Installation Instructions of HomeTech Fakro Skylights

Similar documents
How-To-build guide Garden shed

PV SLATE ROOF INSTALLATION GUIDE

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Installation Guide GRP Dormer

GV Standard PitchVent

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

Installation guide for 20/20

TYPICAL BARGE DETAIL - CROSS SECTION

Installation Manual. This installation is for the Odyssey H1800 Series Ventilation System.

Insulated Corrugated. Patio Installation Guide. SupaCore Insulation Superior Thermal Performance. Colorbond Steel Roof & Ceiling. InsulRoof roof panel

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

NEVADA ASSEMBLY INSTRUCTIONS

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

SecuAnch Roof Anchor System

GV Standard Pitchglaze

IDAHO ASSEMBLY INSTRUCTIONS. BASE SIZE: 1.800m x 1.200m

Ensure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.

GSE INTEGRATION INSTALLATION MANUAL For photo-voltaic systems partially covering the roof

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

Shingle Installation Guide

Asphalt Shingle Roofing NZ PO Box , Royal Oak Auckland

1. Tile Roof Installation:!

ALPINE TRAY. To get the best from this product please follow these recommendations.

The Leka System Installation Guide

Basic Fitting Details No. 1

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

ThermoSpan EPS. Metalcraft COMMERCIAL ROOFING CREPS. Insulated Panel Systems DETAIL LIST

INSTALLATION GUIDE. Flat Roof Homesheds TM BEFORE YOU START TOOLS REQUIRED

How-To-build guide carport

Installation Manual. Future Roof Shingle / Slate Products

Dura-Lock Roof System

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

SunTrackerTwo Preparation

150 MM FREE STANDING WOOD FIRE FLUE KIT INSTALLATION INSTRUCTIONS

DUTCH GABLE FREESTANDING CARPORT

The WANZ Guide to Window Installation

MULTISPAN GABLE WITH HIP END ATTACHED PATIO

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

Guardian warm roof conversion system. Installation Guide

PROFESSIONAL PITCHED ROOFING ANCILLARIES

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

Viva Synthetic Thatch Installation Instructions

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

Finesse Profiles. Nailstrip

STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Roll-Fix Kit The complete dry hip kit RFIG

Table of Contents Light Gauge Metal Roof & Wall Panels

Potting Store Assembly Instructions

INSTALLATION FASCIA & SOFFIT

NEW equinox INSTALLATION GUIDE Issue

YWY M08 The new VELUX solution

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Five Star Panel Installation Instructions

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Radon 07 Installation Instructions & Parts List

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS

General Installation Guidelines

Item Checklist & Additional Tools Required For Installation

SLATE & SHINGLE INSTALLATION

Curium 19H Installation Instructions & Parts List

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

CLEARSPAN GABLE STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. WITH GAZEBO END ATTACHED PATIO

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

Nanton Grain Mill Assembly

installation guide Villa

manthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e

Insuvent Designed to ensure ventilation in existing roofs when insulation quilts are installed

Curium 19.4H Installation Instructions & Parts List

SKY TUNNEL COMMERCIAL INSTALLATION GUIDE ALL WORK CARRIED OUT BY THE INSTALLER SHOULD BE IN ACCORDANCE WITH LOCAL LAWS & SAFETY REGULATIONS.

Blokes Shed INSTALLATION INSTRUCTIONS Custom Design & Build. Nationwide Delivery

How To Build Decorative. Timber Awnings

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

System for 2+ Level Buildings

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

HeavenScape Premium Skylightys Installation Instructions

INSTALLATION INSTRUCTIONS for PYROCLASSIC FIRES LTD. 100mm SLOPING CEILING FLUE KIT

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

Stone coated steel roof tile INSTALLATION GUIDE

Ekoroof LiteTile Dimensions

Installation Procedures

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

Corner Potting Store Assembly Instructions

S H E D A S S E M B L Y I N S T R U C T I O N S

Dubnium 11 Installation Instructions & Parts List

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Playaway Swiss Cottage Assembly Instructions

Transcription:

Installation Instructions of HomeTech Fakro Skylights EH Flashing Suitable for corrugated, concrete tile and pressed metal tile roof types 15-75 For roofs with minimum pitch 15 and maximum pitch 75 IMPORTANT: Read ALL installation instructions before commencing installation. These instructions are to be read in conjunction with the FAKRO installation guides included in the product packs. HomeTech FAKRO 0800 466 383 www.fakro.co.nz Version 2 May 2014

HomeTech FAKRO 0800 466 383 PLEASE NOTE: Special Instructions for different roof profiles are found at the rear of these instructions please read before proceeding to install. HomeTech FAKRO skylights are typically sold supply only. However, this product must be installed by either HomeTech certified installers or by other competent persons. In many cases a building consent will be required and installation will be subject to council requirements. Please note that HomeTech FAKRO recommend you read all instructions prior to installation. Commencement of installation is considered confirmation that you have received and read all installation material. HomeTech provides technical support for installation, but takes no responsibility for workmanship of others, nor responsibility for leaking of the skylight, if the product has not been installed to these manufacturer s installation instructions. HomeTech has an installation service that can be provided for a fee, quoted before commencement of the installation of the skylights. New Zealand Installation Instructions for Fitting Skylights to Rafters 1) The FAKRO Skylights must be installed to roofs with a minimum pitch of 15 and a maximum of 75. 2) The skylight must be installed above a complete row of tiles for concrete or pressed metal. On a new corrugated roof install the skylight above a horizontal lap. In the case of corrugated sheets, it is recommended that the upper edge of the bottom sheet be cut or flattened at an angle so that there are no sharp edges which could tear the lead flashing (Fig 2). 3) The following distances should be maintained between the frame and roofing material. Fig 1 Below the lower edge: 90mm - 120mm for concrete tiles (Fig 2). 90mm - 120mm for corrugated sheets (Fig 2). 70mm - 80mm for pressed metal roofs eg. Decrobond. Along the sides: 40mm. Above the upper edge: 50-80mm (Fig 1). Fig 2 www.fakro.co.nz Installation Instructions EH Flashing 2

4) Mark the Skylight opening on the roofing foil using templates supplied and cut out the battens over the opening. Cut out an opening in the foil leaving a 100mm flap along each of the edges in order to later fold back over battens (Fig 3). 5) Cut off the battens/purlins or the roof boards in the area where the Skylight is to be installed and frame out (Fig 4). Note special rebate requirements for metal tile roofs refer page 9-11. MANDATORY REQUIREMENT ON NEW BUILDS: To adhere to NZ Code E2/AS1 for roof penetrations, the edge of roofing penetrations over 200mm wide shall be supported in either direction with additional treated HI.2 framing, using 50mm wide timber depth to equal purlin depth. Fig 3 On retrofitted roofs additional framing will be required to support roofing. 6) Remove the protection slats from the bottom of the skylight frame. 7) The Skylight rests on two metal location pins and is secured to the rafters with six (180mm long) screws (Fig 5). 8) Place the Skylight on the prepared opening in the roof. Rest the metal location pins on the frame. Using a spirit level check at the bottom if the frame is placed horizontally. Secure Skylight to framed opening with the 6 long screws provided (Fig 6). Fig 4 Fig 6 Fig 5 www.fakro.co.nz Installation Instructions EH Flashing 3

PLEASE NOTE: With existing corrugated roofs, you may have to fix the top flashing (3) to the frame before placing the skylight frame into position. Instructions for Fitting Flashing 9) The H-type flashings for profiled roofing consists of: 1) the bottom profile, 2) side flashing element, 3) top flashing element, 4) metal straps, 5) gutter not needed (for NZ roofs), 6) sponge seals, 10) Position on the bottom flashing (1) on the roof surface. After eventual corrections in positioning the bottom flashing nail it to the frame side on its upper edge (Fig 8). Fig 7 11) Put on the bottom flashing covering the bottom part of the frame (Fig 8) and screw it to the frame. Use only stainless steel wood screws. Remove the paper strip protecting the Bitumous layer underneath the element. Press the lead apron to shape it and stick it to the roof surface. 12) Position the side flashing (2). Nail them to the frame sides and battens using the metal straps (4). Join the bottom flashing with the side flashing pieces. Fig 8 13) Slide on the flashing covering the frame sides and screw them to the frame. Put on the top flashing (3), nail it to the battens using the metal straps and screw it to the frame side. Fig 9 www.fakro.co.nz Installation Instructions EH Flashing 4

14) In order to ensure wind-tightness stick the self adhesive sponge-seal (6) to the flashing and cut them to fit the shape of any gap. Put the missing roofing materials in place keeping the required distance from frame. NOTE: On lower pitch roofs, 15 20, place a small bead of silicone between flashings, where they overlap and between apron and metal frame at the bottom of the Skylight. Fig 10 It is imperative that the lower section flashing is attached firmly up under both sides of the prefitted neoprene apron across the bottom of the skylight. This is to prevent water from tracking across and down the inside of the flashing up stand. After tacking the flashing sides in place, lift the bottom two corners of the neoprene apron and place a small dollop of silicone to seal any gaps at the outer edges and release back into position. Note (Do not silicone across the top of the neoprene as this is a condensation outlet.) Then press the corners of the flashing firmly against the frame before fitting the side cover flashings. www.fakro.co.nz Installation Instructions EH Flashing 5

Special Instructions for New Long Run Roofs Refer to general installation instructions and mandatory requirements featured earlier in this document. 15) See Fig 11: Fit the bottom sheet of iron, first making sure it is 90-120mm away from the bottom edge of the skylight timber frame (see Fig 2). 16) You will need to cut and fold the top of the bottom sheet of iron where the mat laps over the iron, to allow the mat to sit flat on the iron. NOTE: It is important to do this, to prevent creating a catchment area. Ensure there are no jagged edges that may rip the mat (Fig 11). Fig 11 17) Insert flashings as per instructions on page 4. 18) The bottom mat is designed to partially lay under the side sheets of iron. If possible allow sheets to run down the side of skylight, down, over and past the mat. Finish placing sheets around skylight leaving 50-80mm at top and 30-40mm at sides of skylight. Fig 12 Fig 13 www.fakro.co.nz Installation Instructions EH Flashing 6

Special Instructions for Concrete Tile Roofs Refer to general installation instructions and mandatory requirements featured earlier in this document. 20) See Fig 14/15: The skylight must be installed above a complete row of tile. Make sure there is a gap of 9cm between skylight frame and the row of tiles. You will need to chamfer the top of the bottom row of tiles, where the mat laps over the tiles, to allow the mat to sit flat on the tiles. This is important to help prevent a water catchment forming that may cause leaking. 21) Insert flashings as per instructions on page 4. 22) Proceed to place and cut tiles around flashings leaving 50-80mm at top and 30-40mm at sides of skylight. Fig 14 Fig 15 www.fakro.co.nz Installation Instructions EH Flashing 7

Special Instructions for Existing Iron Roofs Refer to general installation instructions and mandatory requirements featured earlier in this document. 23) Cut the roofing material as shown in the diagram (cut line). Provide clearance as shown (see Fig 16). Overcut the lower cut, 210mm long, at the bottom two corners as shown. This allows the mat to pass through the metal sheet. NOTE: Ensure the bottom two cuts finish on the high point of the roofing profile shown in Fig 16 - A and B. Ensure the skylight frame is 90-120mm from the lower cut line. 24) Remove the sheets of iron for later re-positioning. 60mm Cut Line 30mm Skylight Frame 30mm 25) Trim the roof framing to accommodate the skylight as per earlier instructions. A batten will be required under the iron where the bottom mat laps over the lower section of roofing material, to stop the iron sagging. A 210mm Cut Line 30-120mm 210mm B MANDATORY REQUIREMENT ON NEW BUILDS: To adhere to NZ Code E2/AS1 for roof penetrations, the edge of roofing penetrations over 200mm wide shall be supported in either direction with additional treated HI.2 framing, using 50mm wide timber depth to equal purlin depth. Fig 16 On retrofitted roofs additional framing will be required to support roofing. 26) (See Fig 17) You will need to chamfer the top of the bottom sheet of iron, where the mat laps over the iron, to allow the mat to sit flat on the iron cut top of iron profile and fold down. NOTE: It is important to do this, to prevent creating a water catchment area. Ensure there are no jagged edges that may rip the mat. Fig 17 27) Re-fit the roofing material leaving 50-80mm at top and 30-40mm at sides NOTE: With an existing corrugated roof you may have to secure the top flashing to the frame before placing the skylight frame in position. www.fakro.co.nz Installation Instructions EH Flashing 8

28) See Fig 18: Two roofing material fillets need to be made to the dimensions shown in Fig 18, one left hand one right. These can be made from the piece of roofing iron cut out for the skylight. Use the same colour iron as the roof off cuts. The fillets are designed to slide hard up under each corner. The point X must be on a high point of the profile of the roof. Ensure no ragged edges that may cause the mat to rip. They can then be attached at the bottom edge to the roof with pop rivets. The iron that goes over the fillet can then be pop riveted to the fillet to hold it down. Do not screw or pop rivet through skylight flashing. NOTE: Silicone over the pot rivets. These fillets are required to weatherproof the skylight failure to carry out this function may cause leaking. 200mm 100mm X 340mm X 210mm 250mm Fig 18 www.fakro.co.nz Installation Instructions EH Flashing 9

Special Instructions for Metal Tile Roof Refer to general installation instructions and mandatory requirements featured earlier in this document. 30) See pages 11-12: A rebate needs to be formed in the tile battens. Cut a rebate 25mm in depth and 155mm in length. NOTE: Extra timber may be required to strengthen the weakened tile battens. Ensure the skylight frame is at least 70-80mm from complete row of tiles. 31) Proceed to fit flashings as instructions on page 4. 32) Make opening in roof as per earlier instructions. Fig 19 www.fakro.co.nz Installation Instructions EH Flashing 10

Special Instructions for Metal Tile Roof Refer to general installation instructions and mandatory requirements featured earlier in this document. SKYLIGHT CROSS - SECTION FOR DECRA/PRESSED METAL TILES www.fakro.co.nz Installation Instructions E H Flashing 11

Special Instructions for Metal Tile Roof Refer to general installation instructions and mandatory requirements featured earlier in this document. 25mm 1.2m (min) Fixing tile through front at this point may be required on lower pitched roofs (15-20 ). www.fakro.co.nz Installation Instructions EH Flashing 12