For Installer. Duration Windows. Assembly Guide Durafold 1000

Similar documents
Installation Guide. Bi-fold Doors

Pvcu Bi Folding Doors Fitting Instructions.

ASS 70 FD folding / sliding door. Installation Guide

ASS 70 FD folding/sliding door installation guide

Side Light Frame Pack Assembly Instructions

Side Light Frame Pack Assembly Instructions

Installation - Sub Cills

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF55 & SF75 WITH WEATHERED OR FLUSH TRACK

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

Liniar Window. installation guide

VisioGlide 100 System W4F Four doors 2 fixed, 2 sliding

FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

DOOR BiFOLD DOOR SET (3 + 1)

Portofino Installation Guide

Deauville Installation Guide

Folding Sliding door system

SIG Awning / Casement / Fixed Lite 100

Installation Guide. WarmCore. Folding Sliding door system. Glass Packing. Pre-Installation. Removing the Existing Door.

Portofino Case2 Installation Guide

Deauville Installation Guide

How to operate (folding)

B A T H R O O M G L A S S

INSTALLATION INSTRUCTIONS FOR A&L PRODUCTS

PVCu FOLD & SLIDE DOOR OUTWARD OPENING

2300 BI-FOLD INSTALLATION GUIDE

patio door installation guide

Dubnium 11 Installation Instructions & Parts List

Installers guide Deadbolt 02.

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Curium 19.4H Installation Instructions & Parts List

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Curium 19H Installation Instructions & Parts List

CRL OVERHEAD TRACK BI-FOLD DOORS (OTC)

In-line Patio Fabrication & Installation

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

ASS 70.HI Lift/Sliding and Sliding Doors Installation Guide

PVC-u Product Installation Guidelines

window installation TECHNICAL GUIDE Everbrite House, Greenway, Harlow Business Park, Harlow, Essex CM19 5QJ

Method of Build 1. General

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

9 X 9 REMOVABLE TYPE ALUMINUM WINDOW BARS INSTALLATION INSTRUCTIONS Import Note : 9 X 9 Spacing Removable Type Installation is covered in this

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

Installation Instructions for Vista Air Vertically Folding Walls

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

INFINITE RANGE - HINGE DOOR

Sectional Door Installation Instructions

Assembly Instructions

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Vertical Slider Section Detail

Patio door. Installation guide

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

Heavy Wall Applied Stop Tube Frame and Door Installation

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

SECTION side windows round corners

Radon 07 Installation Instructions & Parts List

Panoramic Door Block Frame Installation Manual

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Greenhouse Assembly Instructions

Gallium 03 Installation Instructions & Parts List

Monaco Installation Guide - Surface Profiles

INFINITE RANGE - CENTRE FOLDING DOOR

Semi-Frameless Hinged Door With Panel And Return

Thermally Broken Framing and Door Installation

Figure #1 - VSNEO Shower Door Assembly

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

Storefront Installation Guide

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

Xenon 05 Installation Instructions & Parts List

Installation Instructions

(Non Handed Kits) Slotted Hand Screwdriver. Power Driver & Bits. Work Gloves

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

INSTALLATION INSTRUCTIONS

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

Pocket Door Installation Instructions

INSTALLATION INSTRUCTIONS

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

Chapter 12 - Windows and Doors

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

CONSERVATORY ROOF INSTALLATION GUIDE Issue

Chapter 12 - Windows and Doors

Cold Frame Instructions

InSTallaTIon InSTruCTIonS For 4-lITe PaTIo Door unassembled

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Cleaning. This instruction will cover installation of the following units Codes:

Bi-Pass And Bi-Fold Sliders

INSTALLATION GUIDE. TRANZFORM Sound TRANZFORM Space

GROWING BETTER THROUGH DESIGN. Regent Royale Rosette Regal GREENHOUSE. Assembly Instructions 04/02

INFINITE RANGE - CENTRE FOLDING DOOR

NEPAL Installation procedure

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Transcription:

For Installer Assembly Guide Durafold 1000

Contents Title Page Number Handling Manual Blinds 4 Handling Electronic Blinds 5 Drainage 63 Outer Frame Assembly (Kit Form Door Only) 7 15mm Low Threshold Assembly 8 20mm Low Threshold Assembly 9 Hinges 11 Gasket Positions 12-13 Traffic Door Magnet Retainer 14 Toe & Heeling 15-22 Call 01268 681612 for advice & fitting support Essential Instructions CILL - HEAD - JAMBS must be fitted dead level and square or doors will not operate correctly. Make sure the doors are toe and heeled correctly. See pages 14-21. 2

Manual Blinds Handling and Installation Sheet For Manual Push Block Integrated Blinds Blinds are manufactured with all slats closed at the head track; on NO account should they be tilted or lowered until the unit is correctly installed in the frame. Blind units should be transported either with the closed slats at the top or bottom of the unit, they can be transported on their sides with care. On NO account should they be laid flat. All blind units are gas filled and fully operational before being dispatched. The operating system is powered by magnets and on NO account should the magnet controllers be removed from the glass surface until the unit is installed correctly in the frame. When operating for the first time, lower the blind to its full extent, using the tilt controller; always ensure that the slats are in the horizontal position before using the lift and drop controller. The controllers should not be forced beyond their magnetic connection and are not interchangeable. When the unit is in the frame and before the final bead and gasket is applied, select the operating position for the controllers, these need to be in alignment with the blind jamb sections. These procedures are to assist in the transportation, installation and operation of these products. DURATION WINDOWS CANNOT ACCEPT RESPONSIBILITY FOR PRODUCT FAILURES IF THE INSTALLATION INSTRUCTIONS HAVE NOT BEEN FOLLOWED AND UNITS HAVE BEEN INSTALLED INCORRECTLY. 3

Electronic Blinds Handling and Installation Sheet For Electronic Control Unit Integrated Blinds Blinds are manufactured with all slats closed at the head track; on NO account should they be lowered until the unit is correctly installed in the frame. All bind units are gas filled and fully operational before being dispatched. The battery controller is powered to capacity at manufacture but should be recharged on site before attempting to operate the blind. The battery controller power source should be charged as required from the UK mains house supply, this supply is reduced to 12 volts for safe operation. Each unit will have a short cable exiting at the side of the head track, a female connector is attached and a longer cable is attached to the power plate with a male connector. When the unit is in the frame and before the final bead and gasket is applied, select the operating position for the controller before applying the power plate to the glass. The blinds power plate should be fixed to the internal glass surface, the glass must be cleaned before applying the self adhesive power plate. The fully charged controller should be placed on the power plate, the controller is held in place by magnetic force. DURATION WINDOWS CANNOT ACCEPT RESPONSIBILITY FOR PRODUCT FAILURES IF THE INSTALLATION INSTRUCTIONS HAVE NOT BEEN FOLLOWED AND UNITS HAVE BEEN INSTALLED INCORRECTLY. 4

Drainage When installing a bifold, drainage paths for the threshold need to be taken into consideration. Please discuss drainage with the installer, homeowner and installer of the external flooring. The below images depict an example of each threshold and its drainage path. 15mm Low Threshold 20mm Low Threshold Standard Threshold (Open out) 15mm Low Threshold With Cill 20mm Low Threshold With Cill Standard Threshold With Cill (Open out) Lead Flashing or DPC Supplied By Others. Standard Threshold (Open in) Standard Threshold With Cill (Open in) Images displayed on this page are to show drainage paths only. They are not a guide on good building practice. 5

Outer Frame Assembly This page is only required when the bifold has been ordered in kit form. Image to the left shows the positioning of the cleats once in the frame. The thicker cleat is placed on the door opening side. The slimmer cleat is placed on the opposite side (rebated side). Use a 3mm allen key to tighten inserted blocks. Make sure the mitre is sealed with silicone or small gap sealer before assembling. Insert the blocks with the allen key screw facing the round hole. Use a 3mm allen key to tighten up the mitre. Make sure you have sealed the mitre with silicone or small gap sealer. Image shows how the mitre will look once assembled correctly. 6

Low Threshold Assembly 15mm Low Threshold! Silicone edge! Silicone edge! Silicone edge Silicone end plate to the low threshold. Position low threshold and end plate up against the rebated frame. Make sure to silicone all edges. Tighten fixings evenly. Important: Remember to silicone each corner joint before final fix. Once assembled finally pump silicone into any spaces between the threshold and frame.! Silicone edge! Silicone edge When fitting a cill with this style of threshold you may be required to notch out an area for the rebate to fit into. (Below) Notch on cill for rebated frame to sit in. 7

Low Threshold Assembly 20mm Low Threshold! Silicone edge! Silicone edge! Silicone edge Silicone end plate to the low threshold. Position low threshold and end plate up against the rebated frame. Make sure to silicone all edges. Tighten fixings evenly. Important: Remember to silicone each corner joint before final fix. Once assembled finally pump silicone into any spaces between the threshold and frame.! Silicone edge! Silicone edge When fitting a cill with this style of threshold you may be required to notch out an area for the rebate to fit into. (Below) Notch on cill for rebated frame to sit in. 8

Intentionally Left Blank 9

Hinges Hinge The holes for the hinges will have been pre-drilled at the factory. Line up hinges and machine screws with the pre-drilled holes on the back plate. Insert top and bottom machine screws first Line door up level to the top and bottom of the frame. Check doors are all level. Finally once door is all level add the final fix self tapper screw to the centre of the hinge. Bogie Hinge Guide Hinge 10

Gasket Position Traffic Door & Mullion Cut Through Insert wedge gaskets into positions shown once units are glazed into the door (shown by red circles). 11

Gasket Position Top Section Cut Through Side Cut Through Gaskets supplied already in place: Gaskets supplied loose: ACDV202 ACDV245 ACDV246 ACVG31 ACDV244 ACVL032 (Sash door to door) (Outer frame) (Sash) (E Gasket) (Outer frame rebate) (Door rebate) ACVG33 Wedge for glazing 12

Traffic Door Magnet Retainer Image shows the pair of door retainer magnets in your box. (for configurations with traffic doors) The screw goes through the centre of the magnet. Slide cover over the magnet and screw. Magnet Position on Traffic Door 30mm 165mm Magnet width position: 165mm Magnet height position: 30mm Magnet Position on Folding Panel 165mm 30mm Magnet width position: 165mm Magnet height position: 30mm Magnets Function The magnets are used where traffic or slave doors fold back onto an adjacent panel and are designed to stop the doors and handles colliding with each other. 13

Toe & Heeling Important Glazing Instructions In order for all products to work correctly this sealed unit must be correctly glazed. Bi-folding doors must be correctly toe & heeled. Example Shown Below Viewed from the Inside pack tight until level HINGE EDGE HINGE EDGE Insert Packers tightly across diagonals, ensure head is level and secure packers in place with silicone. Internal hinge positions Packer Final fix packer 14

Toe & Heeling FOLDING / SLIDING OPENING IN OR OUT: Toe & Heel This symbol indicates where to pack each panel. Final Fix Packer All configurations are viewed from the Inside 1 Panel 2 Panel 3 Panel 15

Toe & Heeling FOLDING / SLIDING OPENING IN OR OUT: Toe & Heel This symbol indicates where to pack each panel. Final Fix Packer All configurations are viewed from the Inside 4 Panel 16

Toe & Heeling FOLDING / SLIDING OPENING IN OR OUT: Toe & Heel This symbol indicates where to pack each panel. Final Fix Packer All configurations are viewed from the Inside 5 Panel 17

Toe & Heeling FOLDING / SLIDING OPENING IN OR OUT: Toe & Heel This symbol indicates where to pack each panel. Final Fix Packer All configurations are viewed from the Inside 6 Panel 18

Toe & Heeling FOLDING / SLIDING OPENING IN OR OUT: Toe & Heel This symbol indicates where to pack each panel. Final Fix Packer All configurations are viewed from the Inside 7 Panel 19

Toe & Heeling This guide provides a detailed explanation of how we suggest to toe and heel our doors. This is for use as a guide only as each set of doors are unique and may require different levels of packing in the toe and heeling process (amount of packers used). Please use your own judgment and if unsure please contact an experienced installer or our technical department. The red sections display where to toe and heel on a 3 panel door all one way. The yellow sections display the final fix packer position. Start by toe and heeling the panel attached to the frame first and work towards the traffic door (Or slave door). The remainder of the presentation will show you how to toe and heel the traffic door. Packers are supplied in a range of sizes which are colour coded for ease of use. Packers used in this guide are an example only. Each door is unique and will require different levels of packing. Always use a range of packers to best suit the door being toe and heeled. When toe and heeling use a glazing shovel where needed. 20

Toe & Heeling Place 2-3 packers at the bottom of the door on the hinge side. (number of packers depends on door tolerances) Pack the side of the unit on the handle side of the door. Use a variety of packers until the glazed unit sits firm in place and square within the frame. Place glazed unit into door frame. Pack the side of the unit on the hinge side of the door. Use a variety of packers until glazed unit sits firm in place and square within the frame. Pack the top of the unit on the handle side of the door. Use a variety of packers until the glazed unit sits firm in place. Lastly pack the top side corner on the hinge side of the door. Use a variety of packers until the glazed unit sits firm in place. This will help keep the glazed unit square and in place. Check door is completely level with the outer frame. If not add or remove packers where needed. Once all panels have been toe and heeled check door is running correctly and that the locking system works correctly. If required silicone the packers on the uprights of the door into place. (this will prevent the packers from moving). Finally clip bead into place. 21

Notes Left blank for your personal notes: 22