User s Manual For CT Model IMB

Similar documents
Your safety first! This is the reason why our manual begins with the following guidelines:

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

PV 123 voltage transformer Installation and operation manual

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)

SPECIFICATION No SS-135/ kv METAL OXIDE SURGE ARRESTERS WITHOUT GAPS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

HOW TO SAFE GUARD THE TRANSFORMER..???

TH450A-T TH550A-T THP550-T/TS3000

Ritz Instrument Transformers GmbH. Welcome

SPECIFICATION GUIDE. ABB Power Technology, S.A. Zaragoza, SPAIN. ABB Power Technologies Distribution Transformers

CONTINUING EDUC ATION

COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS

Overtravel of 3.5 mm max. Power source DC D5C-1DS0 D5C-1DP0 D5C-1DA0 AC D5C-1AS0 D5C-1AP0 D5C-1AA0 Antenna only D5C-00S0 D5C-00P0 D5C-00A0

www. ElectricalPartManuals. com INSTRUCTIONS INSTALLATION OPERATION MAINTENANCE

Substation Preventive Maintenance

Arild Furnes,ATPA OGP/Petrobras workshop, Dry type transformers-ideal for FPSO - Transformers for electrical and drive systems

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:

Arc Suppression Coils

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

HBS-AP ASSEMBLING INSTRUCTIONS

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

Basic Principles and Operation of Transformer

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Specialists in HV and MV test and diagnostics. Testing in Substations

Introduction. Centrado leading-edge transformer. Introduction

Reliance SG800 Series Steel Water Gage Valves

Oil-immersed Transformers

ANTENNA EXPERTS. Website: AP MHz. 2.4 Meters 30dBi. Gain

Commissioning Manual Distribution Transformers - Three-phase Oil Filled

Power transformers for Network, Rectifiers, Furnace

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

NAVSEA STANDARD ITEM

22'W x 13'H Peak Style Shelter Frame Assembly Instructions

SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS.

Inductive Voltage Transformers. Types VEOT and VEOS

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

Power Train Lift Max. Capacity: 1,250 lbs.

SC02 BOAT SANDPIT COVER OWNER'S MANUAL

Mechanical Design. Brian Brinson Mechanical Design Manager.

Combined Instrument Transformers. Types IVOKT and TMC

A-E01D1. Austin E-Cap Series Isolation Transformer

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

HOME GYM Owner s Manual

Reliance SG777 Series Steel Water Gage Valves

SECTION SHEET METAL FLASHING AND TRIM

POTENTIAL TRANSFORMER

Capacitive voltage transformers

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.

S. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013)

Trim (Aluminum Substrate)

51-SDMS-04 SPECIFICATIONS FOR. DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

TECHNICAL SPECIFICATION OF ELECTRICAL MATERIALS CT & PT GROUP C

TECHNICAL DATA TYPE CMD OIL-IMMERSED ON-LOAD TAP CHANGER

1ZSC AAJ en, Rev. 1. Vacuum on-load tap-changers, type VUBB Technical guide

Greenhouse Assembly Instructions

Capacitive voltage transformers

Installation and Connection Manual

F. Rotor Head Maintenance

3. COMBINED TRANSFORMERS Oil-paper insulation

Load application in load cells - Tips for users

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS

Comparison of CAN/CSA C88.1, IEEE C /01 & IEC 60137

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Fault location on power cables. Fault location on power cables

25 TONNE HYDRAULIC PRESS MODEL NO: AHP 26

Relevant standards and guidelines

Detection of Incorrectly Set Work Press Position Confirmation Detection of Bent Drills. Press D5C

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

8 TONNE LOG SPLITTER

Handling Precaution for Terminal and Connector

7. INSPECTION AND TEST PROCEDURES

10' W x 8' H or 10' H Round Style Shelter Assembly Instructions

IMPORTANT - STATE AIRCRAFT REGISTRATION NUMBER IN ALL CORRESPONDENCE MOONEY AIRCRAFT, INC. M-l8 SERVICE LETTER NO.17

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

6' x 8' x 6'6" Quad-Vent Greenhouse-in-a-Box Assembly Instructions

SECTION BULLET- RESISTANT DOORS

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Paradigm. Connect100 Installation Guide

GENERAL INSPECTION AND MAINTENANCE PROCEDURE FOR FIXED HF ANTENNA SYSTEMS

HTC Technical Manual

OIL-IMMERSED ARC-SUPPRESSION COILS

Fushun Power Supply Company, Liaoning Electric Power Company Limited, State Grid, China

Garage-in-a-Box SUV/Truck 13' x 20' x 12' Peak Style Shelter Assembly Instructions

PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS

RING CORE CURRENT TRANSFORMERS FOR LOW VOLTAGE TYPE AOS USER MANUAL

This Manual Part recommends design criteria for resistors suitable for railway signaling circuits other than electronic.

51-SDMS-02 SPECIFICATIONS FOR DISTRIBUTION TRANSFORMERS UP TO 36KV 400/230 VOLTS

DISTRIBUTION TRANSFORMER 11 / kv

Transcription:

User s Manual For CT Model IMB

2 of (13) Contents: A. Introduction... 3 B. Steps on receipt and opening the cases... 3 C. Transportation and handling... 3 D. Unpacking the transformer... 4 E. Storage... 6 F. Installation... 7 G. Final inspection after installation...10 H. Normal Controls and Maintenance...11 Attachment: Types and plan for necessary inspections and controls...13

3 of (13) A. Introduction The current transformers model IMB are outdoor type CTs which are designed, manufactured and delivered from 72 kv up to 245 kv. The model can be divided into the two types of IMBD and IMBE (the one with normal expansion tank and the one with corregated expansion tank). The model, depended on order, can include protective or measuring cores or both of them. The main parts of the model are: - Oil tank made from galvanized steel. - Insulator of porcelain in brown or grey color - Expansion tank holding nitrogen gas made from galvanized steel. - Primary terminals made from electroplated copper. - Primary winding made from aluminum or copper. - Cores made from grain oriented or my metal. - Secondary windings made from double enamelled wires. The model can be designed and manufactured up to 4000 A primary current. The secondary current can be 1, 2 or 5 A. In special orders, the secondary current can be different. B. Steps on receipt and opening the cases The first step is opening the cases. So, by full inspection, get sure that the cases are not damaged during transportation. Then check that no cracking on the insulator and no sign of oil leakage can be seen on the surface of transformer specially on the joint between insulator and expansion tank and oil tank. In case any defect as above is seen, the subject shall be documented in writing with photos of the defected area. Then, the insurance company and Nirou Trans Co. shall be informed. The instruction for unpacking and lifting the transformers with crane are fixed on the inner side of the package. C. Transportation and Handling The model of CT can be transported in two ways: C.1. Horizontal transportation: All the sizes of IMBD and some types of IMBE 72, 145 which are designed suitably, can be transported horizontally. All IMBE 245 shall be transported horizontally. If an IMB is transported horizontally, attention shall be payed to the sign of upside direction on the transformer.

4 of (13) C.2. Vertical transportation The models IMBE 72, 145 if not designed for horizontal transport, shall be transported vertically. In this case, the maximum inclination angle from vertical axis is 60. In case any transformer designed for vertical transportation is, by mistake, put in horizontal position, it shall not be put into service, because the nitrogen gas inside the expansion tank may have entered the space of the active part. In this case, there is a risk of explosion, if the transformer is put in service. So, before taking any action, please contact the sales department of Nirou Trans Co. D. Unpacking the transformer The steps for unpacking the transformers will be different as follow: D.1. The transformers which have been transported horizontally The upper part of the package is opened and the transformer is brought out as shown in figure No. 1.A. It is recommended emphatically that the cotton belt used in this action shall be connected to the upper part of the porcelain and not between the sheds. Otherwise, the insulator may be damaged. Chain shall not be used to avoid damaging the insulator. As shown in figure 1.B, after bringing out the transformer and laying it on the ground, by connecting a belt to the upper part of the insulator, the transformer is relocated into vertical position. Thereafter, the transportation of the transformer shall be in vertical position.

5 of (13) Figure No. 1 D.2. The transformers that have been transported vertically or have been relocated into vertical position after horizontal position as in item D.1. : In this case, the cotton belt is used too. The connection points of the belts to the transformer are prepared on the bottom of the oil tank and are 4 plates welded to the walls of the oil tank, each including a hole for the hooks of the belts. After connecting the hooks of the belts to the plates, it is necessary to turn the belts twice around the transformer so that the primary terminals are located between cross passing of the belts from two sides and the transformer is balanced during lifting. In figure 2, the method of connecting the belts and hooks to the transformer before lifting is shown.

6 of (13) E. Storage The storage of the transformers before installation shall be after taking them out of package. Obviously, when opening the package and taking the transformer out, it should be checked against the probable damages. Storage of all the models of IMB shall be in vertical position. Vertical positioning of the transformer is important for adjustment of the sand level. The storage shall be on a fixed flat surface suitably of concrete and shall withstand the weight of the transformer. Since the center of gravity of the transformer is relatively low and the weight of the transformer is high, there is no need to use additional accessories for fixing the transformer to the ground. If the transformer is to be stored more than 6 months, the storage shall be preferably in indoor space, since the inner parts of the terminal box may be susceptible to oxidization as a result of some environmental conditions. The storage of the current transformer in humid atmosphere without correct suitable air conditioning may result in the change of color in galvanized surfaces. The change of color is known as white oxidization which mainly consists of zinc oxide and zinc hydroxide as a result of chemical reaction between pure zinc on the surfaces and moisture.

7 of (13) There is no need to worry about the resistance of the metallic surfaces against such a type of oxidization in long term use, because the zinc-iron layer beneath the surface, is remained unaffected. Also, the white oxide has no had effect on the long term use of the transformer. F. Installation Before installation, the oil level shall be checked when the transformer is in vertical position. There are two sight glasses on the expansion tank which, in normal condition, the upper one shall be light and the lower one shall be dark. Otherwise, the sales department of Nirou Trans Co. shall be informed. It is worthnoting that the lower sight glass shall be full of oil, that is, the oil level shall not be seen in it. If the lower sight glass is light or the oil level can be seen in it, the oil level is too low and the exact leak point shall be located. After getting confident of not leaking or any type of damage as a result of transportation and handling, put the transformer on its structure in complete vertical position. Fixing the transformer in unstable form may result in leakage. By putting metal plates, the stability of the transformer can be improved. Tighten the bolts as long as they withstand the moment. The connections to the secondary terminals shall be done carefully. Each of the secondary windings shall be earthed in one point. The secondary windings which are not used shall be short circuited and earthed. Check the hole in the drain tube of the terminal box and get sure that it is not closed. Never leave the secondary winding open, since very high voltage may be induced on secondary which will expose the user and the transformer to danger. Note: If one of the taps of a secondary is in use, the others need not to and shall not be short circuited. The connection to the primary terminals shall be so that the static force on the terminal is minimum. This is possible by using a flexible connection to the primary terminals. A solid (nonflexible) connection may lead to oil leakage in primary terminals. To establish the connection between the current transformer and other equipment by connection cables, at first, the cables shall be connected to the other side, because of their high weights. Then the connection to the primary terminals of the current transformer can be done. This shall be done to avoid exercising nonpermitted bending moment (figure 3 & 4). If it is appointed to connect the cable to the primary terminals of the CT at first, the fixing bolts shall be tightened completely. On the other hand, the cable shall be

8 of (13) supported by a stand on beneath or a rope from up, before it is connected to the other side. If there is a height difference between the current transformer and the equipment to be connected to the CT, it is necessary to form the cable as needed. The forming of the cable shall be done before connection and it is strictly prohibited to form it after the connection to the transformer. Figure No. 3 Incorrect method: Incorrect connection of cable to the primary terminal of the transformer and its release result in bending of the primary terminals.

9 of (13) Figure No. 4 Incorrect Method: In spite of perfect connection of The cable to the primary terminal, the release of cable result in bending and breaking of the terminal. All the connections shall be made carefully since there is a risk of temperature rise in the connections that are not tightened enough which may damage the transformer (figure No. 5).

10 of (13) Figure No. 5 Correct Method: Perfect connection of the cable to the primary terminal after its connection to nearby equipment. The earth terminal of the transformer is mounted on one or two corners of the oil tank and it is possible to mount them on the other corners. Before applying voltage, the earth terminals shall be effectively earthed. The terminal of the capacitive tap (f-terminal) is brought out from the oil tank via a bushing. When not in use, it shall be connected to the oil tank. G. Final Inspection after installation It is recommended to check the following items again: - Oil level - Damage to the insulator or other parts - The secondary terminals not to be open - Signs of oil leakage - Correctness of connections

11 of (13) H. Normal controls and maintenance Since the transformers are hermetically sealed for air penetration, minimum maintenance is required and usually visual inspection is enough as follow: (please refer to the attached check list). H.1. Signs of oil leakage The following items shall be checked for any oil leakage: - The oil sight glasses and the flange for oil filling. - The joints between the insulator and the oil tank and the expansion tank. - The joint between the oil tank and its cover. - The secondary terminal box - The capacitive tap terminal - The flange for oil emptying (if it exists) H.2. Damages to the transformer Check the metal parts and insulator. Oxidations, if any, shall be so scratched that the base metal gets accessible. Then the point shall be covered with a type of color including a lot of zinc. The insulator shall be cleaned, if necessary. The damages to the sheds of the insulator, if any, can be repaired by epoxy resin. In some cases, if the repair instruction of insulator is needed, please contact the sales department of Nirou Trans Co. H.3. Correct oil level Necessary explanations about the point is given in, the section for installation. If there is oil leakage, the moisture may have entered the transformer. H.4. Check of the primary terminal H.5. Check of the secondary circuits H.6. Check of the earth terminal H.7. Check of the capacitive tap terminal H.8. Oil Sampling After a long-term operation (20 to 25 years) or after short circuits or for example after a disturbance in operation, oil can be sampled and its gas and moisture content can be controlled.

H.9. Measurement of loss angle (tgδ) 12 of (13) The loss angle of a dielectric (tgδ) is an indication of its conductivity. A good insulation has a low tgδ and conductivity and on the other side, a bad insulation has a high tgδ and any change in tgδ is a sign of a change in the insulation characteristics. The insulating paper and its tgδ is affected by usual aging or moisture entering. In general, for an old transformer, a tgδ of up to 1.0 to 1.5 % for IMB 72, 145 kv and up to 1.0 for IMB 245 at 20 C can be considered acceptable. But, the change of tgδ is quite important, since a sudden change of it may be a sign of start of insulation deterioration. It is recommended to measure tgδ every 3-5 years. After 15 to 20 years or if in the last measurement, tg δ was near to limits, it is recommended to do the test each year. If ordered by the customer, the IMB transformers can include a terminal for capacitive tap which is taken out from the last but one capacitive layer in the insulation. The terminal is normally connected to the oil tank (is earthed). After disconnecting from the oil tank, the tgδ of the last layer of insulation can be measured. The recommended voltage for the measurement is 2 to 2.5 kv rms and it shall not exceed 5 kv rms. Attention: Before disconnecting the F-Terminal from earth, the network voltage shall be removed from the transformer and after measurement, it shall be reconnected, because the voltage on an open circuit F-terminal will be between 3 to 5 kv rms, when the nominal voltage is on primary. This may expose the operator to danger and may deteriorate the main insulation as a result of subsequent flashovers.

13 of (13) Attachment: Type of and plan for necessary inspections and controls After Please Check opening the package Damage to packing After installation After putting in to service Sign of oil leakage Normal Controls Annual inspection Control Damage to transformer Correct oil level Primary connection Secondary circuits Earthing Secondary current Oil sample Tan δ After 15 to 20 years