12. Pillar rebar arrangement

Construction Tolerances - The following tolerances apply to cast-in-place structures:

PANEL CRIB PIERS AND TOWERS

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

BRIDGE TYPE CONCEPT EVALUATION

Bulk Storage Rack Assembly Instructions

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.

GLOSSARY OF TERMS SECTION 8

13. Beam rebar arrangement

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

3.1 General Provisions

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

Bridge Design and Drafting Manual Oregon Department of Transportation

This specification describes the minimum requirements for structural steel drawings.

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

Quality Control and Quality Assurance Guide

Value Engineering Design Build MODULAR INFRASTRUCTURE

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

STRUCTURAL ATTACHMENTS

Moebius Soft. Manual. Design of concrete reinforcement.

OpenBridge Modeler: What is it and how can I use it today?

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

Midwest Roadside Safety Facility

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

1. Layout. Step 1. Step 2. Step 3. Fig. 1

INDEX PAGE RELEASE SECTION NUMBER DATE

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

TECHNICAL MANUAL. HPM Rebar Anchor Bolt Easy and Fast Bolted Connections

Midwest Roadside Safety Facility

Section 914. JOINT AND WATERPROOFING MATERIALS

2.9 WINDOW & DOOR BUCKS

COLUMN 11/2013 LINEAR STRUCTURAL ELEMENT

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

Bs Anchor Bolt Design Guide

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

Slope Floor. Measurement Methods

ALL SEASON PATIO COVER

HEXAGONAL DOUBBLE TWISTED GABION & ROCK FALL MATRESSES

TYPE J (20 FT - 40 FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" NOTE: sheet 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.

Forming and Shoring Product Selector

Innovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz

SECTION CHAIN LINK FENCING

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Installation Instructions

Pipe Product Catalog Table of Contents

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

APPLICATION FOR A BUILDING PERMIT

The Iron Skeleton of the Statue of Liberty on Bedloe s Island, New York Harbour.

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

Midwest Roadside Safety Facility

Connection and Tension Member Design

Chapter 6: SHOP DRAWINGS AND OTHER SUBMITTALS

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

1.1 RELATED DOCUMENTS

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

PRECAST CONCRETE STRUCTURES

One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing

Digitally Signed 06/02/2015

Midwest Roadside Safety Facility

AUXILIARY FRAMING AND ACCESSORIES

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.

Glulam Connection Details

BRACING BRACING SECTION 7 SECTION 7

HALFEN Framing channels as compression elements HALFEN SHEAR DOWEL SYSTEMS HSD 13.1-US

Table 5G-2.01: Transverse Joint Requirements. Transverse Joint Type 6 C 12 7 C 15 8 CD CD CD 1 20

Acceptable Standards of Domestic Construction

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER:

DW HORIZONTAL INSTALLATION

CFDTT-01. Control Joint Study (General)

INDEX. Initial SOL Approval. 1. Evergreen Retaining Wall System (Deleted) 3. Sound Barrier Walls (Deleted) Standard Details

24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2

THE POWER OF RED STEEL-PLY CONCRETE FORMING SYSTEM APPLICATION GUIDE

Total precast solution for large stadium projects meet tight schedule


CONTRACT PLANS READING

TYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:

The following instructions will guide you through the installation of your new vinyl railing.

INSTALLATION MANUAL. 2. Check with local utility companies for locations of underground cables or pipe lines.

Garage Design Guide. October 2018

Boardwalk Construction Guidelines

Standard Signs Manual

Shear force transmission in expansion joints

Erstantie 2, FIN Villähde Tel , Fax

Unit 8 Precast Concrete

Simotec. 13.i

Connection Philosophy. p NDS Chapter-by-chapter description Changes from previous editions Examples. Part 1: Member Design Webinar.

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

712 - STRUCTURAL STEEL CONSTRUCTION SECTION 712 STRUCTURAL STEEL CONSTRUCTION

CI/SfB (29) Et6. January DSD/ESD Shear Load Connectors for the Construction Industry

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

STRUCTURAL WOOD DETAILING IN CAD FORMAT

Transcription:

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees General 1. When detailing substructures, it is preferable not to use series bars unless necessary. The first choice is to use slack in the bar laps to accommodate a variety of heights. 2. When a series of bars is required, provide a minimum of 2 difference between each bar in the series. If the difference from the shortest to the longest is not sufficient to maintain that minimum, use different bar marks for each bar or group of bars. 3. When a bar extends from one concrete pour to the next, dimension the minimum lap length, the embedment length, or the projection length. (See Figure 1.) If the bar is bent, show the minimum lap length. If the bar is straight, show the embedment or projection length. Figure 1 4. Bar lengths, splice lengths, and cover dimensions do not need to be adjusted to accommodate potential fabrication or construction tolerances unless specifically mentioned in this document or the LRFD Bridge Design Manual. 5. When detailing clear dimensions, only put the distance required (i.e., 2 clear, not 2 clear (min)). When dimensioning deck thickness, include minimum with the dimension (i.e., 9 (min), not 9 ). 1/24/2018 Page 1 of 6

Dowels and Vertical Reinforcement 1. Compute dowel bar lengths assuming the design lap plus an additional 2 inches. Also, dimension dowels with sufficient length to accommodate any variation in wall height. 2. Dimension laps between dowel bars and vertical bars in the plans rather than the projection from the top of the footing. Show the lap starting from the end of the vertical bar rather than the top of the concrete. (See Figure 2.) 3. Show vertical bars in abutments, wingwalls, retaining walls, and other similar situations as ending above the top of the footing. (See Figure 2.) This provides visual clarity for the drawing, but does not necessarily reflect how the bar will be placed during construction. 4. Compute vertical bar lengths assuming the bar will be placed directly on the footing. Figure 2 1/24/2018 Page 2 of 6

5. For wingwalls that do not have a barrier mounted on top, use a U shaped tie at the top of the wall. (See Figure 3.) Ties are not needed at the ends of wingwalls or at the bottoms of wingwalls that cantilever past the end of a footing. Additionally, ties are not necessary on the tops of wingwalls with a barrier mounted on top, as long as the barrier dowel is adequately lapped to the wingwall vertical bars. Choose bar marks for the ties that correspond to the concrete pour associated with them, i.e. if the concrete around them is abutment concrete, designate them as A bars; if the concrete is superstructure concrete, designate them as S bars. Figure 3 6. Leave the front face vertical bar 4 short of top of wall (or seat) or more as required to account for a sloped top surface. Extend length of A5_E abutment seat tie to ensure proper lap length. Space abutment seat tie bars with the verticals. Use a series if the slope is extreme. Otherwise, keep verticals to a single length. Some laps will exceed the minimum. (See Figure 4.) Figure 4 1/24/2018 Page 3 of 6

Abutment Reinforcement 1. For semi integral abutments, space the A5 E stem tie bars along the entire length of the abutment, even under the pedestals. They are not replacements for pedestal tie bars. (See Figure 5.) Figure 5 Pier Cap Reinforcement 1. Splice all longitudinal top bars to allow for adjustment in overall length at the ends of the pier cap (especially important for pier caps that do not have square ends). (See Figure 6.) 2. Use the same two bar marks with alternating lap location for all top longitudinal bars in the pier cap. The amount of lap may exceed the minimum, where the total length is shorter. (See Figure 6.) Figure 6 1/24/2018 Page 4 of 6

3. Do not place splices at locations of maximum moment. For cap top bars, do not splice over columns. If cap bottom bars are spliced, do not splice at the midpoint between columns or directly over columns; place splice adjacent to column. Avoid placing splices where bearing anchor rods are located. (See Figure 7.) Figure 7 4. When detailing ends of pier caps, consider actual bar bend radii and locations to avoid conflicts. Figure 8 shows an example of good detailing of bent bars at the end of the pier cap. Figure 8 1/24/2018 Page 5 of 6

5. When single stirrups are used in a pier cap, include the note shown in Figure 9. Deck Reinforcement Figure 9 1. When the total length of the top transverse bar exceeds 60 feet, splice the top transverse bars to allow for adjustment in overall length at the outside edge of the bridge deck. 2. When the total length of the top transverse bar is 60 feet or less, detail the bar with 2 clear to the edge of the deck, but compute the bar length assuming 2½ clear. This will result in the top transverse bars being 5 shorter than the total deck width. Detail the bottom transverse bars with 4 clear from the edge of the deck. 3. When detailing concrete end diaphragms for integral, semi integral, or parapet abutments, place transverse diaphragm bars parallel to the beams. (See Figure 10.) Figure 10 1/24/2018 Page 6 of 6