Section 75-ZA-2. Rudder Mounting

Similar documents
Section 6-B-4 Rear Fuselage Riveting

75-TA-4. Elevator Skins

Section 75-FA-2 Top Fuselage Skin & Rear Fuselage Assembly

Cut the center and pre-drill the Hinge Plate. Do not drill the Rudder Hinge hole at this time.

Section 6-T-3 Elevator

Section 75-AA-1. Flaperon Assembly

Section 6-B-6, 6-B-7, & 6-B-8 Firewall Assembly

Section 75-FA-5. Firewall Assembly

Section C75-FA-2 Top Fuselage Skin & Rear Fuselage Assembly

Section 75-SA-1 Slat Section

Section 75-CA-3. Rudder Controls

Section C75-WA-1. Wing Skeleton

ZODIAC CH 601 Series Kit Aircraft

STOL CH H3-3SP Center Hinge Bracket. IMPORTANT: The Bracket 7H5-3SP is not symmetrical

STOL CH 701. Clamp a reference extrusion on the bottom of the spar. Clamp the bottom flange of the rib to the extrusion. Rear Root Rib 7V4-2

REAR FUSELAGE ASSEMBLY

Three vertical L angles must be riveted to each main spar (length = 206mm see boxed diagram on drawing 7-V-2).

STOL CH 701. Standard L ANGLES are supplied in 4ft length. Ref. bottom left diagram on drawing 7-V-2

Photo-Guide (ZE & ZE )

STOL CH F2-2 Side Skin

ZODIAC 601 XL. ZODIAC CH 601 Series. Parts are labeled for easy identification with a part number and description:

ZODIAC CH650. ZODIAC CH 650 Series. Parts are labeled for easy identification with a part number and description:

CENTER WING SECTION (CWS) WORK REPORT

77.5 degrees REAR CHANNEL PLYWOOD TEMPLATE

STOL CH 801 SECTION 2: Nose Rib 8R1-7

ZODIAC 601 XL. REAR RIBS 6W6-1 to 6W6-9. Reference to drawing 6-W-00 for orientations of ribs flanges. Rear ribs are tapered: rib #9 is the shortest.

9.3 FUSELAGE ASSEMBLY 14/03/02

ZODIAC CH 601 Series Kit Aircraft

Elevator Assembly. To assemble the SR3500 Elevator, you will need the following tools:

REAR FUSELAGE ASSEMBLY

FORWARD FUSELAGE SIDES & REAR TOP SKINS

2.1 Parts List Tool requirement Before you start assembling the Stabiliser Front Spar Center Doublers...

10. Wing prep and subassembly

Chap. 9.2 SR3500 Fuselage Assembly - Cabin. MODEL: SR Murphy Aircraft Mfg. Ltd. All rights reserved.

ZODIAC CH 601 XL 6TD3-1 TD MAIN GEAR UPRIGHTS (QTY=1L + 1R) Cutout in the side skin is below the diagonal rivet line.

REVISION DESCRIPTION:

ZODIAC CH 601 Series Kit Aircraft

ZODIAC 601 XL UPRIGHT CHANNELS 6B5-6. Top and bottom outboard flange is joggle to overlap the.093 extrusion 6B2-3 and 6B11-1

STANDARD CANOPY WORK REPORT B-1

ZODIAC 601 XL. Outside Flashing 6C3-3. Mark the no rivet zone for Extrusion Handle 6C3-8

FLAPERON ASSEMBLY. Ref. Drawing 8XA-1 Exploded view SECTION 1 REAR SKIN AND NOSE RIBS ASSEMBLY

STOL CH nd Edition Drawings July 20, 2010 Summary of changes from Edition 1 to Edition 2.

SERVICE BULLETIN

16. Wing Final Assembly and Installation

WING ASSEMBLY 23.5 (Continued)

Ch. 9.0 ELITE FUSELAGE ASSEMBLY 14/02/2003

11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410).

STOL CH st Edition 1 st Revision Drawings Summary of changes from Edition 1 to Edition 1 Revision 1.

SERVICE BULLETIN

Flaperon Assembly Manual

ZODIAC 601 XL. Detail of outboard end. Full length recessed elevator trim tab. Detail of inboard end. Trim tab along left trailing edge of elevator.

Page: REV 2: Added "Step 1: Straighten the W-0007B Rear Spar Reinforcement Fork as described on Page 10-03, Step 4."

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue

Horizontal Stabilizer Service Bulletin

Zodiac CH 601 XL drawing revision log, updates included in 4 th Edition, January 1, 2008.

12. Wings, Flaps, Ailerons and Struts

Ford Pick Up Rear leaf Spring Kit Installation Instructions

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

1881 Airport Road, Mexico Memorial Airport, Mexico, Missouri USA Tel: Fax:

Installation Instructions

FORWARD FUSELAGE ASSEMBLY

SERVICE KIT. March 22, 2011 Original Issue: January 22, 2001 Page 1 of 7

WING ASSEMBLY SECTION 4. Mounting Wing Ribs to Main Spar. 1. Identify the proper locations for those ribs with attachment brackets.

FINAL ASSEMBLY- DOORS

SERVICE BULLETIN. No. SB-AG-45 Rev. B JUNE 1, 2007 FIN SPAR & ATTACH FITTINGS INSPECTION AND UPGRADE IMPORTANT:

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

4. Instrument Panel Support

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design.

Assembly Instructions 10 X 10 Aluminum Roof Support

SZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES

Mallet Painting equipment Pop rivet gun

SECTION 11: EMPENNAGE ATTACHMENT

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

Installation Instructions

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

Section 6-K-1 Fuel Sender Unit Installation

SERVICE BULLETIN

Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals

FLAP AILERON FLAP / FUSE SEAL KIT

CountryAccents Pergola Assembly Instructions

Build the Spitfire: Step-By-step. Pack 3 Stages 21-30

Page: REV 1: Step 5 and Figure 5 updated to better describe the potential necessity of modifying a rivet squeezer yoke.

B A T H R O O M G L A S S

Bi-Pass And Bi-Fold Sliders

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage.

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

Super Sky Surfer 2000 Assembly Instructions

FORD #2228. Gross Trailer Weight (Maximum)...24,000 lbs. Vertical Load Weight (Max. Pin Weight)...6,000 lbs. SYSTEM TOW CAPACITY

Installation Instructions for. Before You Begin TOOLS REQUIRED

American Champion Aircraft Corp. Rochester, WI Page 1 of 5

Installation for Full Size Polaris Ranger Crew Doors

Assembly Instructions 10 X 10 Aluminum Frame Building

Installation Instructions

33/35A Series. Devices covered by these instructions: Rim Exit Device. CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device

Installation Instructions

Locker Pedestal Installation Instructions

INSTALLATION INSTRUCTIONS FOR EXHAUST CUFF MODIFICATION

FUSELAGE CONSTRUCTION

Transcription:

Section 75-ZA-2 This manual has been prepared for installation of the Rudder. This photo assembly manual is intended as a supplement to the drawings. If there is any discrepancy between this manual and the drawings, the drawings supersede this manual. For more information on building standards and allowable tolerances see Construction Standards for Zenair Light Aircraft available from Zenith Aircraft Co. Section 75-ZA-2, Page 1 of 10

P/N: 75Z1-1 Rear Fuselage Angle Draw a center line on one flange of the Rear Fuselage Angles. Trim the top of the flange for clearance on around the tab on the Longeron. Clamp the Angle on the Rear Fuselage with the center line visible through the predrilled holes on the Skin. Section 75-ZA-2, Page 2 of 10

Back drill through the Skin into the Angle with a #30 drill bit and cleco. Deburr and rivet the Angles to the Rear Fuselage. P/N: 75R2-4 Rudder Horn Deburr and rivet the Rudder Horn to the Rudder. Expand the hole in the center of the Horn with a 6.5mm drill bit. Section 75-ZA-2, Page 3 of 10

P/N: 75F2-7 Upper Rudder Hinge Plate Use a 6.5mm drill bit to expand the holes in the Upper Rudder Hinge Plate. Position the Rudder on the Fuselage with the Horn centered vertically between the Lower Rudder Hinges. Mark the Upper Rudder Hinge Plate location on the Rudder Spar. Section 75-ZA-2, Page 4 of 10

Mark a line extending the rivet lines along the edge of the web of the Rudder Spar. Mark a line across the Rudder Spar 5mm above and 5mm below the mark for the Upper Rudder Hinge Plate. Note: DO NOT use a square along the side of the Spar as the sides of the Rudder Spar taper towards the tip. P/N: 75R2-5 Upper Rudder Hinge Angles Clamp two flanges of the Upper Rudder Hinge Angles together. Mark the center of the Hinge Angles. Mark the bearing hole location 9mm from the front edge of the Hinge Angles. Use a #40 drill bit to drill the hole. Expand the hole with a #12 drill bit. Section 75-ZA-2, Page 5 of 10

Mark the center line on the opposite flange as previously drilled. Layout 4 rivet locations, 10mm from each end and 2 evenly spaced between and predrill the holes with a #40 drill bit. Then repeat the procedure on the other Hinge Angle. Mark a point 37mm from the ends of the Hinge on the flange with the bearing hole. Draw a line from the point to the corner of the Hinge. Use a hacksaw or band saw to cut the excess material off of the Hinge. Use a file to smooth out the saw tooth marks on the Hinge. Section 75-ZA-2, Page 6 of 10

Position the Hinge Angle so the edge of the top flange is flush with the line and the lines are visible through the predrilled holes. Back drill through the Hinge Angle into the Rudder Spar and Cleco. Expand the holes with a #20 drill bit and Cleco. Use a 10mm spacer or P/N 75R2-1 to position the second Hinge Angle. Use a #12 drill bit or a 3/16 bolt to align the bolt holes in the Hinge Angles. Back drill through the holes in the Hinge Angle into the Rudder Spar and Cleco. Expand the holes with a #20 drill bit and Cleco. Deburr the holes in the Hinge Angles and rivet them to the Spar. Section 75-ZA-2, Page 7 of 10

P/N: 75R2-1 Upper Rudder Bushing P/N: 75R2-2 Lower Rudder Bushing Bolt the Rudder to the Fuselage using the following steps to install the Bushings. Section 75-ZA-2, Page 8 of 10

Insert the Bushing in the Upper Rudder Hinge. Slide two AN4 washers on each side of the Bushing. Slide the Bushing between the Hinge Angles and install an AN3 bolt. Note: Grease the outer surface of the Bushing before final assembly. Insert the Lower Rudder Bushing in the Rudder Horn. Slide two AN4 washers on the Bushing on each side of the Rudder Horn. Position the Horn between the Hinge Brackets on the Fuselage and install an AN3 bolt. Note: Grease the outer surface of the Bushing before final assembly. Section 75-ZA-2, Page 9 of 10

P/N: 75R2-9 Lower Spar Fairing Position the Lower Spar Fairing between the Rear Skin and the Spar. Set the distance the Fairing is inserted so there is clearance between the Fairing and the Fuselage and so there is at least minimum edge distance for the rivets. Back drill with a #30 drill bit through the Rear Skin into the Fairing and cleco. Use a hole finder tool to drill the bottom hole in the Fairing. Remove the Fairing and deburr the holes. Install the Fairing on the outside of the Rear Skin; rivet the Fairing on the Rudder. Section 75-ZA-2, Page 10 of 10