An introduction to resin infusion

Similar documents
*Before starting, please read entire manual *Changes can be made in order for this manual to work for you. 3 x 6 I-Beam

8 x 10 Sandwich Panel

COMPOSITES LAB MANUAL

FABRICS & BAGGING Fiberglass Cloth. Kevlar Cloth. Carbon Fiber Cloth. Mia Vacuum Bagging Supplies

SEMPEO SQA Unit Code FP42 04 Producing Composite Mouldings using Wet Lay-up Techniques

Step by Step Wing Bagging

How to Build an Advanced Composite Clipboard

COMPOSITES LAB MANUAL

DOUBLE GLAZING SYSTEMS

Instructors Guide. Composites Fabricators Association. September, 1998

RECESSED SKIN FITTINGS

Easyfix. Easyglaze. Superglaze. Filmglaze

Glass Cloth (supplied pre cut) Fibre Flock

Tapecoat. Application Guideline

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above.

Dubnium 11 Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List

Installation Instructions

How to build a Javelin Skiff

COMPOSITES LAB MANUAL

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

Making your Rudder Cassette

EXPRESS ASSEMBLY MANUAL SECTION 3 F5-RG/FT WING ASSEMBLY. Procedure 3.155A WING CLOSE-OUT PROCEDURES

Building a Scarab 350 Trimaran

IMPORTANT: This product cannot perform its intended function if not properly installed.

Hunter 34 Compression Post Repair

EZYSTONE WORKSURFACES

Linear Drain Installation Guide

This section describes those structural components which make up the main frame including bulkheads, spar cover, and roll cage.

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Radon 07 Installation Instructions & Parts List

Pump Replacement Manual. Bill Wallace by Wallace Marine Services, Inc.

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Installation Guidelines

Curium 19.4H Installation Instructions & Parts List

!! " # $ % & '! ( ) * +, -

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

WELDING. Section nine 9.1 CORRECT TOOLS

Pinnacle Technical. Bench and Shelf Trunking. cable management perimeter and distribution. Features.

Foam Core Construction

Artificial Grass. Fitting Guide

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

Note: Lay-Up Schedules.

The making of a 2" (50mm) aerial shell

How to Install EZ Snap Window & Skylight Shades

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE

INFINITE RANGE - HINGE DOOR

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Wallgard 1,3 product

10. Wing prep and subassembly

R2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708)

INSTALLATION GUIDE. StreamLine Linear Drain. Supply Drainage Support.

A Slim,Comfortable. In 1979 I spent five months designing. This system works for most chairs and uses common materials

VALENCIA CORNER DOOR WITH RETURN

Panel Riser Kit Option 1. Installation Instructions 226BEE 0117CH

One Piece Fiberglass Mold Construction

Design and Technology Resistant materials Key words and definitions

CORNER ENTRY ENCLOSURE

MUDGUN Drywall Finishing System

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Frameless Inline Door With Return QCI5263

INSTALLATION GUIDE StreamLine Linear Drain

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

RAKU-TOOL. Liquid Products. Casting, Laminating, Gelcoat and Multipurpose Resins. Our systems for your applications. discover the future

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

FLEXITEEK INSTALLATION INSTRUCTIONS

DIY Bottom Drain with Air Dome Michael Anderson Atlanta Koi Club

Prior to servicing the vehicle, refer to Knowledge Center for the most up to date version of your shop manual.

RangerWare Fiberglass Door System Installation Instructions P/N

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

Deauville Installation Guide

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Repairing Sheet-Molded Compound (SMC) With Epoxy

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

METHOD STATEMENT. Sika FloorJoint S

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Ford Ranger / Bronco II Set Part # Rev B 5-04

3Insert the second rod no. 4

Installation Guide 1

THE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM

B A T H R O O M G L A S S

Argon 02 Installation Instructions & Parts List

Nanton Grain Mill Assembly

Roll Out Vinyl Installation Guide

How is vacuum measured? Vacuum is measured in inches of mercury. Our atmosphere will support a column of mercury 30 inches tall.

I 2. Installation of Omega-Flex Panels over Plywood Sheathing. Installation over Plywood:

VALENCIA RONDO DOOR WITH RETURN

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

From "American Woodturner" the Journal of the American Association of Woodturners, April 2015, vol 30, no 2 - CUSTOM - TOOL HANDLES

Steps and Resources for Composite Construction Mark Westlake

Rosalina Accessories Tutorial Version March 2011 Martyn

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

Piper Cherokee /3 scale. Construction Manual

Transcription:

An introduction to resin infusion The vacuum infusion process is becoming more widespread within the composites industry and is already commonly used in the marine sector and for wind energy. Trevor Osborne, former Technical Service Manager at Scott Bader, explains the basics. In marine, hulls are regularly manufactured from 6 to 40 metres as well as decks, floors, trays and other large components where strength and weight are important. However, the process is not limited to marine and can be used in all other market sectors, in particular construction and land transport for the manufacture of most large structures. Vacuum infusion can be used for both one off mouldings and regular production but due to the preparation time required it would not normally be used for more than one small moulding per day per mould, larger mouldings such as boat hulls would have a much longer cycle time. One specialist area for vacuum infusion is to manufacture low ppm 250 200 150 100 HLU VI smoke fire retardant mouldings for building and train applications using speciality filled resins such as Scott Bader s Crestapol range that are difficult to process by other methods. There are a number of reasons why vacuum infusion is being used more regularly in composites but the two main drivers are a dramatic reduction in styrene emissions and the ability to produce a better consolidated and stronger laminate. The reduction of styrene emissions will help moulders to meet any reductions in permitted styrene levels in the future. Figure 1 shows typical styrene emissions for a laminate made by either hand lay-up or infusion. Comparison of Styrene Emissions Vacuum infused laminates show better consolidation and strength as there should be no air in the laminate and the glass content will be much higher. The higher glass content means that for the same glass weight per square metre the laminate will be thinner with infusion as compared to hand lay-up and this can lead to a reduction in stiffness. Moulds for infusion Vacuum infusion (VI) can use the same moulds as for hand lay-up but with some modification. However, it is essential that the mould itself is in good overall condition as any cracks in it could cause a vacuum leak and therefore compromise the process. The modification necessary is to add a 150mm wide flange around the perimeter of the mould; this will be used to set up the vacuum channel for the infusion. It is possible to use split moulds within the process but extreme care needs to be taken to ensure that the joints are vacuum tight. It is recommended that when first investigating the VI process that experience should be built up on single piece moulds. 50 0 Time Figure 1: Styrene emissions for a laminate by hand lay up or infusion. Resin selection The resins used for infusion should be ones specifically designed for the process. There are a number of options available and they cover all types of resins such as ortho, iso, 0034-3617/14 2014 Elsevier Ltd. All rights reserved January/February 2014 25

particularly on vertical surfaces. There are two options for this; the first being to use adhesive backed glass where there is a layer of pressure sensitive adhesive over the whole surface which when supplied has a release film to protect it. This film is stripped off immediately prior to placing the glass in the mould. The second option is to use standard glass fabric and hold it in place using spray adhesives developed for the infusion process. Figure 2: Typical geltime graph for an infusion resin. DCPD and vinyl ester. It is important that the resin chosen will give the geltime required to fill the mould as this can be quite long. Figure 2 shows a typical geltime graph for an infusion resin. It must be noted that Figure 2 shows geltimes at differing temperatures but in practice it is recommended that the infusions all take place at approximately the same workshop temperature in order to get consistent results. Infusion resins have a low viscosity, typically 100 to 200 cps and they are non-thixotropic. Thixotropic hand lay resins should not be used as they will give very slow flow. It is also recommended that the peroxide used to cure the resins is one that uses vanishing red technology as colour change systems in the resin do not work consistently. The use of a VR peroxide will ensure that it is obvious that the resin is catalysed as any mistakes cannot be corrected. Reinforcement Glass, carbon fibre and Kevlar can all be used within the process but for polyester based laminates glass is the preferred option. It is important that the reinforcement drapes well as it will be necessary to dry fit it to the mould and it is essential that it conforms to the mould shape and can be easily pushed into corners. The most common glass used in vacuum infusion is a combination mat which has a layer of chopped strand mat stitched to the surface of a multiaxial fabric. Other glasses commonly used are combination mats without CSM, and woven roving. When selecting glass it is important to consider both the design requirements of the laminate and the aesthetics of the finished part. For the best surface finish the glass should be as smooth as possible with no gaps between the strands. Where the glass needs to be pushed into corners it is often better to use a number of layers of lower weight glass rather than one very heavy one. If there is bridging in corners then this can lead to resin race tracking and poor fill. The two main drivers are a dramatic reduction in styrene emissions and the ability to produce a better consolidated and stronger laminate As the glass is laid into the mould dry a method has to be used to keep it in place Foams Foams can be used within the infusion process and these are normally PVC, SAN, PU or PET similar to those used in hand lay-up but specifically manufactured for infusion. It is essential that only closed mould foams are used as any open cells would simply absorb resin when under vacuum. In order to ensure the flow of resin around the foam they are normally supplied with pre-drilled holes and a grid of surface grooves on one surface. These grooves are placed away from the mould surface and will act as a distribution system for the resin. This type of foam can be supplied as both flat sheet and scrim backed for more complicated geometry. Vacuum bagging materials There are a number of specific items required in order to make the infusion cell. The film used to make the bag should be one specifically made to be used for infusing the resin selected. These films are supplied in a wide range of widths and the size selected should be wide enough not to need any joints. This film will be held in place using vacuum bag sealant tape (bagging tape), once again there are a number of versions of this and the selection will need to take into account the resin used, the ambient temperature and any resin exotherm. The resin is normally introduced into the moulding through a resin feed which goes through the bag and this feeds into a distribution system which commonly uses spiral tubing. This tubing is normally wrapped in a flow mesh to aid flow. Once resin is in the mould then it will need to flow outwards and this is either achieved with the grooves in the foam, as previously mentioned, or by the use of 26 January/February 2014

any voids between it and the gelcoat and secondly it will reduce the radius of any corners allowing the dry glass to be fitted more easily. Care should be taken to ensure that no splashing occurs onto the mould flange. Once the gelcoat and skincoat have gelled a band of bagging tape should be applied to the outer perimeter of the flange. Figure 3: Glass loading completed. The first layers of glass are then applied dry on top of the skincoat and held in place with the adhesive systems previously mentioned. The glass must be pushed into all corners so that there are no voids. If foam is to be used this can be positioned at this point and where possible if there are any joints then the surface grooves should match up. It is best to chamfer the outer perimeter of the foam in order to make subsequent glass fitting easier. More glass can then be applied as necessary. The spiral wrap vacuum channel is then fixed near to the bagging tape and held in place using small strips of tape. Dependent on the size of the moulding a number of vacuum take off points will be needed and as a minimum two should be used at opposite ends of the moulding. Peel ply can then be fitted over the total surface and should finish under the vacuum spiral. Peel ply should be the only material that links the glass in the mould to the vacuum and will act as a resin brake. Figure 4: Flow mesh and resin feed channels in place. a flow mesh which covers the surface of the monolithic parts of the laminate. This flow mesh should not go to the extremities of the laminate as this can lead to resin getting into the vacuum channel. Flow mesh can be very difficult to remove from a cured moulding and therefore a peel ply is often used between it and the glass. This peel ply is normally applied over the whole surface including any foam areas so that once peeled off the surface has a good aspect. Peel ply also offers the opportunity to get better secondary bonding of the infused laminate if peeled off immediately prior to bonding. The vacuum channel mentioned above is made using spiral wrap and inlet similar to that used for the resin. Vacuum infusion process The actual vacuum infusion from start to finish involves a number of steps. Mould preparation is normal and a gelcoat is applied. This is then normally followed by a hand lay-up skin coat using at least one layer of 300 or 450g CSM. This skincoat has two uses, firstly it will ensure that the first layer of the laminate should not have Flow mesh should be applied to all monolithic areas of the laminate and should overlap onto any foam sections. However, the flow mesh should not go to the edge of the glass pack but should stop approximately 150mm short; this should ensure a more even flow at the end of the infusion and reduce the possibility of resin entering the vacuum channel. The resin flow spiral channels are then positioned on top of the laminate; these should be wrapped in flow mesh to ensure rapid flow from the channel. The positioning and length of the flow channels will need to be designed so as to give an even flow in all directions. With larger mouldings a number of flow channels will be needed as January/February 2014 27

the rate of fill will slow over distance and it is recommended that they should be at maximum 1 metre spacing. Once all the above is in place the land area should be checked to ensure there are no loose fibres as these can affect the vacuum integrity. The next step will be to prepare the film and dependent on the complexity of the moulding this should be approximately 1.5 times the length and width of the dimensions of the mould. Extreme care needs to be taken with the film to ensure that it cannot be damaged as finding small holes in the middle of the film can be difficult. It is recommended that the roll of film is held on a rack which can be taken to the mould and then unrolled directly. The bag should then be cut at the appropriate length and roughly fitted onto the mould. Any blades and sharp objects should not be left in proximity to the mould in order to ensure that the bag is not punctured. The bag is then fitted to the mould by slowly stripping off the release film from the bagging tape and smoothing the film onto it. It is essential that there are no creases in the film where it is fitted as these will lead to leaks. In order to ensure that there is sufficient film to take up the full shape of the moulding it is necessary to introduce pleats. These are needed to give enough film to cover any design features Figure 5: Bag under vacuum to test for leaks. on the moulding as the overall length of the mould will be less than the distance over all the contours. Regular checks need to be made of the film so that there is an excess in all areas to avoid any possibility of bridging. Once the film is fully fitted the vacuum lines can be connected, once again ensuring that there are no creases in the film at this point. The vacuum can then be applied and as the air is being removed the bag needs to be located correctly to avoid any bridging on corners. It is essential to have a catch pot between the mould and the vacuum pump to stop any possibility of resin entering the pump during the infusion. Vacuum pumps can be slow in removing the air due to their throughput and the initial removal can be helped by using a vacuum cleaner. Once the bag is evacuated then checks need to be made for any bridging or poor fit, if found, the vacuum needs to be released and the film moved as required and then vacuum reapplied. The vacuum level used should be greater than 0.8 bar vacuum and as near to 1.0 bar as practical. The bag needs to be checked for leaks and there are Figure 6: The vacuum infusion process set-up. 28 January/February 2014

Figure 7: Completed infusion showing the resin feed system. a number of leak detectors on the market. Any leaks found need to be repaired. When no further leaks can be detected a vacuum drop test should be carried out. This means that there should be a vacuum gauge fitted to the bag and the vacuum pump clamped off. The vacuum drop needs to be as low as possible; an acceptable level of drop would be below 0.1 bar in 15 minutes but the actual level would depend on the mould size. If the drop is too large there will be a leak somewhere and this will need to be found and rectified. When the bag is vacuum tight the resin feed pipes can be connected and once again these should have no creases in the bag in the area where they are fitted. The resin feed pipes need to go from the feed point to the supply container and should be clamped off prior to fitting to avoid vacuum loss. The end to be inserted into the bag should be cut to a point and wrapped with bagging tape at approximately 25mm from the end. The point is then pushed through the inlet port which will pierce the bag and the bagging tape will remake the seal. These areas should be checked for leaks with the leak detector. Figure 6 shows the complete vacuum infusion set-up. The actual infusion can now take place. The catalysed resin needs to be put into a suitable container which should be positioned below the level of the mould. The closed resin feed pipes should be submerged in the resin and held in place. It is normal practice to open the feed lines in sequence; the one in the centre of the moulding should be opened first. This will allow the resin to flow and other feed lines should only be opened when the resin flow has reached them as if opened too early there is a possibility of resin block off to some areas. It is essential to keep the resin container topped up with resin because if any air gets into the moulding then it could be ruined. During the infusion careful watch needs to be made in order to rectify any small leaks observed as soon as possible. When the mould is full there should be minimal resin getting to the vacuum channel and if this is the case the resin feeds can be closed and the moulding left under vacuum. The vacuum needs to be left on at least until the resin has gelled and exothermed but preferably overnight. This process covers the basic method of carrying out vacuum infusion but there are other options available. In some cases it is impossible to use the flange area on a mould. If this is the case the vacuum channel can be applied directly onto the dry glass using specialist vacuum breather pads. The use of these would be outside the scope of this article. A further option is to inject the resin directly into the bag rather than the vacuum pulling it from a container. Composite Integration has developed a system which allows this by carefully monitoring the pressure within the bag and then adjusting the injection rate to give even fill. This process can speed up the infusion and reduce waste resin. Conclusion Vacuum infusion can be successfully used by most composite manufacturers as it is a method of producing high quality mouldings with minimal styrene emissions. However, the process does require training for the operators and care in application. Most operators rise to the challenge of the new process as the benefits become apparent. January/February 2014 29