4,017 408 SF $1,925 31 SF $79 923 SF $1,320 128 SF $93 5 EA $143 8,933 SF $23,203 2,132 SF $5,030 $47,537 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door Transom Window 5 6 7 GRE 6 20 14 4 GRE 6 99 2 GRE 6 324 GRE 7 2 GRE 7 360 38 EA $13,402 10 $28,031 324 SF $6,023 2 EA 360 SF $47,456 DRINKING FOUNTAINS Single Fountain 5 6 3 7 13 EA $5,019 $5,019 Assessment Date: 3/12/2013 Page 8 of 15
GYMNASIUM / AUDITORIUM Ceiling - Exposed Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/Surface Stage Curtain Walls - Concrete Block KITCHEN 5 BLU 5 4,331 6 GRE 6 454 BLU 5 3,877 GRE 6 48 BLU 5 2 GRE 6 6,609 7 4,331 SF $32,949 454 SF $649 3,877 SF $62,205 48 EA $5,834 2 EA $94,380 6,609 SF $56,705 $252,722 Ceiling - Lay-In Ceiling - Plaster/Drywall Ceiling - Splined Flooring - Tile Ceramic/Porcelain Lighting - Pendant/Surface Wall - Concrete Block 5 6 7 GRE 7 78 BLU 5 194 BLU 5 503 GRE 6 775 GRE 6 21 GRE 6 749 78 SF 194 SF $1,099 503 SF $3,568 775 SF $1,973 21 SF $15 749 SF $2,142 $8,796 LIBRARY Ceiling - Splined Flooring Carpet Lighting - Pendant/ Surface 5 6 7,594,594 GRE 7 28 1,594 SF 1,594 SF $2,279 28 SF $2,279 LUNCHROOM Ceiling - Splined Flooring - Tile/Sheet Lighting - Pendant/Surface 5 6 7 GRE 6 311 1,130,441 BLU 5 16 1,441 SF $667 1,441 SF $2,061 16 SF $40 Assessment Date: 3/12/2013 Page 9 of 15
Wall - Concrete Block Wall - Plaster/Drywall MECHANICAL/SERVICE ROOMS Storage Room STAFF RESTROOM,222 GRE 6 814 5 6 60 883 7 1,222 SF $3,495 814 SF $1,921 $8,183 1,043 SF $5,979 $5,979 Accessories Ceiling - Plaster/Drywall Ceiling - Splined Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet 5 6 7,019 820,350 GRE 6 52 417 20 GRE 6 6 2 11 800 800 28 GRE 6 4 8 GRE 6 2 11 15 YEL 4 10 BLU 5 16 1 4 6 YEL 4 5 7 14 GRE 6 2 6 GRE 6 360 1,654 1,580 GRE 7 539 BLU 5 192 40 GRE 6 380 79 GRE 6 32 3 1,839 SF $7,869 1,350 SF 489 SF $1,385 8 EA $1,802 1,711 SF $3,782 128 SF $183 12 EA $868 28 EA $7,808 10 SF $36 27 SF $73 5 EA $1,609 3 $3,048 8 EA $5,949 3,594 SF $7,449 539 SF 232 SF $9,346 459 SF $967 35 EA $11,898 $64,072 Assessment Date: 3/12/2013 Page 10 of 15
VOCATIONAL SHOP Work Sink INTERIOR ROOM ADMIN_WALL Administrative Office Walls CASEWORK 5 6 1 5 6,525 7 7 1 $4,247 $4,247 $446,291 1,525 SF $3,598 $3,598 Casework 5 6 7 GRE 6 6 161 167 LF $215 $215 CEILING Splined Ceiling CLASSROOM Eye Wash Station CORRIDORS Carpet Concrete Block 5 6 GRE 6 23,304 5 6 5 BLU 5 78 6 GRE 6 581 14,088 7 7 7 23,304 SF $49,987 $49,987 $2,681 $2,681 78 SF $279 14,669 SF $44,678 Assessment Date: 3/12/2013 Page 11 of 15
Concrete Epoxy/Painted Drop/Lay-In Exposed Lay-In Pendant/Surface Plaster/Drywall Splined Stair Handrails Stairs Structural Glazed Tile Student Lockers Tile Ceramic/Porcelain Tile/Sheet Flooring Walls CORRIDORS CEILING 7 397,504 28 152 BLU 5 210 1,960 2,000 GRE 6 947 4 6,281 160 BLU 5 493 80 GRE 6 815 6,947 87 8 90 GRE 6 4,596 70 BLU 5 395 BLU 5 90 GRE 6 99 4,854 GRE 6 5,126 494 414 SF $1,954 1,504 SF $3,226 280 SF $242 4,170 EA $7,191 7,392 EA $13,712 573 SF $2,326 7,762 SF $19,516 187 LF 108 EA $1,544 4,666 SF $32,861 395 EA $70,606 90 SF $1,416 4,953 SF $7,502 5,620 SF $12,095 $219,149 Plaster/Drywall 5 6 7 GRE 6 992 613 160 1,765 SF $7,353 $7,353 FLOOR Carpet Concrete Tile/Sheet KITCHEN_WALL 5 6 GRE 6 718 GRE 6 2,624 9,962 7 718 SF $1,027 2,624 SF $12,383 19,962 SF $28,546 $41,955 Kitchen Walls 5 6 7 GRE 7 321 321 SF Assessment Date: 3/12/2013 Page 12 of 15
LIBRARY_WALL Concrete Block 5 6 GRE 6 937 7 937 SF $2,680 Plaster/Drywall GRE 6 480 480 $1,133 LIGHTING $3,812 Lay-In Pendant/Surface 5 6 7 GRE 6 23 400 BLU 5 28 34 3 423 EA $1,645 65 EA $13,442 $15,087 MARKER BOARD Marker Board 5 6 7 GRE 6 86 198 284 LF $2,460 $2,460 RESTROOM_WALL Restroom Walls STAIRS Tile WALL Concrete Block Plaster/Drywall Wall 5 6 GRE 6 552 5 6 0 5 6 GRE 6 22,137,835 BLU 5 7,550 7 7 7 552 SF $1,405 $1,405 10 SF $76 $76 22,137 SF $63,312 1,835 SF $4,330 7,550 SF $35,628 Assessment Date: 3/12/2013 Page 13 of 15
$103,270 ROOM $451,047 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 5 6 7 GRE 7 5 GRE 7 3 5 EA 3 EA FENCING Chain Link Guard Rail Ornamental Iron Wood Fencing w/ Steel Frame 5 6 7 GRE 7 253 60 04 GRE 7 24 253 LF 160 LF $4,530 104 LF $1,963 24 LF $6,493 FIELD HOUSE 5 6 7 Wood Frame Fieldhouse BLU 5 100 100 SF LANDSCAPE Benches Grass Hardscape - Concrete Hardscape - Pavers Parkway trees Planting Beds/ Areas Trash Receptacles 5 6 7 GRE 7 7 GRE 7 4,368 0 2,615 GRE 7 3,550 9 GRE 7 8,553 7 EA 4,368 SF 2,625 SF $5,125 3,550 SF 19 EA 8,553 SF Assessment Date: 3/12/2013 Page 14 of 15
$5,125 PARKING LOT Asphalt Concrete Curbs Parking lot interior plantings Trash Enclosure Vehicular Screening 5 6 7 GRE 6 7,800 16,920 GRE 7 957 2 GRE 6 336 51 24,720 SF $6,692 957 LF 12 LF 336 SF $3,604 151 LF $10,296 SIDEWALKS Internal Walks Perimeter Sidewalks 5 6 7 GRE 6 5 94 6,103 99 LF $156 16,103 SF $156 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 5 6 7 $22,070 $2,608,685 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 3/12/2013 Page 15 of 15