RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

Similar documents
Permit Application. General Information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Clear Creek County Site Development

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

PLANNING AND DEVELOPMENT

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Town of Apex, North Carolina

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Conceptual, Preliminary and Final Site Plan Review in Holladay City

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

SITE PLAN APPLICATION

UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Minor Site Plan Application and Checklist Land Disturbing Activities

Minor Site Plan Review Process

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

Application for Site Plan Review

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

Operating Standards Attachment to Development Application

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

APPLICATION FOR SITE PREPARATION PERMIT

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Checklist for Tentative Subdivision Map

TOWN OF NORTH BRANFORD

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

Subdivision Application Checklist

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

Residential Construction Checklist Single and Two Family Construction

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

DESIGN REVIEW PROCESS AND APPLICATION

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

ADMINISTRATIVE DESIGN REVIEW Information

Site Plan/Building Permit Review

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

City of Massillon Site Plan Checklist

OAK RUN BUILDING PERMIT

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

City of Palmetto Florida

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

SECTION 2 GENERAL REQUIREMENTS

City of Romulus Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

Residential Room Addition / Remodel Submittal Requirement Checklist

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

Applying for a Site Development Review

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

Checklist for Minor Plan Modification

APPLICATION DESIGN REVIEW Please Print or Type

Residential Plot Plans

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

DECK PERMIT APPLICATION PACKET

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

Planning and Zoning Application & Checklist

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

ARB Submittal Package Checklist

Owner Information and Authorization:

City of Del Mar Planning Department Submittal Checklist ADR ADMINISTRATIVE DESIGN REVIEW PERMIT

Major Site Plan Application

Land Use & Development Application

Applying for a Site Development Review (Sign CVCBD only)

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

PRELIMINARY PLAT CHECK LIST

Town of Skowhegan Application For Development Review

Porter County Plan Commission

SUBDIVISION PLAT APPLICATION

MASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET

MINOR DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS

Minor Site Plan Application

Concept Plan. Application Upload Checklist & Submission Requirements

CONCEPT REVIEW GUIDELINES

SIGN PERMIT APPLICATION

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS

Grading, Erosion and Sediment Control (GESC) Checklist

1.1 GENERAL RECORD DRAWING REQUIREMENTS

City of Santa Paula Planning Department

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

PROJECT ADDRESS: PERMIT #

Transcription:

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects; 2) the standards that staff will employ in reviewing permit submittals; and 3) provide the inspection standards staff will employ to confirm the implemented scope of work is consistent with both the approved scope of work and compliant with the ordinances and building codes as amended and adopted by McHenry County. A residential demolition project consists of the complete removal (demolition) of a single family residence or a residential accessory structure. This checklist is purposely brief and does not replace consulting the County s adopted ordinances and codes. If the information described in the Submittal Checklist section is not provided, the permit application will not be accepted. The information provided in the Office Review Checklist section is for the applicant s general information. This checklist does not restrict staff s ability to review or inspect additional items, as appropriate, based on the permit submittals and construction site observations. Applicants are ultimately responsible for ensuring that their development complies with the County s adopted zoning and stormwater ordinances and building codes and amendments, which are available on the County s website: www.co.mchenry.il.us/plandevordinances. SUBMITTAL CHECKLIST Completed PERMIT APPLICATION FOR RESIDENTIAL DEMOLITION. Current plat of survey (unless the Planning Division determines that one is not necessary). Contact the Planning Division to determine if a plat of survey is available for your parcel (if you do not have one). Two (2) sets/copies of the Site Plan with, at a minimum, the following information. The Site Plan shall be drawn and scaled in a manner that clearly identifies and details the proposed scope of work. Incomplete submittals will be rejected. o Demolition of a Single Family Residence Notarized letter from the property owner authorizing the demolition of the single family residence. If ownership is not clear, then proof of ownership will be required. Dimension the building footprint and locate the house in relation to other structures on the site and the property lines. Specify the existing number of stories and approximate height of the structure. Specify the depth of the basement or foundation. Locate the termination point of the existing electrical service and any service feeders to remain. Locate the termination point of the existing gas service and any service pipe to remain. Locate the septic system and well, approval may be required from the MC Department of Health Identify the extent of demolition and related work on site including but not limited to: Major tree removal that may require filling, driveway removal or re routing, walkway removal or rerouting, other non residential structures. If the demolition of a single family residence creates a non conforming status on that parcel, then the permit application shall include the construction of a new single family residence. Exception: A letter of credit in the amount of 150% the cost of the demolition of the structures that create the non conforming status. o Demolition of a Residential Accessory Structure Notarized letter from the property owner authorizing the demolition of the accessory structure. If ownership is not clear, then proof of ownership will be required. Dimension the building footprint and locate the house in relation to other structures on the site and the property lines. Specify the approximate height of the structure. C:\Users\abmartin\Desktop\Res_Demolition_Checklist_R20160803.docxRev. 8/3/2016

DEMOLITION PERMIT APPLICANT CHECKLIST Page 2 Specify the depth of the foundation If applicable, locate the termination point of the existing electrical service. If applicable, locate the termination point of the existing gas service. Identify the extent of demolition and related work on site including but not limited to: Major tree removal that may require filling, driveway removal or re routing, walkway removal or rerouting, other non residential structures. A letter from the electric utility company, ComEd, or the owner that provides the anticipated date of termination by the electrical service provider, if applicable. Review ComEd requirements for disconnection and demolition. A letter from the natural gas utility company, Nicor, or the owner that provided the anticipated date of termination by the natural gas service provider, if applicable. Review Nicor requirements for stopping service. Non refundable review fee of $75.00 or 25% of permit, whichever is greater, must be paid at the time of application. Permit fees are calculated in accordance with the current Fee Ordinance. Cash, Check or Credit Card accepted. OFFICE REVIEW CHECKLIST (may be used by Applicant for further clarification of the permit review process) ZONING Verify development meets zoning requirements: o Street, side, and rear setback requirements o Effective yard restrictions o Setback distance from other structures o Lot coverage and impervious surface area requirements Verify location meets well and septic setback requirements (coordinate with McHenry Co. Health Dept. if necessary) NOTES: STORMWATER Verify proposed impervious area and limits of disturbance. Determine if project requires a Stormwater Permit based on criteria in Stormwater Management Ordinance: o Located in a flood hazard area o Located in a wetland o Hydrologically disturbs 5,000 sf or more o Hydrologically disturbs 50% or more of parcel o Additional 20,000 sf of impervious area since 1/20/04 o Post 12/1/14 platted lots that exceed allowable impervious area o Part of a larger common plan of development If project requires a Stormwater Permit, review plans for: o Appropriate SE/SC measures and restoration methods o Spoil haul off or re spread locations o Proposed development including limits of grading/disturbance, proposed elevations o Path/location of utilities o Base flood elevation (both mapped and by elevation), if necessary o New structure in floodplain will require that building protection standards are met o 50% Rule Form, if necessary o Grading in floodplain may require compensatory storage o Limits of wetlands & buffers, if necessary o Other requirements, as appropriate NOTES: C:\Users\abmartin\Desktop\Res_Demolition_Checklist_R20160803.docxRev. 8/3/2016

DEMOLITION PERMIT APPLICANT CHECKLIST Page 3 BUILDING PLANS All Demolition Permits o Verify the completeness and clarity of the Site Plan. o Verify the notarized letter from property owner stating the intentions to demolish a structure. o Verify the notarized letter from the Utility Companies (ComEd, Nicor, etc) stating the services have been disconnected. Demolition of a Single Family Residence o Verify the extent of demolition and identify any dependent structures that could be affected by the demolition. o Verify the point of termination for the electrical service, verify all service feeders to remain. o Verify the point of termination for the gas service, verify all service pipe to remain. o Verify location of the septic system and well, approval required from the MC Department of Health Demolition of a Residential Accessory Structure o Verify the extent of demolition and identify any dependent structures that could be affected by the demolition. o Verify the point of termination for the electrical service, verify all service feeders to remain. o Verify the point of termination for the gas service, verify all service pipe to remain. o If applicable, verify location of the septic system and well, approval required from the MC Department of Health NOTES: ON SITE INSPECTIONS CHECKLIST (may be used by Applicant for further clarification of the inspection process) Final Inspection Verify disconnect of utilities, gas and electric. Verify proper termination of existing utility feeders or supply lines to remain Verify the extent of demolition and ground disturbance related to the demolition. Identify any dependent structures or existing condition that could be affected by the demolition. Verify construction waste and debris is removed according to the approved plans. NOTES: C:\Users\abmartin\Desktop\Res_Demolition_Checklist_R20160803.docxRev. 8/3/2016

For internal use only Permit #: Zoning: Date: Twp Road Jurisdiction: PERMIT APPLICATION FOR RESIDENTIAL DEMOLITION OWNER/PRIMARY CONTACT INFORMATION Property Owner s Name: Company Name (if any): This section required only if primary contact is different than the owner Primary Contact: Project Address: Company Name (if any): Address: Email Address: Phone: Email Address: Preferred Method of Permit Release: Pick up Mail Phone: PROPERTY INFORMATION Parcel/Tax Number: Subdivision Name: Parcel/tax numbers can be found at: www.mchenrycountygis.org/planning Lot: Block: PROJECT INFORMATION Project Description: $ Approximate value of proposed work sf Area of existing structure ft Depth of existing basement or crawlspace. If slab on grade, provide the foundation depth. Structural / Gen. Is there any proposed grading, trenching, excavation, etc? (If yes, provide the area of disturbance) sq.ft. Is there any proposed impervious area? (If yes, provide the area of the proposed impervious surfaces) sq. ft. Will the foundation be removed? If yes, provide complete foundation dimensions Are there any adjacent or dependent structures that are scheduled to remain Electrical Service feed: Underground / Overhead Letter from the Electrical Service Company (ComEd) Mechanical Gas Service: Liq. Propane (LP) / Natural Gas Y N Letter from the Natural Gas Company (Nicor) Sanitary Will the well be removed? Will the septic system be removed? An abandonment permit through the MCDH is required unless a new single family residence is scheduled for construction Excavator: Engineer: CONTRACTOR/SUB CONTRACTOR INFORMATION OWNER/PRIMARY CONTACT CERTIFICATION Electrician: _ General/Other: _ I declare that this Application is true and correct to the best of my knowledge. I realize that the information that I have provided forms the basis for the issuance of the Permit and have included all work to be authorized with this Permit. I agree to construct said development in compliance with the permitted documents. Signature: STATEMENT OF AUTHORIZATION (Must be signed when primary contact is not owner AND a Stormwater Permit is required) Date: I hereby authorize (Primary Contact) to act on my behalf as my agent in the processing of this Application and to furnish, upon request, supplemental information in support of this Permit Application. This person will act on my behalf as the point of contact for permit correspondence. Owner's Signature: Date:

SITE PLAN APPLICANT CHECKLIST Every application for a building permit or agricultural exempt structure construction card must be accompanied by a site plan. The purpose of this form is to inform applicants of the requirements for the site plan. If the information described in the Submittal Checklist is not provided on the site plan, the permit application may be rejected. The information is provided for the applicant s general information. This checklist does not restrict staff s ability to require additional information, as appropriate, based on the permit and site conditions. If a Stormwater Management Permit is required or if the site plan must be reviewed by the Staff Plat Review Committee, a more detailed site plan may be required. Staff will review the site plan to ensure that the project complies with the County s adopted Unified Development Ordinance and Stormwater Management Ordinance. Applicants are ultimately responsible for ensuring that their development complies with these regulations, which are available on the County s website: www.co.mchenry.il.us/plandevordinances. SUBMITTAL CHECKLIST (if the information is not provided, the permit application may be rejected) The site plan may, but is not required to, be drawn on the back of this form. The site plan may also be drawn on an aerial photograph, plat of survey, or septic plan as long as it contains all required information. Aerial photographs may be printed from the County s website: www.mchenrycountygis.org/planning. The site plan should be drawn to scale (such as one inch equals 30 feet). The following information, as appropriate to your project, should be represented on the site plan: 1. Lot lines and lot dimensions. 2. Parcel size (acres or square feet). 3. A graphic scale bar or narrative scale (such as one inch equals 50 feet) and a north arrow. 4. Adjacent road rights of way and platted but unbuilt road rights of way with road names labeled. 5. Existing and proposed easements. 6. Existing structures, sidewalks, access roads, driveways, parking areas, retaining walls, seawalls, piers, etc. 7. Proposed new or modified structures, access roads, driveways, parking areas, retaining walls, seawalls, piers, and berms with dimensions. 8. Existing and proposed well(s) and septic systems. 9. Existing and proposed utilities, equipment, culverts, landscaping, ponds, and creeks. 10. Limits of land disturbance for construction, including grading, spoil piles, spoil re spread areas. 11. Soil erosion and sediment control measures. 12. Measured setbacks from new or modified structures (measured to building walls) to lot lines, wells and septic fields, and existing structures. 13. Measured setbacks from areas of land disturbance to wells and septic fields. C:\Users\abmartin\Desktop\_Site_Plan_Checklist.docx Rev. 6/15/15

SITE PLAN Address: _ PIN: (draw arrow) Parcel Size: Drawing Scale: Permit # (for office use only)